Loading...
HomeMy WebLinkAbout20131114Volume II.pdfnntntr'!.4 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPANYIS APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE INVESTMENT IN SELECTIVE CATALYTIC REDUCTION CONTROLS ON .JIM BRIDGER UNITS 3 AND 4. CASE NO. rPC-E-13-1 6 TECHNICAL HEARING rrJ _.: ..,,1 c,.) (.,J1 HEARING BEFORE COMMISSIONER MARSHA H. SMITH (Presiding) COMMISSIONER MACK A. REDFORD COMMISSIONER PAUL KJELLANDER PLACE:Commission Hearing Room 472 Vflest Washington StreetBoise, Idaho November 'l , 20L3 rr Pages 206 361 DATE: VOLUME ,a-t-\ EII -nl.^HE POST OFFICE BOX 578 BOISE, IDAHO 83701 208-336-9208 HEDRICK COURT REPORTING ,9edy tb 4/a/ wwwt?,etoo lfr8 l_ 2 3 4 5 6 '7 I 9 10 11 L2 13 L4 15 t6 t7 18 T9 20 21, 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD APPEARANCES For the Staff:KRISTINE A. SASSER, Esq. Deputy Attorney General- 412 West Washj-ngton Boise, Idaho 83102 LISA D. NORDSTROM, Esq. -and- JENNIFER REINHARDT-TESSMER, Esq. Idaho Power Company L22L West Idaho Street Boise, Idaho 83702 For ldaho Power Company: For Industrial Customers Idaho Power: of RICHARDSON ADAMS, PLLC by PETER J. RICHARDSON, Esq. 5l-5 North Twenty-seventh Street Boise, Idaho 83616 For Idaho Conservation League: BENJAMIN J. OTTO, Esq. fdaho Conservation League 710 North Sixth Street Boise, Idaho 83102 McDEVITT & MILLER, LLPby DEAN J. MILLER, Esq. 420 Vfest Bannock Street Boise, Idaho 83702 For Snake River Alliance: 83701 APPEARANCES 1 2 3 4 5 6 1 I 9 10 l-1 72 13 t4 15 L6 L7 18 1,9 20 2L 22 23 24 25 INDEX WITNESS EXAMINATION BY PAGE Michael \T. Youngblood(Idaho Power Company) Ms. Reinhardt-TessmerPrefiled DirectPrefiled RebuttalMr. Richardson (Cross) Mr. Miller (Cross) Mr. Otto (Cross) Ms. Reinhardt-TessmerMr. Mi1ler (Recross) Ms. Sasser (Direct) Prefiled Direct Ms. Reinhardt-TessmerMr. Mil-l-er (Cross )Ms. Sasser (Redirect) Ms. Sasser (Direct) Prefil-ed Direct Ms. Reinhardt-TessmerMr. Richardson (Cross) Mr. MiIler (Cross) Mr. Otto (Cross) Ms. Sasser (Redirect) ( Direct ) 206 209 23]- 243 250 265(Redi) 27L 272 213 275 (Cross) 28L 284 285 286 288 (Cross ) 322 325 326 329 336 Patricia Harms ( Staff ) Mike Louis ( Staff) Dr. Don Reading ( Industrj-al- Customers fdaho Power) of Mr. Richardson (Direct) Prefiled Direct Ms. Sasser (Cross) Ms. Nordstrom (Cross) Commissioner Smith EXHIBITS 340 342 351 354 35s NUMBER PAGE Fgr, Idaho Power Company: 1 . (Conf idential- ) For Staff: PremarkedAdmitted 243 l-01.( Confidential )PremarkedAdmitted 322 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD INDEX EXHIBITS83701 1 2 3 4 5 6 7 8 9 10 11 1"2 13 L4 15 L6 77 18 l_9 20 2L 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD 702. 103. (Conf idential- ) (Confidential ) PremarkedAdmitted 322 Premarked Admitted 322 Eor IndustriaL Customers of Idaho Power: 201-.Don C. Reading Curricul-um Vitae, 4 pgs PremarkedAdmitted 351 For Idaho Conservation League: 301-.(Renumbered from Exhibit No. 302)Marked 359Admitted 359 For Snake River Alliance: 401 403 472 Admitted 359 Admitted 359 83701 EXHIBITS 1 2 3 4 5 6 1 I 9 10 11 L2 13 L4 15 16 77 1B 19 20 27 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (Di) IPC BOTSE, TDAHO, NOVEMBER 7, 20t3, ]-245 p.M. COMMISSIONER SMITH: Wel-come back. Werre ready to begin again. Ms. Nordstrom, I believe werre wj-th you. MS. NORDSTROM: Ms. Reinhardt-Tessmer will be taking it from here. COMMISSIONER SMITH: Oh. MS. REINHARDT-TESSMER: Idaho Power cal-Is Michael- Youngblood. COMMISSIONER SMITH: And weLcome to our hearing room. MS. REfNHARDT-TESSMER: Thank you. M]CHAEL J. YOUNGBLOOD, produced as a witness at the instance of Idaho Power Company, being first duly sworn, was examined and testified as fo11ows: DTRECT EXAMINATION BY MS. REINHARDT-TESSMER: O. Good afternoon, Mike. A. Good afternoon. O. Can you please state your name and speI1 your l-ast name for the record? 206 83701 1_ 2 3 4 5 6 7 B 9 10 11 L2 13 !4 1-5 1,6 77 1B 19 20 2t 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (Di) IPC A. Michael- J. Youngblood. Last name is spelled Y-O-U-N-G-B-L-O-O-D. O. By whom are you employed and what is your current position? A. I'm employed with Idaho Power Company, and my current position is I am the manager of regulatory projects. O. Are you the same Michael Youngblood that filed direct and rebuttal- testimony in this case? A. f am. O. Do you have any corrections or additions to that testimony? A. I do not. O. And if I were to ask you the same questions that are outlined in your prefiled testimony, woul-d your responses be the same today? A. Yes, they wou1d. MS. REINHARDT-TESSMER: If it would please the Commission, I move for Michael YoungbJ-ood's prefiled direct testimony along with Exhibit 7 and his prefiled rebuttal- testimony be admitted onto the record and into evidence. COMMISSIONER SMITH: Without objection, we wil-1 spread the prefil-ed direct and rebuttal testlmony of Mr. Youngblood upon the record as if read, and admit Exhibit 7. (The fol-lowing prefiled dj-rect and 20't 83701 1 2 3 4 5 6 7 B 9 10 11 l2 13 !4 15 L6 17 18 19 20 2t 22 rebuttal testj-mony of Mr. Youngblood is spread upon the record. ) 208 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (Di) IPC 23 24 25 83701 o 1 Q. Please state your name and business address. 2 A. My name is Michael J. Youngblood and my 3 business address is L22l West Idaho Street, Boise, Idaho. 4 Q. By whom are you employed and in what 5 capacity? 5 A. I am employed by Idaho Power Company ("Idaho ? Power" or "Company") as the Manager of Regulatory Projects 8 in the Regulatory Affairs Department. 9 Q. Please describe your educati-onal background. 10 A. In May of L917, I received a Bachelor of 11 Science Degree in Mathematics and CompuEer Science from the 12 University of Idaho. Erom 1994 through L996, I was a 13 graduate student in the Executive MBA program of Colorado 14 State University. Over the years, f have attended numerous 15 industry conferences and training sessions, including 16 Edison Electric Institute's "Electric Rates Advanced L'l Course. " 18 O. Please describe your work experience with 19 Idaho Power Company. 20 A. I began my employment with Idaho Power in 2L 1911. During my career, I have worked in several 22 departments of the Company and subsidiaries of IDACORP, 23 including Systems Development., Demand Planning, Strategic 24 Planning and IDACORP Solutions. From 1981 to 1988, I 25 worked as a Rate Analyst in the Rates and Planning YOUNGBLOOD, Dr 1 Idaho Power Company 249 1- Department where I was responsible for the preparation of 2 electric rate design studies and bill frequency analyses. 3 I was also responsible for the validation and analysls of 4 t,he Load research data used for cost, of service 5 allocations. 6 From L98B through I99L, I worked in Demand Planning 7 and was responsible for the load research and load B forecasting functions of the Company, including sample 9 design, implemenEaLion, data retrieval, analysis, and 10 reporting. I was responsible for the preparation of the 11 five-year and twenty-year Ioad forecasts used in revenue 12 projections and resource plans as welI as the present,ation 13 of these forecasts to the public and regulatory \4 commissions. 15 From 1991 through 1998, r worked in Strategic 16 Planning. As a Strat,egic Planning Assoeiate, f coordinated 11 the complex efforts of acquiring Prairie Power Cooperative, 18 the first acquisit.ion of its kind for the Company in forty 19 years. I was Ehe team leader on combined departmental 20 efforts responsible for evaluating performance based 2L regulation and reviewing potential telecommunications 22 business opportunities as a direct resulE of changes in 23 telecommunication legislation. Erom L996 to 1998, as a 24 part of a Strategic Planning initiative, I helped develop 25 and provide two-way communication between cust,omers and YOUNGBLOOD, DI 2 Idaho Power Company 2L0 L energy providers using advanced computer technologies and 2 teleconmunications. 3 From 1998 to 2000, I was a General Manager of 4 IDACORP Solutions, a subsidiary of fDACORP, reporting to 5 the VP of Marketing. I was directly responsible for the 6 direction and management of the Commercial & Industrial 1 (*C&I") Business Solutions division. f had the overall B responsi.bility for the research, development and 9 implementation of new products and services for C&I 10 customers. These new products and services included energy 11 information services, biII payment and management products, 12 facility monitoring, telecommunication and interne! 13 services, onsite generation and power quality analysis. I L4 was directly involved in the direction and product 15 development of the Allied Utilities Network, an alliance of 16 utilities with the common goal of providing products and L1 services for their respective customers as well as the 1B growth of those services into new territories, including 19 national and regional accounts. 20 fn 2001, I returned to the Regulatory Affairs 2l Department and worked on special projects related to 22 deregulation, the Company's Integrated Resource Plan, and 23 filings with both the Idaho Public Utilities Commission 24 ("Commission" or 'IPUC") and the Public Utility Commission 25 of Oregon (*OPUC"). yoUNGBLOOD, Dr 3 Idaho Power Company 27L L In 2008, T was promoted Eo the position of Manager 2 of Rate Design for Idaho Power. In that posiEion I was 3 responslble for the management of the rate design 4 strategies of the Contpany as well as the oversight of aII 5 tariff administration. 6 In January of 2012, I became the Manager of 7 Regulatory ProJects for Idaho Power, which is my current 8 position. In this position, I provide the regulatory 9 support for many of the large individual projects and 10 issues currently facing the Company. Most recently that 11 has included providing regulatory support for the inclusion LZ of the Langley Gulch pohrer plant investment in rate base 13 and supporting t,he Company's efforts to address numerous 14 issues involving Qualifying Facillties (*QF") as defined 15 under the Public Utility Regulatory Policies Act of 1978 16 ("PURPA") , including t.he Company's efforts in Case No. GNR- l7 E-11-03, the review of PURPA QF contract provisions. 18 I. O\IERVIEI.I L9 0. What it the purpose of your testimony in 20 this matt,er? 2L A. The Company is reguesting t,he IPUC issue a 22 Cert,ificate of Public Convenience and NecessiLy (*CPCN") 23 related to the Selective Catalytie Reduction ('SCR") 24 invest.rnents planned for Jim Bridger Unit 3 and Jirn Bridger 25 Unit 4 ("the Project"). In my testimony, I will briefly YOUNGBLOOD, DI 4 Idaho Power Company 2t2 1 describe the portfolio analysis of coal-fired generation 2 alternatives developed for the Company's 2013 Integrated 3 Resource Plan (*2013 fRP"). The 2013 IRP is being filed 4 concurrently with this filing in Case No. IPC-E-13-15 and 5 is Attachment 4 to the Application in this case. 6 In addition, I wiII present the cost estj-mates for 7 the Jim Bridger SCR systems and the estimated revenue I requirement impact of including that investment in the 9 Company's rate base. Finally, I wiII discuss the Company's 10 request for the Commission to provide authorization and lL binding ratemaking treatment for the Company's SCR 12 investments in Jim Bridger Units 3 and 4 pursuant to Idaho 13 Code S 61-54L. 14 a. The Company has filed a number of CPCNs for 15 peaking facilities over the last decade, and most recently, 16 for the Company's combined-cycle combustion turbine project 11 at the Langley Gulch power plant. fs this request for a 18 CPCN different from those requests? 79 A. Yes it is. Most of the Company's previous 20 requests for a CPCN were for new generating plants. This 21 requesE is different in that it is for the addition of 22 emj-ssion equipment required for the Company to remain 23 compliant with environmental regulations at an existing 24 generation resource. The Jim Bridger Plant is already a 25 valued part of the Company's generation fleet, and in fact, YOUNGBLOOD, Dr 5 Idaho Power Company 2L3 1 as noted in Ms. Lisa Grow's testimony, is the Company's 2 lowest cost thermal plant. The Jim Bridger Plant is 3 currently included as production plant in the Company's 4 rate base. Ongoing operation and maintenance of the plant, 5 including the invest,ment in emission controls mandated by 6 state or federal environmentaJ. regulations, would noE 7 typically be an investmenE for which the Company would 8 request a CPCN. 9 Q. why then is the Company reguesting a CPCN at 10 this time? 11 A. As described in Ms. Grow's testimony, the 12 Company is requesting a CPCN for the SCR investment beeause 13 of the magnitude of the investment and the uncert,ainty 14 surrounding coal-fired generation in today's politisal and 15 social environment, as weII as the amount of interest 16 expressed by stakeholders. L7 O. P1ease generally describe the Project, for 18 which the Company is requesting a CPCN. 19 A. The Project refers to the Company's 20 investment in SCR systems Eo reduce the emissions of 2l nit.rogen oxide for Jim Bridger Units 3 and 4. A complete 22 discussion of the specific emission conErols and equipment 23 reguired for the Project can be found in Mr. Tom Harvey's 24 testlmony. 25 YOUNGBLOOD, DI 6 Idaho Power Company 21,4 1 Q. Why are the investments in SCR systems at 2 Jim Bridger Units 3 and 4 necessary? 3 A. The Best Available Retrofit Technology 4 Appeal Settlement Agreement and the Wyoming Regional Haze 5 State Implementati-on Plan ("Wyoming Regional Haze SIP-) 5 require the inst.allation of SCR systems on ,.Iim Bridger 7 Unit 3 by the end of 2015 and on Jim Bridger Unit 4 by the 8 end of 2016. On ltlay 23, 201-3, the Environmental 9 Protection Agency (*EPA") proposed to approve t.he Wyoming 10 Regional Haze SIP for installation of SCR systems on Jim 11 Bridger Units 3 and 4 in 2015 and 2016, respectively, as l2 outlined in the SIP- The EPA has indicated it wiII sign 13 a not,ice of final rulemaking on November 2L, 2OL3. This t4 would make these emission reduction reguirements at, Jim 15 Bridger Units 3 and 4 federally enforceable as we1l. This 16 is discussed more fully in Mr. Harvey's t.estimony. fn Ll order for the continued operation of the plant to be 1B compliant with environmental regulation, it will be 19 mandatory for the SCR systems to be installed at Jim 20 Bridger Units 3 and 4. 2L O. When do the SCR emission control systems for 22 Jim Bridger Units 3 and 4 need to be installed and 23 operational? 24 A. fn order to be compliant with these current 25 state and anticipated future environmental regulations, and 2L5 YOUNGBLOOD, Dr '1 Idaho Power ComPany 1 enable continued operation of the Jim Bridger Plant, the 2 SCR emission control systems for Jim Bridger Units 3 and 4 3 must be installed and operational by December 31, 2015, and 4 December 31-, 20L6, respectively. 5 Q. Is Idaho Power solely responsible for the 6 SCR investments for the Project.? 1 A. No. Idaho Power is not the sole owner of I the Jim Bridger Plant. The Company is a one-third partial 9 owner of the plant, the remaining two-thirds being owned by 10 PacifiCorp. PacifiCorp is also the operating partner of 11, the plant. Nevertheless, while the decision to add SCR L2 systems to Jim Bridger Units 3 and 4 does not solely reside 13 with Idaho Power, t,he Company did conduct its own L4 independenr analysis to determine if the additiqn of SCR 15 systems was econornically prudent - This analysis is 16 discussed in greater detail in Mr. Harvey's testimony. 11 O. What did the Company conclude from the 18 results of the economic analysis discussed by Mr. Harvey? 19 A. Based upon the economic analysis discussed 20 in Mr. Harvey's testimony regarding both the Science 21 Applications International Corporation (*SAIC") and Idaho 22 Power evaluations analyzing the installation of SCR systems 23 at rlim Bridger Units 3 and 4, t.he Company's conclusion is 24 that compared to alternative compliance options, the 25 installation of the SCR systems is the lowest incremental YOUNGBLOOD, DI 8 Idaho Power Company 2t6 1 2 3 4 5 6 7 I 9 cost and least risk option, and therefore, a prudent economic decision for t,he ongoing operation of the Jim Bridger Plant. II. 2OL3 IRP A}IALYSIS o.Subsequent to the Company's conclusion that the installation of SCR systems is the prudent economic decision for the ongoing operation of the Jim Bridger Plant, did the Company nonetheless evaluate any potential reduction or early retirement of its existing coal-fired 11 t2 13 L4 15 16 l1 1B 19 20 2L 22 23 24 25 10 resources? A.Yes. As part of the development of the Company's 2013 fRP, the Company included four resource planning portfolios that explored options for reducing the amount of coal-fired generation in Idaho Power's generation portfolio. The options to reduce t,he reliance on coal included replacement with natural gas-fired generation, increased demand-side measures including demand response, changing the fuel at the North Valmy plant to natural 9ds, and the Boardman to Hemingway transmissj-on line. Two of the portfolios specifically ceased coal-fired operations at the Company's Jim Bridger and North VaImy coal plants (the Boardman coal plant ceases coal-fired operations at year- end 2020 in aII resource portfolios). YOUNGBLOOD, DI 9 Idaho Power Company 2L7 1 O. What were the results of the 20L3 IRP 2 analysis with regard to the portfolios that eliminated a 3 coal-fired resource at the Jim Bridger P1ant? 4 A. As described on pages 93-94 of Attachment 4 5 to the Application, Portfolios 6 and 7 ceased coal-fired 6 operations at the Company's Jim Bridger and North Valmy 7 coal plants. These tbro portfolios ranked as the two I highest cost resource portfolios of the nine portfolios 9 analyzed. As shown on Table 9.2 on page 98 of Attachment 10 4, PortfoLio 6 had a net present value for the 20-year 11 planning period (20L3-24321 that was S1r5L2,173,000 more LZ costly than the Company's preferred portfolio, and 13 Portfolio 7 was $1,785,578,000 more costly. 14 O. Based upon the analysis conducted in the 15 20L3 IRP, ls rhe continued operatlon of the coal-fired 16 resource aE the Jim Bridger Plant cost-effective? L1 A. Yes. As noEed on page 113 of Attachment 4, 18 the Company's preferred resource portfolio in the 20L3 IRP 19 is Portfolio 2. Resource Portfolio 2 includes continued 20 operations at the Jim Bridger and North Valmy coal plants. 2L Idaho Power intends to operate it,s facilities, including 22 the coal-fired generation plants, in full compliance wit,h 23 environmental regulations. 24 25 YOUNGBLOOD, DI 10 Idaho Power Company 2'18 O. Do you believe the 2013 IRP was sufficient 2 Ln analyzing the complexities surrounding coal-fired 3 generation? A. Yes. I believe the 2013 IRP, in addition to 5 the previously fileci Coal Study, adequately analyzes the 6 Company's options for compliance while supporting its 7 obligation to reliably serve the electricity needs of its 8 customers. The ldaho Power resource planning process has 9 four primary goals: 10 (1) Identify sufficient resources to 11 reliably serve the growing demand for energy within the 12 Idaho Power service area throughout the 20-year planning O 13 period. 14 (2\ Ensure the selected resource portfolio 15 balances cost, risk, and environmental concerns. 15 (3) Give equal and balaneed treatment to 17 supply-side resources, demand-side measures, and 1B transmissi-on resources. 19 (4) Involve the public in the planning 20 process in a meaningful way. 2L IRP analyses are conducted by the Company on an 22 ongoing basis with the formal fRP document being filed for 23 acceptance with the IPUC and acknowledgement with the OPUC 24 every two years. 25 2L9 YOUNGBLOOD, DI 11 Idaho Power Company III. PROJECT COST ESTIIATE O. Has the Company determined a total project cost estimate for Idaho Power's share of the Project ("Project Cost") ? A.Yes. The total cost of the Project, before Allowance for Funds Used During Construction ("AEUDC") is 9353,843,886. fdaho Power's share of that amount, the Project Cost, is one-third, or $117,947,962, comprised of a $57,649,113 investment in Jim Bridger Unit 3 and a $60,298,849 investment in .lim Bridger Unit 4r before AFUDC. 1 2 3 4 5 6 1 I 9 10 1l L2 13 L4 15 16 l1 a. A. What is included in the Project Cost? Confidential Exhibit 7 shows the budget, projections for each cost description by year for Jim Bridger Units 3 and 4. The largest portions of the total Project Cost estimate are the costs included under the engineer, procure and construct contract ('EPC Contract") 0.Has a contracL been signed with an EPC 18 Contractor? 19 A.Yes.As discussed in Mr. Harvey's of the extent of the Project and the time it takes to plan, permit, and construcE SCR systems, and the final ruling from t.he EPA on approval the Wyomlng Regional Haze SIP that systems at Jim Bridger Units 3 and 4, a YOUNGBLOOD, Dr L2 Idaho Power Company 20 testimony, because 2L extended period of 22 engineer, procure, 23 uncertaint,y of Ehe 24 of the portion of 25 addresses the SCR 220 1 Limited Notice to Proceed (*LNTP") contract, was signed 2 with the successful bidder on May 31, 20L3. O. Has PacifiCorp, the majority ohrner and plant 4 operator, made regulatory filings similar to this filing by 5 Idaho Power? 