HomeMy WebLinkAbout20170303IPC to Tidwell Attachment 27.4.pdfIDAHO POWER COMPANY
WORK ORDER SUMMARY
THIS WORK ORDER PROVIDES FUNDS TO RELOCATE i.4 MILES OF THE
WOOD RIVER -KETCHUM 138KV LINE AT THE REQUEST OF VALLEY RANCH
GOLF COURSE.ALL EXPENSES ARE TO BE PAID BY VALLEY RANCH.
WR#:T-T940 2006 .0 EST.DATE:08/03/94 CUSTOMER NAME:VALLEY RANCH
PAGE
REC'O AUG 9 4 1994
WO#:33 433 0 10 P-1
CMP L DT:__/__/__STRT :__/__/
MAINT CMPL BY: PLANT RESERVESUMMARYOFESTIMATETOTAL
1DIRECTMAN-HOURS
TRAVEL-HOURS
TOTAL DIRECT MAN-HOURS-
LABOR APPORTIONMENT (%)
LABOR $3|3 .00 PER MAN-HOUR
INDIRECT 1LAB0R COST
COMPANY VEHICLES
MATERIALS!
CONTRACT jWORK ETC.
2,814 2,058 755 DESIGN.:TL PHILLIPS
721 527 193
(NO)3 ,534
100 .00
116,638
14,641
22,386
104,709
2,586
73.17
85,335 j
10,713 '
16 ,380
104,709
949 STAKED
26.83
31 ,303
3,928
6,007
(YES)ROW REQD .
/__/DATE OBTAINED
/__/
/__/I
iNON-CONTRACT VOUCHER MATL.
TOTAL;FIELD COST
GENERAL OVERHEADS 18.0 (%)
AFUDC
RETIREMENTS SALVAGE SCRAP
NET CHARGES
40,652
299,026
53 ,825
40,652
257,789
46,402
!WO-CATEGORY:A
41.238 ;
7,423 :DIST.:
-67,603
236,588 s
-29,982
322,870
37,621 I
86,282 !
CITY:ST:ID
IEQUIPMENTALREADYINPLANT
TOTAL:PROJECT COST
APPROVAL COST
322,870
352,851
236,588 86,282 I CLOSE TYPE:Si
l
SPONSOR :
T BLOMSTROM
!IREIMBURSEMENTS
NET EXTENSION COST
LINE EXTENSION UPGRADE
RELOCATION
BGT ITEM COPYAMTBUDGETTITLE
300000 SYSTEM WI DE /TJN I DENT I F I ED SUBTRANSMI SSI ONC5>4£4
MANAGERENGR/STAFF 8-3-^SUPT/iDIST ENG .
-fLfU'tur -feT sf)B 8/3^4 CUST SERV DIST DIV
APPROVAL,-DIV
i
RECOMMENDED-GO
APPROVED-GO (ACCTG )
i
rt(DEPARTMENT (CONTR &REV)
yrya
II
PRINTED:08/03/94 -11:24:40 -TLP8090 WO#:33 433 010
-002
I
IDAHO ROWER .COMPANY
WORK ORDER INFORMATION PAGE
CUSTOMER NAME:VALLEY RANCH
EST.DATE:08/03/94 WO#:33 433 010WR#:T -T9402006 .0
JUSTIFICATION (PURPOSE &NECESSITY)
THIS WORK ORDER IS A REVISION OF A PREVIOUS WORK ORDER WRITTEN
2/28/94 TO RELOCATE 1.5 MILES OF THE WOOD RI VER-KETCHUM 138KV
TRANSMISSION.ALL COSTS ASSOCIATED WITH THE PROJECT ARE BEING
FUNDED BY VALLEY RANCH GOLF COURSE.
THE ORIGINAL W.O.WAS APPROVED FOR $406,460.THE DIFFERENCE
BETWEEN THE TWO ESTIMATES IS DUE TO A CHANGE IN THE TYPE OF
CONSTRUCTION USED :(WOOD H-FRAME TO SINGLE POLE STEEL).
