Loading...
HomeMy WebLinkAbout20170522IPC to Rock Rolling 17.pdf3:ffi*. An IDACORP Companv DONOVAN E. WALKER Lead Counsel dwal ker@idahopower.com May 22,2017 VIA HAND DELIVERY Diane M. Hanian, Secretary ldaho Public Utilities Commission 472 West Washington Street Boise, ldaho 83702 Re Case No. IPC-E-16-28 Certificate of Public Convenience and Necessity for Wood River Valley ldaho Power Company's Response to the Second Set of Production Requests of Rock Rolling Properties, LLC Dear Ms. Hanian Enclosed forfiling in the above matter please find an originaland three (3) copies of ldaho Power Company's Response to the Second Set of Production Requests of Rock Rolling Properties, LLC. Also enclosed are four (4) copies of a non-confidential disk containing information responsive to Rock Rolling Properties, LLC's production request. very yours, ovan E. Walker DEW:csb Enclosures 1221 W. ldaho 5t. (83702) PO, Box 70 Boise, lD 83707 (: DONOVAN E. WALKER (lSB No. 5921) ldaho Power Company 1221West ldaho Street (83702) P.O. Box 70 Boise, ldaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 dwalker@ida hooower.com Attorney for ldaho Power Company BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A CERTIFICATE OF PUBLIC CONVEN!ENCE AND NECESSITY FOR THE WOOD RIVER VALLEY CASE NO. IPC-E-16-28 IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REOUESTS OF ROCK ROLLING PROPERTIES, LLC COMES NOW, ldaho Power Company ("ldaho Power"), and in response to the Second Set of Production Requests of Rock Rolling Properties, LLC, to ldaho Power Company dated May 3, 2017, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REQUESTS OF ROCK ROLLING PROPERTIES, LLC - 1 ,i;f-,,:11/FI.)! !i-,!r .-l r LLl :r,1" j;l Pll tr:53 ( i.l rl ) ) ) ) ) ) ) ) ) REQUEST NO. 17: Reference Testimon y of David Angell, Ex. No. 2 at Appendix J, containing photographic overlays of the proposed transmission configuration. a. Provide color copies of all similar photographic overlays in ldaho Power's possession of the overhead portion of the proposed 138 kV line Underground Transmission configuration TP1 (underground at Elkhorn Road), which depict locations between the TP2 location (south of Hospital Drive) and the TP1 location (ust north of Elkhorn Road). b. For each copy of a photographic overlay provided, please explain whether the photo overlay was provided to: (i) the Community Advisory Committee, and if so explain how it was made available and when; (ii) the Blaine County Planning and Zoning Commission, and if so explain how it was made available and when; (iii) any property owners along the proposed route, and if so explain who it was made available to, how it was made available, and when. c. Please identify which photo overlay(s) accurately depicts the current plans for the Underground Transmission TPI option for the overhead portion of the line as it crosses Big Wood River north of Hospital Drive, including depiction of all trees that must be removed to place the overhead line in this location. lf this photo does not exist or was not provided to the parties listed in subpart b., please explain why. RESPONSE TO REQUEST NO. 17: a. Please see the photos provided on the enclosed CD. Annotations are provided on each photo, including dates when presented at the Blaine County public hearings. IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REQUESTS OF ROCK ROLLING PROPERTIES, LLC - 2 b(i). The photos provided on the enclosed CD were not directly provided to members of the Community Advisory Committee ("CAC"). However, these photos were provided through the public hearing process associated with ldaho Power's Conditional Use Permit Application in Blaine County. CAC members were regularly updated of the status of the pQect throughout 2016, and several CAC members attended the public hearings. b(ii). Photos provided at the October 13,2016, public hearing were included in ldaho Power's Conditional Use Permit Application, submitted September 9, 2016. Blaine County Staff ("Staff') provided copies of these images to each Planning and Zoning Commissioner. ln subsequent hearings, ldaho Power provided hardcopies of revised photos and a presentation for Staff and the Blaine County Planning and Zoning Commission. Copies of the presentation were provided to Staff after each hearing. b(iii). Property owners along the proposed route were notified the project was being considered, as required by the Blaine County Code Section 9-25-4, Public Hearing and Notice. The Blaine County Planning and Zoning Commission notified the property owners prior to each public hearing held on the following dates: October 13,2016 October 20,2016 (planning and zoning workshop) November 10,2016 December 1,2016 January 5,2017 c. Two primary options exist for an overhead transmission line