6 A. Yes. As indicated by Mr. Harvey, in August 1 20L2, PacifiCorp, d/b/a Rocky Mountain Power, filed a CPCN I with the lrlyoming PubIic Service Commission ("Wyoming 9 Commj-ssion") to construct two SCR systems on units 3 and 4 10 of the Jim Bridger Plant, ds weII as a "voluntary request lL for approval of resource decision to construct SCR systems L2 on Jim Bridger units 3 and 4" with the Public Service 13 Commission of Utah ("Utah Commission"). L4 15 O. 9{hat. were the results of those filings? A. On May 10, 2013, the Utah Commission issued Based on the foregoing discussion andthe evidence presented in this case, w€ approve the Company's resource decision to construct SCR systems to achieve 0.07 Ibs,/MMBIu limits at Bridger Unit 3 by 2015, and Unit 4 by 20L6, as described in the Application. We find the Company has demonstrated the Bridger SCR Project is the least-cost means, adjusted for risk, to meet the emlssions limits for Bridger Units 3 YOUNGBLOOD, Dr 13 Idaho Power Company L6 a final Report and Order approving the resource decision to L1 construct the SCR systems, which is included as Attachment l-B 2 lo the Application. The Utah Commission's conclusions 79 are provided below: 20 2L 22 23 24 25 26 21 2B 29 30 227 L 2 3 4 5 6 7 I 9 10 1t L2 13 L4 t5 16 L7 18L9 Docket20 May 10, 2L 22 Company's proposed t,iming forcompleting t,he Project wilI benefitratepayers by avoiding increasedProject cost due to the requirernents ofa compressed construcEion schedule andpossible additional outages. Coordinat.ing the timing of the Projectwith the four-year maintenanceschedules of the Bridger P1ant alsowill manage costs and risks associatedwith potential replacement power costwhile the Project is implemented.Importantly, this timing will also ensure the Project is completed in timeto meet the Wyoming SIP deadlines. No. L2-035-92, Commission Report and Order, issued 2013, pdge 32). on May 29, 2013, the Wyoming Commission issued a and 4 established by emission standards. We UIe conclude there addltional service the wyomingalso find the is need forwhich warrants 23 final order approving the CPCN for Ehe SCR upgrades, which 24 ls included as Attashment 3 to the Appllcatlon. A summary 25 26 27 28 29 30 31 32 33 34 35 36 31 3B 39 4o 47 42 43 44 of the Wyoming Comrnission's conclusions is provided below: construction of the proposed SCR upgrades to Bridger Units 3 and 4 based upon our findings, which are supportedby the t.estimony of the intervenors asweII as the Application and testimony and exhibits of RMP. We concl-ude that: Ii ] the proposed expenditures are reasonable and in thepublic int,erest, Iii ] the present andfuture public convenience and necessityreguire the construction and operationof SCR upgrades to Bridger Units 3 and4, and tiiil a CPCN should be issued inthis case. RMP has carried its burdertsof proof and persuasion. It is in thepublic interest that the certificate be YOUNGBLOOD, DI 14 Idaho Power Company 222 1 2 3 4 o. issued. (Docker No. 20000-418-EA-1_2, Record No. 13314 paragraphs 84-86). What amount has the Company determined to be Cost includinq AEUDC ("Total Commitment5 the Project 6 Estimate") ? 7 8 9 10 11 L2 A.The Total Commitment Estimate for the Project is the Project Cost of $L1,7,941 ,962 plus $11,889,43L in AFUDC. The Total Commitment Estimate for the Project, including AFUDC, is $129,837,393. Of this amount, $62,923,521 is the Commitment Estimate for Jim Bridger Unit 3 and $66,913,866 is the Commitment Estimate A.Based on the EPC Contract, actual eosts incurred in the development phase and the forecast estimates of the work to be completed, Idaho Power is able to make a reliable estimate of the total capital cost of the Project. As it has done in prior CPCN applications, fdaho Power has termed this estimate a "Commitment Estimate." The Commitment Estimate is a good faith estimate of Idaho Power's total capital cost, including AFUDC, and additional costs the Company anticipaEes it wiIl incur but cannot quantify with precision at this time. YOUNGBLOOD, DI ]-5 Idaho Power Company 13 for Jim Bridger Unit 4. L4 O. Please clarify what you mean by the term 15 Commitment Estimate. L6 L-t 18 19 20 2l 22 23 24 25 223 L Idaho Power's Total Cornmj-tment Estimate for the Project is 2 $t29,831,393. 3 Q. What is the estimated revenue requirement 4 impact of these proposed additions to the Company's rate 5 base? 6 A. Based upon the system invesEment stated 7 above, Ehe Company performed a high-IeveI jurisdictional 8 revenue requirement analysis. Based upon the current 9 )urisdictional split between Idaho and Oregon, the Idaho 10 jurisdictional addition to productlon plant would be 11 $60, L96,724 for investments at Jim Bridger Unit, 3 and L2 $64,0L4,LAL for investment at Jim Bridger Unit 4. At the 13 Company's current rate of return, the additional annual 14 revenue requlrement for Jim Bridger Units 3 and 4 would be 15 approxi-mately $9-1 million and 99.7 million, respectively. 16 rV. RTQTTESTED REGUT.ATOBY TREAtt{Elfil 11 O. What regulatory treatment is the Company 18 requesLing as part, of this CPCN request? 19 A. The Company is requesting that the 20 Commission issue a CPCN order by November 29, 2013. 2L Pursuant to ldaho Code S 67-547, Ehe Company is requesting 22 that Ehe Commission provide Idaho Power with aut,horization 23 and a binding commitmenE to provide rate base treatment for 24 the Company's capital investment in the SCR sysEems at Jim 25 Bridger Units 3 and 4 in the amount of the Total Commitrnent YOUNGBLOOD, DI 16 Idaho Power Company 224 1 2 3 4 5 6 1 B 9 10 t1 t2 13 L4 15 76 L1 18 1.9 20 21 22 23 24 25 Estimate of 5129,837,393. Of that amount, the Commitment Estimate of $62,923,52'7 for the investment in Jim Bridger Unit 3 would be closed-to-plant and authorized for cost recovery on or after January 1, 20L6, and the Commitment Estimate of $66,913,866 for the investment in Jim Bridger Unit 4 would be closed-to-plant and authorized for cost recovery on or after January L, 2OL1. If binding ratemaking is approved for the Total Commitment Estimate of $129,83'1,393, the Company could be assured that amounts incurred up to the Commitment Estimate amount would be determined to be prudent. Should the cost of the ProjecL be less than the Corunitment Estimate, the savings would directly benefit the customer through a lower amount in rate base- on the other hand, should the Project come in over the Conunitment, Estimate, fdaho Power would have to demonstrate to the Commission that amounts above the Commitment Estimate were prudently incurred and should be recovered in rates. The return on equity the Company expects to earn on the Project investment is the authorized rate in effect at the time the Project is placed in service. Idaho Power wiIl depreciate the investments over the remaining Iife of the Jim Bridger Plant in accordance with the IPUC-approved depreciation rates in effect at the time the investment is YOUNGBLOOD, DI L7 Idaho Power Company 225 t closed-to-plant. The Company's current deprecj.ation rates 2 were approved in Case No. IPC-E-12-08, Order No. 32559. 3 Q. Why is the Company requesting a CPCN order 4 by November 29, 20L3? 5 A. The LNTP concept described above was used 6 to reduce the risk and upfront cosEs of a FuIl Notice to 7 Proceed ("ENTP") until the final ruling from the EPA is 8 released, and to ensure the EPC Contractor can meet t,he 9 deadlines for installation as per the ldyoming Regional 10 Haze SfP. A provision in the LNTP states that December 1, 11 2013, which is defined as che FNTP Date, is Lhe deadllne by L2 which the FNTP must be issued in order for the EPC 13 Contractor t.o attain the Project completion guaranLee dates 14 without requiring a contract change. Idaho Power and 15 PacifiCorp have agreed thatr ds long as the FNTP is issued 16 on or before DeeeftU)eE l, 2013, neither the EPC Contracc L1 price nor the Project guarantee dates wiII be adjusted. lB The Company is requesEing a CPCN order by November 29, 19 2013, so that in the event that a favorabLe CPCN order is 20 issued, the Company will be able to approve PacifiCorp's 2l execution of the FNTP by December L, 2013. 22 O. Why is the Company reguesting the Commission 23 provide authorization and binding ratemaking treatmenL for 24 t.he Company's SCR investments in.Iim Bridger Units 3 and 4 25 pursuant to ldaho Code S 51-541? YOUNGBLOOD, DI 18 fdaho Power Company 226 1 A. Because of the uncertainty and political 2 realities surrounding the topic of coal-fired generation 3 described in the testimony of Ms. Grow, the Company is 4 concerned that decisions made today may be second guessed 5 in the future. Even with a favorable determination 6 provided with a certificate, the risk of disallowance at a 7 future date is a concern for the Company. For that reason, 8 the Company is requesting that the Commission provide 9 binding ratemaking treatment under ldaho Code S 61-541. L0 O. Does Idaho Code S 61-54i- require the lL Commission to make certain determinations regarding Idaho 72 Power's activities as a regulated utility? 13 A. The Iaw provides that the Commission wiII L4 determine r.rhether: (1) the utility has a Commission- 15 accepted integrated resource plan in effect. (2) the 15 Project is in the public interest, (3) the utility has L] considered other resources, (4) the Project is reasonable 18 compared to other resource options such as energy 19 efficiency, demand-side management, and other alternative 20 sources of supply or transmiss.ion, and (5) the utility 2L participates in regional transmission planning. 22 O. Based upon the informati-on the Company has 23 presented in this case, will Ehe Commission be able to make 24 these determinatj.ons with regard to Idaho Power? 25 YOUNGBLOOD, DI L9 Idaho Power Company 227 A. Yes. This information has been addressed in the Company's test,imony, and in the Coal Study and 2013 IRP that are filed with this case. V. SUI!!}!ARY A. In summary, what specifically is the Company Commission to include in its cpctl order? Idaho Power believes that the results of the CoaI Study conducted by the Company (SAIC analysis and Idaho Power's Aurora simulation) and the portfol-io costs ident,ified in the 2013 rRP clearly demonstrate that the investment in SCR systems at .Iim Bridger Units 3 and 4 represent the most cost-effecCive means of assuring continued operation of the Jim Bridger Plant to provide sufficient, resourees to reliably serve the growlng demand for energy within ldaho Poh,er's service area. Even so, the Company believes thar rhe current political and environmenEal climate provides addit.ional risk of future recovery of Company investments and necessitates a transparent public process to review the results that support the Company's conclusion. Therefore, the Company requests the Commission evaluate the merit.s of providing a favorable CPCN order. Specifically, Idaho Power requests Ehat the Commission issue an order approving a CerEificate of Public Convenience and Necessity by November 29, 20L3, which finds that,: YOUNGBLOOD, DI 20 Idaho Power Company l_ 2 3 4 5 6 7 I 9 10 11 12 13 L4 15 16 l1 18 19 20 27 '22 23 24 25 o. requesting the 228 1 (1) The installation of Selective Catalytic 2 Reduction systems planned for Jim Bridger UnJ-ts 3 and 4 is 3 consistent with Idaho Power's resource plans and is an 4 appropriate invest.ment to assure the ongoing compliant 5 operation of the Jim Bridger Pl-ant to reliably serve its 6 customers. 1 (21 Existing wyoming and ant.icipated 8 federal regulations require the installation of Selective 9 Catalytic Reduction systems for Jim Bridger Units 3 and 4 10 by December 3L, 2015, and December 3L, 2OL6, respectively. 11 (3) The approved Total Commitment Estimate L2 for the Project, including $11,889,43L in AFUDC is 13 $L29,83'1,393, which includes a Commitment Estimate for Jim L4 Bridger Unit 3 of $62,923,527 and a Commitment Estimate for 15 Jim Bridger Unit 4 of $66,913,866. L6 (4) Pursuant to rdaho Code S 61-541, the L'7 Commission provides Idaho Power with authorization and a 18 binding commitment to provide rate base treatment, as 19 described previously in my testimony, for the Company's 20 capital investment in SCR controls at Jim Bridger Units 3 2L and 4 and related facilities up to the amount of the Total 22 Commitment Estimate of $129,837,393 at such time the plant 23 is placed into operation. Retail customers wiII receive 24 the full benefit of the Project being completed under the 25 Total Commitment Estimate, while the Company will have the 229 YOUNGBLOOD, DI 2L Idaho Power Company 1 2 3 4 5 6 7 8 9 10 11 72 13 14 15 16 L7 18 19 20 2L 22 23 24 25 opportunity Estimate as o. A. to justify any costs above the Total Commitment prudently incurred for recovery. Does this conclude your testimony? Yes, it does. YOUNGBLOOD, DI 22 Idaho Power Company 230 1 O. Please state your name and business address. 2 A. My name is Michael J. Youngblood and my 3 business address is L221 West fdaho Street, Boj.se, Idaho 4 83702. 5 Q. By whom are you employed and in what 6 capacity? 7 A. I am employed by Idaho Power Company ("Idaho I Power" or "Company") as the Manager of Regulatory Projects 9 in the Regulatory Affairs Department. 10 O. Are you the same Michael Youngblood that 11 previously filed direct testimony in this docket.? L2 A. Yes I am- 13 A. what is the purpose of your testimony in L4 this matter? 15 A. The purpose of my rebuttal testimony is to 15 address certain issues raised in the direct testimony of 11 Idaho Public Utilities Commission ("Comrnission") Staff 18 witness Mike Louis and the direct testimony of the 19 Industrial Customers of Idaho Polrer (*ICIP") witness Dr. 20 Don Reading. Specifically, I will address the issues 2l raised concerning the authorization and binding ratemaking 22 treatment for the Company's Selective Catalytic Reduction 23 ('SCR") J-nvestments in Jim Bridger Units 3 and 4 pursuant, 24 to ldaho Code S 61-541 and the issue regarding the 25 YOUNGBLOOD, REB 1 Idaho Power Company 231 l_ 2 3 4 5 6 7 I 9 10 1L t2 13 l4 t5 16 l7 1B 19 20 2t 22 23 24 25 suggestion of Equity (*ROE") an adjustment to the Company's Return on o.Please describe the recommendations of Staff witness Mr. touis. A.The Company recognizes that Mr. Louis supports the Company's decision to move forward with the emission controL investment project for ,.]im Bridger Units 3 and 4 as prudent action, and that he supports authorization of a Certificate of PubIic Convenience and Necessity ('CPCN") issued under ldaho Code S 6L-526. However, Mr. Louis recommends that only of the of direct costs requested by the Company be authorized for binding ratemaking treatment under Idaho Code S 61-541. 0.what rationaLe did Mr. Louis give for not recomrnendinq the full of direct costs requested by the Company for binding ratemaking treatment? A.On page 20 of his direct testimony, Mr. Louis states that he believes binding ratemaking treatment should be limited to only those expense categories that are necessary, and known and measurable, with a high level of certainty. Based upon that belief, Mr. Louis states that uncertain budgeted amounts for individual project categories should be excluded from preapproval because preapproval of budgeted amounts that are set using "liberal estimating methods or that include slack from contingency YOUNGBLOOD, REB 2 Idaho Power Company 232 1 amounts" allow project managers to spend up to the amount 2 of their authorized budget without regard for potential 3 savings. 4 Q. Does Mr. Louis offer any evidence that the 5 Company's budgeted amounts were established using "liberal 6 estimating methods" or that the contingency dollars 7 included "slack" amounts? B A. No, he did not. 9 Q. Did Mr. Louis offer any explanation for 1.0 suggesting that if the expense categories he recommended to 11 be excluded from preapproved ratemaking were approved and LZ binding, that the project managers would disregard 13 opportunlties to achleve reduetions in costs relatlve to 14 Company commitment estimates? 15 A. No, he did not. 16 a- Is it realistic to assume that exp€nses will 71 be incurred in the categories that Mr. Louis has excluded? 18 A. Yes. While f agree with Mr. Louis that 19 preapproval should be based on expense categories that are 20 determined to be necessary, I believe t,hat Mr. Louis' 2L standard for certainty of costs related to necessary 22 expense categories is unreasonabLe. While the cost 23 ,magnitude of necessary expense categories that are yet to 24 be incurred may not be easily quantifiable, uncertainty 25 does not negate the necessity of those items as part of the YOUNGBLOOD, REB 3 Idaho Power Company 233 1 2 3 4 5 6 l I 9 10 11 L2 13 t4 15 16 L7 18 19 20 2L 22 23 24 25 installation cost of the SCRs. Mr. Tom Harvey describes categories excluded by Mr. Louis ineach of the expense more detail in his are necessary. rebuttal testimony and explains why they o.What amount does the Company recommend the Comrnission consider for preapproved ratemaking treatment? A.The Company stil} requests the Commission provide fdaho Power with authorization and binding commitment to provide rate base treatment pursuant to ldaho Code S 6L-54L, for the Company's capital investment in the SCRs at Jim Bridger Units 3 and 4 in the amount of $L29,837,393, which includes $11,889,431 in Allowance for Funds Used During Construction (*AEUDC"). However, if the Commission rrere to eonsider another approach in determining an appropriate amount for preapproval as suggested by Mr. Louis, the Company would encourage the Commission to consider an approach consistent with the way "uncertain" expense categories were handled in Case No. IPC-E-09-03, the Langley Gulch CPCN case. ltlhile some costs were uncertain or not quantifiable at the time of the appli-cation, Staff and the Commission recognj-zed that those cost categories were prudent and that some amount of expense would be incurred. In Order No. 30892, the Commj-ssion approved Staff's recommendation of an amount for preapproved ratemaking which refl-ected 50 percent of the YOUNGBLOOD, REB 4 Idaho Power Company 234 L 2 3 4 5 6 -t 8 9 10 11 L2 13 14 15 16 t7 18 19 20 2L 22 23 24 25 costs t,hat were known with reasonable certainty would occur, but were not quantifiable at that time. This approach seems more reasonable than to include no costs at aII for expense estimates in categories that are certain to be incurred. O. Using this approach, what additional amounts should be included in the Staff's recommendation for preapproved ratemaking? A. With the uncertainty of whether or not the Low Temperature Economlzer wiII be necessary at all, and uith the unknown nature of the estimates for the Contingency category, it is understandable that Mr. Louis wouLd .recommend excluding these two categories. llowever, in providing treatment consistent with that used in the Langley Gul.ch CPCN dockeL, the additional amounts that should appropriately be included in the Staff's reconrmendatj.on for preapproved ratemaking would include half of the amounts estimated for: the Boiler and Air Pre- heater Reinforcement , the the Flue GasEconomizer Upgrade Reinforcement t.he Spare Parts Allowance and Other Costs (which include lubricants and ammonia reagent,, contracted site construction management and inspection services, cosL for removal and disposal of existing hazardous waste materials YOUNGBLOOD, REB 5 Idaho Power Company 235 1 2 3 4 5 6 7 I 9 t_0 11 L2 13 14 15 L6 l7 18 19 20 2t 22 23 24 25 encountered, conrmunication cost of supplementary plant security and features, etc. ) expense . Under this approach, the Company also recommends including half of the AFUDC amount in excess of tn. I of AFUDC calculated for the actual these reduced amounts Staf f 's recotnmendation, costs incurred through May 31-, 20L3 The sum of would be added to the resultS-ng in an amount of ratemaking treatment. for preapproved o.Do you agree with Mr. Louls' assertion that ofaexcluding unsertain amounts protects against recovery fuII preapproved amount if actual costs are less? A.No. The assertion Mr. Louis makes assumes that just because an amount is preapproved for binding ratemaking treatment, it is the amount that would then be automatically included in rate base. fdaho Power does not believe this is an accurate assumpti-on. fn fact, as Mr. Louis later points out i-n the Company's application, Idaho Power states that if the costs of the project are less than the cost estimate, the savings would directly benefit the customer through a lower amount in rate base. Only the costs that are actually incurred will- be included in rate base, regardless of whether a higher amount was preapproved. YOUNGBLOOD, REB 6 fdaho Power Company 236 1 2 3 4 5 6 7 I 9 10 11. 72 13 14 15 16 L7 18 1.9 20 2t 22 23 24 25 a.ICIP witness Dr. Reading testified that there is no compelling reason for preapproved ratemaking treatment at this time because a full vetting of contested issues could equally occur at the time the Company requests the investment be. included in rates. Do you agree with this conclusion? A. No. The risks inherent in these construction investments are compelling and the subject of national and local debate. The Company understands that absent its CPCN application, a fulI vetting of the contested issues could have occurred post-construction when the Company reguested the investment.s be included in rate base. Houeuer, beeause of the magnitude of the investment, the uncertainty surroundlng coal-fired generation in today's political and social environment,, and the amount of interest expressed by stakeholders, the Company chose to request a CPCN with binding ratemaking treatment prior to incurring those expenses. This CPCN filing allows interested parties to fully vet the controversial issues prior to the Commission making a decision. It is important to the Company that customers and stakeholders have an opportunity to participate in the public process before the Company undertakes a significant investment llke that required for these SCRs. It is also important for the Company to receive assurance from the Commission that its 237 yOUNGBLOOD, REB 't Idaho Power Company 1 continued investment in coal-fired generation will obtain 2 rate base treatment prior to proceeding with such large 3 expenditures. By filing its application, the Company. 4 intended to provide the Commission with the ability to 5 evaluate whether this investment is economically, socially, 6 and politically prudent, and in the best interest of the 7 Company and its customers, before the investment is made. I Q. Is the Company requesting a specified ROE 9 related to this filing? 10 A. As I stated in my direct testimony, the ROE 11 the Company expects to earn on this investment is the 12 authorized rate in effect at the time the project is placed 13 in service. 14 A. Has the Commissj-on typically addressed ROE 15 prior to completion of a capital project? 16 A. In the Commission's Order for the Langley L7 Gulch CPCN docket, Order No. 30892, the Commission found it 18 reasonable to authorize an ROE that would be the same ROE 19 authorized for the rest of the Company's rate base when the 20 project was placed in service and achieved commercial 2L operation. The ROE would change over the life of the plant 22 facilities $rith Commission-authorized changes to the 23 Company's ROE for other rate base items. 