Loading...
HomeMy WebLinkAbout20140425Staff 1-15 to IPC.pdfKARL T. KLEIN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, TDAHO 83720-0074 (208) 334-0320 IDAHO BAR NO. 5156 Street Address for Express Mail: 472W. WASHINGTON BOISE, IDAHO 83702-5918 Attorneys for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF ) IDAHO POWER COMPANY FOR AUTHORTTY ) CASE NO. IPC-E-14-05 TO TMPLEMENT POWER COST ) ADJUSTMENT (PCA) RATES FoR ELECTRIC ) rrRsr pRoDUCTToN SERVICE FROM JUNE 1,2014 THROUGH MAY) REeUEST OF THE 31,2015, AND TO UPDATE BASE RATES IN ) COwTMISSION STAFF TO COMPLIANCE WITH ORDER NO.33OOO ) IDAHO POWER COMPANY The Staff of the Idaho Public Utilities Commission requests that Idaho Power Company (Company; IPC) provide the following documents and information as soon as possible, by FRIDAY, MAY 2,2014.1 This Production Request is to be considered as continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of the person preparing the documents. Please identiff the name, job title, location and telephone number of the record holder. ' Staff is requesting an expedited response. If responding by this date will be problematic, please call Staff s attorney at (208) 334-0320. FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY I APRIL 25,2014 In addition to the written copies provided as response to the requests, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 1: Please provide the monthly Idaho jurisdictional base sales in megawatt hours (MWh at customer meter) which makes up the annual sales amount used to determine Idaho base rates for the PCA defenal period (April I , 2013 through March 30, 2014) . REQUEST NO.2: Please provide the same monthly base sales (MWh at customer meter) referenced in Request No. 1, but for the Idaho Power system. REQUEST NO. 3: Please provide the monthly Idaho jurisdictional load at generation used to calculate the Load Change Adjustment Rate (denominator of LCAR) for the PCA deferral period. REQUEST NO. 4: Please provide the monthly base system loads (MWh's) measured at generation that produces the base Net Power Supply Expense (NPSE) included in the Company's filing. If there are differences between these loads and the loads shown on line 11 of Company Exhibit No. 5, please quantiff and explain the difference. Also, please quantify and explain the difference between these loads and the loads referenced in Request No. 3 other than differences due to jurisdictional allocation. REQUEST NO. 5: Please provide the monthly Idaho allocation of the loads (MWh's) referenced in Request No. 4. Also, please describe how the figures are measured or derived and include all calculations in a spreadsheet with formulas intact, REQUEST NO. 6: Please provide the monthly actual system loads (MWh's) measured at generation that produced the actual NPSE included in the Company's filing. Describe how the figures are measured or derived and include all calculations in a spreadsheet with formulas intact. If there are differences between these loads and the loads shown on line l0 of Company Exhibit No. 5, please quantiff and explain the difference. Also, please explain in detail what the FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY APRIL 25,2014 Company means by "Actual Firm Load-Adjusted" as shown on line 10 of Company Exhibit No. 5 and quantify what is meant by "adjusted." REQUEST NO. 7: Please provide the monthly Idaho allocation of the loads in the above request. Also, please describe how the figures are measured or derived and include all calculations in a spreadsheet with formulas intact. REQUEST NO. 8: Please provide the actual monthly sales (MWh's measured at customer meter) for the system and for the Idaho jurisdiction. Amounts should reflect actual sales in the months that the loads occurred (i.e., billing cycle adjusted). Please describe how the amounts are measured, describe the method used to adjust for the billing cycle, and include all calculations in a spreadsheet with formulas intact. REQUEST NO. 9: Did the Company include Qualiffing Facility costs and Demand Response incentive payments in the LCAR numerator that the Company used to determine the Load Change Adjustment for any part of the deferral period in the Company's filing? If so, please provide documentation showing that the Company included these costs and payments in the Load Change Adjustment. REQUEST NO. 10: Did the Company include any sulfur dioxide (SO2) sales or Renewable Energy Credits in base rates over the deferral period? If so, were any of these amounts in the base included in the numerator of the LCAR that the Company used to determine the Load Change Adjustment for any part of the deferral period in the Company's filing? If so, please provide documentation showing that the Company included these costs in the Load Change Adjustment. REQUEST NO. 11: Please provide the workpapers used to derive the $8,290,603 in forecasted Idaho jurisdictional demand response payments through March 2015. FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY APRIL 25,2014 REQUEST NO. 12: Please provide the monthly total of actual Idaho jurisdictional demand response payments made in the 2013 through2014 PCA year by program. As part of this response, please state which part of the payments are "continuity payments" and which part of the payments are related to a load-reduction product. REQUEST NO. 13: Of the Idaho jurisdictional demand response payments made in the 2013 through2}l4 PCA year related to load reduction, please provide the amount of load curtailment contracted by week andlor month. REQUEST NO. 14: Please provide the monthly demand-side management (DSM) rider revenue and DSM-related expense forecasts through May 2015 that result in $26 million surplus cited on page26 of Mr. Tatum's testimony. Please provide DSM-related expenses by class and program. REQUEST NO. 15: Please provide the forecasted energy savings for Idaho Power's energy efficiency portfolio in 2014 and 201 5. Please provide these savings by customer class and program. DATED at Boise, Idaho, this 2 f y day of April2}l4. Technical Staff: Mike Louis/l-10 Stacey Donohue/l 1-15 i:umisc:prodreq/ipce l4.5kkmlsd prod req I FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY /(J //L Karl T. Klein Deputy Attorney General APzuL 25,2014 I HEREBY CERTIFY THAT I SERVED THE FOREGOING FIRST COMMISSION STAFF TO IDAHO IPC.E-I4.05, BY MAILING A COPY FOLLOWING: LISA D NORDSTROM IDAHO POWER COMPANY PO BOX 70 BOrSE rD 83707-0070 E-MAIL: lnordstrom@idahopower.com dockets@idahopower. com CERTIFICATE OF SERVICE HAVE THIS 25TH DAY OF APRIL 2014, PRODUCTION REQUEST OF THE POWER COMPANY, N CASE NO. THEREOF, POSTAGE PREPAID, TO THE TIMOTHY E TATUM GREG SAID IDAHO POWER COMPANY PO BOX 70 BOrSE rD 83707-0070 E-MAIL: ttatum@idahopower.com gsaid@idahopower.com CERTIFICATE OF SERVICE