COST ALSO REFLECTS THE CONSTRUCTION BID COST BY ANDERSON
THE SELECTED CONTRACTOR FOR THE PROJECT.
THE NEW
&WOOD,
j
1
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
SPECIAL WO:ACCIDENT '
REPAIR ALLOWANCE
BETTERMENT
^GENERAL OH
RI WAY RECONSTR.'
iUSED EQUIPMENT
MAINT .ONLY
LICENSED
ENVIR ./ARCH .
RES.AND DEV.
OTHER UTILITY CONTRACT BILLING
UG VAUL"
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxmxxxxxxxxixxxxxxxxmxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
X
I
f"
IFINANCIALCALCULATIONS
I!¦
I
1
I I
WO#:33 433 010t;
CMI4500 -002!
8/3/94
Doug:This is a revision downward and would not have to be
revised except that changing from wood to steel poles completely
changes the body of the workorder.The engineer feels it will bemucheasiertoreconcilelaterifthisrevisedversionisused.
The customer is paying for the relocation costs and that figure
is based on this revised cost.
Thanks,
IDAHO POWER .COMPANY
WORK ORDER DETAILS PAGE 3
33 433 010WO#:
THIS WORK'ORDER PROVIDES FUNDS TO RELOCATE 1.4 MILES OF THE
WOOD RIVER -KETCHUM 138KV LINE AT THE REQUEST OF VALLEY RANCH
GOLF COURSE.ALL EXPENSES ARE TO BE PAID BY VALLEY RANCH.
WR#:T -T9402006 .0
FEEDER:
;
LINE #:ESTIMATE DATE:08/03/94433i
LOCATION STATE:ID
,iDESIGNER:;TL PHILLIPS ¦
i
!1DIVISION:.*UNKNOWN*CUSTOMER:VALLEY RANCH
i
DESIRED IN-SERVICE DATE:022894 i !
PRIORITY:;001
:i
BUDGET TITLE:SYSTEM WIDE,UNIDENTIFIED SUBTRANSMISSION
!
LOCATION:
I ;
COGEN IND:
LABOR ONLY-BLANKET WO IND:i
!BUDGET ITEM:BUDGET AMT :300000
i
CLOSE TYPE:S SPONSOR NAME:T BLOMSTROM
WAREHOUSE LOCATION:0201 BOISE OPERATIONS CTR
i
t
PRINTED:08/03/94 -11:24:40 -TLP8090 WO#:33 433 010
CMI4500 -002
IDAHO POWER COMPANY
BODY OF WORK ORDER PAGE 4
CUSTOMER NAME:VALLEY RANCH
WR#:T-T9402006 .0 EST.DATE:08/03/94 WO#:33 433 010
ASSET MANT
NUMBER ACCOUNT
QUANTITIES ----
INST REMV SLV/T DESCRIPTION
ESTIMATED
COST
RETIRED SALVAGE
PRICE VALUE :INST REMV MANT HOT
HOURS
STATE &COUNTY CODE =107
55000140*
55000140*^
55000150*:
55000150*'
55000155*
55000155*!
55000160*:
55000 160 *:
55000165*
55000165*
55000170*;
55000170*!
55000202
55000202
55000202
55000202
55000202
55000202 '
55000202 !