24 25 238 YOUNGBLOOD, REB 8 Idaho Power Company 1 2 3 4 5 6 7 8 9 10 1L t2 13 L4 15 16 l1 18 19 20 2L 22 23 24 25 O. Should the SCR j-nvestment and ROE be determined in tandem as fCIP's witness Dr. Reading suggests on page 8 of his direct testimony? A.No. In a general rate case, the Commission approves an overall rate of return that is applied to the Company's rate base included in the rate case test year. If approved, the SCRs should receive the same RoE authorized for the rest of the Company's rate base at the time the project is placed into service. o.What is the purpose of setting a reasonable ROE? A.?he ROE compensates investors for the use of their capital to finance bhe plant and equipment necessary to provide utility service. A reasonable ROE aIlows the Company to fairly compensate its investors, attract new capital on reasonable terms, and maintain the Company's financial standing. o. Do you agree with ICIP that an investment with regulatory preapproval is less risky for the utility, and therefore, should earn a lower return? A.No, I do not. If the Company were to use Dr. Reading's 1ogic, aII other investments, regardless of size, wi.thout regulat.ory preapproval would be considered "riskier" and the ROE should be adjusted upward. The truth of the matter may be that, based upon the current 239 yoUNGBLOoD, REB 9 fdaho Power Company 1 uncertainty surrounding coal-fired generation in today's 2 political and social environment and the amount of concern 3 expressed by stakeholders on this issue, the magnitude of 4 investment the Company anticipates making in the emission 5 controls at the Jim Bridger plant may provide more risk to 6 the Company. That would suggest the Company's ROE, or at 7 least, the return on this investment, should be higher. 8 The Company's request for binding ratemaking treatment for 9 this investment helps bring the risk associated with this 10 investment back in line wj-th the Company's overall risk and 1,1 return. L2 Regulatory preapproval under ldaho Code S 61-541 13 does not reduce the overall risk for the Company. By 14 issuing a CPCN under Idaho Code S 6L-526 and authorization 15 for preapproved binding ratemaking treatment under ldaho 16 Code S 61-541, the Commission has determined that the 11 investment is prudent and in the best interest of Idaho 18 Power's customers. The Company may then proceed with the 19 emissions project; however, it does not give the Company a 20 free pass to act in an imprudent manner simply because it 2L has regulatory preapproval. The Company must stilI 22 initiate a regulatory proceeding with the Commission to 23 place the SCR investments into rates once they are 24 completed. At that time, the Commission wiLL conduct a 25 thorough review and audit of aII actual expenses incurred, YOUNGBLOOD, REB 1.0 Idaho Power Company 240 1 2 3 4 5 6 1 I 9 10 t1 L2 13 L4 15 t6 L7 r.8 19 20 2t 22 23 24 ?5 and will determine the actual amount to be added to rate base and recoverable through rates. o.Do you believe t.hat preapproved ratemaking treatment for the SCRs at Jim Bridger Units 3 and 4 sets a precedent for Units I and 2 at a later point in time? A.Despite Dr. Reading's suggestion to the contrary, I do not believe preapproved ratemaking treatment at Jim Bridger Units 3 and 4 will estabLish a precedent for future investments in SCRs at Units 1 and 2. The Company will have to go through the same analysis to determine if those investments, at that time, are the least cost and lowest risk alternative for compliance with environmental laws and regulations. The Company would have to decide on an approprlate course of action based on the existing political and regulatory environment at Ehat future time- o.Does the Company need assurance of binding ratemaking treatment for financing the SCRs? A.Yes. A Commission order providing assurance of recovery and binding ratemaking treatment demonstrates ongoing regulatory support to the rating agencies and to the external financial community, thereby reducing the risk of unfavorable financing costs not only for the SCR controls, but also for Idaho Power's total construction program. In this manner, Idaho Power and its customers both benefit. But financing risk is not the primary reason 24L yOUNGBLOOD, REB 11 Idaho Power CompanY 1 2 3 4 5 6 7 I 9 10 11_ l2 r.3 L4 15 L6 L7 18 19 20 2L 22 23 24 25 the Company seeks preapproved ratemaking treatment - the current social and regulatory risk associated with coal- fired investments is. o. A. Does this conclude your testimony? Yes, it does. YOUNGBLOOD, REB 12 Idaho Power Company 242 1 2 3 4 5 6 7 I 9 10 11 t2 13 L4 15 t6 L7 1_8 19 20 2L 22 23 24 25 HEDRTCK COURT REPORTINGP. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC (The following proceedings were had in open hearing. ) (Idaho Power Company Exhibit No. 7, having been premarked for identification, was admitted into evidence. ) MS. REINHARDT-TESSMER: Thank you. This witness is available for cross-exam. COMMISSIONER SMITH: Thank you. Ms. Sasser, do you have questions? MS. SASSER: No questions, Madam Chair. COMMISSIONER SMITH: Mr. Richardson, do you have questJ-ons? MR. RICHARDSON: Thank you, Madam Chair. CROSS-EXAMINATION BY MR. RICHARDSON: A. Good afternoon, Mr. Youngblood. A. Good afternoon, Mr. Richardson. A. fs that a Boise State tie? A. We11, I went to U of I but my daughter goes to Boise Stater so it's my supporting colors now. COMMISSIONER SMfTH: I was just going to object that it's beyond the scope of his testimony. MR. RICHARDSON: That was in the nature of an impeachment. 243 83701 1 2 3 4 5 6 1 I 9 10 11 1"2 13 L4 15 L6 1,7 18 79 20 2l 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) rPC O. BY MR. RICHARDSON: Mr. Youngblood, on page 71 of your direct testimony at line 4, you state that should the cost of the project be less than the commitment estimate, the savings would directly benefit the customer through a lower amount in rate base. Do you recaIl that? A. o. A. Seventeen, Iine 4? Eleven, excuse me. Seventeen, Iine 11.Yes. "Should the cost'r -- that j-s correct, yes. o.Can you telI me specifically what the economlc proj ect onl j-ne at aincentive is for the Company to bring the cost less than the commitment estimate? A.We1I, the economic incentj-ve is that we woul-d be abl-e to recover those costs. The Company would not be all-owed to put anything into rate base that is not prudently incurred. o.Right, but you say that if you bring the project on fess than the commj-tment estj-mate. And Irm assuming that by that you're referring to a commitment esti-mate thatrs blessed by the Commission through regulatory preapproval? A.That is correct. O. And if you bring the project j-n at the commitment estimate, the entire project goes into rate base. Correct? A. If those costs were prudently incurred at the tj-me the Company would come to ask for those to be put into rate base, yes. 244 83701 1 2 3 4 5 6 7 8 9 10 11 1"2 13 L4 15 1,6 t7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC O. So you're not asking for regulatory preapproval then? A. We are asking for regulatory preapproval, bindj-ng ratemaking treatment under Idaho Code 541, but we are asking So Irm curious what your question was again, please. We are asking for preapproval yes. O. Right. And you said that if you bring the project in at the commitment estimate level-, that you wouldn't be able to put that j-nto rates until- a prudency review was conducted? A. When you say if it came in at the commitment estimater my assumption there is that the prudently-incurred costs were at the commitment estj-mate, and then the Company would come at that poj-nt in time to have those moved into rate base. The preapproval would say that there coul-d not be second-guessed at that poj-nt in time, that prudently-i-ncurred costs woul-d be allowed within rate base as J-ong as they were below the at or below the commitment estimate. O. So when you say "prudently lncurred costsr " when is that decision or when does that decision get made? A. It is the Company's understanding that right now we're asking for binding ratemaking treatment of what our commitment estimate is. That does not mean that the Company can go out and imprudently incur costs up to that amount; and that if that amount was approved for binding ratemaking 245 83701 1 2 3 4 5 6 7 I 9 10 11 72 13 L4 15 16 t7 18 1,9 20 2L 22 23 24 25 HEDRTCK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC treatment, that it would be allowed in rate base regardless. The Company's understandj-ng is that it would say that those costs, Lf they continue to be incurred in a prudent manner, if they were at or below that commltment estimate, would be allowed to be put j-n rate base at the time that the project is used and useful, put into service. a. So you do anticipate a subsequent prudency review of these investments? A. I anticipate an audit of the costs that have been incurred, a review of the costs that have been incurred at that time, yeS. O. And so the prudency revj-ew is just -- wouJ-d be how broad, just an audit to see that the money was spent r ox how the money was spent r or whether the money should have been spent in the first place given new developments? A. Not the latter, not the last. That the costs incurred were prudently incurred, meanJ-ng that those costs were needed and necessary; that the costs that incurred were not incurred j-n a haphazard manner; and that they were at or below the commitment estimate. The latter that you said is that if situations had changed or, you know, different regulations or whatever may have happened during that time. That is why the Company is asking for at this point in time binding ratemaking treatment, so that the Company doesnrt incur all of the risk of a 246 83701 potential where things may change and cou1d be second-guessed at a later point in time. O. Would you say the prudency includes questions such as whether the investment was needed or necessary? A. I bel-ieve that under the CPCN that the Company is requesting right now, it would be determined, if the Commission were to rule favorabl-y on the CPCN, that it j-s determined by the Commission that it is prudent for the Company to proceed on this lnvestment. We have established a commitment estimate that we believe is a fair estimate of what the costs to be incurred are. The Company has put that forth as its commitment estimate saying that the costs that we would incur would be at or below that amount, and at a later point in time when there is a review of the numbers that the actuals that the Company -- the actual costs that are incurred by the Company, that there wouldn't be a second-guessing at that point in time of whether or not it shoul-d have been done. 0. So, second-guess by whom? A. By any future Commj-ssion or Intervenors or O. Is it your position that future Commissions will not act 1n a reasonable and prudent manner in reviewing your investment in the future? A. It j-s my posi-tion that the statute, the bj-nding ratemaking authorJ-ty, says that that decision would be made now and woul-d be binding on future Commissions. 241 3 4 5 6 1 B 9 1o 11 L2 13 74 15 L6 L1 1B 19 20 27 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC83701 1 2 3 4 5 6 7 I 9 10 11 t2 13 L4 15 L6 L7 1B L9 20 2L 22 23 24 25 HEDRICK COURT P. O. BOX 578, REPORTING BOISE, ID YOUNGBLOOD (X) T D/-Jlv O. And you said that you were concerned about second-guessing by future Commissions. And my question was are you concerned that future Commissions, future Idaho Publ-ic Utility Commissions, wil-l- not make a reasonable and prudent decisj-ons regarding your investments down the road? A. f would hope and antj-cipate that future regulatory Commi-ssions wil-I always make prudent and wise decisions. However, the Company has experj-enced, for example, in Oregon, as has been brought up earlier in testimony, where a decision to invest in plant was changed by a Commission at a later point in time or there was a question about the prudency of an actj-on that had already occurred. O. And do you think that restricting future Commissions' ability to make prudency decisions is good ratemaking? A. I believe that is good ratemaking and i-t is a provision of the statute that is in place now. O. And it's good ratemaking because it shifts risks from the shareholders to the ratepayers? A. Not that it shifts risks; that it shares risks. There are risksr ds you mention, especially with somethj-ng Iike this that is highly socia11y, environmental-Iy contentiousr ds evj-denced by this proceeding, and that the Company is sayi-ng letrs get that out in the open now, letrs decide that now. In any future Commission, the makeup of the Commission may change 248 83701 I 2 3 4 5 6 7 I 9 10 11 1,2 l-3 L4 15 1,6 L7 1B L9 20 2t 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC over time. In any makeup of the Commission that may change, Iet's donrt aIl-ow decisions that are made now for the Company to invest in the resource or the additions to the resource that is considered to be economically prudent to do at this point i-n time to be second-guessed by a later Commission or other Intervenors at a later point 1n time. O. And Ir11 ask you the same questJ_on I asked Ms. Grow this morning, and that is assume you come in at or under your commitment estimate, you buil-t the environmental upgrades, and a year later for some reason the plant is closed. Will the ratepayers still- be responsible for paying for these? A. And I want to make sure where the year later was in time. The year l-ater is af ter j-t's all done and it's in service? a. A year after the project is completed and in service. A. The Company would stil-l- need to come back to ask for that to be put into rate base so that it could be again earnj-ng recovery of that. O. WeIl-, 1et I s assume that j-t ' s in rate base . A. Then, y€s, the customers would be paying for that addition that had been determined at this tj-me to be prudent and economically vj-able to do. O. So future ratepayers, if that plant turns out not to be used and useful, are going to be eontinuing to pay for 249 83701 1 2 3 4 5 6 7 B 9 10 1l- L2 13 l4 15 1,6 77 18 L9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC this one-hundred-and-some-mj-llion-dollar investment even though it's not used to serve the customers? A. And future ratepayers will benefit from that decision as well if the costs of any other alternate resource or regulatj-on does not come into play or whatever the future may ho1d. What we're saying is knowing what we know today, is this a prudent and wise decision to do, and, if sor l-etrs bind that for preapproved ratemaking at the commitment estimate. O. Thank you. I have no further questions. COMMISSfONER SMITH: Mr. Miller. Do you have questJ-ons ? MR. MILLER: Thank you, Madam Chairman. CROSS-EXAMINATION BY MR. MILLER: O. Good afternoon, Mr. Youngblood. A. Good afternoon, Mr. Miller. O. Do you have both your direct and rebuttal testimony with you? A. f do. O. Would you turn to page 16 of your dj-rect testimony. 250 83701 1 2 3 4 5 6 't 8 9 10 11 1-2 13 1,4 15 L6 77 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTTNG P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC A. I'm there. 0. And if we l-ook at your answer starting on page L2 and going through line 15 A. I'm sorry, you direct me to page L6. Are we on page 72 now? a. Oh, my error. Page 16, line 12 through 15. A. Okay. 0. And as I understand it, there your at a high level, attempt to estimate an annual revenue requirement for these two projects. One woul-d be $9.1 mj-11ion, and one would be $9.7 mi11ion, approximately. Correct? A. That is the high-Ievel estimate with the assumptions that it was at the Company's current rate of return and is if those moneys went into rate base today, which we are not asking, but that was the high-Ieve1 assumption there. O. That would be the revenue requirement when we get to the stage of actually putting this in rates? A. That is correct. O. Could I direct your attentj-on now to Exhibit 405, should be included in that packet of documents. A. Yes, I have it. A. And is the first page of Exhibit 405 a staff discovery request asking for more detail in how you calculated the 9.1 and 9.7 million do]lars? A. Yes, it is. 251" 83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 1,6 L7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD YOUNGBTOOD (X) IPC O. And is the second to that request contaj-ning more A. Yes, the response Excel file containing requested. And page 2 of your page of Exhibit 405 responsive detai-1s of the cal-cul-ations? is: Please see the attached exhibit here is a copy of that Excel fi1e. O. Rj-ght. Good. .fust so we can understand it, let me direct your attention to the fj-rst column of the exhibit, and for those of us who are sometimes baffled by utility accounting, could you just explain for us how the calculation works? A.Wel-lr ds I am often baffled by utility accounting, the amounts that we have talked about previously, the 62.9 mill-ion for Jim Bridger 3 and 66.9 million for Jim Bridger 4, that j-s the total- amount, and so for this example herer w€ have taken the Idaho jurisdictj-ona1 share of that. We have used the current allocation between ldaho and Oregon to determj-ne the amount of plant that would go j-nvestment or r into rate base. And so of the 62.9 milIion, the Idaho share of that or Idaho portion would be the 60.1 millj-on as you see at the top of that o. A. Right. col-umn As we come down, this is what would go into production p1ant. 252 83701 This is Jim Bridger. Did I mj-sspeak? COMMISSIONER SMITH: You said "Oregonr" so Irm confused. THE WITNESS: We took the Idaho jurisdictional share of the total- amount for this analysis here. COMMISSIONER SMITH: And why i-s Oregon THE WITNESS: Because of the 62.9 million for Jim Bridger 3 -- COMMISSIONER SMITH: Oh, I've got it. THE WITNESS: approxj-mately 95 percent of that woul-d be recovered f rom Idaho. COMMISSIONER SMITH: Okay, I got it. Sorry. THE V{ITNESS: And that 95 represents the 60,196,724. There's the accumul-ated depreciation, one year's accumulated deprecj-ation there, resulting in the net el-ectric plant in service of the 59.4. There is depreciation expenses, there is current income taxes, €t cetera, coming down to a rate of return as filed of minus two percent. The Company has used the using the current authorized overall rate of return of 7.86 to get an earnings deficiency of 5.5 miIlion. That is then grossed up to account for taxes using the L.642 tax mul-tiplier to end up with $9.1 million of additional- income or revenue recovery, revenue requlrement. 253 3 4 5 6 1 8 9 10 11 t2 13 L4 15 76 L7 18 L9 20 2t 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC83701 1 2 3 4 5 6 1 B 9 10 11 72 13 t4 15 1,6 L7 18 19 20 2t 22 23 24 25 HEDRICK COURT REPORTINGP. A. BOX 578, BOTSE, fD YOUNGBLOOD (X) rPC O. BY MR. MILLER: That's helpful to me. f do notice in your calculation that in the column of net income, you are not showing any revenue associated with these investments. Is this what is known in regulatory accounting parlance as a nonrevenue-producj-ng investment? A. I'm not familiar with the termi however, there would be no additional revenue that woul-d be included from putting this investment in p1ace. This is a determination of the revenue requirement. O. Right. So this is sort of a long walk down a short pier, but the basic poi-nt here is that the entire investment goes into retail rates not offsetted by -- not offset by any other revenue? A. It goes into rate base. This is the revenue requirement that would be asked for to go into rate base. There would be a rate i-ncrease that would be associated with that additional revenue requirement. Did that answer that questj-on? O. The revenue deficiency is the number by which rates woul-d be increased if if, eventually, when we get to the inclusion of rates? A. It is the amount that the revenue would be increased, yes. O. A11 right, 9ot it. Could I now dj-rect your attention to Exhibit 406 that's in front of you. 254 83701 1 2 3 4 5 6 7 I 9 10 11 1,2 13 1,4 15 t6 t7 l_B L9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 5'lB , BOTSE, rD YOUNGBLOOD (X) rPC A. a. Company's response? A. o. A. o. project will response to A. o. Yes. And is this a Staff discovery request and the Yes, it is. Number 18? Yes. And the question asks "Please describe how the be financed, " and then the answer fol-Iows after Request No. 18. Correct? That is correct. And is thi-s stiIl an accurate statement of how this project wj-II be financed, to your knowledge? A. WeI1, I believe the way it says that it is going to be financed is that the Company has not determined how it would be financed. It would be financed with internal and external financing, that is not looked into any alternative financing for this project. So, yes, that is still correct. o.So there arenrt any alternative financing arrangements contemplated for this project? A.No, there is not, not at thj-s time. O. Now 1et me direct your attention to Exhibit 407, which is a request again from Staff to the Company, asking for copJ-es of minutes of the Idaho Power board of directors at which the project was discussed. And the answer is somewhat lengthy, but please turn to page 4.At the bottom, there is a 255 83701 1 2 3 4 5 6 7 I 9 10 11 1,2 13 L4 15 t6 L7 18 L9 20 2t 22 23 24 25 HEDRTCK COURT REPORTING P. O. BOX 518, BOTSE, rD YOUNGBLOOD (X) IPC reference ta the 20r.3 capital budget approval? A. Yes. ,fust for clarity, the bottom of page 4 is a response in response to Request No . 20, which is not the request that you had asked about originally. You had requested l_9. O. My error once again. I'm referring to Request No. 20 and the response to No. 20. A. Yes. And at the bottom of page SRA Exhibit 407, page 4, there is a 20L3 capital budget approval, yes. MR. MILLER: Now we're going to, Madam Chaj-rman, head into a semidelicate area and I'11 ask for your guidance on how to do it. O. BY MR. MILLER: Let me direct your attention to Exhibit 408. COMMISSIONER SMITH: So 1et's go off the record just for a second. (Discussion off the record. ) COMMISSIONER SMITH: Back on. O. BY MR. MILLER: Are you stil-l- with me? A. f am right here with you. O. Okay, good. On page 2 of four of the Exhibit 408, therers a line item entitled Bridger Selective Catalytic Reduction. A. ,Just below the word "thermal. " O. Just bel-ow the word "thermal-." 