BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
CASE NO. IPC-E.16-28
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
CERTIFICATE OF PUBLIC
CONVENIENCE AND NECESSITY TO
CONSTRUCT S YSTEM IMPROVEMENTS
FOR WOOD RIVER VALLEY
CUSTOMERS.
)
)
)
)
)
)
)
)
)
)
FOURTH PRODUCTION REQUEST
OF KIKI LESLIE A. TIDWELL TO
IDAHO POWER COMPANY
Pursuant to Rule 225 of the Rules of Procedure of the ldatro Public Utilities Commission
(the "Commission"), Kiki Leslie A. Tidwell by and through her attorney of record, Peter J.
Richardson, hereby requests that tdaho Power Company ("Company") provide the following
documents
This production request is to be considered as continuing, and the Company is requested
to provide by way of supplementary responses additional documents that it or any person acting
on its behalf may later obtain that will augment the documents produced.
Please provide one physical copy and one electronic copy, if available, of your answer to
Mr. Richardson at the address noted above. Please provide an additional copy to Ms. Tidwell at
300 Let'er Buck Road, Hailey, Idatro 83333 ktinsv@cox.net.
Tidwell Fourth Production Request - IPC-E-I 5-28 I
For each item, please indicate the name of the person(s) preparing the answers, along
with the job title of such person(s) and the witness at hearing who can sponsor the answer.
REOUEST FOR PRODUCTION NO. 59
In the event a redundant line to the North Valley, for whatever reason, is not approved
what are the Company's plans to rebuild/replace/repair the existing Wood River transmission
line from the Wood River Transmission Station in Hailey to the Ketchum/Sun Valley area.
Please include in your answer a proposed timeline, budget and construction details.
REOUEST FOR PRODUCTION NO. 60
In the event a redundant line to the North valley is approved what are the Company's
plans to rebuild/replace/repair the existing Wood River transmission line from the Wood River
Transmission Station in Hailey to the Ketchum/Sun Valley area. Please include in your answer a
proposed timeline, budget and construction details.
DATED this 12ft day of June 2017.
Richardson Adams, PLLC
By
Peter J. Richardson Attorney for
Kiki Leslie A. Tidwell
2Tidwell Fourth Production Request - IPC-E- I 6-28
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the l2th day of June 2017, a true and correct copy of the
within and foregoing FOURTH PRODUCTION REQUEST OF KIKI LESLIE A. TIDWELL
TO IDAHO POWER COMPANY, in Docket No. IPC-E-16-28 was served VIA ELECTRONIC
MAIL (EM) and/or HAND DELIVERED (HD) as indicated, to the following:
Donovan Walker EM HD
Tim Tatum EM HD
Idatro Power Company
1221 West tdaho St.
Boise,Idaho 83707
dwalker@idaho power. com
ttatum@idahopower. com
Kelsey Jae Nunez EM
Sierra Club
920 N. Clover St.
Boise, Idaho 83703
kelsey@kelsevj aenunez.com
ZackWaterman EM
Siena Club
Zack. waterman@ sierrac lub. or g
Laura Midgley EM
231 Valley Club Drive
Hailey,Idaho 83333
midgley@gmail.com
C. Tom Arkoosh EM
Cox Com, LLC
802 West Bannock St.
Boise,Idaho 83701
Tom.arkoosh@.arkoosh. com
Daphne Haung EM HD
Camille Christen EM HD
Idaho Public Utilities Commission
472West Washington St.
Boise,Idaho 83702
daphne.haun g@nuc. idaho. gov
Camille. christen@puc. idaho. sov
Michael Heckler EM
Sierra Club
3606 N. Prospect Way
Boise,Idaho 83714
michael.p.heckler@ email.com
Benjamin J. Otto EM
Idaho Conservation League
710 N. 6th St.
Boise, Idaho 83702
botto@ idahoconservation. org
Matthew A. Johnson EM
City of Ketchum
5700 E. Franklin Rd., Ste. 200
Nampa,Idaho 83687
mj ohnson@whitepeterson. com
Greg Adarns EM
Rolling Rock Properties
515 N.27s St.
Boise,Idaho 83702
gree@richardsonadams. com
3,*o
Peter Richardson