55000202
55000202
55000202
55000202
55000202 I
55000202 i
55000202
55000202
55000202
55000202
55000202
55000202
55000202
5 5P0LE WOOD 40 FT CL 3
40 FT POLE CLASS 3
5P0LE WOOD 50 FT CL 3,
50 FT POLE CLASS 3 :
255 FT POLE CLASS 1
55 FT POLE CLASS 2
60 FT POLE CLASS 1
'60 FT POLE CLASS 2
15,65 FT POLE CLASS 1
,65 FT POLE CLASS 2
70 FT POLE CLASS 1
¦70 FT POLE CLASS 2
DE BLTD AL 1/0-4/0
ILINK SGL 5/8 IN
!CN PG 2 BLT 795&336
'LINK MD 4WAY POLEBNDj
SHV POLE BND 3/4
;link twtd angle 7/8 :
BLT GALV MCH 3/4X14
IN U T MF 3/4 IN
FLAT 'POLE EYE PLATE i
)BLT GALV MCH 3/4X18 :
jBLT GALV MCH 3/4X16
:NUT MF 3/4 IN
iBJJ GALV MCH 3/4X14 '
iBLT GALV MCH 3/4X12
FLAT POLE EYE PLATE
BLT GALV MCH 3/4X18
BLT GALV MCH 3/4X16
GRIP GUY AUT 3/8 RL
LINK TWTD ANGLE 7/8
C L V THMB BNK
20
5 2,265 35
5 20
5 2.923
2 .143
35i323,545 1,212 21 4
1 2
2 1 .747 14
12 24
16 15 14,419:43.426 11,542 160 45
6 18
2 2,674 20
4 12;12 120 2
12 60:
3 30
4 40
5 10
9 90
6 12;
6 4
32 640't
12 30
12 30
48 24
8 16
8 1 6
16 3 20
6 6
6 6
4 28 4'
4 40,
2 36
i
M QUANTITY FOR LABOR ONLY WO#:33 433 010t
CMI4500 -002
IDAHO POWER OOMPANY
BODY OF WORK ORDER PAGE 5
CUSTOMER NAME:VALLEY RANCH
WR#:T -T9402006 .0 EST.DATE:08/03/94 WO#:33 433 010
ASSET ¦MANT --QUANTITIES ---|
NUMBER ACCOUNT INST REMV SLV/T
ESTIMATED
COST
RETIRED SALVAGE
PRICE VALUE
HOURS
INST REMV MANT HOTDESCRIPTION
55000202
55000202
55000202
55000202
55000202 .
55000202
55000202 I
55000202
55000202
55000202
55000202
55000202
55000202
55000202
55000202
55000202
55000202
55000202
55000501*
GRIP GUY FMD 3/8 EHS
CN PG 2 BLT 7 9 5 &3 3 6
2X-ARM ASSMBD GX-14
ANTI-SPLIT BOLT
IX-ARM 3X8X28
:bracket-shield wire
iDOWN GUY 3/8 EHS SH
DOWN GUY 3/8 EHS LNG
GUY INS 7FT FOR 3/8
OHG 3/8IN EHS
POLE BAND 4 WAY LD
POLE EYE ASSEMBLY
.POLE EYE PLATE
TMBRS FOR AHX16 STR
ANCHOR 19 IN DISK
jANCHOR 23 IN DISK
IX BRACE 13FT 6IN PS
!X BRACE 16FT 6IN PS '
LIGHT-DUTY STEEL POL'
2 6,
3 30
2 2 964 854 40 24
33 143 17
11 88
9 257 5
45 1.922 113
17 815 43
54 1 .766 27
2 40 5
10 387 10
12 364 7
20 577 12
2 854 20
6 359 21
43 4 3 .560 151 2
2 2 486 16 11
2 658,24
18 40 .652 180i
ES
55000501
55000501
55000501
18 ROD GRD CW 5/8X8 FT
CLP GRD 5/8 IN 8-1/0
ANODE/"MAGNESIUM 17LB
108'
54 54J
18 1 .260 18
55 -i ACCT ****SUB TOTAL 82 .991 46,971 13,607 998 270
56000055*!
56000270
25 270 IINSLTR 1 0 1 N B&S DISC
1 5 HWD 138KV HP POLY IN
378 929 1
15 15 780;650;
SI
56000270*
56000270*
56000270*
56000270*
56000270*
6138KV HP POLYMER INS!
3 0:1 3 8 K V HP POLY INS
138KV HL S/DE STL
15J138KV VERT HL INS
2 1!1 3 8K V HL S/DE WOOD ;
45 6 13,278!