256 83701 1 2 3 4 5 6 1 I 9 10 11 t2 13 t4 15 1,6 71 1B 19 20 21, 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578t BOTSE, rD YOUNGBLOOD (X) IPC A. Yes. O. And then in a corresponding column, there is a number, a doll-ar val-ue. A. Yes. A. And to the best of your knowledge, is that the dollar value number thatrs approved in this 2013 budget? A. That is the dol-l-ar amount that was part of the overal-l- capital expenditures, O&M and capital expenditures, that were approved for the 20L3 budget, yes. A. And at the very bottom of page 2 of four, there is a line that reads "Total Idaho Power capital expenditures " ? A. Yes. O. And across from that is another number? A. Yes. O. And to your knowledge, is that the correct val-ue of the approved total capital expenditures for 201,3? A. Yes, just I was checking to see who responded to Request No. 20. I believe it might have been Pat Harrington, the corporate secretary. I did check with Mr. Harrington prj-or to this and just to make sure that these were the numbers that were in approved by the board of directors of Idaho Power and, y€sr they were. O. And I guess it's obvious but just for clarity, the val-ues that are shown on page 2 of four are in millions of 257 83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 t4 15 L6 t7 18 L9 20 2! 22 23 24 25 HEDRICK COURTP. O. BOX 578, REPORTTNG BOISE, ID YOUNGBLOOD (X) IPC dol-1ars. Correct? A. Yes, at the top of the page, it indicates that all- of the numbers there are in mill-ions, yes oxt actuaIly, in thousands. O. Now I'd like to go to, if you don't mind -- give me a moment -- page 4 of your direct testimony and direct your attention to line 12. A. Line L2? O. Line 72. A. Yes. O. And this portion of your testimony, of course, relates to your qualifications and experience, and here you j-ndicate that you provided regulatory support for j-nclusion of the Langley Gul-ch power plant in rate base. Correct? A. That i-s correct. O. So you are generally familiar with the circumstances surrounding the Langley Gul-ch project? A. Yes, I am. O. Would you care to contrast for us the size of the Langley Gulch investment relat j-ve to the Company's total- construction budget versus the size of the j-nvestment 1n the SCRs relative to the Company's construction budget? A. Clarification: Yourre asking me to take the amount of the Langley investment and compare that to the 201"3 O&M and capj-tal budget that we just identified? 2s8 83701 1 2 3 4 5 6 7 8 9 l_0 l-1 t2 13 L4 15 L6 L7 1_8 1,9 20 2L 22 23 24 25 HEDRTCK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) rPC 0. WeII, 1et me ask it perhaps a different way: In leveI of magnitudes, was the Langley Gulch investment larger rel-ative to the Company's overall construction budget than are the SCR investments? A. I don't know what the overall capital budget was at the time Langley went in, but in if you're asking for a compari-son of the amount of the Langley capital investment compared to the capital investment of the SCRs, Langley was significantly larger. 0. Right. That's what frm trying to get to. Thanks for helping the economy at consideration A. me exactly what I was out. Would you contrast for us the general state of the time the Langley Gulch plant was under by the Commission compared to today? The state of the economy was in poorer shape, Lf you will; it was not quite as certain as perhaps today. Today, I thj-nk, I believe, that we are looking up j-n the economy. O. Could you contrast for us the f'm not sure exactly what the right words here are, but I'11 try these and if you need something better, let me know. But could you contrast for us the general state of the flnancial markets at the time the Langley Gulch investment was being considered versus today? A.It was a concern for the Company for to be able to finance the Langley Gulch project at that point in 259 83701 1 2 3 4 5 6 1 B 9 10 11 L2 13 L4 15 L6 L7 l-B 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOISE, rD YOUNGBLOOD (X) IPC time. 0. Could you contrast for us the length of time that was required to construct the Langley facility compared to the length of time that is required to construct the SCR investments ? A. Donrt have the exact amounts, but the length of time to construct an entire 300 megawatt generating pIant, combine cycle combustion turbine generating p1ant, is longer than it does than it is to add the additions of selecti-ve reductive catalytic reduction at Jim Bridger p1ant. a. Okay. Thank you very much. Now 1et me direct your attention to Exhibit 409. A. Yes. O. Have you found that? A. I have that, yes. O. Does IDACORP, the parent company of Idaho Power Company, perj-odica11y publish or make public its financial results for the preceding financial period? A. "Financial period" bej-ng a quarter? O. Quarter. A. Yes. they do. O. Is Exhibit 409 the dated November 5th the Company's most recent publj-c dj-sclosure of financial results for the preceding quarter? A. Yes, it is, for the third quarter of 2073. 260 83701 1 2 3 4 5 6 7 I 9 10 11 1,2 13 t4 15 t6 L7 1B 79 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC O. I won't ask you necessarily to read it into the record, but letrs just take a collective minute and all read the third ful-I paragraph of Exhibit 409. And, again, this perhaps is belaboring the obvious, but it's not the case that Idaho Power needs binding ratemaking treatment because Idaho Power is in financial- distress, is it? A. f hear two things in your question Ird lj-ke to clarify. O. Sure. A. The Company does believe that they need binding ratemaking treatment. No, the Company is not in financial stress currentl-y at this point in time. A. But financial- distress is not the reason for the need for binding ratemaking treatment? A. That is correct. The financial- situation today is different than it was with Langley. Those are not the reasons that the Company has asked for binding ratemaking treatment here. O. Got it. Now, mercifully, we're coming close to the end. Coul-d you turn to page 1l- of your rebuttal testimony. A. Irm there. O. WeI1, I guess it would help if I looked at your test j-mony, not Mr. Harvey's . A. Hj-s may be more interesting. 261 83701 1 2 3 4 5 6 7 I 9 l_0 1l_ L2 13 t4 15 L6 L7 18 L9 20 2t 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC a. I thought he was a very engaging witness. On line 20, you say that binding ratemaking treatment demonstrates ongoing regulatory support to rating agencies. Correct? A. Yes, in response to the question "Does the Company need assurance of binding ratemaking treatment for financing the SCRs?" I respond and say "Yes, the Commission order providing assurance of recovery and binding ratemaking treatment demonstrates ongoing regulatory support for the ratJ-ng agencies and to the external- financial community, thereby reducing the risk of unfavorable financing costs not only for the SCR controls, but al-so for Idaho Powerrs total- construction program. " A. A11 right. V'lel-l-, you've done a fine job of reading that for us. Have any representatives of any rating agencies said to Idaho Power in writing that the fai-l-ure to secure binding ratemaking treatment wiII result j-n unfavorable ratlng actions ? A. I am not aware if they have or have not. O. Then as you have read, binding ratemaking treatment woul-d provide support to the external financing community. Who do you mean by "the externaf financing community" and why is it relevant when the Company is not seeking external financing? 262 83701 1 2 3 4 5 6 7 B 9 10 11 L2 13 L4 15 t6 L7 18 t9 20 2L 22 23 24 25 HEDRICK COURT REPORTTNG P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC A. I believe my response for how the Company was to finance this was both with internal and external financing, so it is not seeking so1ely externa1 financing. So it woul-d be both with internal and external financing. And as we are statj-ng here, that the binding ratemaking treatment would provide an assurance that the Commission is supportive of the Companyrs decision for the investment and that it is prudent to incur this investment at this point in time. That would affect the rates that would be treated -- that the Company would have for not only partial or fuII support of financing of this project, but also of our entire construction project. O. Now, I think we established when we looked at that one exhibit that these projects are not being financed separately, but being financed as part of the overall capital budget. Correct? A. I believe what we looked at was the 20L3 budget that had been approved by the board of directors, and that there was a do1Iar amount in that for the year 20L3. O. Has any representative of whoever this external- financing community is said to Idaho Power that the failure to secure binding ratemaking treatment wiII jeopardize or make more expensj-ve external financing? A. I am not aware if anyone has or has not. O. To your knowledge, they have not? 263 83701_ 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 16 L7 18 L9 20 21 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC A. To my knowledge, I am not aware that they have or have not. O. If they had, woul-dn't you think you'd know about it? A. That is not my job with regard to the financing department, and so had someone who is dealing directly with the financial- institutions received that information, I am not sure that they would come and tell- me. O. A11 right. If you hear of anything like that, will you 1et us know? A. Absolutely. O. Then you read part of this, your paragraph, starts on page 18. Woul-d you now read the l-ast sentence? A. "In this manner, Idaho Power and its customers both benefit." I'm sorry, apologize. "But financing rj-sk is not the primary reason the Company seeks preapproved ratemaking treatment; the current social and regulatory risk associated with coal--fired investments is. " a. WeII, thank you, Mr. Youngblood. It's always a pleasure to visit with you. A. With you too, sir. COMMISS]ONER SM]TH: Mr. Otto. MR. OTTO: Thank you, Madam Commissioner. I just have a few questions this time. 264 83701 1 2 3 4 5 6 1 I 9 10 11 L2 13 !4 15 t6 t7 18 t9 20 2t 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC CROSS-EXAMINAT]ON BY MR. OTTO: O. Hell-o, Mr. Youngblood. A. He11o, Mr. Otto. O. I'm going to ask you about IRP, because you talk about that in your dj-rect testimony, pages 9 and 10. A. Yes, sj-r. O. f'11 just give everyone a minute to get there. A. frm there, thank you. O. Okay. Would you agree that the key to determining the prudence j-s to compare a preferred course of action with alternati-ves? A. P1ease just state that again so I can think about it again. O. Do you agree that a key to determining the prudence of an investment is to compare that preferred course with alternative courses? A. In comparison j-n light of other other factors, I mean, other social, economic factors, and looki-ng at other alternatives, yes, I woul-d think that would be a determination of prudence: Prudent, economically viabl-e, yes. a. The comparj-son plays a big role, of course not the only rol-e, but a big rol-e? A. Yes. Yes. 26s 83701 1 2 3 4 5 6 't B 9 10 l_1 t2 l-3 1,4 15 16 t1 1B 1,9 20 2L 22 23 24 25 HEDRICK COURTP. O. BOX 578, REPORTTNG BOISE, ID YOUNGBLOOD (X) IPC O. So in determining -- is the resource position the beginning of how you design an al-ternative portfolio, like l-et me ask this a different way. Eor Idaho Power's IRP, does the design of the alternative portfolios begin with determining the Utility's current resource position compared to loads? A. I don't know that it's the design of the resource portfolj-os. The beginning of the IRP process, the whole integrated resource process, begins with the load forecastr ds you know, and l-ooks at the l-oad resource balance at that point in tj-me. So in that regard, we look at the a load resource balance j-s determined, yes. O. And then from there, you begin designing alternative portfolios? A. Through thisr w€ looked at different means of achieving. We looked at different technologj-es to meet that Ioad prlor to designing the portfolios. We l-ooked at different ways to technologically meet a comparative analysis. So, for example, we did a group of scenarios -- not scenarios group of analyses with regard to different technologies at a 200 megawatt leveI, all looking at those and seeing what i-s the most cost effectj-ve technology at that point in time, and then used those technol-ogies, the Jower cost ones, to go ahead and implement or begin lookj-ng at different alternative scenarios. 266 83701 1 2 3 4 5 6 7 B 9 10 11 L2 13 t4 15 76 L1 18 19 20 21, 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC When I discuss scenarios, I'm talking across the fuII 2O-year planning period, okay. A. Sure. So maybe to put a finer point on it: The Company develops it was nine portfolios? A. That is correct. 0. And they're comprised of a suite of different resources? A. Each of them, y€sr uh-huh. 0. And the megawatts for each resource is sorry, Iet me ask: That suite of resources and the megawatts that is represented there are designed to match or they're desi-gned based on the load and resource bal-ance as determined in the rRP? A. The load and resource balance is the beginning, as you said. The Company has an obligation to serve. And so when the Company sees that there are deficits with regard to that, then we are trying to l-ook at different kinds of technologies, different scenarios, to meet that. A11 nine of those scenarios woul-d meet -- would meet the objective of meeting the load by eliminating the deficits. O. OkaY- A. And just to contj-nue oDr we look at the 2O-year period oL, 2O-year net present va1ue of each of those and that's how those are compared. 267 83701 1 2 3 4 5 6 7 B 9 10 11 T2 13 L4 15 L6 !7 18 1,9 20 27 22 23 24 25 HEDRTCK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC O. In determining the resource position, did the Company include the existing demand response programs? A. Demand response programs? There were some scenarios that had demand response in them, y€sr including the preferred portfolio. O. Sorry, the questj-on might have been unclear. The resource posi-tion that was the beginning before you designed the portfol-ios, that resource posi-tion, was it determined with or without demand response? A. It was determined wj-thout demand response at that point in time because the Company had asked for suspension of the demand response programs. O. But at that time, the Company knew that it had access to over 400 megawatts of demand response? A. We knew that the Company had had access to 200 over 400 approxi-mateJ-y, 400 megawatts. The Company had requested a suspension of that that plan or that program, the demand response program, at that point in tj-me, because as it looked at its load resource balance in the near future anyway, the demand response programs were not needed. And so rather than incur those costs for our customers, the Company asked for suspensJ-on of that program until- we could reevaluate with the fntervenors and the stakeholders within those programs and redesign those programs, which we have now done and has been filed for approval a settl-ement approval. 268 83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 T4 15 16 t7 1B 79 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOISE, rD YOUNGBLOOD (X) IPC O. Sorry, f feel like I got off on a tangent there. I'm trying to puII it back. So, okay, here's the point: Here's what werre doing here: We have a portfolio or, we have a preferred course of action l-et's continue, 1et's j-nvest the money in Bridger and forward; and we're comparing that to other portfolios don't have coal- in them. Is that a fair assessment? that says continue that A. o. o. comparj-ng to it that for fn this docket here? Yeah. A. This docket is specifically with regard to the investment of the sel-ective SCR investment in Bridger's 3 and 4. As part of that analysis, the Company has conducted a coal study with a third party, SAIC, its own internal coal- study that added to that, and added to that the scenario analysis that was done in the 20L3 IRP. Atl of that, together, is used for the Company's decisj-on that the best course of acti-on for and for Jim this docket here is to invest in the SCR investment Bridger 3 and 4. And the resource, the portfolios that you were the cont j-nued ..Iim Brj-dger portfolio l-et's cal1 simplicity's sake those were designed assuming zero demand response? A. No, the scenarios have demand response j-n them. And, in fact, the preferred portfolio has demand response in ir. 269 83701 1 2 3 4 5 6 7 B 9 10 11 t2 1_3 L4 15 16 L7 18 19 20 2t 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) ]PC O. What I was aski-ng about was the origj-naI load and resource balance before you designed the portfolios, so just the portfolios have to meet our design to rectify a resource deficit. That resource deficit is the l-oad and resource balance Irm talking about, and that one was calculated with no demand response in it. A. That is correct. As I stated before, dt that point in time the Company had asked for those to be suspended. O. So you knew they existed and you elected to ask to suspend them? A. The Company saw that those programs had flexibility and those programs were j-ncurrj-ng costs and woul-d not be needed in the short term, so asked the Commission if we could suspend those programs so that we could meet with the stakeholders, redesign those programs to be more cost effective, and meet the needs of the Company. O. Fair. Thatrs all I have. COMMfSSIONER SMITH: Thank you, Mr. Otto. Are there questions from the Commission? COMMISSIONER KJELLANDER: NO. COMMISSIONER REDFORD: No. COMMISSIONER SMITH: Nor f. Redirect? MS. REINHARDT-TESSMER: I have just a couple of quest j-ons. 210 83701- 1 2 3 4 5 6 7 I 9 10 11 t2 l-3 t4 15 L6 77 18 t9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (Dj- ) IPC REDIRECT EXAMINATION BY MS. REINHARDT-TESSMER: A, Mike, I'm going to refer you back to SRA's Exhibit 408. And just so we're cl-ear, it l-ooks like these numbers are expressed in the thousands and not mj-I1ions. fs that correct? A. We're on page 2 of 408? O. Correct. A. And, y€s, I misspoke. I apologize. There are a doIlar sign and three zeros at the top of the page, indicating that these are in thousands. So i-t would be thousands of thousands if it was millions, so a. And do projects of the magnitude of the SCRs typically span more than one budget year? A. Yes, they do. O. And are the budget items listed here financed both internally and externally? A. Yes, they are. This is the Company's capital and O&M budget, and they are financed both with internal and external financing. MS. REINHARDT-TESSMER: I have no further questi-ons. COMMISSIONER SMITH: Thank you, Mr. Youngblood; appreciate your he1p. 277 83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 16 L7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD YOUNGBLOOD (X) IPC RECROSS-EXAMINATION BY MR. MILLER: O. ,Just so we're cfear on thj-s point COMMISSIONER SMITH: Mr. Mill-er. O. BY MR. MILLER: -- on 408, Exhibit 408, you just added three zeros to each of these numbers to see what they were. Riqht? A. That is correct. You would add three zeros to the end of each of the numbers on that page. O. Got it. (The witness left the stand. ) COMMISSIONER SMITH: Does that concl-ude the Company' s presentation? MS. REINHARDT-TESSMER: It does. COMMISSIONER SMITH: Thank you. f was going to go to Staff, but, Mr. Richardson, if you would like Dr. Reading to go now or if he's on a schedule, w€ could do that. Your pleasure. MR. RICHARDSON : Dr . Reading I s f lex j-ble, so we can go to Staf f if you l-ike. COMMfSSIONER SMITH: Okay. Ms. Sasser. MS. SASSER: Thank you, Madam Chair. Commission Staff caIls Patricia Harms to the stand. 