HomeMy WebLinkAbout20170526ICIP 1-6 to IPC.pdft Peter J. Richardson ISB # 3195 RICHARDSON ADAMS, PLLC 515 N. 27th Street Boise,Idatro 83702 Telephone: (208) 938-7901 Fax: (208) 938-7904 peter@richardsonadams. com Attorneys for the Industrial Customers of Idaho Power BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A DETERMATION OF 20 I 6 DEMAND-SIDE MANAGEMENT EXPENSES AS PRUDENTLY INCURRED. CASE NO. IPC.E-17-03 FIRST PRODUCTION REQUEST OF THE TNDUSTIAL CUSTOMERS OF IDAHO POWER ) ) ) ) ) ) Pursuant to Rule 225 of the Rules of Procedure of the ldatro Public Utilities Commission (the "Commission"), The Industrial Customers of ldaho Power ("ICIP") by and through their attorney of record, Peter J. Richardson, hereby requests that tdatro Power Company ("Company") provide the following documents. This productiori request is to be considered as continuing, and the Company is requested to provide by way of supplementary responses additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide one physical copy and one electronic copy, if available, of your answer to Mr. Richardson at the address noted above. Please provide an additional electronic copy, or if unavailable a physical copy, to Dr. Don Reading at: 6070 Hill Road, Boise, Idaho 83703, Tel: (208) 342-1700; Fax: (208) 384-15l 1; dreading@mindspring.com I -FIRST PRODUCTION REQUEST OF INDUSTzuAL CUSTOMERS OF rDAHO POWER- rpC-E-17-03 I For each item, please indicate the name of the person(s) preparing the answers, along with the job title of such person(s) and the witness at hearing who can sponsor the answer. REOUEST FOR PRODUCTION NO. 1: Please provide all of the Company's discovery responses to all other parties that have provided and any future discovery responses the Company will provide in this docket. REQUEST FOR PRODUCTION NO. 2: Please provide in electronic format the spreadsheets used to create the following table's included in Connie Aschenbrenner's Direct Testimony; A. Table l;2016 DSM Programs by Sector . . . .,page 4, B. Table 2; Incremental Annual Energy Efficiency 2002-20l6,page 6, C. Table 3; Peak Demand Reduction Capacity 2004-2016, page 8, D. Table 4; Annual lncremental Energy Efficiency . . . .2002-2016, page 9, E. Table 5; Annual Cumulative Energy Efficiency . . . .2002-2016, page 10, F. Table 6; Idaho Energy Efficiency Rider (Jan-Dec-2Ol6), page 14. REOUEST FOR PRODUCTION NO. 3: Please provide in electronic format the spreadsheets used to create Exhibit l;'2016Idaho DSM Expenses and Adjustment for Prudence filing', attached to Connie Aschenbrenner's Direct Testimony. REOUEST FOR PRODUCTION NO. 4: Please provide in electronic format the spreadsheets used to create Table 2;'2016 program sector summary and energy usage/savings/demand reduction', found on page 10 of the Demand-Side Management 2016 Annual Report. 2 -FTRST PRODUCTION REQUEST OF TNDUSTRTAL CUSTOMERS OF rDAHO POWER- rPC-E-17-03 t REQUEST FOR PRODUCTION NO. 5: Please provide in electronic format the spreadsheets used to create Table 6; 'Cost- effectiveness summary by program', found on page 27 of the Demand-Side Management 2016 Annual Report. REOUEST FOR PRODUCTION NO. 6: On page 8 of the Demand-Side Management 2016 Annual Report it stateg Also in 2016, the new Twin Falls Operation Center was constructed to replace the 195L-built center used to house the operations stafr, The design incorporates energt-fficient lighting, heating and cooling, dayltght harvesting, and a rooftop solar array. Please provide the details for the rooftop solar array installed on the new Twin Falls Operation Center. Please include the size, type of panels, cost to install, etc. DATED this 26ft day of May,2Ol7 RICHARDSON ADAMS, PLLC \ ,f ./1 /t. l' ---f ;' , l,i ,' ; ,'- -1c'ri , .Ltu-/hLzY)-(r'-- 'By: Peter J. Richardson, ISB #3195 Attorney for THE INDUSTRIAL CUSTOMERS OF TDAHO POWER 3 -FIRST PRODUCTION REQUEST OF INDUSTRTAL CUSTOMERS OF rDAHO POWER- rpC-E-17-03 ) CERTIFICATE OF SERVICE I hereby certify that on this 26h day of May 2Ol7,I delivered true and correct copies of the enclosed FIRST PRODUCTION REQUEST OF THE INDUSTRIAL CUSTOMERS OF IDAHO POWER in this Docket No. IPC-E-17-03 to the following persons via the service method indicated ("E" electronic; "H" hand delivery; "US" United States Mail, postage prepaid). Diane Hanian (E, H) Commission Secretary Idaho Public Utilities Commission 472 W est Washington Street Boise,Idatro 83702 Diane.hanian@puc. idaho. eov Diane.holt@Auc.idaho. gov Brad M. Purdy (E, US) 2019 N. 17ft Street Boise, Idaho 83702 bmpurdy@hotmail.com Eric Olsen (E, US) 505 Pershing Ave., Ste. 100 Pocatello,Idaho 83205 elo@,echohawk.com Connie Ashcenbrenner (E, H) PO Box 70 Boise,Idaho 83707 caschenbrenner@ idahopower. com Daphne Huang (8, H) Idatro Public Utilities Commission 472 W est Washington Street Boise,Idaho 83702 daphne.huan g@puc.idaho. gov Lynn Tominga (E, US) PO Box2624 Boise,Idaho 83701 LisaNordstrom (E, H) PO Box 70 Boise,Idaho 83707 lnordstrom@ idahopower. com dockets@ idahopower. com Tony Yankel (E, US) 12700 Lake Avenue, Unit 2505 Lakewood, Ohio 44107 tony@yankel.net J. Richardson 4 -FTRST PRODUCTTON REQUEST OF INDUSTRTAL CUSTOMERS OF rDAHO POWER - rPC-E-17-03