HomeMy WebLinkAbout20170526ICIP 1-6 to IPC.pdft
Peter J. Richardson ISB # 3195
RICHARDSON ADAMS, PLLC
515 N. 27th Street
Boise,Idatro 83702
Telephone: (208) 938-7901
Fax: (208) 938-7904
peter@richardsonadams. com
Attorneys for the Industrial Customers of Idaho Power
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE
APPLICATION OF IDAHO POWER
COMPANY FOR A DETERMATION OF
20 I 6 DEMAND-SIDE MANAGEMENT
EXPENSES AS PRUDENTLY
INCURRED.
CASE NO. IPC.E-17-03
FIRST PRODUCTION REQUEST OF
THE TNDUSTIAL CUSTOMERS OF
IDAHO POWER
)
)
)
)
)
)
Pursuant to Rule 225 of the Rules of Procedure of the ldatro Public Utilities Commission
(the "Commission"), The Industrial Customers of ldaho Power ("ICIP") by and through their
attorney of record, Peter J. Richardson, hereby requests that tdatro Power Company
("Company") provide the following documents.
This productiori request is to be considered as continuing, and the Company is requested
to provide by way of supplementary responses additional documents that it or any person acting
on its behalf may later obtain that will augment the documents produced.
Please provide one physical copy and one electronic copy, if available, of your answer to
Mr. Richardson at the address noted above. Please provide an additional electronic copy, or if
unavailable a physical copy, to Dr. Don Reading at: 6070 Hill Road, Boise, Idaho 83703, Tel:
(208) 342-1700; Fax: (208) 384-15l 1; dreading@mindspring.com
I -FIRST PRODUCTION REQUEST OF INDUSTzuAL CUSTOMERS OF rDAHO POWER- rpC-E-17-03
I
For each item, please indicate the name of the person(s) preparing the answers, along
with the job title of such person(s) and the witness at hearing who can sponsor the answer.
REOUEST FOR PRODUCTION NO. 1:
Please provide all of the Company's discovery responses to all other parties that have
provided and any future discovery responses the Company will provide in this docket.
REQUEST FOR PRODUCTION NO. 2:
Please provide in electronic format the spreadsheets used to create the following table's
included in Connie Aschenbrenner's Direct Testimony;
A. Table l;2016 DSM Programs by Sector . . . .,page 4,
B. Table 2; Incremental Annual Energy Efficiency 2002-20l6,page 6,
C. Table 3; Peak Demand Reduction Capacity 2004-2016, page 8,
D. Table 4; Annual lncremental Energy Efficiency . . . .2002-2016, page 9,
E. Table 5; Annual Cumulative Energy Efficiency . . . .2002-2016, page 10,
F. Table 6; Idaho Energy Efficiency Rider (Jan-Dec-2Ol6), page 14.
REOUEST FOR PRODUCTION NO. 3:
Please provide in electronic format the spreadsheets used to create Exhibit l;'2016Idaho
DSM Expenses and Adjustment for Prudence filing', attached to Connie Aschenbrenner's Direct
Testimony.
REOUEST FOR PRODUCTION NO. 4:
Please provide in electronic format the spreadsheets used to create Table 2;'2016
program sector summary and energy usage/savings/demand reduction', found on page 10 of the
Demand-Side Management 2016 Annual Report.
2 -FTRST PRODUCTION REQUEST OF TNDUSTRTAL CUSTOMERS OF rDAHO POWER- rPC-E-17-03
t
REQUEST FOR PRODUCTION NO. 5:
Please provide in electronic format the spreadsheets used to create Table 6; 'Cost-
effectiveness summary by program', found on page 27 of the Demand-Side Management 2016
Annual Report.
REOUEST FOR PRODUCTION NO. 6:
On page 8 of the Demand-Side Management 2016 Annual Report it stateg
Also in 2016, the new Twin Falls Operation Center was constructed to replace the 195L-built
center used to house the operations stafr, The design incorporates energt-fficient lighting,
heating and cooling, dayltght harvesting, and a rooftop solar array.
Please provide the details for the rooftop solar array installed on the new Twin Falls Operation
Center. Please include the size, type of panels, cost to install, etc.
DATED this 26ft day of May,2Ol7
RICHARDSON ADAMS, PLLC
\ ,f ./1 /t. l' ---f ;' , l,i ,' ;
,'- -1c'ri , .Ltu-/hLzY)-(r'-- 'By:
Peter J. Richardson, ISB #3195
Attorney for THE INDUSTRIAL
CUSTOMERS OF TDAHO POWER
3 -FIRST PRODUCTION REQUEST OF INDUSTRTAL CUSTOMERS OF rDAHO POWER- rpC-E-17-03
)
CERTIFICATE OF SERVICE
I hereby certify that on this 26h day of May 2Ol7,I delivered true and correct copies of
the enclosed FIRST PRODUCTION REQUEST OF THE INDUSTRIAL CUSTOMERS OF
IDAHO POWER in this Docket No. IPC-E-17-03 to the following persons via the service
method indicated ("E" electronic; "H" hand delivery; "US" United States Mail, postage prepaid).
Diane Hanian (E, H)
Commission Secretary
Idaho Public Utilities Commission
472 W est Washington Street
Boise,Idatro 83702
Diane.hanian@puc. idaho. eov
Diane.holt@Auc.idaho. gov
Brad M. Purdy (E, US)
2019 N. 17ft Street
Boise, Idaho 83702
bmpurdy@hotmail.com
Eric Olsen (E, US)
505 Pershing Ave., Ste. 100
Pocatello,Idaho 83205
elo@,echohawk.com
Connie Ashcenbrenner (E, H)
PO Box 70
Boise,Idaho 83707
caschenbrenner@ idahopower. com
Daphne Huang (8, H)
Idatro Public Utilities Commission
472 W est Washington Street
Boise,Idaho 83702
daphne.huan g@puc.idaho. gov
Lynn Tominga (E, US)
PO Box2624
Boise,Idaho 83701
LisaNordstrom (E, H)
PO Box 70
Boise,Idaho 83707
lnordstrom@ idahopower. com
dockets@ idahopower. com
Tony Yankel (E, US)
12700 Lake Avenue, Unit 2505
Lakewood, Ohio 44107
tony@yankel.net
J. Richardson
4 -FTRST PRODUCTTON REQUEST OF INDUSTRTAL CUSTOMERS OF rDAHO POWER - rPC-E-17-03