272 83701 1 2 3 4 5 6 1 I 9 10 11 L2 13 L4 15 1,6 L7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD HARMS (Di) Staff PATRICIA HARMS, produced as a witness at the instance of the Staff, being fj-rst duly sworn, was examined and testified as follows: DIRECT EXAMINATION BY MS. SASSER: O. Good afternoon. A. Good afternoon. A. Could you please state your name and spe1I your last name for the record? A. My name is Patricia Harms, H-A-R-M-S. O. And with whom are you employed and in what capacity? A. Irm employed by the fdaho Public Utilities Commission as a principal financial specj-alist, s1ash, senior auditor. O. Are you the same Patri-cia Harms that filed direct testimony on October 11, 20L3, with the Commission? A. Yes, I am. O. And are there any changes or corrections to your testimony? A. No. O. If I were to ask you the questions laid out in your prefiled direct testimony, woul-d your answers be the same 273 83701 1 2 3 4 5 6 7 I 9 10 11 72 13 L4 15 L6 t7 18 L9 20 2L 22 23 24 25 HEDRICK COURT P. O. BOX 578, REPORTING BOTSE, rD HARMS (Di) Staff today? A. Yes. MS. SASSER: Madam Chair, I would move that Ms. Harms'prefiled direct testimony be spread on the record as if read. COMMISSIONER SMfTH: If there is no objection, it is so ordered. (The following prefiled testimony of Ms. Harms is spread upon the record. ) 274 83701 L 2 3 4 5 6 7 I 9 10 1t_ L2 l-3 t4 l_5 L6 L7 18 19 20 2L 22 23 24 25 O. Please state your name and address for the record. A. My name is Patricia Harms. My business address is 4?2 west washingt,on SEreet, Boise, Idaho. O. By whom are you employed and in what capacity? A. I am empLoyed by the Idaho Public Util-ities Commission (Commission) as a Principal Financial Specialist/Senior Audj.tor. a. Please give a brief description of your educational background and experience. A. I graduated from Boise State University, Boj.se, Idaho in 198L with a B.A. degree in Business Administration, emphasi-s in Account,ing. f am a Certified Public Accountant licensed by the State of ldaho. Prior tro joining the Commission Staff in 2000, I was employed by the State of Alaska as an In Charge Auditor and performed both financial and performance audiE,s of governmental agencies. I was responsible for projecE management of many of E,hose audits. I have attended many seminars and classes involving audit,ing and accounting. While at t,he Commission I have audited a number of ut,iliE,ies j,ncluding water, electric, 9as and E.elephone utiliEies and provided commenEs and t,est,imony in a number of cases that, dealt with general rates, hook-up fees, accounting issues, and other regulatory issues including cAsE NO. rPC-E-L3-1"5 t0 /LL/L3 HARMS, P. (Di) 1 STAFF 215 1 2 3 4 5 6 7 8 9 L0 L1 L2 13 L4 15 L6 t7 18 19 20 2L 22 23 24 25 CerEificates of Public Convenience and Necessity (CPCNs). I have also completed E.he National Association of Regulatory Utility Commissioners' (N]\RUC) annual regulatory studies program at Michigan State University. I also regularly at,t,end meet,ings of NARUC's Staf f Subcommj-ttee on Accounting and Finance and serve as secretary f or the Subcommj-tEee. O. What is the purpose of your test,imony? A. The purpose of my testj.mony is Eo present Staff's recommendations regarding the treatment of return on equity, depreciation and the Allowance for Funds Used During Construction (AF[DC) in Idaho Power's reguest for a CPCN authorizing investment, in Selective Catalytic Reduct,ion (SCR) controls in Jim Bridger Units 3 and 4 (Project) and inclusion of the ProjecE's cests in rate base once the SCR controls are installed and operational. O. Please explain Staff's recommendation for the return on equity in this case. A. The ratemaking E,reatment requested by Idaho Power for the Project under ldaho Code S 61-541 includes a detrermination of the method or the actual return on common equity for the Project in section (2) (b) (i) ..The return on common equity investment or method of determj.ning t,he return on common eguity investment.,, St,af f supports Company witness Youngblood, s expectat,ion cAsE NO. rPC-E-13-15 t0 /LL/13 HARMS, P. (Di) STAFF 276 o L 2 3 4 5 6 7 8 9 10 L1 t2 13 L4 15 16 L7 18 L9 20 2L 22 23 24 25 t,hat, t.he ProjecE earn the authorlzed reEurn in effect, at, t,he time the Project is placed in service. Adopting the methodology where t,he ret,urn on eguity (ROE) for the Project is t,he same as aut.horized for ot.her rate base items is consi-stent, wit,h normal rate base treatment and is appropriate. Staff recommends the Order for a CPCN and ratemaking Ereatment, if approved, authorize a return on equity for Ehe Project the same as t,he ROE aut,horized for the rest of Ehe Company's rate base when the Project, is placed in service. Staff also recommends that Ehe ROE change with Commission-authorized changes eo the Company' s ROE over the l,if e of the plant,. O. Please explain Staff's recommendation for depreciation in this case. A. The ratemaking t,reaEment requested by Idaho Power for the ProjecE, under Idaho Code S 61-54L (section (2) (b) (ii) ) includes *the depreciation life or schedule." Staff supports Company wltness Youngblood's statemenE that Idaho Power will depreciate the invesEments over the remaining life of E,he 'Jim Bridger P1ant, in accordance wiEh the Commission-approved depreciation rates in effect at the time the investment is closed-to-plant. St,aff also recommends that t,he depreciation ratee change with Commission-authorized changes t,o the Company' s depreciation rates over the llfe of the plant whether cAsE NO. rPC-E-13-15 1"0/LL/1,3 HARMS, P. (Oi1 STAFF 277 1 2 3 4 5 6 7 8 9 L0 11 L2 r.3 L4 t-5 15 L7 18 l_9 2A 2t 22 23 24 25 those changes occur as a result of deprecj-ation rate cases like Case No. IPC-E-12-08 or as part of other cases. O. Please explain St.aff 's recommendaE,ion for AFIIDC in this case. A. Staff witness Louis is the primary wi-tness addressj-ng the Project and, among oE.her things, recommends issuance of a CPC-![ and t,he ratemaking treatment including Staf f 's proposed Commitment Est,imat,e. SEaff recommends that the Company accrue actual AFUDC based upon the actual capitaI expenditures of the Project. (excluding PacifiCorp's AFUDC) as iE is under construction. This is Staff's understanding of the method Idaho Power current,Iy uses to accrue AFUDC on the Project. When Idaho Power seeks cost recovery in rates after t,he Project is placed in service, the monthly expenditures would be subjected Eo a prudency review of the amounEs to which the AFUDC raEe is applied except for those plant amounts approved ln this proceeding. Absent specific rat,emaking authority, AFUDC will cease when the plant is placed in service. Staff also recommends Ehat, the actual AFUDC rates applied during the course of Ehe Project be reviewed by SEaff when the ProJect is broughE, bef ore the Commi.ssion for inclusion wit,hin rat,es. O. What is AFUDC? cAsE NO. IPC-E-13-L5 LO /Lt/ L3 FIARMS, P. (Di) STAFF 278 1 2 3 4 5 6 7 I 9 10 11 L2 13 t4 L5 L6 L7 18 19 20 2L 22 23 24 25 A. AFUDC is an accounting mechanism which recognizes capital costs associated with financing construction. Generally, the capital costs recognized by AFLTDC include int,erest charges on borrowed funds and the cost of eguity funds used by a ut,ility for purposes of constructj.on. The main purposes of AFUDC are to capitalize with each projects the costs of financing that consLructioni separate the effects of the construction program from currenE operat,ions; and to allocate current capital costs to future periods when t,hese capital facilities are in service, useful and producing revenue. AFUDC represenes Ehe cost of funds used during the construction period before plant and plant addit.ions go into service. When it is placed in service, the entire cost of the plant and plant additions, includj-ng AFUDC, is added to rate base, where it earns a rate of return and is depreciated over t.he life of the plant/p1ant addition. O. How does Idaho Power calculate the AFUDC rate it. applies to projects? A. Idaho Power calculates t,he Company's AFUDC rate on a monthly basis consistent with Ehe AFUDC formula established by the Federal Energy Regulatory Commission (FERC) . Annually t,he annualized AFIIDC rates are calculaEed and compared to the mont,hly AFUDC raEes to cAsE NO. rPC-E-13-L6 to /tL/13 HARMS, P. (Di) STAFF 219 L 2 3 4 5 6 7 I 9 10 l_ l_ L2 r-3 L4 L5 16 l7 18 19 20 2L 22 23 24 25 determine reasonableness and ensure the AFUDC amount,s are calculated using the met,hod set, by the Idaho Commission. O. WhaE has fdaho Power requested in this case for AFUDC? A. Idaho Power has included in its reguest, for a CPCN and binding ratemaking treatment, a Commitment, Estimate including $11,889,43t in AFUDC. O. How has Idaho Power calculated the $11,889,43L? A. Generally speaking, Idaho Power has taken t.he current Project estimates by year (less current charges through May 30, 20L3) and calculated a monthly amount on which they applied an AFUDC rate. The AFUDC rate applied was calculaEed from actual charges through May 30, 20L3. A. Has any portion of fdaho Power's Commitment Estimat,e of $11,889,437 in AFUDC actually been incurred? A. Yes. According to Ehe Company's response Eo Production Request No. 15, approximately $40,000 of the almost $12 million AFUDC has been incurred as of May 30, 20L3. If the Commissj-on chooses to include any AFTDC within binding ratemaking in this case, Staff recommends that, the actual AFIIDC incurred (approximately $40,000) be Ehe amount included for binding ratemakj.ng treatmenE. O. Does this conclude your direct testimony in this proceeding? A. Yes, it, does. cAsE NO. rPC-E-L3-L6 Lo /]-t/ t3 HARMS, P. (Di) STAFF' 280 1 2 3 4 5 6 7 B 9 10 11 L2 13 t4 15 t6 L7 18 19 20 2t 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, ID HARMS (X) Staff (The fol-l-owing proceedj-ngs were had in open hearing. ) MS. SASSER: And f would al-Iow Ms. Harms to be open for cross. COMMISSIONER SMITH: Thank you. Are there any questions from the Company? MS. REINHARDT-TESSMER: .fust a few. CROSS-EXAMINATION BY MS. RE]NHARDT-TESSMER: a. Ms. Harms, I have a couple of questions relating to Idaho Power's request for an allowance for funds used during construction, which I'11 refer to here as "AEUDC." Do you believe it is reasonabl-e for the Company to expect recovery of AEUDC on expenses incurred up through the time the SCRs are online? A. Yes, and my testimony suggests that the Company, if the Commission approves regulatory ratemaking, include actuals that are occurred by the Company and that those be subject to an audit in terms of the rates applied. O. And in his prefiled testimony, Mr. Louis recommends binding ratemaking treatment for the amount of the EPC contract and actua1 costs already incurred in the development phase. Correct? 28]- 83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 t4 15 1,6 77 r-8 19 20 27 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD HARMS (X) Staff A. Correct. O. You agree with that reconrmendation? A. Yes. O. And do you agree that AEUDC in an amount commensurate with that recommendation should be given binding ratemaking treatment? A. The reconrmendation that I have in my testimony is to include the amount of AFUDC that would be associated with the actual-s and consistent with his testimony, and that going forward, the actual AEUDC when the Company comes in for recovery of the project and costs be a1lowed for actual amounts and audited for the application and calculatj-on of the rates over the period of time of the project. 0. Okay. And just so I can be clear though, the AEUDC that corresponds to actuals is a much smal-ler number than that that woul-d be commensurate with Mr. Louis's reconrmendation. Correct? A. His recommendatlon I believe i-s also for actual AFUDC through May 31 , 20L3. A. Plus the EPC contract amount. Correct? A. Yes, the contract amount. A. And have you run the calculation to see what a reasonabl-e estimate of the AEUDC wou]d be on the EPC contract amount plus the actual- costs incurred? A. I haven't run a cal-culation of the AFUDC 282 83701 1 2 3 4 5 6 7 B 9 10 11 L2 13 t4 15 1,6 t7 18 19 20 21 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 5'78, BOTSE, rD HARMS (X) Staff associated with the EPC contract because that contract spans multiple years and the AFUDC rate is calculated each month, and O. Do you consider the AEUDC rate to be particularly volati-l-e? A. It varies from month to month and year to year. O. Does it fluctuate sharply though? A. It does fluctuate. O. Sharply? A. In my review, it does fl-uctuate. O. Would you agree, subject to check of course, that the AFUDC that corresponds to the amount reconrmended by Mr. Louis for binding ratemakj-ng treatment would be around 8.1 million? A. Yes, I would agree, subject to check. 0. Thank you, Ms. Harms. COMMISSIONER SMITH: Mr. Richardson, do you have questions? MR. RICHARDSON: No guestions, Madam Chair. COMMISSIONER SMITH: Mr. Mill-er. MR. MILLER: Thank you, Madam Chairman. 283 83701 t- 2 3 4 5 6 7 8 9 10 11 L2 13 1,4 15 1,6 l7 1-8 t9 20 2L 22 23 24 25 HEDRTCK COURT REPORT]NGP. O. BOX 518, BOTSE, rD HARMS (X) Staff CROSS-EXAMINATION BY MR. MILLER: O. Ms. Harms, after reading your testimony, I take it that the purpose of your testimony is to make recommendations for various accounting treatments assuming that the Commission decides to grant the Company's request for binding ratemaking treatment under Idaho Code 61-541. Is that the purpose of your testimony? A. Correct. MR. MILLER: Madam Chairman, young lawyers often ask me for tips on how to cross-examj-ne an expert. COMMISSIONER SMITH: Those are the ones that donrt know you. Right? MR. MILLER: Now Irm going to make this exact point: My first advice is always think twice about examining an expert who is smarter than you are. And I'm going to follow my advice in this case and not have any questions for Ms. Harms. COMMISSIONER SMITH: Mr. Otto, have you asked Mr. Mil-ler for any advice? MR. OTTO: In fact, I have, and he gave me the same advice, and I'm golng to folIow his lead and do the same. I have no questions for Ms. Harms. COMMISSIONER SMITH: A11 right. Do we have any 284 83701 1 2 3 4 5 6 7 I 9 10 11 1,2 13 t4 15 L6 1,7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD HARMS (Di) Staff from the Commission? COMMfSSIONER REDFORD: No. COMMISSIONER SMITH: Any redirect? MS. SASSER: Only one, Madam Chaj-r. REDIRECT EXAMINATION BY MS. SASSER: O. And that is, Ms. Harms COMMISSIONER SMITH: Remember, this is the hardest one. MS. SASSER: Yeah. O. BY MS. SASSER: Would you believe me, subject to check, that Mr. Louis's testimony does not refer to AFUDC in any regard but speaks to actual- costs? A. I actually do belj-eve that and recall that, y€s, I do. O. That' s al-l- I have. Thank you. COMMISSIONER SMITH: Okay. Thank you, Ms. Harms. (The witness left the stand. ) MS. SASSER: Staff cal-l-s Mr. Louis to the stand. 285 83701 1 2 3 4 5 6 7 I 9 10 11 12 13 L4 15 t6 L7 1B 19 20 2L 22 23 24 25 HEDRTCK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUrS (Di) Staff MIKE LOUIS, produced as a witness at the instance of the Staff, being first duly sworn, was examined and testified as follows: DIRECT EXAMINATION BY MS. SASSER: O. Hell-o . A. Hel-lo. O. Mr. Louis, would you please state your name and spe1l your last name for the record? A. My name is Mike Louis. My last name is spelled L-O-U-I-S. A. Which we need to give our own internal Staff a memo of, since we spelled it wrong on the initial direct filed testimony. A. Ird gj-ve her a pass though. O. I know it did. Vfith whom are you employed and in what capacity? A. I'm employed with the Idaho Public Utilities Commission as a util-ity analyst. O. And are you the same Mike Louis that filed direct testimony on October LL, 2013, along with Exhibits 101, !02, and 103, with the Commission? A. f am, and yes. 286 83701 1 2 3 4 5 6 7 8 9 10 11 L2 13 L4 15 L6 L7 18 L9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUIS (Di) Staff O. Are there any changes or corrections to your testimony? A. I have one correction: On page 10, line 8, it says "afl of the Company's generation resources." It should read "af1 of the Company's thermal generation resources." That's the onJ-y correction that I have. O. Okay, thank you. And if I were to ask you the questions laid out in your prefiled direct testimony, would your answers be the same today? A. They would. MS. SASSER: Madam Chair, I move that Mr. Louis's prefiled direct testimony be spread on the record as if read, and I would also ask that Exhibits L02 oh, 101, L02, and 103 be admitted and marked for the record. COMMfSSIONER SMITH: If there is no objection, it is so ordered. (The fol-lowing prefiled testj-mony of Mr. Louis is spread upon the record. ) 287 83701 l_ 2 3 4 5 6 7 B 9 10 l_ l_ t2 1_3 1,4 l_5 15 L7 18 t9 20 2L 22 23 24 25 O. Please state your name and business address for the record. A. My name is Mike Louis. My business address is 472 West Washingt.on Street, Boise, Idaho. a. By whom are you employed and in what capacity? A. I am employed by the Idaho Public Utilities Commj-ssion as a Utilit j-es Analyst. O. What is your educational and professional background? A. I recej-ved my Bachelor and Master of Science degrees in fndustrial Engineering with concentrations ln manufacturing syst,ems and engineering economj-cs from Purdue University in 1985 and 1-992, respectively. I also received my Masters in Public Policy and Administration at Boise State University in 2005. In addition to my formal education, I have attended Michigan State University fnstitute of Public Utilities Annual Regulatory Studies Program, NARUC Utility Rate School, Electricity Grid School, and Advanced Regulatory Studies Program. My work experience includes 18 years of industrial/commercial practice developing and managing manufacturJ-ng systems and operatj-ons, planning processes, and supply chains for General Motors, Hewlett-Packard, ,Jabi1 Circuit, and Albertsons Companj-es. I also have spent six years administrating and conducting energy policy CASE NO. IPC-E-]-3-15 1-o / LL/ t3 LOUTS, M. (Di) STAFF 288 l_ 2 3 4 5 6 7 8 9 l_0 i_ l_ 1,2 l_3 1,4 L5 16 t7 18 19 20 2t 22 23 24 25 research wit,h the Energy Policy Institute at Boise State University. As part of my manufacturing and academia experience is Lhe management of departmental budgets as a mid-leve1 manager and project, budgets as a manager of several large strategically-orlented projects. I have also taughE classes in program and project management in the Department of Public Policy and Administratj-on at Boise State University. At, the Idaho Public Utilities Commission, my work responsJ-bilities have included a variety of elecLric and natural gas cases including integrated resource p1ans, purchased gas and power cost adjustment cases, prudence reviews of power plant investmenEs, and several general rate cases looking specifically at emission control investments. O. What is the purpose of your testimony in this proceeding? A. The purpose of my test,imony is to describe Staff's analysj-s as to the prudence of the Company's proposed investment in selective catalytic reduction (SCR) controls on Jim Bridger Units 3 and 4. In addition, I provide recommendations related Eo the issuance of a Certificate of Public Convenience and Necessity (CPCN) and propose ratemaking treatment. O. Please summarize your test.imony in this case. CASE NO. IPC-E-13-15 to /Lt/13 LOUIS, M. (Di) STAFF 289 1 2 3 4 5 6 7 8 9 10 1L a2 13 t4 15 t5 l7 L8 L9 20 2L 22 23 24 25 A. I believe the Company's decision to move forward with the emission control investment project for Jim Bridger Units 3 and 4 j-s prudent; supporting authorization of a CPCN issued under ldaho Code 561-526. However, I only recommend authorization of $81,378,000 in direct project cosEs of the $L17,947,962 requested in the Company's Application based on provisions for binding ratemaking treatment under ldaho Code 561-541. I have also made several recommendations related to t,he handling of variances between the Commitment Estimate and actual costs. O. What documents did you analyze that lead to your recommendation? A. I examined the following documents: l-. The Company's Applicat j-on, direct. testimony of Company wi-tnesses, and accompanying exhibits; 2. Idaho Power's 20L3 Integrated Resource Plan; 3. Discovery by Staff and intervening parties including but not limited to the Company's most recent business p1an, Engineering, Procurement, and Construction (EPC) contractor evaluatj-on documents, EPC Contract, and the Jim Bridger operations contract between fdaho Power Company and Pacifj-Corp; 4. PacifiCorp's CPCN cases in Wyoming and Utah cAsE NO. rPC-E-13-l-5 1-o / Lt/1-3 LOUTS, M. (Di) STAFF 290 l_ 2 3 4 5 5 7 8 9 10 l- l_ 1,2 l_3 l4 15 1,6 t7 l_8 19 20 21, 22 23 24 25 including the Application, testimony, discovery requests, and orders; 5. Idaho's CPCN statutes including ldaho Code $ot-set, and SS0r -526 through 5L-530,. 6. Environmental Protection Agency's (EPA) proposed rule on the Wyoming SIP contained in the Federal Register (Vo1 . 7I , No . l-11-, ,June 1"0 ) . O. How will your testimony be organized? A. My testimony can be broken down to an analysis of two object.ives related to concepts of prudency: l-) whether or not lt is prudent to recommend issuance of a CPCN pursuant to ldaho Code Sef-sZe and 2) whether and to what extent t,he Company's proposed budget should be pre-approved for bindi-ng ratemaking treatment pursuant to ldaho Code 551- s41, . I begin by considering questions related to whether or not a CPCN should be issued. I consider if the Company's decision to invest in emission cont.rols is necessary and whether the project is least cost and least risk for customers over the long-term when compared to othe:: alternatives given inf ormati-on known at. this time. The second objective considers factors that ensure the project is consLructed and deployed in a cost effective manner. First, under ldaho Code 56L-541 CASE NO. IPC-E-13-16 to/L1-/1,3 LOUTS, M. (Di) STAFF 29L t_ 2 3 4 5 6 7 8 9 t_0 1L L2 13 L4 15 15 a7 L8 1,9 20 2L 22 23 24 25 (2) (b) (iii) , I analyze whether any or all of the Company's proposed budget for the SCR investments should be pre- approved by the Commission. Second, under ldaho Code S5l--541- (2) (b) (iv), I recommend an approach for handling project variances. A table of contents is provided beIow. Table of Contents Page No. Prudence of Proposed Investment Drivers for Investment. Sufficiency of Company Analysis Prudence of the Project Budget Maximum Pre-approved Amount Method of Handling Project Variances Summary and Recommendations Prudence of Proposed Investment Drivers for Investment page 5 page 5 page 6 page 20 page 20 page 29 page 32 LOUTS, M. (Dl) STAFF O. Please describe the primary drivers for the need to invest in SCR emission conErols for Jim Bridger generating Units 3 and 4. A. In complj-ance with Clean Air Act Regional Haze (RH) rules, The Wyoming Department of EnvironmenEal Quality (WDEQ) through its State Implementation Plan (SIP) requires Ehe Company to install SCR emission controls by December 201,5 on Jim Bridger Unit 3 and by December 20L5 on Unit 4 to limit Nitrogen Oxide (NOx) emissions to 0.07 lbs/MMBtu (on a 30-day rolling average). Because the SIP is CASE NO. rPC-E-13-15 to / Lt/ t3 292 1 2 3 4 5 6 7 8 9 1_0 11 1,2 l-3 t4 15 1-5 1,7 1_8 L9 20 2L 22 23 24 25 enforceable by the State of Wyoming, the Company must discontinue operatj-on or install the necessary controls by the dates stipulated in the SIP to continue operation. The Company relies on L'74 MW and 177 MW of net dependable baseload capacity from Units 3 and 4, respectively. This represents approxj-mately L0? of Idaho Power's total system generation capacity and approximately L9e< of the Company's baseload capacity. The Company would need to maintain at least an equivalent amount of baseload capacity to contj-nue to reliably and economically meet customer's electricity needs. Therefore, permanently halting operation of Bridger Units 3 and 4 without replacing its generation capacity is not an option. Sufficiency of Company Analysis O. Please provide a brief description of the Company's analysis. A. The Company's analysis consisted of two separate types of studies: (1) a static unit by unit analysis performed by an outside consultant, and (2) a system analysis using fixed cost assumptions from the static analysis combined with variable costs derived from the Company' s AURORA modeI. For both studies, net present value (NPV) cost comparisons were made using alternatives to j-nvesting in SCR controls. Nine different combinations of natural gas cAsE NO. rPC-E-13-16 t0 / 1-1-/ t3 LOUTS, M. (Di) STAFF 293 L 2 3 4 5 5 7 8 9 10 11 t2 13 L4 L5 L6 l7 18 19 20 27 22 23 24 25 and carbon price forecasts were examined. The NPV costs were calculated across a twenty-year tj-me period from the year 2Ol3 through 2032. The static analysis looked at each Jim Bridger unit individually. This analysis provides a cost comparison for each alternative resource as if it is dispatched in exactly the same way as the Jim Bridger unit lt is assumed to replace. Although this analysis illustrates the operating characteristic differences between the different alternatives, its value is limited because the calculated NPV costs are not representaEive of how the alternative would be realistically dispatched within the Company's overall system. By contrast, the system analysis dispatches each generati-on resource based on j-ts own costs and operating characEeristics. For example, ga.s generation alternatives are dispatched according to their respective fuel costs and heat rates, insEead of being dispatched like the coal units they are intended to replace. Because of these reasons, the Company's system analysis more realistically reflects how each alternative mj-ght actually operate in the Company's system. This provides more realistj-c NPV comparJ-sons when testing sensitivit,y t,o natural gas and carbon prJ-ces. O. What alternatives to the "Upgrade" proposal, CASE NO. IPC-E-13-15 t0 /tL/13 LOUIS, M. (Di) STAFF 294 1 2 3 4 5 5 7 I 9 L0 l_1 1-2 L3 L4 l_5 16 t7 l-8 1,9 20 2t 22 23 24 25 investing in SCR controls for Jim Bridger Units 3 and 4 on the SIP complj-ance deadlines, did the Company choose to compare? A. Idaho Power analyzed and compared the following four different alternatives to the "Upgrade" proposal: 1. Natural Gas Conversion - Each Jim Bridger unit j-s converted to natural gas fuel by the SIP compliance deadlines. 