HomeMy WebLinkAbout20170303IPC to Tidwell Attachment 20.5.pdfJ:\Line 433\Line 433 Replace Structures Woodpecker Damage\Construction Book\000 - Transmittal Letter\Transmittal Letter27439191.Docx 12/23/2014 Project ID: T433160001 WO 27439191 REPLACE WOOD PECKER DAMAGED STRS Location: Between Wood River and Elkhorn Subs Line: 433 Engineer: Jeff Lincoln Est. Man-Hours: 658 Est. Construction Cost (W/O Overheads): $116,774 Material Request: 01136747 Date: October 12, 2015 Project Description: Woodpeckers have damaged structures to the point of failure. Wreck out and replace Structures 536, 538, and 539 while the line remains energized. . A significant amount of road, approximately .75 mile, must be re-established. Working pads are required at two structures. Agreements have been struck with the property owner at the entrance to this area. His name is Buffalo Rixon. He lives at the entrance to this stretch. Flaggers are required on the roadway below the line during excavation to safeguard against rolling rocks. Poles are steel and will not be pre-drilled. See the structure list for further instruction. Permits: Although a SWPPP is not required, all vehicles and equipment must be cleaned of weed seeds prior to beginning the project. Locates: The contractor or crew is responsible for notifying digline and acquiring all necessary locations prior to commencing work. Outages: No outage allowed. All construction expenses should be charged to task 2. Contacts: Jeff Lincoln Engineer – 388-2234 or cell 870-2244 Tom Barber Project Leader – 388-5667 or 869-5997 Daisi Pohonka Line Scheduler – BOC 388-2026 (Cellular 320-8801)