Loading...
HomeMy WebLinkAbout20141202IPC to Staff 3-4.pdf3Effi*. An IDACORP Company DONOVAN E. WALKER Lead Gouneel il.ICIi1.;'1 i., ?CIlt n[[ -2 p]1 t2: hg tir, r, r'u I -. E/:. i JT lLl i: "i (:Cl,ii:::'Il - ii December 2,2014 VIA HAND DELIVERY Jean D. Jewell, Secretary ldaho Public Utilities Commission 472 West Washington Street Boise, ldaho 83702 Re: Case No. IPC-E-14-32 Murphy Flat Powea LLC - ldaho Power Company's Response to the Second Production Request of the Commission Staff Dear Ms. Jewell: Enclosed for filing in the above matter are an original and three (3) copies of ldaho Power Company's Response to the Second Production Request of the Commission Staff. DEW:csb Enclosures 1221 W. ldaho St. (83702) P.O. Box 70 Boise, lD 83707 Very tryly yours, 6novan E. Walker DONOVAN E. WALKER (!SB No. 5921) ldaho Power Company 1221West Idaho Street (83702) P.O. Box 70 Boise, Idaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 dwalker@idahopower.com Attorney for ldaho Power Company IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR APPROVAL OR REJECTION OF AN ENERGY SALES AGREEMENT WITH MURPHY FLAT POWER, LLC FOR THE SALE AND PURCHASE OF ELECTRIC ENERGY. nf C[1r,r:irt :IM[[ -2 Pt4 12: t+9 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. IPC-E-14-32 IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY COMES NOW, ldaho Power Company ("ldaho Powe/' or "Compaoy"), and in response to the Second Production Request of the Commission Staff to ldaho Power Company dated November 20,2014, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 1 REQUEST NO. 3: ldaho Poweds application states under Paragraph 15 that "[c]onsistent and materia! deviations from the hourly energy estimates in the generation profile will be considered by ldaho Power to be a material breach of the agreement-- meaning that the entire pricing is fundamentally flawed as a result of an inaccurate generation profile". Please discuss how consistent and materia! the deviations need to be before the entire pricing can be considered fundamentally flawed, and before ldaho Power would consider this to be a material breach of the agreement. RESPONSE TO REQUEST NO. 3: A key input of the ldaho Public Utilities Commission-approved avoided cost calculation (ldaho Power incremental cost lntegrated Resource Plan methodology) for this Energy Sales Agreement ("Agreement") is the hourly energy estimates provided by the project (Appendix ! of the Agreement). As described in paragraph 15 of the Application, the Agreement contains various price adjustment mechanisms and materia! deviation clauses to provide a level of assurance that the hourly energy shape provided by the project and the resulting avoided cost calculation is an accurate estimate of the project's expected energy production. Evaluation of materia! deviations will be on a case-by-case basis for each project. Numerous factors will be considered in determining the impact of material deviations, some of those factors being time, magnitude, and frequency of the deviations, as well as whether the pricing adjustments within the Agreement are adequately addressing the deviations, etc. The response to this Request is sponsored by Randy C. Allphin, Energy Contract Coordinator Leader, ldaho Power Company, in consultation with Donovan E. Walker, Lead Counse!, ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 2 REQUEST NO. 4: If the entire pricing is considered fundamentally flawed, what actions would ldaho Power take? RESPONSE TO REQUEST NO. 4: Idaho Power would determine the most appropriate action on a case-by-case basis and at the time the material breach occurred. Please see the Company's response to Staffs Request No. 3 above. The action taken will be intended to protect ldaho Power customers' interests and ldaho Power will seek the ldaho Public Utilities Commission's approva! of the action at the time it is required. Some examples of actions that could be taken are termination of the Agreement, recalculation of future contract year avoided cost payments, collection of damages, etc. The response to this Request is sponsored by Randy C. Allphin, Energy Contracts Coordinator Leader, ldaho Power Company, in consultation with Donovan E. Walker, Lead Counsel, ldaho Power Company. DATED at Boise, ldaho, this 2nd day of December 2014. IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 3 AN E. WALKER Attorney for ldaho Power Company CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 2nd day of December 20141 served a true and correct copy of IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY upon the following named parties by the method indicated below, and addressed to the following: Gommission Staff Kristine A. Sasser Deputy Attomey General ldaho Public Utilities Commission 47 2 W est Washington (83702) P.O. Box 83720 Boise, ldaho 83720-007 4 Murphy Flat Power, LLG Ron Williams Williams Bradbury, P.C 1015 West Hays Street Boise, ldaho 83702 Ben Fairbanks Director, Development First Wind Hand Delivered U.S. Mail Overnight Mail FAXX Emai! kris.sasser@puc.idaho.gov Hand Delivered U.S. Mail Overnight Mail FAX Email ron@williamsbradburv.com Hand Delivered U.S. Mail Overnight Mai! FAX Email bfairbanks@firstwind.com Christa Bearry, Legal Assistant IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REOUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 4