HomeMy WebLinkAbout20170303IPC to Tidwell Attachment 18.2.pdf••'-4;:
w
¦
Addendum To The Final Report
(Electrical Reliability Study)
&
IDAHO POWER COMPANY
STRUCTURAL RELIABILITY AND
RISK ASSESSMENT
OF THE
WOOD RIVER -KETCHUM 138 kV LIN^#433
m
m
December 1993
IKS
^--v.?
II EDM
ENGINEERING
DATA
MANAGEMENT,INC.
4700 McMurray Avenue
Fort Collins,Colorado 80525
(303)223-0457 FAX (303)223-0484
---
RELIABILITY AND RISK ASSESSMENT
Electrical Reliability
Idaho Power Company outage records for the Wood River to Ketchum 138kV
Transmission Line were examined for the years 1980 through 1993.Only two outages
were noted for this period.Of these two outages,one event was caused by weather
(heavy snow)and one event by switching operations.No outages during the last 14 years
were the result of lightning,an extraordinary record.
As a comparative study,in an effort to establish a baseline level of electrical reliability,
outage performance data from the Mid-America Interconnected Network (MAIN)and
Mid-Continental Power Pool (MAPP)was obtained.The available MAIN data is for 1986
only and the MAPP data is for 1977 through 1986.A brief summary of the outage rates
(per 100 miles per year)for the MAPP and MAIN data follows:
MAPP
Planned Outage Rate 3.80
Forced Outage Rate 3.11
Total 6.91
MAIN
Planned Outage Rate 4.74
Forced Outage Rate 1.42
Total 6.16
The Wood River to Ketchum 138kV Transmission Line was also analyzed using EPRI
MULTIFLASH software to estimate lightning performance.Table 1 illustrates the results
of this analysis for a tangent H-frame structure,with unbonded crossarms,using 65'poles,
the predominant structure type and pole height.The actual results are included in the
appendix.
Table 1
PREDICTED LIGHTNING OUTAGE RATE
(Flashovers per 100 miles per year)
FOOTING UNBONDED CROSSARM (2)
KERAUNIC LEVEL (3)RESISTANCE (1)
Resistance Percentage 10 15 20
25 Ohms 15
50 Ohms 40
100 Ohms 35 2.16 3.2 4.24
200 Ohms 5
400 Ohms 5
Notes:(1)See Table 2 for measured resistivity.
(2)Backflashes occur across insulator strings and along crossarms to pole grounds.
(3)Thunderstorm days per year.
The following observations can be made by comparing the actual line outage performance
to the MAPP and MAIN data,and the predicted lightning outage rates:
The actual lightning rates are much lower than the
predicted values.
The geography ofthis particular line may account for
the absence of lightning related outages.
The unbonded crossarm increases the insulating value
of the structure limiting the incidence of flashover.
The footing resistances used in the lightning outage performance analysis are from the
measured resistivity values in Table 2 and Figure 1.These values illustrate a considerable
range of resistances for the soil types encountered along the line.
Conclusion
The outage records speak for themselves.Two outages in the past fourteen years for a
total duration of three minutes include one weather related outage,attributed to heavy
snow,and one switching outage.The low incidence of lightning in this area combined with
the line's proximity to the mountains and relatively good condition of the entire power line
give the Wood River to Ketchum 138kV Transmission Line an operating record that is
practically unsurpassable.
PEI-HLY 22-474 (12/28/93)248158-01-22-01-01 lrh
IDAHO POWER CO.,WOOD RIVER to KETCHUM 138kV TRANSMISSION LINE
MEASURED SOIL RESISTIVITY VALUES
by POWER ENGINEERS,INC.
