Loading...
HomeMy WebLinkAbout20170303IPC to Tidwell Attachment 20.8.pdfPOWER( An idacorp Company 9/6/201 1 Project ID:T4331101 27340452:T433 KING-WOOD RIVER 138,correct priority 2 DEFECTS. Location:Ketchum area,between Wood River and Ketchum Substations Designer:Bill Finlay Est.Man-Hours: Required In Service Date:10/27/2011 Scope of Work: Perform maintenance work on Line 433 consisting of 1 structure replacement (Str 18),6 cross arm replacements,including 1 truss (Str.526,546 548 549,565,572),4 cross arm repairs (Str. 517,521,537,563),and bell replacements at 3 structures (Str.492,493,494).Some work will be performed with the line hot and some during a short outage (6 hrs) Vehicle access is limited to structures and some may require climbing C Extra bells,shoes,and armor rod have been provided.Replace any additional defects found while performing the primary maintenance. Coordination of Work: Outages:T433 is schedule for a short outage. Permits:Acquire permits for work done in road right of way. Locates:The contractor or crew is responsible for notifying digline and acquiring all necessary locations prior to commencing work. Contacts: Project Leader -388-5667 Project Engineer-388-2756 Grid Operator -388-2861 Tom Barber Bill Finlay Tim Trimmel c