between TP1 and TP2; one along State Highway 75 and the other along Hospital Drive continuing north along the bike path. The originally proposed route in ldaho Power's application to Blaine County, submitted on September g, 2016, placed the transmission line along State Highway 75. This route was presented in the October 13, 2016, hearing and the October 20, 2016, workshop. IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REQUESTS OF ROCK ROLLING PROPERTIES, LLC - 3 After a field review with Blaine County Staff and Planning and Zoning Commissioners on November 10, 2016, the route was moved to the east side of Hospital Drive to reduce visua! impacts along the State Highway 75 corridor, spanning over the Big Wood River, and continuing along the east edge of the bike path to Elkhorn Road. Photos and aerial imagery were presented, reviewed, and discussed at the December 1,2016, and January 5,2017, public hearings for all those in attendance. This is the current alignment. ldaho Power had a tree arborist field review tree interference for the current alignment and the State Highway 75 route. ldaho Power does not have a drawing showing specific trees that need to be removed. However, a count was performed during the fielding. Approximalely 21 large trees need to be removed to support the route along State Highway 75. Approximately 12large trees need to be removed, six of which are dead, to support the route along the bike path. The response to this Request is sponsored by Ryan N. Adelman, Transmission and Distribution Projects Manager, ldaho Power Company. DATED at Boise, ldaho, this 22nd day of May 2017. NOVAN E. WALKER Attorney for Idaho Power Company IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REQUESTS OF ROCK ROLLING PROPERTIES, LLC - 4 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on the 22nd day of May 2017 I served a true and correct copy of IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REQUESTS OF ROCK ROLLING PROPERTIES, LLC, upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Daphne Huang Camille Christen Deputy Attorneys General ldaho Public Utilities Commission 47 2 W estWashington (83702) P.O. Box 83720 Boise, ldaho 83720-007 4 ldaho Conseryation League Benjamin J. Otto ldaho Conservation League 710 North 6th Street Boise, ldaho 83702 Sierra Club Kelsey Jae Nunez KELSEY JAE NUN EZLLC 920 North Clover Drive Boise, !daho 83703 Zach Waterman Director, ldaho Sierra Club 503 West Franklin Street Boise, ldaho 83702 Michael Heckler 3606 North Prospect Way Garden City, ldaho 83714 Kiki Leslie A. Tidwell Peter J. Richardson RICHARDSON ADAMS, PLLC 515 North 27th Street (83702) P.O. Box 7218 Boise, ldaho 83707 X Hand Delivered _U.S. Mail _Overnight Mail _FAXX Email daphne.huans@puc.idaho.qov camille.christen@puc. idaho.qov _Hand DeliveredX U.S. Mail _Overnight Mail _FAXX Email botto@idahoconservation.orq _Hand DeliveredX U.S. Mail _Overnight Mail FAXX Email kelsev@ke aenunez-com _Hand DeliveredX U.S. Mail _Overnight Mail _FAXX Email zack.waterman@sierraclub.orq _Hand DeliveredX U.S. Mail _Overnight Mail_FAXX Email michael.p.heckler@qmail.com _Hand DeliveredX U.S. Mail _Overnight Mail _FAXX Email peter@richardsonadams.com IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REQUESTS OF ROCK ROLLING PROPERTIES, LLC - 5 Kiki Leslie A. Tidwell 300 Let'er Buck Road Hailey, Idaho 83333 Rock Rolling Properties, LLC, and Rock Rolling Properties #2, LLC Gregory M. Adams RICHARDSON ADAMS, PLLC 515 North 27th Street (83702) P.O. Box 7218 Boise, ldaho 83707 Rock Rolling Properties, LLC Rock Rolling Properties, LLC c/o Kris Dondero P.O. Box 739 Sun Valley, ldaho 83353 Rock Rolling Properties #2, LLC Rock Rolling Properties #2, LLC c/o John Dondero P.O. Box 739 Sun Valley, Idaho 83353 City of Ketchum Matthew A. Johnson Wm. F. Gigray, lll WHITE PETERSON GIGRAY & NICHOLS, P.A. 5700 East Franklin Road, Suite 200 Nampa, ldaho 83687 lndividua! Laura Midgley 231 Valley Club Drive Hailey, ldaho 83333 _Hand DeliveredX U.S. Mai! _Overnight Mail _FAXX Email ktinsv@cox.net _Hand DeliveredX U.S. Mail _Overnight Mail _FAXX Email qreq@richardsonadams.com _Hand DeliveredX U.S. Mail _Overnight Mail _FAX Email _Hand DeliveredX U.S. Mail _Overnight Mail _FAX Email _Hand DeliveredX U.S. Mail _Overnight Mail_FAXX Email miohnson@whitepeterson.com _Hand DeliveredX U.S. Mail _Overnight Mail _FAXX Email Midolev221S@omai!.com IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REQUESTS OF ROCK ROLLING PROPERTIES, LLC.6 Coxcom, LLC C. Tom Arkoosh ARKOOSH IAW OFFICES 802 West Bannock Street, Suite 900 P.O. Box 2900 Boise, ldaho 83701 _Hand DeliveredX U.S. Mail Overnight Mail_FA)(X Email tom.arkoosh@arkoosh.com Bearry, IDAHO POWER COMPANY'S RESPONSE TO THE SECOND SET OF PRODUCTION REQUESTS OF ROCK ROLLING PROPERTIES, LLC - 7