Measured Resistance (Ohms)2-Layer Equivalent (Ohm-Meters)Calculated Resistivity (Ohm-Meters)
40"30'20'10'40*TOP LAYER BOTTOM 5'20'30*TOP5'10'STRUCTURE SPACINGSPACINGSPACINGSPACINGSPACINGLAYERSPACINGSPACINGSPACINGSPACINGSPACINGDEPTH(ft)LAYER
6.6210.1321.268.2126.2507.46 13.20 1338.00 351.404931209.23 1306.97 812.54 582.39
13.36 7.32797.8253559.58 9.40 2535.00 486.505152424.21 1874.21 1034.84 768.08
0.436 0.3990.5441.0710.00 27.41 3.4525.07 30.59 27.4151933.06 20.52 20.85
11.6817.7433.3105.47.70 852.60 289895.33 2912.005272769.16 2019.86 1276.30 1019.89
4.195.187.3916.9346.50.00 343.40 343.40445.56 321.18543324.44 283.24 297.80
0.5750.731.7195.46136.50 38.96 13.7141.97 44.08 9.00559131.37 104.63 65.88
1.075.33 2.2117.712.00 421.60 43.282.02 56.70573413.94 339.20 204.29 127.06
TABLE 2
PEI-HLY (12/28/93)2 18158-01 Irti
U:\TDES\lDAHOPWR\RESTVTY.XLS
IDAHO POWER COMPANY
WOOD RIVER to KETCHUM 138kV TRANSMISSION LINE
3000.00 I A:
2500.00 til-.-|
2000.00
MEASURED RESISTIVITY 1500.00
(OHM-METERS)
i*l
1000.00
500.00 TT7 r.fj
C-~YSr 5 FEET
10 FEET
W 20 FEET
F 30 FEET
40 FEET PROBE SPACING
0.00
r*i
a\io
H r-IO (N
On
TRANSMISSION LINE
STRUCTURE
Ir^
?40 FEET ¦30 FEET ¦20 FEET ?10 FEET El 5 FEET
PEI-HLY (12/28/93)248158-01-22-01-01 Irti
U:\TDES\IDAHOPWR\WR KRSTY.XLC FIGURE 1
OUTAGE REPORT
L
L
t I
1PAGE
IDAHO POWER COMPANY
TRANSMISSION OUTAGE REPORTING SYSTEM
JUMBO REPORT
01/01/B0 TO 12/27/93CONSTRAINTS...TIME PERIOD:
CAUSE CODE:
OPERATION TYPE:ALL
FACILITIES:
VOLTAGE:
ALL
ALL
138
DESCRIPTION:KETCHUM-ttOOD RIVER 13BKV LINE
DURATION
SUB1 SUB2 SUB3 §OPN DATE TIME HRS:Ml OPERATION REMARKS
:01 SWITCH03/23/90 0621
03/23/90 0621
03/23/90 0621
CAUSE:OTHER
CLOSING A BYPASS AIRBREAK IN ORDER TO PICK UP THE WOOOR 1 VER-S I LVER
138KV LINE.
KCHM WDRI
EKHN
KCWrf
:01
:01
03/04/9 1 1266
03/04/61 1256
03/04/91 1256
CAUSE:WEATHER
HEAVY SNOW IN THE WOOCRIVER AREA.:02 FAULT
KCHM WDR1
KCHM
EKHN
102
102
TOTAL TRIP/CLOSE:DURATION:TOTAL OUTAGES::032
0
AVGi :01
12/27/9
T0RRPT1
RUN ON:
PROGRAM:
USERIO:SJN1002
93 AT 10.21.09
FOCEXEC
[
APPENDIX
r
FLASH *****Version 4.01MULTI
EPRI Lighting Outage Rate Calculation Program
RP1284-3 &RP2151-1
IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINETITLE:
Echo of Input Data
t r 10.0 Thunder Days per Year
12.4 Miles
Keraunic Level ...:
Line Length :
Data for the 2 Shield Wires:
Node Lateral
No.Distance(ft)Height(ft)Diam(in)Sag(ft)Name
26.00 3/8HS
26.00 3/8HS
.360
.360
59.00
59.00
1 -6.80
6.802
Data for the 3 AC Phases and 0 DC Poles:
Voltage
Height (ft)(kV)Angle Sag(ft)
Node Lateral
No.Distance(ft)
240.B
0.A
120.C
3 -13.50 45.50
45.50
45.50
138.0
138.0
138.0
30.00
30.00
30.00
4 .00
13.505
No.Bundle
Cond Dia(in)
Node
No.Diam(in)Name
Insulators
No.Len.(in)
Series
Wood (ft)
.563
.563
.563
3 1 .6 9PENGUIN
PENGUIN
PENGUIN
5.74
5.74
5.74
6.8
4 .61 9 6.8
5 1 .6 9 6.8
i
|
L
r FLASH *****Version 4.01MULTI
f EPRI Lighting Outage Rate Calculation Program
RP1284-3 &RP2151-1
IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINETITLE:
Echo of Input Data (Continued)
82TowerType
Tower Height
Number of Nodes...