2. Retire and Replace Each Jim Bridger unit is retired and replaced by an equal-sized combined cycle combustion turbj-ne (CCCT) gas plant with operating characteristics simj-Iar to the Langley Gulch CCCT plant by the SIP compliance deadlines. 3. CTA Natural Gas Conversion - This i-s a compliance timing alternative (CTA) that is identical to the "natural gas conversion" alternatj-ve described in number 1 above, except it is assumed the SfP compliance deadline can be delayed by five years. 4. CTA Retire and Replace This is a compliance timing alternatj-ve (CTA) that is j-dentical to the "retire and replace" alternative described in No. 2 above, except it is assumed the SIP compliance deadline can be cAsE NO. rPC-E-L3-L6 to /tt/1,3 LOUTS, M. (Di) STAFF 295 1 2 3 4 5 6 7 I 9 10 11 t2 13 L4 15 15 1,7 18 L9 20 2L 22 23 24 25 delayed by five years. O. Were the number and type of resource alternatives reasonable for comparison purposes? A. I believe so. Based on fdaho Power's analysis methodology, I believe the goal was more to confj-rm the inst.al-lation of emission controls as the most economical solution given current and future circumstances rather than to ident,ify the one best solution using a clean sheet approach. By using an incremental approach, the Company was able to use a minimal set of highly feasible alternatives to get an indication it was choosing the best course of actj-on. The strength of that indication, which in this case is the magnit,ude of difference in NPV between each alternative and the "Upgrade" proposal, told the Company if it was making t.he best decision or if a more detailed and rigorous analysis was waranted. O. How did you assess if the alternatives used were feasible and suitable for comparison? A. I identified four factors that are important to test feasibility. To be feasible, the alternatj-ve needed to meet all four criteria. First, all the alternatives needed to meet the reliability needs of Idaho customers. As explained previously, Jim Bridger Units 3 and 4 provide approximately 19* of the Company's baseload generation capacity. In addition, fdaho Power already has a large cAsE NO. rPC-E-13-16t0/Lt/L3 LOUTS, M. (Di) STAFF 296 L 2 3 4 5 6 7 8 9 l_0 l_ l- t2 L3 l4 l-5 L5 L7 18 1,9 20 2t 22 23 24 25 amount of seasonal or intermittent hydropower and wind resources. Alternatj-ve resources considered as part of the analysis must be dispatchable and reliable year round. Second, the alternatives needed to have a cost that can reasonably compete with an SCR equipped Bridger unit to minimize rate impact to Idaho customers. The Jim Bridger facillty currently has the lowest dispatch cost of all of the Company's generation resources. The types of alt,ernatives t,hat can compete economically while meeting all the other criteria is realistically very limited, even with the additional cost of SCR controls and potential future environmental compliance costs. Third, the alternatives needed to meet or surpass all current and potential environmental regulations relevant to each alternative, including regulatj-ons under consideration for the Jim Bridger units. Fina11y, all alternatives for comparison needed to be constructed and operational by the SIP complj-ance deadline. O. Do you believe the compliance timing alternatives considered by Idaho Power were realistic? A. At one time t,here may have been an opportunity to negotiate a delay in the Regional Haze compliance dates in exchange for shutting down one or both units and replacing them with an alternatj-ve resource. However, I believe the cAsE NO. IPC-E-L3-15 t0 /tt/13 LOUIS, M. (Di) 1O STAFF 297 1 2 3 4 5 6 7 8 9 10 1_1 t2 13 L4 l_5 L6 t7 18 t9 20 2t 22 23 24 25 opportunity for delay no longer exists. O. Why do you believe Lhe opportunity to delay compliance no longer exists? A. There are several reasons. First, the Wyoming SIP carries the force of law in the State of Wyoming until such time as the EPA approves it or replaces it with a Federal Implementation P1an. Second, on May 23, 2013, the EPA created additional certainty by re-proposing rules t,hat will approve the Wyoming SIP making the SIP requirements federally enforceable upon final approval. Third, PacifJ-Corp, as a majority partner and owner-operator of the Jim Bridger facilit,y, is moving forward with installing the controls. It received a CPCN in both Utah and Wyoming on May 29, 2OL3 and May 10, 201-3, respectively, and signed an Engineering, Procurement, and Construction (EPC) contract to install the controls. In reviewing the contractual obligations between the two companj-es, f bel j-eve it would be very difficult for Idaho Power to pursue a different alternative than what PacifiCorp has already selected without significant additional cost. O. What would Idaho Power need to do if iE decided not to participate in PacifiCorp's installation of envlronmental controls? A. I believe the most, feasible option would be for Idaho Power to seII its share of the facility Eo PacifiCorp cAsE NO. rPC-E-13-15 L0/11-/L3 LOUTS, M. (Di) 1-L STAFF 298 1 2 3 4 5 6 7 8 9 l_0 l_1 t2 l_3 L4 t_5 16 L7 18 19 20 2t 22 23 24 25 or a third party. Although the possibility exists, f believe there is 1itt1e incentive for PacifiCorp or a third party to buy out Idaho Power's share in the time frame required. Moreover, Idaho Power would incur potential costs associated with stranded assets, the additional cost of replacing lost .Iim Bridger capacity, and damages owed to PacifiCorp for breach of contract (See Company response to St,aff Production Request No. 9 attached as Staff Exhibit No. 101-) . a. Despite your belief that negotiating a delay in the compli-ance deadlj-nes in exchange for shutting down Units 3 and 4 is not realistic, do you see value j-n analyzing the compliance timing alternatives? A. Yes I do. f believe the CTA analysis demonstrates how much more cost effect,ive Idaho Power's proposal is over the "natural gas conversion" or "retire and replace" alternatives. WiEh the CTA option, the "natural gas conversion" and "retire and replace" alternatives allow operation of Jim Bridger Units 3 and 4 without additional operational and capital costs of SCR controls for a period of five years. It also avoids five years of carrying costs associated with the capital required to build a CCCT plant or t.o convert Jim Bridger Units 3 and 4 to burn natural gas. Even with these advantages, the SCR "Upgrade" option was most economical, cASE NO. rPC-E-13-l-6 L0/1-1-/t3 LOUIS, M. (Di) STAFF 299 l2 o 1 2 3 4 5 6 7 B 9 10 11 1,2 l-3 l4 l_5 1-6 1,7 18 19 20 2L 22 23 24 25 providing furt.her evidence justifying the Company's proposal. A. Please describe how Idaho Power evaluated risk associated with each of the alternatives considered. A. The Company's analysis focused on Ewo primary risk factors that would cause significant NPV differences between each of the alternatives: carbon dioxide (CO2) price and natural gas price. These factors were chosen because the alternatives being compared are primarily fueled by coal or natural gas. The Company calculated nine NPV results using combinations of three different CO2 and three different natural gas price forecasts. Comparing the NPV results across the nine alternative model runs provides an effective evaluation of risk associated with each resource alt,ernative . Overall, I believe the factors chosen and the methodology used to evaluate risk in the Company's analysis are reasonable. a. Do you believe the natural gas and CO2 price forecasts used are reasonable? A. I do, with some caveats related to the natural gas price forecast. Fj-rst, the natural gas and CO2 price forecasts were identical to the forecasts used to develop the 201,3 Integrated Resource PIan (IRP). This means they were reviewed publically through the IRP Advisory Council cAsE NO. rPC-E-13-L5 1-o / L1-/13 LOUTS, M. (Di) 13 STAFF 300 L 2 3 4 5 6 7 8 9 l_0 11 1,2 l-3 L4 L5 15 1,7 l_8 19 20 2t 22 23 24 25 as part of the IRP development process. Second, the forecast,s were based on data from repuEable third party sources. The CO2 price forecast utilized data from the "201-l-" and "207-2 Carbon Dioxide Price Forecast" published by Synapse Energy Economics, Inc. The nat,ural gas forecast was derived from the "Annual Energy Outlook, 201-2" published by the US Energy Information Administration (EIA) . With respect to CO2, the Idaho Power CO2 price forecast is somewhat more conservative when compared to the forecast used by PacifiCorp in its 2Ol3 IRP. This favors t,he "natural gas conversion" and "reEire and replace" alternatives by phasing in CO2 cost earlier. ft also provides a forecast t.hat is approxi-mately equal to the PacifiCorp forecast in the low and planning CO2 cases and consistently higher in the high CO2 case over the analysis time period. However, I believe the Company's natural gas forecast may be less conservative by being higher than other nominal forecasts. This favors investment in SCR controls over natural gas fueled alternatives. The Company applied a three percent inflation rate to the EIA forecast in real 20lO dollars to get a nominal do11ar forecast over the planning period. When compared to PacifiCorp or EIA's nomj-na1 dol1ar forecast, Idaho Power's gas price forecast CASE NO. IPC-E-13-]-5 t0/1-1-/L3 LOUTS, M. (Di) STAFF 301 a4 1 2 3 4 5 6 7 8 9 10 11 t2 13 L4 15 15 1,7 18 t9 20 2t 22 23 24 25 is considerably higher, especially in the out years. Although I don't believe the Company's method is necessarily unreasonable, I believe that uslng EIA's nominal do11ar forecast is more transparent and uses an inflation rate that is likeIy more accuraEe for natural gas. For comparison purposes, these forecasts are illustrated in Staff Exhibit No. 1-02. O. How does Idaho Power's comparatively higher natural gas price forecast affect the analysis? A. To better understand how the natural gas forecast affected the analysis, I looked at the "tipping point" analysis provided by t,he Company in response to Staff Production Request No. 44. The analysis determined how much gas prices would need to decrease to make the next best alternative more economical than investing in SCR controls (the planning CO2 price forecast was used as t,he baseline). The analysis showed that natural gas prices on average would need to decrease by 52 percent in order to make the "retire and replace" with a CCCT alternative more economically favorable. Because this percentage decrease is larger than the percentage difference between the Company's gas price forecast and EIA's nominal forecast, I concluded that the differences in the natural gas price forecasts are not substantial enough to change the Company's final recommendation. Regardless of the forecast CASE NO. IPC-E-13-15 to /tt/1,3 LOUTS, M. (Di) STAFF 302 l_5 l_ 2 3 4 5 6 7 8 9 L0 11 t2 l_3 14 15 15 a7 18 'J,9 20 2t 22 23 24 25 used, the forecast would O. Were there any consj-der regarding risk? have to be considerably 1ower. other important factors to A. The other important factor is the cost of compliance for future environmental regulations beyond Regional Haze. For some of the regulations, there is considerable uncertainty about what will be required. Potential future regulations subject to consideration for ,Jim Bridger Units 3 and 4 lnclude: (1) Mercury and Air Toxic Standards (MATS) Ru1e, (2) Clean Water Act Section 3l-6 (b) , (3) Coal Combustion Residuals (CCR) , and (4) future regulations to limit greenhouse gas emissions. O. How did Idaho Power account for these potenEial compliance costs? A. With the exception of greenhouse gas regulations, the Company included incremental capital and operation and maintenance costs for controls required by each regulation depending on the type and technology of each alternative under considerat.ion. Most of the incremental cost est,imates were originally developed by PacifiCorp. However, the consultant hired by Idaho Power to do the "static" analysj-s was tasked to review and valj-date all of the capital and variable cost assumptions, including the cost of replacement capacity and environmental compliance costs for each alternative. Given the highly technical cAsE NO. rPC-E-13-15 to/L1-/L3 LOUTS, M. (Di) t6 STAFF 303 l_ 2 3 4 5 5 7 8 9 10 11 t2 13 t4 1-5 L5 L7 l_8 19 20 2t 22 23 24 25 nature of environmental control technology, I believe this approach provided reasonable assessment of potential future environmental costs and added credibility to the Company's analysis. O. How did Idaho Power account for greenhouse gas regulation compliance costs? A. EPA Greenhouse gas regulations for exj-sting sources are currently not expected to be finalized until June of 2015. Nevertheless, the Company included a surrogate CO2 cost adder to the variable cost of each alternative on a do1lar per megawatt-hour basis with the fu1I CO2 cost charged to coal-fueled alt.ernatives and 50? of the cost charged to natural gas fueled alternatives because CO2 emlssions for natural gas are approximately half that of coal. As mentioned earlier, the coz cost was included as a sensitivity variable. I believe this is reasonable treatment for greenhouse gas compliance costs until a framework for EPA rulemaking is proposed and finalized. O. Did higher CO2 prices affect the NPV results? A. When high CO2 costs were combined with the Iow natural gas price forecast j-n the Company's analysis, the "retire and replace" was a better alternative economically than the "upgrade" proposal based on the NPV results. To understand the sensitivity of the analysis on CO2 price CASE NO. IPC-E-13-15 t0 / 1-L/ t3 LOUTS, M. (Di) L7 STAFF 304 1 2 3 4 5 6 7 8 9 10 t_ t_ t2 13 1,4 15 L5 t7 l-8 19 20 2L 22 23 24 25 aIone, f requested the Company perform a "tipping point" analysis to determine how much CO2 prices would need to increase to make the next best alternative more economi-caI than investing in SCR controls using the planning natural gas price forecast case as a baselj-ne. The analysis showed that CO2 prices on average would need to increase approximately 423 percent in order to make the "retire and replace" alternative more economically favorable. O. Is there anything else you considered in the Company's analysis leading to its decision Eo upgrade Jim Bridger Units 3 and 4? A. Yes. The EPA has not yet approved the Wyoming SIP regarding NOX compliance for Bridger Units 3 and 4. However, after several delays by the EPA, the agency released a re-proposal to effectively approve SCR installation on Units 3 and 4 by December 201-5 and 20L5, respectively, by authorizing an emissj-on limit of 0.07 lbs/MMBtu. rf the EPA issues a notice of final rulemaking on November 21, 201-3 as expected with no changes to the re- proposal, it will effectively make j-nstallation of SCR controls federally enforceable. In the unlikely event that the EPA decides to change the Wyoming SfP, it would probably make the requirements more stringent. O. Did the Company consider this contingency? A. Yes. The Company, through PacifiCorp as the CASE NO. IPC-E-].3-].5 to / tt/ t3 LOUTS, M. (Di) l-8 STAFF 305 1 2 3 4 5 5 7 I 9 L0 11 t2 13 1,4 15 t5 L7 l_8 19 20 2L 22 23 24 25 operator of the pIant, has signed a Limited Notice to Proceed (LNTP) contract with an EPC contractor to design and install the controls. The LNTP alIows the Company flexibility to make changes to the specifications of the design and purchased equipment to meet a 0.05 Ibs/ttuetu NOX limit up to the date the EPA is expected to issue its final ruIes. O. Would the additj-onaI cost of meeting a more stringent emission limit change the outcome of the alternative analysis performed by the Company? A. I do not believe it wouId. Based on the Company's response to Staff Production Request No. 5, t,he incremental capital cost of meeting a 0.05 Ib/MMBtu NOX limit is estimated to be less than $1.7 million per unit. Amortized over the life of the unj-t, and brought back to present value over the study period, the effect on the NPV results for the "upgrade" proposal would not. make a material difference. a. What do you recommend based on your review of the Company's analysis? A. Based on the overall sufficiency and reasonableness of the Company's analysis and also based on the overall magnitude of difference in net present value between each alternative and the "upgrade" proposal for the different sensitivity scenarios, I agree with the Company's cAsE NO. rPC-E-13-l_5 1-o / 1-t/ 1-3 LOU] S, M. (Di) t9 STAFF 306 1 2 3 4 5 6 7 8 9 10 11 t2 l-3 t4 15 15 t7 18 t9 20 2t 22 23 24 25 "upgrade" proposal and recommend the Commission issue a CPCN pursuant to Idaho Code S6L-525. Prudence of the Project Budget Maximum Pre-approved Amount O. How did you determine your recommended level of project costs eligible for binding ratemaking treatment pursuant to Idaho Code S6f -541-? A. Pursuant to ldaho Code s51-541 (2) (b) (iii), the Commission is to consider "the maximum amount of costs that the Commission will include in rates at the time determined by the Commission without the public utility having the burden of moving forward with additional evidence of the prudence and reasonableness of such costs." Based on this guidance, I believe bj-nding ratemaking treatment in this case should be limited to only those expense categories that are necessary, and known and measurable with a high Ieve1 of certainty. I also recommend that each category of cosEs should be pre-approved individually rather than on a total project cost perspective. This protects against premature approval of budgeted amounts when actual costs on an individual caEegory basis could be potentially lower. This approach ensures the Commission's right to review the prudency of actual cost before they are put into rates. O. Why should uncertain budgeted amounts for individual project categories be excluded from pre- CASE NO. IPC-E-13-16 L0 / tt/ t3 LOUTS, M. (Di) 20 STAFF 307 1 2 3 4 5 6 7 I 9 10 11 72 L3 L4 15 1,6 l7 18 L9 20 21" 22 23 24 25 approval? A. There are two reasons. First, excluding uncertain amounts incents the Company to contj-nue to find cost-effective ways of implementing a project once lt is underway. Pre-approval of budgeted amounts that are set usj-ng liberal estimating methods or thaL include slack from contj-ngency amounts a1low project managers to spend up to the amount of their authorized budget without regard for potential savings. Second, excludlng uncertain amounts protects against recovery of a fuI1 pre-approved amount if actual costs are l-ess. Consequently, I recommend that the Commission conservatively set pre-approved project costs to assure costs are reasonably incurred in aI1 cost item categories throughout project development. a. Will the Company have difficulty financing the project if the Commission denies pre-approval of costs on a total project basis? A. Not necessarily in this case. In response to Staff's Productlon Request No. 18, which asks how the project will be flnanced, the Company said, Idaho Power expects to finance this projectconsistent with the financing of its totalconstruction program. The Company expectsto finance it,s capital requirements with acomblnation of internally generated funds and externally financed capital. Idaho Power has not entered into any alternativefinancing agreements and therefore has not developed a financing payment schedule basedon non-t.raditional f inancing schemes. CASE NO. IPC-E-13-15 Lo / tL/ 1-3 LOUTS, M. (Di) 2t STAFF 308 1 2 3 4 5 5 7 8 9 10 1l_ 1,2 l_3 L4 L5 l_5 L7 18 L9 20 2a 22 23 24 25 Because Idaho Power is using a combinatj-on of internally generated funds and capital from its overall construction program budget and is not required to secure financing specifically for this project, Ehe need for binding ratemaking treatment to secure favorable financing is reduced. Moreover, the Company's ability to secure favorable financing is not a requirement of ldaho Code s51-54L. Therefore, more of the focus should be placed on assuring that project costs are properly incurred and are subject to review when actual costs are known. This means t.hat uncertain budgeted amount.s should not be included in the pre-approved total. A. Does Idaho Power's shared ownership of Bridger with PacifiCorp affect your recommendations in this case? A. Yes. PacifiCorp, as the operat,or of the pIant, has the responsibility to manage the project. However, Idaho Power stil1 has a responsibility to make sure PacifiCorp does everyt,hing it reasonably can to implement the project cost-effectively. A. Is there evidence that the Company has had difficulty providing managerial oversight of its operating partner's operating and investment decisj-ons in the past? A. Yes. For example, in Oregon Case UE 233 (Order No. 1,3-L32), the Oregon Commj-ssion dj-saIlowed Idaho Power 309CASE NO. IPC-E-].3-15 t0/1-L/t3 LOUTS, M. (Di) 22 STAFF l- 2 3 4 5 6 7 I 9 10 1l_ t2 L3 l4 15 t6 1,7 18 L9 20 2L 22 23 24 25 management expenses because t.he Company was "unaware of the existence of a key sEudy underlying the decision to upgrade Bridger 3," in its general rate case. O. What. amount do you recommend for pre-approval j-n this case? A. The only costs I recommend for binding rat.emaking treatment are the amount of the EPC contract and actual costs already incurred during the development phase. I have illust,rated my recommendatj-ons for budget pre-approval by expense category in Staff Exhibit No. 103. O. Please explain how Staff Exhibit No. 103 is organized relatj-ve to your testimony. A. Staff Exhibit No. 103 illustrates amounts included and excluded in Staff's proposed Commitment Estimate by cost item category. Amounts included in Staff's proposed Commitment Estimate are further broken down by actual cost shown in Column 1 and by estj-mates from competitive bids and contracts shown in Column 2 with Staff's total proposed amounts shown in Column 3. Amounts excluded from Staff's proposal are shown in Columns 4 and 5. Column 4 shows amounts that require both fu11 prudence review and cost verj-fication because there are questions whether the cost item is necessary. Column 5 reflects amounts for cost item categories that I believe are necessary; however, the amounts are uncertain at this time CASE NO. IPC-E-13-15 1o/L1-/t3 LOUTS, M. (Di) 23 STAFF 310 1 2 3 4 5 6 1 8 9 10 l_1 72 13 L4 15 t6 L7 1B 19 20 2! 