Loading...
HomeMy WebLinkAbout20170306IPC to Staff Attachment 8-10.docx Table 3. Additional Information Requests Resource/AIR Number AIR Description Filing Due General Operations OP-1 Operational Scenarios 9 months OP-2 Current Operations Scenario 3 months Geology and Soils S-1 Sediment Transport 9 months Water Quantity and Quality WQ-1 Dissolved Oxygen Augmentation 9 months WQ-2 Temperature Control 9 months Aquatic Resources AR-1 Hells Canyon Fish Trap Modifications 6 months AR-2 Listed Molluscs 9 months Terrestrial Resources TR-1 Habitat Resource Management 9 months Land Use LU-1 Project Boundary Change 6 months Developmental Resources DR-1 Thermal Alternative Cost of Capital 3 months DR-2 Flood Control 6 months DR-3 Power Economics 6 months DR-4 Estimated Cost of PM&E Measures 9 months Transmission Lines TL-1 Transmission Line Jurisdiction 3 months