58.50 (ft)
5
Data for the 5 Tower Elements:
No.Node A Node B Length(ft)Diam(ft)Sparsity
.33 1136.89
14.44
6.89
45.28
45.28
1
.33 1221
.33 1243
.333 145
.33 1455
Conductor
at Node
Flashes to
Tower Node
3 3
4 3
5 4
Surge Footing Resistance Connected to Node 5
Footing R
(ohms)
Frequency of
Occurrence
25.0
50.0
100.0
200.0
400.0
.1500
.4000
.3500
.0500
.0500
L
r
FLASH *****Version 4.01MULTI
r EPRI Lighting Outage Rate Calculation Program
RP1284-3 &RP2151-1
IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINETITLE:
Shielding Failure Flashover Rates
NO SHIELDING FAILURES CALCULATEDr*
Back Flashover Rates
Backf lashes %of Total
per Year BackflashesNodesFlashing
.061
.097
.055
.016
.002
.033
.003
22.89
36.33
20.53
6.10
3
35
5
4
.7245
4 3 12.41
1.02
5
r 4 3
Total =.27
SUMMARY FOR TOTAL LINE LENGTH
10.00 Thunder Days per Year
12.40 Line Length (Miles)
1.63 Strokes to Line per Year
.00 Shielding Failures per Year
.27 Back Flashovers per Year
.27 Combined Flashovers per Year
L
L
FLASH *****Version 4.01MULTI
EPRI Lighting Outage Rate Calculation Program
RP1284-3 &RP2151-1
TITLE:IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINE
Echo of Input Data
15.0 Thunder Days per Year
12.4 Miles
Keraunic Level...:
Line Length :
Data for the 2 Shield Wires:
Node Lateral
No.Distance(ft)Height(ft)Diam(in)Sag(ft)Name
26.00 3/8HS
26.00 3/8HS
59.00
59.00
.360
.360
1 -6.80
6.802
Data for the 3 AC Phases and 0 DC Poles:
Node Lateral
No.Distance(ft)
Voltage
Height (ft)(kV)Angle Sag(ft)
3 45.50
45.50
45.50
138.0
138.0
138.0
240.B
0.A
120.C
-13.50 30.00
30.00
30.00
4 .00
5 13.50
Node
No.Diam(in)Name
Bundle
Dia(in)
Insulators
No.Len.(in)
SeriesNo.
Cond Wood (ft )
3 .563
.563
.563
.61 9 5.74
5.74
5.74
PENGUIN
PENGUIN
PENGUIN
6.8
4 .6 91 6.8
5 1 .6 9 6.8
I
%
¦
L
r FLASH *****Version 4.01MULTI
f EPRI Lighting Outage Rate Calculation Program
RP1284-3 &RP2151-1
IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINETITLE:
Echo of Input Data (Continued)
PNp
82TowerType
Tower Height
Number of Nodes...
58.50 (ft)
5
Data for the 5 Tower Elements:
No.Node A Node B Length(ft)Diam(ft)Sparsity
16.89
14.44
6.89
45.28
45.28
.33311
.33 1212
.33 1324
.33 1435
.33 1455
Flashes to
Tower Node
Conductor
at Node
3 3
4 3
45
Surge Footing Resistance Connected to Node 5
Footing R
(ohms )
Frequency of
Occurrence
25.0
50.0
100.0
200.0
400.0
.1500
.4000
.3500
.0500
.0500
L
L
r
PLASH *****Version 4.01MULTI
EPRI Lighting Outage Rate Calculation Program
RP1284-3 £RP2151-1
IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINETITLE:
Shielding Failure FlaBhover Rates
NO SHIELDING FAILURES CALCULATED
Back Flashover Rates
Backflashes %of Total
per Year BackflashesNodesFlashing
22.89
36.33
20.53
6.10
.092
.145
.082
.024
.003
.050
.004
3
35
5
4
!.7245
12.41
1.02
4 35
34
Total =.40
SUMMARY FOR TOTAL LINE LENGTH
15.00 Thunder Days per Year
12.40 Line Length (Miles)
2.44 Strokes to Line per Year
.00 Shielding Failures per Year
.40 Back Flashovers per Year
I .
.40 Combined Flashovers per Year
I .
