HomeMy WebLinkAbout20141211IPC to Staff 5.pdf7!lDryp
NIPO1TER
An IDACORP Company
20lir DtC I
:
l.l/ l, i ..
lJ llLlli:i
I PH 3122
DONOVAN E. WALKER
Lead Counsel
dwalker@idahopower.com
December 11,2014
VIA HAND DELIVERY
tJean D. Jewell, Secretary
ldaho Public Utilities Commission
472 West Washington Street
Boise, ldaho 83702
Re: Case No. IPC-E-14-33
Simco Solar, LLC - ldaho Power Company's Response to the Third
Production Request of the Commission Staff
Dear Ms. Jewell:
Enclosed for filing in the above matter are an original and three (3) copies of
ldaho Power Company's Response to the Third Production Request of the Commission
Staff.
An external hard drive containing the requested files is provided. The files
provided on the extemal hard drive are confidential and should be handled in
accordance with the Protective Agreement in this matter.
DEW:csb
Enclosures
1221 W. ldaho St. (83702)
PO. Box 70
Boise, lD 83707
hovan E. Walker
DONOVAN E. WALKER (lSB No. 5921)
ldaho Power Company
1221West ldaho Street (83702)
P.O. Box 70
Boise, ldaho 83707
Telephone: (208) 388-5317
Facsimile: (208) 388-6936
dwalker@idahopower.com
Attorney for ldaho Power Company
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR
APPROVAL OR REJECTION OF AN
ENERGY SALES AGREEMENT WITH
SIMCO SOLAR, LLC FOR THE SALE AND
PURCHASE OF ELECTRIC ENERGY.
iii:cFi"i"i,
I0ll0[C I I pH 3: 23
t iirl,, :,; ,t ,- ,.... , ._.
l-iT ll i'f ilS i,'i' ^, i, i ir..S ji_;,
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
CASE NO. !PC-E-14-33
IDAHO POWER COMPANY'S
RESPONSE TO THE THIRD
PRODUCTION REQUEST OF THE
COMMISSION STAFF TO IDAHO
POWER COMPANY
COMES NOW, ldaho Power Company ("ldaho Powe/'), and in response to the
Third Production Request of the Commission Staff to ldaho Power Company dated
December 10,2014, herewith submits the following information:
IDAHO POWER COMPANY'S RESPONSE TO THE THIRD PRODUCTION
REQUEST OF THE COMM]SSION STAFF TO IDAHO POWER COMPANY - 1
REQUEST NO. 5: Please re-calculate the rates for the project by using in
AURORA the exact generation quantities and hourly and monthly shapes as are
represented in Appendix I of the Agreement. Please compare the resulting rates to
those contained in Replacement Appendix E included as Attachment 1 to ldaho Poweds
lnitial Comments. Please compare the 20-year levelized rates under both scenarios
and calculate the difference in the total 2O-year contractual obligation. With your
answer, please provide copies of all AURORA and Excel files used for the analysis.
RESPONSE TO REQUEST NO. 5: ldaho Power already uses the exact
generation quantities and hourly and monthly shapes as contained within Appendix I in
the incremental cost lntegrated Resource Plan ("lRP") model in the incremental pricing
tool. One input into the AURORA model that is required to establish the hourly
generation resource stack of existing resources (not including the proposed qualifying
facility ("QF') project) is the estimated hourly generation from all availabb resources
that exist prior to the addition of the proposed QF project. In many cases, ldaho Power
does not have specific hourly energy estimates from the various QF projects; instead,
ldaho Power only has monthly energy estimates. Therefore, to create an hourly energy
shape of these QF resources, ldaho Power shapes the monthly energy estimates by
using generic information related to the resource types. ln the case of solar projects,
this hourly shaping has been based upon industry and local information with regards to
solar radiation and the expected energy deliveries from generic solar projects. Because
some solar projects are now providing hourly energy estimates, a potential
enhancement to the incremental cost IRP model will be to include the project specific
hourly energy estimates (when available) in the cumulative solar hourly energy shapes
IDAHO POWER COMPANY'S RESPONSE TO THE THIRD PRODUCTION
REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 2
that are used in establishing the hourly generation resource stack. ldaho Power has
included the applicable information for the revised incremental cost IRP model runs with
this response. A comparison of the 2O-year levelized rates under both scenarios is
listed below.
20-year Levelized Rates
lst Production 3rd Production
Below is the difference in the total 2O-year contractual obligation.
Z$-year Gontractual Obl i gation-l ncl ud i ng ! nte g ration
lst Production 3rd ProductionRequest Request u[Terence
$68,083,588 $67,594,1 10 ($489,478)
Please see the directory titled "lPC-E-14-33,34 !PUC Staffs Third Production
Request" and the confidential subdirectory titled "CONFIDENTIAL-IPC-E-14-33-Simco
Solar-IPUC 3rd PROD Request-Response 5" on the external hard drive for the Excel
files used for the analysis. In addition, please see the directory titled "|PC-E-14-33,34
IPUC Staffs Third Production Request" and the confidential subdirectory titled
'CONFIDENTIAL-IPC-E-14-33,34-AUROM Change Set-IPUC 3rd PROD Request-
Response 5" for the AUROM files. The files and data contain non-public, confidential,
and proprietary dispatch costs or project generation of ldaho Power resources and
should be handled in accordance with the Protective Agreement. The extemal hard
drive and file subdirectories are marked 'CONFIDENTIAL." However, to maintain the
integrity of the files, the files themselves are not further marked or identified as
confidential.
IDAHO POWER COMPANY'S RESPONSE TO THE THIRD PRODUCTION
REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 3
Simco Solar
Simco Solar
Request
$64.31
Request
$63.94
Difference
($o'ez1
The response to this Request is sponsored by Randy C. Allphin, Energy
Contracts Coordinator Leader, Idaho Power Company.
DATED at Boise, ldaho, this 11h day of DeEe(mber 2014.
DONOVAN E. WALKER
Attomey for ldaho Power Company
IDAHO POWER COMPANY'S RESPONSE TO THE THIRD PRODUCTION
REOUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 4
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this 11h day of December 2014 I served a true and
conect copy of IDAHO POWER COMPANY'S RESPONSE TO THE THIRD
PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER
COMPANY upon the following named parties by the method indicated below, and
addressed to the following:
Commission Staff
Kristine A. Sasser
Deputy Attomey General
Idaho Public Utilities Commission
472 West Washington (83702)
P.O. Box 83720
Boise, ldaho 83720-007 4
Simco Solar, LLC
Ron Williams
Williams Bradbury, P.G
1015 West Hays Street
Boise, ldaho 83702
Ben Fairbanks
Director, Development
First Wind
Hand Delivered
U.S. Mall
Overnight Mail
FAXX Email kris.sasser@puc.idaho.oov
_Hand Delivered
U.S. Mail
Overnight Mail
FAXX Emai! ron@williamsbradbury.com
Hand Delivered
U.S. Mail
Ovemight Mail
FAXX Email bfairbanks@firstwind.com
IDAHO POWER COMPANY'S RESPONSE TO THE THIRD PRODUCTION
REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 5
Christa Bearry, Legal