22 23 24 25 (This page, consisting of prefil-ed direct testimony of Mike Louis, is CONFIDENTIAL and under separate cover at the Commission. ) 311 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD t,ouIS, M. (Di) STAFE83701 1 2 3 4 5 6 7 I 9 10 11 1"2 13 t4 15 1_6 t7 18 19 20 2L 22 23 24 25 (This page, consisting of prefiled direct testimony of Mike Louis, is CONEIDENTIAL and under separate cover at the Commission. ) 312 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD LOUTS, M. (Di) STAFF83701 1 2 3 4 5 6 7 I 9 10 11 12 13 L4 15 t6 L7 18 19 20 2L 22 23 24 25 (This page, consJ-sting of prefil-ed direct testj-mony of Mike Louis, is CONFIDENTIAL and under separate cover at the Commissj-on. ) 313 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD LOUTS, M. (Di) STAEE83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 L6 L1 18 1,9 20 2L 22 23 24 25 (This page, consisting of prefiled direct testimony of Mike Louis, is CONFIDENTIAL and under separate cover at the Commission. ) 3]-4 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD LOUTS, M. (Di) STAFE83701 1 2 3 4 5 6 7 8 9 10 11 L2 13 L4 15 t6 L1 18 79 20 27 22 23 24 25 (Thj-s page, consisting of prefiled direct testimony of Mike Louis, is CONFIDENTIAL and under separate cover at the Commission. ) 31s HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD 83701 LOUTS, M. (Di) STAEF 1 2 3 4 5 6 7 I 9 10 11 !2 13 t4 15 L6 L7 18 19 20 27 22 23 24 25 (This page, consisting of prefil-ed direct testimony of Mike Louis, is CONEIDENTIAL and under separate cover at the Commission. ) 3L6 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD 83701 LOUTS, M. (Oi1 STAFF t_ 2 3 4 5 6 7 I 9 10 11 l2 13 t4 15 16 1,7 l_8 19 20 2t 22 23 24 25 rates. Second, in those proceediflgs, all actual expenditures should be reviewed against pre-approved amounts by cost item category. Any actual cost item category that exceeds the pre-approved budget amount should be reviewed to ensure any amount above the soft-cap for each category is reasonable and prudent. Soft-cap j-s defi-ned as the maximum amount the Commission will aIIow without performing a prudence review of any excess amount above the cap before being put into rates. This recommendation is an augmentation of the soft-cap used in the Langley Gulch CPCN case (IPC-E-09-03), where the soft- cap was set for the total approved Commitment Estimate. Unlike Langley Gu1ch, however, in which the project was constructed mostly under a single EPC contract, this project will possibly entail as many as four additional contracts. Set,t,ing a sof t-cap for each cost category will ensure a higher leve1 of cost control by not. allowing slack in one expense category estimate to serve as a cost contingency for another category with unrelated expenses. Third, I recommend that the Commission allow either all or none of the expense in any category to be approved. If the Commission only pre-approves a percentage of each category, it is 1ike1y the Company will exceed the soft-cap for those categories requiring a fuII prudence CASE NO. rPC-E-L3-l-5 to / tt/ t3 LOUTS, M. (Di) 30 STAFF 3L7 l_ 2 3 4 5 6 7 I 9 L0 l_1 t2 13 l4 15 t6 t7 l_8 t9 20 2L 22 23 24 25 review of all expenses within that category at the time they are put into rates. Fourth, if the Commj-ssion does al1ow partial pre- approval of the Company's estimate of a cost item category, any amount put into rate base should not exceed the actual cost of that category. The Company says in it.s Application that, "Should Ehe cost of the project be less than the cost est.j-maLe, the savings would direct,ly benefit the customer through a lower amount in rate base." I agree with the Company's proposal that any amount put into rate base should not exceed act,ual cost. However, I recommend, consistent with my earlier recommendation, that this apply to each cost item category in isolation and not for the total pre-approved amount. Fifth, t,he Company should provide to the Commission quarterly project updates that illustrate plan vs. actual status of expenditures by cost item category and for the overall project timeline. This will alert the Commission of major difficulties, unseen clrcumstances or changes in scope throughout the life of the project. It will also provide better documentation when reviewing prudence in a subsequent proceeding. Finally it will ensure that Idaho Power is actively performing oversight of a project PacifiCorp is managing. O. Please discuss any other issues related to CASE NO. IPC-E-13-16 t0 / 1,1/1,3 LOUTS, M. (Di) STAFF 31318 1 2 3 4 5 6 7 I 9 10 11 12 13 L4 15 t6 L7 18 79 20 2L 22 (This page, consisting of prefiled direct testimony of Mike Louis, is CONFIDENTIAL and under separate cover at the Commission. ) 319 HEDRICK COURT REPORTTNG P. O. BOX 578, BOTSE, rD 23 24 25 LOUTS, M. (Di) STAEE83701_ 1 2 3 4 5 6 7 8 9 10 11 L2 13 L4 15 L6 L7 18 t9 20 2L 22 23 24 25 (This page, consisting of prefiled direct testimony of Mike Louis, is CONEIDENTIAL and under separate cover at the Commission. ) 320 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD LOUTS, M. (Di) STAFF83701 L 2 3 4 5 6 7 I 9 l_0 1_ l- t2 13 l4 15 1,5 L7 18 L9 20 2L 22 23 24 25 6. The Company should develop a method with its partner, PacifiCorp, to ensure the ability to track costs by cost item category and Work Breakdown Structure element so that prudency can be reviewed on an on-going basis. O. Does this conclude your direct testimony in this proceeding? A. Yes, it does. CASE NO. IPC-E-1.3-15 t0 / tt/ t3 LOUTS, M. (Di) 34 STAFF 32L (The following proceedings were had in open hearing. ) (Staff Exhibit Nos. 101 through 103, havJ-ng been premarked for identification, were admitted into evidence. ) MS. SASSER: And I would open him up for cross. COMMISSIONER SMITH: Any questions from the Company? MS. REINHARDT-TESSMER: I have just a couple. CROSS-EXAM]NATION BY MS. REINHARDT-TESSMER: O. Mr. Louis, is it fair to say that the Company's commitment estimate provides a gauge to the Commission of reasonable costs the Company bel-ieves it's necessary to incur for a particular project? A. I woul-d say for this particular project, parts of it are what I would say known and measurabl-e, and some of them are not. 0. But would you agree that, for example, it will be necessary to incur additional expenses beyond that amount that you recommended for binding ratemaking treatment in order to reasonably construct ox, excuse me, implement the SCRs? A. I be]ieve that thatrs I believe that that's a 322 2 3 4 5 6 7 I 9 10 11 t2 13 L4 15 t6 t7 18 19 20 21, 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 518, BOTSE, rD LOUIS (X) Staff83701 possibility, y€sr I do. 0. In other words, even though we can't measure them with 100 percent accuracy, there's a substantial number of items left out in your preapproved ratemaking recommendation that wil-1 have to be incurred by the Company? A.Potentially, yes. I believe that there will be additional- costs that are represented in your commitment estimate. I do believe that the uncertainty and the fact that they are not fu1ly known and measurable, that that does beg a question of whether or not they should be up for preapproval. a.Would you agree that if the Commission approves the Company's application in this proceeding j-n the ful1 amount of the Company's commitment estimate, that the Company would stil-l have a duty to execute the project in a prudent manner? A. I bel-ieve that is the case, that they do have that duty. 0. And if a party fel-t that they did not execute the project in a prudent manner, they could challenge that during a related rate case. Correct? A. Parts of it cou1d be challenged, parts of it couldn't. If we preapprove parts of the commitment estimate that are not known and measurable, they may not be up for challenge. They would not be up for challenge, depending upon whether or not the amount above the commi-tment estimate above the commitment estimate for the cost categories that I'm 323 2 3 4 5 6 7 I 9 10 11 L2 13 t4 15 L6 77 18 L9 20 2L 22 23 24 25 HEDRICK COURT P. O. BOX 578, REPORTING BOISE, ID LOUrS (x) Staff83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 1,6 t7 18 L9 20 21_ 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUrS (x) Staff recommending be reviewed separately whether or not those were exceeded or not. A. Just so we can be clear: So the Company woul-d stil1 have a duty to execute the implementation of the SCRs 1n a prudent manner even if they obtained approval from this Commission in the fuII amount of the Company's commitment estimate. Correct? A. Yes. I bel-ieve that the Company would dutifully try to implement the project in a prudent manner. I bel-ieve that that would be the intention of the Company. Whether or not the incentives are there and in place to make sure that they are the most cost effective ways, that they are to implement the project, i-s in question because of the uncertain amounts of some of the estimates. O. Ir11 change directions. Do you bel-ieve that it is reasonable for the Commission to grant the Company binding ratemaking treatment that correl-ates to the amount that you've recommended for binding ratemaking treatment? A. I do. MS. REINHARDT-TESSMER: I don't have anything further. COMMISSIONER SMITH: Thank you. Mr. Richardson. MR. RICHARDSON: Thank you, Madam Chair. 324 83701 1 2 3 4 5 6 7 8 9 10 11 t2 13 1,4 15 16 77 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUrS (X) Staff CROSS-EXAMINATION BY MR. RICHARDSON: O. Good afternoon, Mr. Louis. A. Good afternoon. O. Just following up on your questions from Idaho Power, if Idaho Power still if they -- if the Commission grants blnding ratemaking treatment, you said that Idaho Power would stil-l- have to show that it was invested in a prudent manner? COMMISSIONER SMITH: So while Mr. Louis i-s thinking of that, President Kjellander has an important thing to take care of and we'Il be off the record just for a moment. (Discussion off the record. ) COMMISSIONER SMITH: Mr. Richardson, I apologize for interrupting your cross. MR. RICHARDSON: Not a problem, Madam Chair. O. BY MR. RICHARDSON: Do you recall the question? A. Could you please repeat it for me, please. MR. RICHARDSON: Could you read the question back. (Whereupon, the requested portion of the record was read by the court reporter. ) THE WITNESS: What I said was that parts of it, they would have to, depending upon how the Commission approves 325 83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 16 L7 18 I9 20 2L 22 23 24 25 HEDRTCK COURT REPORTINGP. O. BOX 578, BOTSE, rD 83701 LOUIS (X) Staff the costs. I'm suggesting that in my testj-mony I'm suggesting that they approve, track, and review those costs by cost item category. Some of those cost item categories f believe or at least one in particular I bel-j-eve is not -- may not be necessary. There are several- that are uncertain. In those cases, I am not recommending preapproval-. MR. RICHARDSON: That's all I have, Madam Chair. COMMISSIONER SMITH: Thank your Mr. Richardson. Mr. Miller. MR. MILLER: Thank you, Madam Chairman. Hey, Rick, could you move just slightly? CROSS_EXAMINATION BY MR. MILLER: O. Good afternoon. A. Good afternoon, Mr. Mil-l-er. O. Is the packet of Snake Rj-ver Al-liance exhibits stil-I on the hearing stand? A. It is. O. Vfoul-d you dJ-rect your attention to Exhibit 410. A. Okay. A. Are you with me? A. I'm with you. O. AII right. During the course of this proceeding, 326 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 16 L7 1B 1,9 20 27 22 23 24 25 HEDRICK COURT REPORT]NG P. O. BOX 578, BOTSE, rD LOUIS (X) Staff did the Snake River A]Iiance submit to the Commission Staff certain production requests numbered one through six? A. They did. O. And did the Staff prepare responses to those requests? A. Yes, we did. 0. And were you the primary author of a response in consultation with other Staff members and Ms. Sasser? A. I was. A. Yes? A. I was. O. Were the answers to the questions that are set forth in Exhibj-t 10 410 correct, to the best of your knowledqe, when you wrote them? A. Yes, they are. O. Are they correct, to the best of your knowledge, today? A. They are. They have not changed. O. In the in Staff 's opi-nion WeII, those are all the questions f have on Exhibit 4L0, and the Commission can read the questions and answers without me having to spend time here. Now, in Staffrs opinion, has the Company, Idaho Power, made a compelling case that binding ratemaking treatment is necessary in order to finance these investments? 327 83701 1 2 3 4 5 6 7 I 9 10 11 72 13 !4 15 L6 77 18 l-9 20 21, 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUIS (X) Staff A. I believe that they have made an application, which is their right to do so under state law. I believe that they have the right to do so and I believe that under the information that was presented, f believe that the that the recommendations that I have made for the for the commitment estimate are reasonable, as well- as the recommendations that I made for tracking actuals versus the commitment estj-mate for cost tracking purposes. a. I understand your answer, I think. The question, however, was I I 1l- rephrase it again has the Company made a compelling case that binding ratemaking treatment is necessary in order to fj-nance the projects? A. In order to finance the project. f believe that that it is not as compelling from a fj-nancing perspective as it coul-d be. O. A11 right. I'm going to foll-ow my own advj-ce again and quit. Thank you for your time. A. Youtre welcome. COMMISSIONER SMITH: Ird say you were ahead on that one, Mr. Mil-Ier. Mr. Otto. MR. OTTO: Irm not going to fol-l-ow Mr. Mi1ler's advice this time and wade into uncharted waters. 328 83701_ 1 2 3 4 5 6 7 8 9 10 11 1,2 1-3 1-4 15 L6 !'7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUIS (X) Staff CROSS-EXAMINATION BY MR. OTTO: O. So, Mr. Louis, I do see you. Here we go. As long as nobody moves, we're good. A11 right, there, fine, stay right there. So on your direct testimony on page 9, begins on Iine 5, you describe the goal of Idaho Power's analysis? A. Yes, I do. A. And thatrs to confirm that the j-nstallatj-on of the controls was most economical given current or future circumstances, rather than identify using a clean sheet approach? A. That's correct. O. Okay. Is it the Staff position that considering the ability of existing capacity and energy to absorb coal retirement is not a relevant factor? A. I believe it is relevant, and I think the analysj-s that the Company performed basically shows that looking at all of the resources in concert working together basically shows that is the lowest cost, lowest risk option. O. WelI, is that the so the coal so the Bridger investment standing alone is the l-owest cost option, not in compari-son to an alternative? A. Coul-d you repeat the questi-on, please? 329 83701 1 2 3 4 5 6 7 I 9 10 l-1 72 13 L4 15 L6 t7 1B 79 20 2t 22 23 24 25 HEDRTCK COURTP. O. BOX 518, REPORTING BOTSE, rD LOUrS (X) Staff O. Are what you 1s what you're saying that the analysis shows that looking just at the Bridger investment alone, that just looks reasonable, not j-n comparison to alternatives? A.I think what I say in my testimony is that looking at, for example, in the SAIC study that was completed, I do not feel- like that is a very strong analysis because it does not l-ook at the alternatives as wel-l- as the BrJ-dger with the upgrades. It does not it does not provide a good net present val-ue comparison as those alternatives would operate in Idaho Power's system. I do believe that the net present val-ue AURORA analysis that was performed by the Company does do that. o. A. presented. o. considering Company? A. o. By comparing to alternatives? By comparing it to the al-ternatives that they So those alternatives, were they designed while the existing capacity and energy position of the I bel-ieve they were, y€s. Even though they did not acknowledge that there is excess energy and now we see excess capacity? A. I bel-ieve that the analysis, the way it's conducted, l-ooks at comparing those al-ternatives in the system as they exist as they stand existingly. So as you compare it against those al-ternatives, they consj-stently showed the 330 83701 1 2 3 4 5 6 7 I 9 10 1t_ t2 13 !4 15 76 t7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 518, BOTSE, rD LOUIS (X) Staff l-owest net present vaJue. The upgrade, the Company's preferred option that they recommend in this case, shows the lowest net present value across the widest range of possj-ble futures. o.And, sure, that makes sense, because you have one option whj-ch is -- we covered with Ms. Grow there are l-56 average megawatts each unit, roughly. So, roughly 300 average megawatts is Bridger, that's one optJ-on, but you paid out a bunch of that plant so you've just got a little bit more to keep that going. Then the other al-ternative is 300 average megawatts of a gas plant. That's what the A. Each one was basically each unit was compared against a separate unit, a separate combined cycle pIant. o. A. Of the same Of the same capacity, with the same characteristics as the Langley Gulch plant. o.Would that comparison change if instead you comparedr sEryr 100 megawatts of exj-sti-ng capacity and maybe 200 megawatts of new? Woul-d the alternative be a lower cost al-ternative than the one compared in the coal study? A. I didnrt perform that analysj-s: I could not teII you what the result would be. o.You're an expert in this area. Just based on your understanding of this system, the portfol-io that starts the 100 megawatts that already exist and adds 200 new, would that be lower cost than a portfol-io that is 300 megawatts of 331 83701 new power; or to put it more simply, is a portfolio that is 200 megawatts of one resource l-ess cost than 300 megawatts of that same resource? A. Are you talking about from a dollar-per-megawatt-hour or -megawatt perspective? O. Any perspective that you want. You have two resources. A. I have two resources. a. One is 200 megawatts. One is 300 megawatts. A. Of wind, of the same types of capacity. MS. SASSER: Madam Chair, these matters are outside the scope of Mr. Louis's testimony. If Mr. Otto wanted these analyses to be accomplished or wanted Mr. Louj-s's answers to these questions, he coul-d have done it through the discovery process and given Mr. Louis a fair opportunity to come to a conclusion. COMMISSIONER SMTTH: MT. Otto. MR. OTTO: Mr. Louis testifies that he supports the comparison the Company did of the different investment alternatives, and I'm just exploring his understanding of the comparative alternative. COMMISSIONER SMITH: We11, I think if you could tighten down your question it would he1p, because, frankly, I got lost, and so I'm certain that maybe the wj-tness mJ-ght have the same confusion that I experienced. 332 2 3 4 5 6 1 I 9 10 11 L2 13 t4 15 t6 L7 18 19 20 21 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUrS (X) Staff83701 1 2 3 4 5 6 7 B 9 10 11 T2 13 L4 15 L6 77 18 1,9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUrS (X) Staff MR. OTTO: Eair enough. a. BY MR. OTTO: Letrs start over here. Herers what I'm asking you: You have the Bridger investment j-s one alternatj-ve. You compare that to a different investment. Are you with me? A. Irm with you, yes. A. Now we're talking about the different investment. Idaho Power used one, yet that investment was designed to have the same number of megawatts as Bridger? A. Thatrs correct, in their analysi-s they did that compari-son, yes, for two different alternatives. O. And that analysis showed that the Bridger investment was a lower net present value? A. That's correct. O. So what I'm asking is looking at that alternate investment, woul-dn't it have been reasonable and informative and 1ikeIy lower cost to use some of the existing capacity as wel-1 as potentially new capacity as the replacement for Bridger? A. I don't understand the question because, first of all, I haven't not I donrt understand which alternate capacity you're talking about for new capacity and I have not done that analysis. My testimony rests on reviewing the Company's analysis. I did not perform my own analysis. 