L
r
FLASH *****Version 4.01MULTI
EPRI Lighting Outage Rate Calculation Program
RP1284-3 &RP2151-1
IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINETITLE:
Echo of Input Data
Keraunic Level...:
Line Length :
20.0 Thunder Days per Year
12.4 Miles
Data for the 2 Shield Wires:
Node Lateral
No.Distance(ft)Height(ft)Diam(in)Sag(ft)Name
26.00 3/8HS
26.00 3/8HS
.360
.360
59.00
59.00
1 -6.80
6.802
Data for the 3 AC Phases and 0 DC Poles:
Voltage
Height(ft)(kV)Angle Sag(ft)
Node Lateral
No.Distance(ft)
45.50
45.50
45.50
138.0
138.0
138.0
240.B
0.A
120.C
30.00
30.00
30.00
3 -13.50
4 .00
5 13.50
Node
No.Diam(in)Name
No.Bundle
Cond Dia(in)
Insulators
No.Len.(in)
Series
Wood (ft)
3 .563
.563
.563
1 .6PENGUIN
PENGUIN
PENGUIN
9 5.74
5.74
5.74
6.8
4 1 .6 9 6.8
5 1 .6 9 6.8
L
FLASH *****Version 4.01MULTI
r EPRI Lighting Outage Rate Calculation Program
RP1284-3 &RP2151-1
IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINETITLE:
Echo of Input Data (Continued)
82TowerType
Tower Height
Number of Nodes...
58.50 (ft)
5
Data for the 5 Tower Elements:
No.Node A Node B Length (ft)Diam(ft)Sparsity
6.89
14.44
6.89
45.28
45.28
.33 1131
.33 1212
.33 1234
.33 1345
.33 1455
Flashes to
Tower Node
Conductor
at Node
3 3
4 3
5 4
Surge Footing Resistance Connected to Node 5
Footing R
(ohms)
Frequency of
Occurrence
25.0
50.0
100.0
200.0
400.0
.1500
.4000
.3500
.0500
.0500
L
r
FLASH *****Version 4.01MULTI
EPRI Lighting Outage Rate Calculation Program
RP1284-3 &RP2151-1
IDAHO POWER,WOOD RIVER-KETCHUM 138KV TRANSMISSION LINETITLE:
r Shielding Failure Flashover Rates
NO SHIELDING FAILURES CALCULATED
r
Back Flashover Rates
Backflashes %of Total
per Year BackflashesNodesFlashing
.122
.194
.109
.033
.004
.066
.005
22.89
36.33
20.53
6.10
3
5 3
5
4
.7254
12.41
1.02
4 35
4 3
Total =.53
SUMMARY FOR TOTAL LINE LENGTH
20.00 Thunder Days per Year
12.40 Line Length (Miles)
3.26 Strokes to Line per Year
.00 Shielding Failures per Year
.53 Back Flashovers per Year
.53 Combined Flashovers per Year
L
Thunderstorm Days Thunderstorm Days
v:T .i TB13J
|g ?S S 2 B -.Oil
g I s s s s S
-?ODBiiisa M'l
F"sfV •Jl—
>^1»LNvW-
O
Z-m7
fi,(CMS
Lor
T Emm
®?lr
S<5??CO
IE i ;
rr4K
!
O A !.i—*o ,
k H
dfe
5 S
m WSm
r
i !5X
W iiJ :*.:&%rmj$Q
xB
s
t^p .,..™0
ML
'l\\^si |il-a>
?—<.rOlOU<TTO
H «_I-:
5 •9
a ••
|i>
!snX
H .I
k <-«v
AhIis->_rAT i
i .i ?<;2l?;vCO¦i>*I V<I ....D5-s
1 'Sr*
£*/r
=i
-¦O
V&:$
'->
"To
JLLf !f I 'J"—H-t~
X g.«
¦jLw_nN »
sB#et i)i \=j £§1
\?mn •*-¦•¦/"vi'^^sN
*"*"»•'..—v •5*-.
X
X 3
>J-"<
i
X
*J &jA uo
:\?<2 ^
\V?
V A
%•it Mlirsy-^
•xjrrc,xl I 7TTTTD y/~A-
-sM:->r?jit
.feO-ctrAJnTT7.7>>s.
r M !'""r4
>'¦>T*
L/\i>S u&1
Pr^B,
Krrr!<§!\kl :.«T
K'h
'll-
ns
;riXJ-i
M.I Mr *•T.-'
\L ysji it"'/>\t li
.f'/Nt /rf^i if.'
5 '1?¦.hj
:Xa
J-UAU ZT.
E-8
r
r
r
r
r
r
f
[
L
L
L
L
U
L
L