Loading...
HomeMy WebLinkAbout20170404ICL&Sierra Club 1.1-1.7 to IPC.pdfBenjamin Otto,ISB No. 8292 Idaho Conservation League 710 N 6th St., Boise,ID 83701 (208) 345-6933,ExL 12 botto@idahoconservation. org David Bender, WI Bar# 1046102 Earthjustice 3916 Nakoma Road Madison, WI 5371I (4ts) 977-s727 dbender@earthj ustice. org BEFORE THB IDAHO PUBLIC UTILITIES COMMISSION ) IN THE MATTER OF TIIE PETTTION OF ) CASE NO. IPC-E-17-01 IDAHO POWER COMPANY FOR )A DECLARATORY ORDER REGAtPryg ) FIRST SET OF DATA REQUESTS BY ft$lto*r, tffJT;"rDEDrEm i tg:coNSERVATIoNLEAcuEpRICIN6 FOR BATTERy SrOnaOp ) AND SIERRA CLUB TO IDAHO FACILITIES ) POWER Idaho Conservation League (*ICL") and Sierra Club hereby serve their first set of data requests regarding the above-mentioned docket. ICL and Sierra Club request that Idaho Power Company provide responses as expeditiously as possible, but not later than the deadline of 2l days. INSTRUCTIONS 1. Please provide copies of responses to the following contacts: David Bender Earthjustice 3916 Nakoma Road Madison, WI 5371I dbender@,earthj ustice.org Ben Otto Idaho Conservation League 710 N 6th St. Boise,ID 83701 bgttq.@ idahoc onservato n. otg 2. Whenever possible, Sierra Club and ICL prefer to receive electronic copies of data responses either by email or on CD. 3. Responses to any and all of Sierra Club and ICL's data requests should be supplied to Siera Club and ICL as soon as they become available to Idaho Power. 4. The requests herein shall be deemed to be continuing in nature and ldaho Power is requested to supplement its responses as necessary and as additional information becomes available. 5. In responding to each data request, please consult every document source which is in your possession, custody, or control, including all documents in the possession of experts or consultants. 6. For each response, identifr the person who prepared the answer to the data request as well as his or her position with Idaho Power or any Idaho Power affiliate or parent. 7. Please reproduce the data request being responded to before the response. 8. If the responses include computer modeling input and output files, please provide those data files in electronic machine readable or txt format 9. If the responses include spreadsheet files, please provide those spreadsheet files in useable electronic Excel readable format. 10. In responses providing computer files, list the file names with cross-reference to the data request, and ifnecessary to the understanding ofthe data, provide a record layout ofthe computer files. Computer files provided with a response must be in or compatible with the current version, or the immediately prior version, of Microsoft Office. I l. For each dollar amount provided in response to a discovery request please state if the amount is in nominal or constant dollars and what years dollars. ICLISC 1.1 ICL/SC I.2 ICL/SC 1.3 ICLISC I.4 DATA REQUESTS Please identify each Qualified Facility ("QF") from which you expect or anticipate purchasing electricity (capacity andlor energy) during 2017 and for each Qualified Facility identified, please provide each of the following: (l) The fuel and/or generation source for the QF; (2) The approximate location of the QF generation; (3) The date on which the QF first delivered electricity to you; (a) The date on which the QF obligation (contract or legally enforceable obligation) occurred for the QF; (5) The projected capacity factor of the QF during 2017; (6) The total generation expected from the QF during 2017; (7) The expected capacity value of the QF during your system peak during 20171' (8) The expected pricing for capacity and energy from the QF during 2017. Please provide an updated version of Allphin Exhibits 2,3,4,6,8,9, and 10 filed in Docket No.IPC-E-15-01, based on data cunent through the date of your response (for Exhibit 8, please include at leastyears 2014,2015 and 2016). For each of the projects identified in Allphin Exhibit 3 filed in Docket No. IPC-E-15-01, please state the current status of the