Loading...
HomeMy WebLinkAbout20160428Staff 1-5 to IPC.pdfBRANDON KARPEN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-03s7 IDAHO BAR NO. 7956 Street Address for Express Mail: 472W. WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR AUTHORITY TO IMPLEMENT POWER COST ADJUSTMENT (PCA) RATES FOR ELECTRIC SERVICE FROM JUNE 1,2016, THROUGH MAY 31,2017. R[CE IVED 2015 APR 2B fit{ ll: h2 ':,!nt lnr'r,Irri;Lllv ' - 1'l !',',,'t";t;litltssloN BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC.E.16.O8 FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF'TO IDAHO POWER COMPANY The Staff of the Idaho Public Utilities Commission requests that Idaho Power Company provide the following documents and information as soon as possible, by THURSDAY, MAY 5,2016.r This Production Request is continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations. Please include the name, job title, location and phone number of the record holder. I Staffis requesting an expedited response. If responding by this date will be problematic, please call Staff s attorney at (208) 334-0357. FIRST PRODUCTION REQUEST TO IDAHO POWER APRIL 28,20T6 In addition to the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 1: Please provide workpapers that reflects the method used to derive the revenue-smoothed (redistributed) base net power costs shown on lines 32 through 37,ltte 56, and line 67 in Matt Larkin's Exhibit #1 from the original Aurora Base Net Power Supply Expense in base rates for the deferral period for all NPSE accounts. Please include all worksheets with calculations intact. REQUEST NO.2: Please provide workpapers used to calculate the percentages in lines 6 and 7 of Matt Larkin's Exhibit I including an explanation of the method and basis used to determine the amounts. Please include all worksheets with calculations intact. REQUEST NO.3: Please provide a spreadsheet listing the 320 MW of solar and 50 MW of wind projects that are expected to come on-line in the 2016-2017 PCA year. Please include the name of each project, the latitude and longitude of each project, the nameplate capacity ofeach project, the type ofsolar array for the solar projects, the expected on-line date for each project, the expected MWh production during the2016-2017 PCA year for each project, the owner's name, and the current estimated percentage of completed construction for each project. REQUEST NO. 4: Please provide data on the 2015 forecasted and current reservoir levels for the Upper Snake River Basin. REQUEST NO. 5: Please provide the Actual Idaho Jurisdictional Billing Monthly Sales for each customer class from line 5 of Mr. Larkin's Exhibit No. 1. Please provide this breakdown for each month listed in the exhibit. FIRST PRODUCTION REQUEST TO IDAHO POWER APRIL 28,2016 Dated at Boise, Idaho, this l\9a^yofApril 2016. Technical Staff: Mike Louis (l-2) Mark Rogers (3-5) i:umisc:prodreq/ipcel6.8bknlrk*lsphmrdk prod reql FIRST PRODUCTION REQUEST TO IDAHO POWER APRIL 28,2016 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 28th DAY OF APRIL 2016, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY IN CASE NO. IPC.E.16-08, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: LISA D NORDSTROM REGULATORY DOCKETS IDAHO POWER COMPANY PO BOX 70 BOrSE rD 83707-0070 E-mail : lnordstrom@idahopower.com dockets@ idahopower.com MATTHEW T. LARKIN TIMOTHY E. TATUM IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 E-mail : mlarkin@idahopower.com ttatum@ idahopower. com CERTIFICATE OF SERVICE