HomeMy WebLinkAbout20170630IPC to Tidwell 59-60.pdf@
An TDACORP Company
DONOVAN E. WALKER
Lead Counse!
dwalker@idahopower.com
June 30,2017
VIA HAND DELIVERY
Diane M. Hanian, Secretary
ldaho Public Utilities Commission
472 West Washington
Boise, ldaho 83702
Re Case No. IPC-E-'16-28
Certificate of Public Convenience and Necessity for Wood River Valley
ldaho Power Company's Response to the Fourth Production Request of Kiki
Leslie A. Tidwell
Dear Ms. Hanian
Enclosed forfiling in the above matter please find an original and three (3) copies of
ldaho Power Company's Response to the Fourth Production Request of Kiki Leslie A.
Tidwell.
Very yours,
3Effi*
ilrb\t
Donovan E. Walker
DEW:csb
Enclosures
1221 W. ldaho 5t. (83702)
PO. Box 70
Boise, lD 83707
DONOVAN E. WALKER (lSB No. 5921)
ldaho Power Company
1221West ldaho Street (83702)
P.O. Box 70
Boise, ldaho 83707
Telephone: (208) 388-5317
Facsimile: (208) 388-6936
dwalker@ idahopower. com
Attorney for ldaho Power Company
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
' l {i1' ^L'-t i.; J ;.J
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
CERTIFICATE OF PUBLIC CONVENIENCE
AND NECESSIry FOR THE WOOD RIVER
VALLEY
CASE NO. rPC-E-16-28
IDAHO POWER COMPANY'S
RESPONSE TO THE FOURTH
PRODUCTION REQUEST OF
KIKI LESLIE A. TIDWELL
)
)
)
)
)
)
)
)
COMES NOW, ldaho Power Company ("!daho Power" or "Company"), and in
response to the Fourth Production Request of Kiki Leslie A. Tidwell to ldaho Power
Company dated June 12,2017, herewith submits the following information:
IDAHO POWER COMPANY'S RESPONSE TO THE
FOURTH PRODUCTION REQUEST OF KIKI LESLIE A. TIDWELL - 1
REQUEST FOR PRODUCTION NO. 59: ln the event a redundant line to the
North Valley, for whatever reason, is not approved what are the Company's plans to
rebuild/replace/repair the existing Wood River transmission line from the Wood River
Transmission Station in Hailey to the Ketchum/Sun Valley area. Please include in your
answer a proposed timeline, budget and construction details.
RESPONSE TO REQUEST FOR. PRODUCTION NO. 59: As stated in the Direct
Testimony of David M. Angell, even if a redundant transmission line to the North Valley
is not approved, the Transmission Design Department has determined that the existing
transmission line requires reconstruction. See Angell Dl, pp. 21-23. However, the
reconstruction of the existing line would not eliminate the need for a redundant
transmission !ine. Without another source of energy into the North Valley, the
reconstruction of the existing radial line would have its own significant challenges. The
Company would strive to rebuild the existing radial line in the existing right-of-way.
Idaho Power has not yet established a timeline, budget, or construction details
for the reconstruction of the existing 138 kilovolt ('kV') transmission line. Please see
the Company's response to Sierra Club's Request for Production No. 1.
The response to this Request is sponsored by David Angell, Transmission and
Distribution Planning Manager, ldaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE
FOURTH PRODUCTION REQUEST OF KIKI LESLIE A. TIDWELL - 2
REOUEST FOR DUCTION NO. 60:ln the event a redundant line to the
North valley is approved what are the Company's plans to rebuild lreplacelrepair the
existing Wood River transmission line from the Wood River Transmission Station in
Hailey to the Ketchum/Sun Valley area. Please include in your answer a proposed
timeline, budget and construction details.
RESPONSE TO REQUEST FOR PRODUCTION NO. 60: As stated in the Direct
Testimony of David M. Angell, even if a redundant transmission line to the North Valley
is approved, the construction of the redundant 138 kV Iine does not eliminate the need
to reconstruct the existing line. See Angell Dl, p. 23. The reconstruction of the existing
line must be done regardless. However, with the construction of the redundant source,
the reconstruction of the existing line can be done with little to no disruption of service.
The new redundant line can meet the North Valley's electrical needs during the time
when the existing line is taken out of service for reconstruction.
ldaho Power has not yet established a timeline, budget, or construction details
for the reconstruction of the existing 138 kV transmission line. Please see the
Company's response to Sierra Club's Request for Production No. 1.