project, including but not limited to: (l) whether the project proponent obtained a contract or legally enforceable obligation; (2) the date of the conEact or legally enforceable obligation; and (3) The date on which the project either first.produced electricity transferred to Idaho Power or is projected to first produce electricity to transfer to Idaho Power. Please provide the following for the Langley Gulch natural gas fired power plant for 2015,2016, and projected for 2017: (l) Total annual generation in Megawatt Hours (MWh); (2) The generation for each hour ofthe year; (3) The fuel cost in dollars per MWh of net production for each hour of the year; (4) The variable operation and maintenance (O&M) costs in dollars per net MWh for each year; { .'r:r''.1 TCL/SC I.5 ICL/SC I.6 (5) The categories of costs that were included in your calculation of variable O&M costs. Please provide the following for 2015, 2016, and projected for 2017: (l) The marginal energy cost for each hour of the year; (2) The marginal generation resource for each hour of the year- Please provide the following: (t) Each potential QF that has requested an energy sales agreement since February 5, 20t5; (2) The fuel or generation source for each potential QF that requested an energy sales agreement since February 5, 2015; (3) The nameplate generation size of each potential QF that requested an energy sales agreement since February 5,2015; (4) Each potential QF that submiued a written request for indicative pricing since February 5,2015; (5) The fuel or generation source for each potential QF that subrnitted a written request foi indicative pricing since February 5,2015; (6) The nameplate generation size of each potential QF that submitted a written request for indicative pricing since February 5,2Al.5; (7) Each potential QF that has requested an energy sales agreement since August 20, 2015; (8) The fuel or generation source for each potential QF that requested an energy sales agreement since August 20,2015; (9) The nameplate generation size of each potential QF that requested an energy sales agreement since August 20,2015; (10) Each potential QF that submitted a written request for indicative pricing since August 20,2015; (l l) The fuel or generation source for each potential QF that submitted a written request for indicative pricing since August 20,2015; (12) The nameplate generation size of each potential QF that submitted a written request for indicative pricing since August 20,2015; and (13) The approximate location of each QF identified in response to subparts l-12, .".\\I above. ICL/SC 1.7 Please provide the spreadsheets, workpapers, and/or analyses conducted and/or relied on in any way for your response to the foregoing requests. Dated: lsl David C. Bender 7 David Bender Eartffustice 3916 Nakoma Road Madison, WI 5371I dbender@eaghiustise.grg &ck- Ben Otto Idaho Conservation League 710 N 6th St. Boise,ID 83701 botto@.idatroqo{rssrvalion. or g CERTIFICATE OF Sf,,RVICE I hereby certiry that on this 4th day of Aprilz}lT,I delivered true and correct copies of the foregoing FIRST SET OF DATA REQUESTS BY IDAHO CONSERVATION LEAGUE AND SIERRA CLUB TO IDAHO POWER to the following persons via the method of service noted: ELECTRONIC MAIL ONLY: Diane Hanian Commission Secretary Idaho Public Utilities Commission 427 W. Washinglon St. Boise,ID diane.hanian@puc.idaho. gov Camille Christen Daphne Huang Deputy Attorneys General Idaho Public Utilities Commission 427 W. Washington St. Boise,lD 83702 camille.chdsten@puc. idaho.gov daphne.huang@puc.idaho. gov Idaho Power Donovan Walker Lead Counsel Idaho Power Company P.O. Box 70 Boise,ldaho 83707 dwalker@idahopower. com dockets@idahopower. com Franklin Enerry Storage One through Four, LLC Peter Richardson Richardson Adams, PLLC 515 North 27ft Street PO Box 7218 Boise,ID 83707 Peter@ichardsonadams.com IPC-E-17-01 l'l Data Request of SCiICL to Idaho Power Black Mesa Enerryn LLC Brian Lynch Black Mesa Energy,LLC PO Box 2731 Palo Verdes, CA 90274 brian@mez.zdev.com Benjamin J. Otto ri:l