8.031
2.0631
5,747i
3 ,1 2 9j
1 ,975 1 ,551
7 ,1 0 7j
45 4
30 30 51 30i1818I15154,937
6,911
5,086
1,762
15 8
33 21 33
i
i
=)QUANTITY FOR LABOR ONLY WO#:33 433 010
CM 1 4500 -002
IDAHO PQWER .COMPANY
BODY OF WORK ORDER PAGE 6 ¦-
CUSTOMER NAME:VALLEY RANCH
WR §:T-T9402006.0 EST.DATE:08/03/94 WO#:33 433 010
ASSET ,~MANT
NUMBER ACCOUNT
QUANTITIES ---
INST REMV SLV/T DESCRIPTION
ESTIMATED
COST
RETIRED SALVAGE
PRICE VALUE
HOURS
INST REMV MANT HOTi
I
56000525*
56000659 *i
56000681*
56000691*!
56000799
56000799 !
56000799
56000799 :
56000799 1
56000799
56000799
56000799
56000799
56000799
56000799
56000799 !
56000799
56000799
56000799
56000799
56000799
56000799 ,
1435 3075
6550
5638 5638
11485
5/16 EHS GALV SW
AC SR 4/0 STRING CND
AAAC 246 STRING COND;
;ACSR 397 STRING CND :
IDE AUT AL 4/0
iCLEVIS Y-BALL 3/4PIN;
¦CLP PG 246 TO 246
:CLP PG 397 TO 397
POST CLP 0.35-0.84RG
12SUS CLP 0.70-1.17 RG
|SUSP CLP 0.30-0.70S W
SUS CLP 0.40-.85 RG
SUS CLP 1.00-1.47 RG
DE CND AAAC 246 AUTO
DE CND AAAC 246 BLTD
IDE CND ACSR 397 BLTD
ROD ARMOR 246.9 AAAC
¦ROD ARMOR 397AR
ARMOR ROD FOR 5/16HS
:SW RUN ANGLE
SW DE POLE EYE
SW DEADEND 5/16 EHS
1 .134.1,230
4,650
43 62i
196
6.765
12.978
366 186
310
3 30 4
81 481
18 208
3 62;
15 97'
48 12 991 219
9 93i
6 88:I
51 1 ,047'
3 165 5
24 1 ,330;
1 .145
48
12 24
36 527i 7
48 863 14
16 129 2
7 121 4
635!62 62
8 78 8
f-l 156ACCT****SUB TOTAL 62.370 20,632 16,374 1061 485i
i
i
I
!5
i
:
yi QUANTITY FOR LABOR ONLY WO#:33 433 010
CMI4500 -002
Idaho
Power
IDAHO
WORK REQUEST
WORK REQUEST NUMBER
T°i H 07-00&,O
DAILY CASH REPORT NO.WORK ORDER NUMBERDATE
"V2LI
CUSTOMER ACCOUNT NO.TOTAL CUSTOMER PAYMENT
RECORDED DATECUSTOMERORDERNO.
PHONE NUMBER DISTRICTCUSTOMER\ltilU\f p-tinoh
BILLING ADDRESS „,,-,,
\JiAl-0vA S~b>|>Vt7y\&oo jjw 6-
z
2 STATE ZIP CODECITYVbr-f U-fG °il<
5 PHONE NUMBERPHONENUMBERPERSONTOCONTACTccr^d |-o -"2-7 71U.
5
SERVICE ADDRESS COUNTYCITY
cc
LU
s
COORDINATE ADDRESSRANGEO RATE SCHEDULESECTIONMERIDIANTOWNSHIP
CO
¦=>
o WORK REQUEST TYPE Q COMMERCIAL EU SUBDIVISION LD RECONST:OH
D RESIDENTIAL L)IRRIGATION S'OTHER D RECONST:UG
PERMANENT DATETEMPORARYDATEDATESERVICE
NEEDED
MOTOR CODELARGESTMOTORTOTALHPRESIDENTIAL/
COMMERCIAL
WATER HTR KWl KW HEATING
SO.FOOTAGE VOLTAGE 0 PHASES
IRRIGATION
VOLTAGE PHASE
CONVERTER
0 PHASESKWA/C KW MOTORS LARGEST MOTOR2 JYES TYPE
J NO
<CT LOCATIONACRESIRRIG.PUMP 0TOTAL
DEMAND ?