The response to this Request is sponsored by David Angell, Transmission and
Distribution Planning Manager, ldaho Power Company.
DATED at Boise, ldaho, this 30th day of June 2017.
DONOVAN E. WALKER
Attorney for ldaho Power Company
IDAHO POWER COMPANY'S RESPONSE TO THE
FOURTH PRODUCTION REQUEST OF KIKI LESLIE A. TIDWELL - 3
CERTIFICATE OF SERVIGE
! HEREBY CERTIFY that on the 30th day of June 2017 I served a true and
correct copy of IDAHO POWER COMPANY'S RESPONSE TO THE FOURTH
PRODUCTION REQUEST OF KlKl LESLIE A. TIDWELL upon the following named
parties by the method indicated below, and addressed to the following:
Commission Staff
Daphne Huang
Camille Christen
Deputy Attorneys General
ldaho Public Utilities Commission
47 2 W est Wash ington (83702)
P.O. Box 83720
Boise, ldaho 83720-0074
Sierra Glub
Kelsey Jae Nunez
KELSEY JAE NUNEZLLC
920 North Clover Drive
Boise, ldaho 83703
Zach Waterman
Director, ldaho Sierra Club
503 West Franklin Street
Boise, Idaho 83702
Michael Heckler
3606 North Prospect Way
Garden City, ldaho 83714
Kiki Leslie A. Tidwel!
Peter J. Richardson
RICHARDSON ADAMS, PLLC
515 North 27th Street (83702)
P.O. Box 7218
Boise, ldaho 83707
Kiki Leslie A. Tidwell
300 Let'er Buck Road
Hailey, ldaho 83333
X Hand Delivered
_U.S. Mai!
_Overnight Mail
_FAXX Email daphne.huanq@puc.idaho.qov
cam i I le. ch risten@puc. idaho. oov
_Hand DeliveredX U.S. Mail
_Overnight Mail
_FAXX Email kelsey@kelseviaenunez.com
_Hand DeliveredX U.S. Mail
_Overnight Mail
_FAXX Email zack.waterman@sierraclub.orq
_Hand DeliveredX U.S. Mail
_Overnight Mail
_FAXX Email michael.p.heckler@smail.com
_Hand DeliveredX U.S. Mail
_Overnight Mail
_FAXX Email peter@richardsonadams.com
_Hand DeliveredX U.S. Mail
_Overnight Mail
FAXX Email kti
IDAHO POWER COMPANY'S RESPONSE TO THE
FOURTH PRODUCTION REQUEST OF KIKI LESLIE A. TIDWELL - 4
net
Rock Rolling Properties, LLC, and
Rock Rolling Properties #2, LLC
Gregory M. Adams
RICHARDSON ADAMS, PLLC
515 North 27th Street (83702)
P.O. Box 7218
Boise, ldaho 83707
Rock Rolling Properties, LLC
Rock Rolling Properties, LLC
c/o Kris Dondero
P.O. Box 739
Sun Valley, ldaho 83353
Rock Rolling Properties #2, LLC
Rock Rolling Properties #2, LLC
c/o John Dondero
P.O. Box 739
Sun Valley, ldaho 83353
Gity of Ketchum
Matthew A. Johnson
Wm. F. Gigray, !ll
WHITE PETERSON GIGRAY
& NICHOLS, P.A.
5700 East Franklin Road, Suite 200
Nampa, ldaho 83687
!ndividual
Laura Midgley
231Yalley Club Drive
Hailey, ldaho 83333
CoxCom, LLG
C. Tom Arkoosh
ARKOOSH LAW OFFICES
802 West Bannock Street, Suite 900
P.O. Box 2900
Boise, ldaho 83701
_Hand DeliveredX U.S. Mail
_Overnight Mail
_FAXX Email oreo@richardsonadams.com
_Hand DeliveredX U.S. Mail
_Overnight Mail
_FAX
Email
_Hand DeliveredX U.S. Mai!
_Overnight Mail
_FAX
Email
_Hand DeliveredX U.S. Mail
_Overnight Mail
_FAXX Email miohnson@whitepeterson.com
_Hand DeliveredX U.S. Mail
_Overnight Mai!
_FAXX Email Midolev221S@omail.com
com
_Hand DeliveredX U.S. Mail
_Overnight Mail
FAX
x Email tom
ch Bearry,
IDAHO POWER COMPANY'S RESPONSE TO THE
FOURTH PRODUCTION REQUEST OF KIKI LESLIE A. TIDWELL - 5
.-L