NEW
LOAD ?
0 METERS
30 10 30105
cr
o LJOH
?UG
j ]IPCO
?other?north Geast Gother
?south Gwest
service
ownership
CT LOCATIONMETER
LOCATION
OHU_SERVICE r=PRIMARY2 UG
JOH 0 ?ipco
?other
PLAT
APPRVD?PINO
AVG LOT FRONT FT?SERVICE
OWNERSHIP
OH »LOTS YESSERVICEPRIMARYSUBDIVISION<UG UGO
0 OHOH
?
LOCATION CODE WORK SERVICEPRIMARYRECONSTRUCTION UGUG
d-g S ~h>t (-P
{Uvi*3 \AJooA
vJerl?osA-eV)V \TO\/\PCC
<
05
UJ
cc
DATE?AVERAGE UNIT COST
WORK ORDER COST
REQUEST RECEIVED BYADDITIONAL
APPLICANT?
D YES D NO
RIGHT-OF-WAY REQUIRED?
^YES D NO
CUSTOMER COST
DETERMINED BYS ~7Tua 3-"ZX
o
80S11.1/4 COMMON SHARE PORTION (NSR) ...
12.RIGHT-OF-WAY PERMIT (NSR)
13.SVC OH/UG DIFFERENCE (NSR)
14.SVC OH/UG UNUSUAL CONDITIONS
15.SVC OH/UG CON.CR.(FOJE CAM 3.28-1)....
16.TOTAL OH/UG SERVICE COST (13+14-15)....
17.CUSTOMER RELOCATION COSTS (NSR)
18.GOVT.AGENCIES RELOC.COSTS (NSR)
19.CASH (10+11+12 +16+17+18)
20.TOTAL CUSTOMER PAYMENT (9+19)
•assign to work order and indicated line number te complete DCR (Gl 511-2)
1.LINE EXTENSION/UPGRADE COST ...
2.UNUSUAL CONDITIONS
3.COMPANY BETTERMENTS
4.NET CONSTRUCTION COST (1 +2-3).
5.LINE EXTENSION ALLOWANCE
6.CONSTRUCTION CONTRIBUTION (4-5)
7.LINE EXT.CREDIT (FOJE CAM 3.28-1)
8.VESTED INTEREST PAYMENT
9.NET FOR 252 ACCOUNT (6-7+8)
80S
(S )
U)
s
CO
(S )o ()
o
85scc
UJ (*)615
O 63SI-
en
D 80 S
O
81*$10.TEMPORARY EXT./UP &DOWN (NSR)
This written quotation shall be binding on the Company for a period of sixty days from the date below indicated,subject to changes in information provided by
the Customer or changes in the Company's ability to obtain satisfactory rights-of-way,or to comply with governmental regulations,including but not limited to the
rules,regulations and tariffs of the Idaho Public Utilities Commission.The Customer must make payment of the quote amount not less than thirty (30)days prior
to the start of construction,but the Company does not represent that construction will commence within 30 days of receipt of payment.The start of construction
will be subject to the company's ability to obtain the necessary labor,materials and equipment.
UJ
2
o
z
—IDAHO POWER COMPANY-
DATECUSTOMERSSIGNATURE ENERGY MANAGEMENT DATE
II
Is
DISTRICT-DATE
QUOTATION DATE DATEDIVISIONEMMANAGER
DATEDIVISIONMANAGER
GENERAL OFFICE DATE
AC!DFE 031 REV B-88