333 83701 1 2 3 4 5 6 1 8 9 10 11 L2 13 14 15 76 t7 18 19 20 2t 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD LOUIS (X) Staff 0. Ir11 move on then. On page 10, line 22, you admit that at one time the Company had the opportunity to negotiate a delay in the complj-ance dates? A. I said -- I would l-ike to requote that. What I say is at one time there may have been an opportunity. O. Fair enough. May have been? A. Yes. 0. We heard today that the Company didn't ever explore that opportunity? A. Idaho Power, to my knowledge, did not, y€s. WelI, Idaho Power, to my knowledge, did not have any discussions. They did run an analysis of that as compliance ti-ming alternatives in their coal- study. O. In 20L3? A. I belleve the study started in 2012. O. Fair enough. So it's the Staff posj-tion that Idaho Power should not bear any consequences for missing an opportunity earller to explore al-ternative compliance dates? MS. REINHARDT-TESSMER: Objection: It misstates pri-or testimony regarding Idaho Powerrs efforts. COMMISSIONER SMITH: Mr. Otto. MR. OTTO: Irm not quite sure I understand the objection. I didn't refer in that questj-on to Idaho Power's testimony. MS. REINHARDT-TESSMER: You're asking him what 334 83701 1 2 3 4 5 6 7 8 9 10 11 t2 13 14 15 16 t7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUrS (X) Staff efforts Idaho Power made and his testimony responsive to that on page 10. Earlier, an Idaho Power witness gave an explanatj-on as to Idaho Power's analysis and compLiance with that directive, and he has mj-sstated that in his question to Mr. Louis. MR. OTTO: I asked Mr. Louis whether the Company -- whether he heard the Company say they did or did not explore the complJ-ance alternati-ve, and he answered that he heard -- weII, he answered the way he answered, that which, f think my understanding, Mr. Louis accurately represented the Company's position. COMMISSIONER SMITH: So is there any way to ask the question and get the answer to the question you want without characterizing a previous witness's testimony, because, frankly, the best place to look for what that witness said is in the transcript, and the Commission can do that. Perhaps you could formulate it as a hypothetical-. MR. OTTO: How about that is a good suggestion, but Irm going to ask j-t a different way. Actually, I'm done. No more questions; no need to answer. COMMISSIONER SMITH: Are there questions from the Commissioners? COMMISSIONER REDFORD: No. COMMISSIONER K,JELLANDER: No. 33s 83701 1 2 3 4 5 6 7 B 9 10 t_1 L2 13 t4 15 L6 !7 1B 19 20 27 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, ID LOUIS (Di) Staff COMMISSIONER SMITH: Ms. Sasser, do we have any redirect? MS. SASSER: Maybe one or two. THE WITNESS: Okay. REDIRECT EXAMTNATION BY MS. SASSER: O. We1I, I think that there was a little confusion with some of the initial cross questions as to what Staff's position is, what your testimony conveys regarding a preapproved amount versus what the Company later has to come in and ask for recovery of. Can you explain that for the people here and the Commissi-oners? If , as Staff 's testj-mony is, your testimony reflects, there j-s a preapproved amount under 541, for 86 mil-l-ion, then and as you explaj-ned to Idaho Power, Staff 's position is to break it down into categories A. That's correct. O. for a categoryr sdy, that is whol1y preapproved, when Idaho Power l-ater comes to the Commission j-n order to be abl-e to include those numbers in rates, is there a prudency review, an additional prudency review, at that time of those preapproved amounts, in your opinj-on i or is the prudency review something that occurs prior to giving a preapproval 336 83701 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 L6 17 18 l_9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD LOUrS (Di) Staff under 54L? A. So, my recommendatj-on, first of all, is that the project over all j-s prudence is prudent from moving forward in a project that's needed and necessary. In terms of ratemaking treatment, what I am suggesting is that the Commj-ssion preapprove by cost item categTory. I have l-aid out in Exhibit 1-- 103 how -- the amounts that f suggest for preapproval and the rational-e for each of those cost item categories. I recommend that the EPC contract and actual- costs to date, that those be preapproved. Eor one of the cost item categories surrounding the O. Can I stop you, only so that I just don't think it's necessary for you to go through each one individually because A. Okay. Excuse me. I have excuse me, go ahead. Excuse me. O. Hardest questi-ons are from your own lawyer. So if the if an amount in a cost category though is preapproved, does that require the Company to come back in and prove prudency of those amounts again j-f j-t's preapproved by the Commission under 54L, in your opinion? A. Only if they -- rror they would not, for the most part, unless they exceed that amount. 0. Thank you. That's what I was trying to get at. 337 83701 1 2 3 4 5 6 7 B 9 10 11 L2 13 L4 15 76 t7 18 t9 20 2L 22 23 24 25 HEDRTCK COURTP. O. BOX 578, REPORTING BOISE, ID LOUIS (Di) Staff Thank you for that. One other question: Mr. Miller was askj-ng about whether preapproval -- whether Idaho Power has proven that preapproval j-s necessary for them to obtain financj-ng. Recognizi-ng that you're not a lawyer but understanding that you've reviewed Idaho Power's application and all of the evidence, 1s it your understanding that in order to get binding ratemaking treatment under 54L, Idaho Power has to prove that it's necessary for them, that binding ratemaking treatment is necessary in order for A. I did not see anything i-n the statute. MR. MILLER: Objection. COMMISSIONER SMITH: Mr. Miller. MR. MILLER: Thank you, Madam Chairman. I object to the question as calling for a conclusion as to what the statute does or doesnrt requj-re, which I think is a an appropriate topic for the briefing that wil-l- come up and which the Staff will- have a complete opportunity to brief, but I don't think j-t's an appropriate topj-c f or thj-s witness who is not a lawyer. COMMISSIONER SMITH: Sustained. O. BY MS. SASSER: Thatrs all I have. Thank you. A. You're welcome, Ms. Sasser. COMMISSIONER SMITH: Thank you, Mr. Louis, for 338 83701 1 2 3 4 5 6 7 8 9 10 11 L2 13 t4 15 t6 1"7 18 1,9 20 2t 22 23 24 25 HEDRTCK COURT REPORTING P. O. BOX 518, BOTSE, rD LOUrS (Di) Staff your heIp. (The witnes$ left the stand. ) COMMfSSIONER SMITH: Dr. Reading is our next witness. Unless there is someone who thinks they have extensive cross for Dr. ReadJ-ng, we will just proceed and not take a break. MR. RICHARDSON: Thank you, Madam Chairman. The Industrial Customers of Idaho Power caII Dr. Reading to the stand. COMMISSIONER SMITH: While Dr. Readj-ng has taken the stand, Mr. Otto, I have given thought to your witness, Ms. White, and I have two alternatives that you could think about and the other parties could think about, and then after we're done with Dr. Reading we'11 decide. The first is that the testimony could just be a public comment that the Commission woul-d consider as it does all written comments that are received. The second is if you wish to have it be actual- testj-mony and her appear, we have another hearing on the 25th of November at 7:00 p.m. We could come maybe at 6:45 and have her take the stand and be subject to cross-examination. So not asking for any answers rj-ght now -- we'Il go to Mr. Richardson and Dr. Reading -- but those are the two alternatives I thought of. MR. OTTO: Thank you for that, Madam Chair. 339 83701 1 2 3 4 5 6 7 I 9 10 11 t2 13 L4 15 L6 t7 18 t9 20 2L 22 23 24 25 HEDRICK COURT REPORTTNG P . O. BOX 5'18 , BOTSE, rD READING (Di) ICI P DR. DON READING, produced as a witness at the instance of Industrial- Customers of Idaho Power, being first duly sworn, was examined and testif i-ed as foll-ows: DIRECT EXAMINATION BY MR. RICHARDSON: O. Are you the same Dr. Readi-ng who caused prefiled dj-rect testimony and Exhibit No. 20L to be fj-1ed in this case? A. Yes. O. And was that prefiled direct testimony prepared by you or under your supervision? A. Yes. a. And was Exhibit 20L prepared by you or under your supervision? A. Correct. O. And do you have any correctj-ons or additions to make to your testimony and/or exhibits today? A. Yes. If you look at the last two lines, t9 and 20, on page 9, they are should I smile, Rocky? they are repeated on the top of the next page, page 10. So delete the last two lines on page 9 for contJ-nuj-ty. O. With those corrections Does that concl-ude your corrections and 340 83701 1 2 3 4 5 6 7 I 9 10 11 t2 13 L4 15 1,6 L7 18 1,9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD READING (Di) ICI P additions? A. Yes, it does. a. And with those correctj-ons, if I were to ask you the same questions today that you were asked in your prefiled direct testimony, wou1d your answers be the same? A. Yes, they would. O. Thank you. MR. RICHARDSON: With that, Madam Chairman, I move that the prefil-ed direct testj-mony of Dr. Reading be spread upon the record as if j-t were read in fuII, and Exhibit 201- be marked for identification purposes. COMMISSIONER SMITH: If there is no objection, it is so ordered. (The following prefiled testimony of Mr. Readj-ng is spread upon the record. ) 34L 83701 a. 4 5 6 1 x A. a A. 1 I 3 10 11 1,2 13 t4 15 76 t1 1B 19 20 11.L 22 Z5 INTRODUCTION a. A. PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. My name is Don Reading and my business address is Ben Johnson Associates. 6070 Hill Road, Boise, Idaho. I am Vice President and Consulting Economist for Ben Johnson Associates. HAVE YOU PREPARED AN EXHIBIT OUTLTNING YOUR QUALIFICATIONS AND BACKGROUND? Yes. Exhibit 201 serves that purpose. WHAT IS THE PURPOSE OF YOUR TESTTMONY IN THIS CASE? I have been retained by the lndustrial Customers of ldaho Power ("ICIP") to review ldaho Power's ("lPC" or the "Company") application for a certificate of public convenience and necessity for investments in selective catalytic reduction controls ("SCR") on Jim Bridger units 3 and 4. I address the imprudence of this Commission's locking in a ratemaking treatment fbr this proposed investment such that l'uture commissions will effectively have their hands tied as to other, at the time, prudent ratemaking decisions. I discuss the uncertain future of coalplant investments. While not advocating the outright denial of the company's application, I urge the Commission to proceed with great caution as to how it signals the future ratemaking treatment of this investment. Certificate of Public Convenience and Necessitv DR. READING, COULD YOU BRIEFLY REVIEW WHAT IDAHO POWER'S REQUEST IS IN THE CURR"ENT DOCKET? Reading, Di IPC-E-13-16 a 342 1 2 3 4 5 6 1 U 9 10 11 72 13 74 15 t6 1_7 1B l_9 .A 2t A.Yes. The Company is asking for a Certificate of Public Convenience and Necessity ("CPCN") for the installation of selective catalytic reduction systems fbr Jim Bridger units 3 and 4 to reduce nitrogen oxide ("NOx") emissions to comply with existing state and proposed federal emission requirements. The Company expects the amount of this investment to be $129.8 million for both units, and it is asking the Commission to accept this amount as a "Commitment Estimate". HOW DOES THE COMPANY DEFINE ITS *COMMITMENT ESTIMATE'? According to Idaho Power's Application in this docket: As it has done in prior CPCN applications, Idaho Power has termed this estimate a "Commitment Estimate." The Commitment Estimate is a good faith estimate of Idaho Power's total capital cost, including AFUDC, and additional costs the Company anticipates it will incur but cannot quantify with precision at this time.r However the $129.8 million "Commitment Estimate'' may or n"ray not be the eventuat investment requested by ldaho Power in luture rate proceedings. Q. DO yOU ASST.JME THE COMPANY WILL ASK FOR RATE RELIEF FOR rTS SCR INVESTMENTS IN THE NEXT GENERAL RATE CASE? A. At this point, when Idaho Power will ask the Commission to approve ratebase treatment for the Bridger pollution control investments, is uncertain. In its response to an ICIP production request the Company stated, "The Company has not determined the approach by which future cost recovery will be requested."z Therefore it may be in a general rate case or possibly in some other type of frling by Idaho Power ldaho Power Application, IPC-E-13-16, Item 16, p 7 . Idaho Power Response to ICIP's Iiirst Production Request No. 3-C. Reading, Di IPC-E-r 3-16 a. A, 1 2 343 1 2 3 4 q 6 1 8 9 i0 11 1,2 13 l4 15 16 t1 1B 19 20 2t 22 a. A. ARE YOU SAYING, FOR WANT OF A BETTER TERM, THE COMPANY IS NOT ASKING FOR THE $129.8 MILLION BE A HARD COMMITMENT, RATHER A SOFT COMMITMENT, WHERE IT MAY WELL ASK FOR MORE THAN THIS AMOUNT SHOULD THE COSTS EXCEED ITS ESTIMATE ? That appears to be true. According to the Company's testimony: If binding ratemaking is approved for the Total Commitment Estimate of $ I 29,837.393, the C'ompany could be assured that amounts incurred up to the Commitment Estimate amount would be determined to be prudent. Should the cost of the Project be less than the Commitment Estimate, the savings would directly benefit the customcr through a lower amount in rate base. On the other hand, should the Project come in over the Commitment Estimate, Idaho Power would have to demonstrate to the Commission that amounts above the Commitment Estimate were prudently incurred and should be recovered in rates. 3 Therefore, Idaho Power is stating the Commission may need to engage in additional examination of the prudence of the pollution control investment for Bridger 3 and 4 sometime in the future. 'l'he Company will be asking that its proposed investment in SCR equipment be put into rates at some future time. When that happens, it will then be the time to examine the prudence of the total investment. A review of part of the investment in this docket and part of the investment at a later unspecified time is simply not prudent. A. IS THE COMMISSION REQUIRED TO IMPLEMENT PRE-APPROVAL OF THE INVESTMENT IF THE COMPANY REQUESTS SUCH TREATMENT? A. No. Idaho Code Section 6l-541 states: 3 Direct 'festimony of ldaho Power Witness Mike Youngblood, IPC-E-13-l 6, p. 17. Reading" Di IPC-E- I 3- l6344 1 ) 3 4 5 6 1 I 9 10 11 T2 13 74 15 16 1.7 1B t9 20 11 Based upon the hearing record, the commission shall issue an order that addresses the proposed ratemaking treatments. 'fhe commission may accept, deny or modify a proposed ratemaking treatment requested by the utility. In determining the proposed ratemaking treatments, the commission shall maintain a fair, just and reasonable balance of interests between the requesting utility and the utility's ratepayers.4 Therefore, the Commission can approve the requested CPCN without pre-approving the requested "Commitment Estimate" of $128.9 million. The examination of the prudence of the SCR emission investments would then take place at the time the Company requests it to be placed into rates. A DID THE COMPANY NEED TO REQUEST THE COMMISSION ISSUE A CPCN BEFORE IT WOULD BE ALLOWED TO INVEST IN THE SCR's FOR BRIDGER 3 AND 4? A. No. In fact ldaho Power is installing pollution control equipment at its Northem Nevada Valmy coal plant without first requesting a CPCN for those investments. As Idaho Power witness Grow stated: a.ARE EMISSION CONTROL INVESTMENTS AT VALMY PART OF THE COMPANY'S CURRENT CPCN APPLICATION? No. While the Valmy plant is nol a part clf the Company's request fcrr a CPCN for the SCR investments at Jim Bridger Units 3 and 4, the Nevada legislation associated with NV Energy's announcement is yet another indication of the Reading, Di tPC-H-t3-t6 A- a lclaho Code $ 6l-541(4) 345 1 2 2 4 5 6 1 a 9 10 11 t2 13 14 15 15 11LI 1B 79 20 2t a A. changing climate with regard to coal-fired generation.5 Witness Grow was referring to the announcement by the Company's partner in the Valmy Plant, NV Energy, of its intent to remove coal from its generation portfolio. It was ldaho Poweros choice to ask this Commission for a CPCN for Bridger Units 3 and 4. WHY DID IDAHO POWER CHOOSE TO ASK FOR A CPCN AT THIS TIME? According to Idaho Power: The Company is requesting a CPCN and binding ratemaking treatment under Idaho Cttde $ 6l-541 for the SCR investment because of the magnitude of the investment, the uncertainty surrounding coal--fired generation in today's political and socialenvironment. and the amount of interest expressed by stakeholders. With the magnitude of the investment and the changing climate for investments in coal-fired generation, the Company has chosen to request a CPCN even though it does not believe it is required to do soby ldaho Code $ 6l-526.ln this way. a public process is initiated to provide the Company. Commission, and interested parties a regulatory forum to i'ully vet these contested issues.6 ldaho Power asserts that by filing for a CPCN the Company would be able to use ldaho Code section 6l -541 in asking the Commission for pre-approval of its pollution control investments for Bridger. ldaho Power states by doing so it will provide for a regulatory forum to fully vet the prudence of its investment. However what the Company does not say. is that a full vetting of the contested issues, could equally occur at the time it requests the investments be included in rates. There is no compelling reason the s Direct testimony of ldaho Power witness Grow, I PC-E- I 3- I 6 at p I 9. 6 lbid, p. 15. Reading, Di IPC-E-13-16 346 I 1 2 3 4 5 6 1 o 9 IU 11 L2 13 l4 15 16 11 1B 19 20 21 22 a-)LJ a. Commission needs to bind itself or future Commissions with these investments at this time. THE COMPANY APPEARS TO BE SEEKING TO REDUCE INVESTMENT RISK GIVEN THE *CHANGING CLIMATE FOR INVESTMBNTS IN COAL- FIRED GENERATION'BY ASKING FOR PRE-APPROVAL FOR ITS COAL PLANT POLLUTION CONTROL INVESTMENTS. DO YOU THINK THIS IS A RATIONAL STRATEGY TOR THE COMPANY TO FOLLOW? From the shareholders perspective yes: however it is not rational from the perspective of the ratepayer. Idaho Power, Iike all other regulated utilities, is allowed the opportunity to eam a return on its investments. The Commission sets the utility's retum on equity (ROE) in a general rate case setting. The ROE is designed to. among other things, compensate ldaho Power's shareholders for the risk they take by investing in the Company. The Commission sets the levelof the Company's ROE so that it is high enough to attract investors who are in the market evaluating their investment opportunities compared to other places they could invest their funds. The Commission also considers a level of ROE low enough that the regulated monopoly cannot take advantage of its captive ratepayers. Idaho Power cunently enjoys a Power Cost Adjustment (PCA) that recovers its net power supply costs on an annual basis. It also enjoys a liixed Cost Adjustment (FCA) for residential and small commercial customers that compensate it for some of the fixed investments that are impacted by declines in loads outside of a general rate case. The PCA significantly reduces risks to the Cornpany tbr changes in a major part on their variable cost. The PCIA essentially holds ldaho Power harmless from the vagaries of the Reading, Di IPC-E-13-16 A. 347 1 2 3 4 5 6 1 B 9 10 11 12 13 14 15 15 11 1B 19 20 2t 22 a. volatile wholesale market. ln addition. the FCA reduces risks for sonle of their investments in plant on an annual basis. As noted, the return on equity fbr the utility is determined in a general rate case. Also the amount of plant that is included in ratebase is likewise determined in a general rate case, The two need to be considered in tandem. Pre-approving the SCR Bridger investments at this time would not allow the Commission to f'ully weigh the investment and the ROE together. If the Commission were to pre- approve these investments it should. at a minimum, take this binding commitment into account and adjust the ROE level of downward accordingly. ARE THERE OTHER CONSIDERATIONS THE COMMISSION SHOULD TAKf, INTO ACCOUNT IN DETERMINING WHETHER TO GRANT PRE- APPROVAL FOR THE SCR INVESTMENTS IN BRIDGER UNITS 3 AND 4? Yes. The Company indicates it will need additional investments in pollution control installations fbr Bridger units 1 and 2 in2022 and202l.7 'fhese expected emission compliance costs are based on current regulations and therefore the decision before the Commission should not be looked at in isolation from the other already-on the-drawing- boards future pollution control expenditures. Granting pre-approval can tend to establish precedent for f'uture filings by the Company. It would be good regulatory policy to evaluate the level of these expenditures at the time Idaho Power asks them to be included in rates. The Company's coal studies indicate, in present value terms, the SCR installations at Bridger are the lowest cost path. However, under the "Low Gas/High Carbon" scenario it is not the lowest cost path. Under that scenario the lowest cost path 7 Investor Meeting Power Point. San Francisco, September 25,2013. Reading, Di IPC-E-13-16348 1 2 3 4 5 6 1 B 9 10 11 12 13 L4 15 16 t1 1U 19 20 a. A. is to convert the units to natural gas rather than install the SCRs.8 As an economist, I have learned the only thing true about economic forecasts is that they are not very good about accurately predicting the future.e No one is prescient. It is possible the low gas/high carbon scenario will come to fruition. Other scenarios could play out, even in the near term, that makes the SCR option uneconomic. One likely scenario that could impact the prudence of the SCR investment are tighter environmental requirements. I"he Con'rmission should avoid locking itself in and locking in all future Commissions with these expenditures by pre-approving them in this proceeding IS THE ICIP OPPOSING THE ISSUANCE OF A CPCN FOR BRIDGER UNITS 3 AND 4 AT THIS TIME? No. However, we are asking the Commission to not pre-approve the requested expenditures. For the reasons stated above we believe it is bad regulatory policy for such pre-approval and will deny the Commission and intervenors the opportunity to examine the reasonableness of the expected expenditures when the Company asks that they be placed into rates. DO YOU HAVE ANY THOUGHTS ON THE APPROPRIATE RATEMAKING TREATMENT IF THN COMMISSION DOES CHOOSE TO GO DOWN THE PRE-APPROVAL PATH? Yes. Reference my testimony earlier on risk and rate of retum. Should the Commission go down that path. which I strongly oppose, Irecommend this $129.8 million investment a Idaho Power Coal Linit Environmental Analysis for the Jim Ilridger and North Valmy Coal-Fired Plants. 201 I IRP Update. p. 15. e When I was an in-house economist for this very Commission, one of the Commissioner's I worked for was fond of saying that an economic fbrecast is like a broken clock: it is right twice a day whether it meant to or not. Reading. Di IPC].E.I 3- I6 0. 349 1 2 3 4 5 6 1 8 9 10 11 12 13 14 15 t_6 t1 1B 19 20 2L 22 23 Yes. Reference my testimony earlier on risk and rate of return. Should the Commission go down that path, which I strongly oppose, I recommend this $129.8 million investment be placed into rate base, at the appropriate time. and be allowed to earn a fiaction of the Company's overall rate of return. The Company's overall rate of return assumes much riskier investments than one with regulatory pre-approval that ties the hands of future commissions from questioning the prudence of this investment. Such favored regulatory treatment surely does not carry the same risk as standard investments that must wait until they are in the ground/used and useful and proven prudent after the fact. a. DOES THIS END YOUR- TESTTMONY AS OF OCTOBER 11,2013? A. Yes. Reading, Di IPC-E-t3-16 350 10 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 16 L7 1B t9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD READING (X) ]CIP (The following proceedings were had in open hearing. ) (Industri-al Customers of Idaho Power Exhibit No. 20L, having been premarked for identification, was admitted into evidence. ) MR. RICHARDSON: Thank you, Madam Chair. Dr. Reading is now avail-ab1e for cross-examination. COMMISSIONER SMITH: Thank you. Mr. Otto, do you have any questions? MR. OTTO: I have no questions. COMMISSIONER SMITH: Ms. Sasser. MS. SASSER: Thank you, Madam Chair. CROSS-EXAMINATTON BY MS. SASSER: a. Good afternoon, Dr. Reading. A. Good afternoon. O. Nice to have you here. I just have one, which may become two-part, but on page 4 of your testimony, l-ine 18, you go through an analysls in the preceding paragraph about preapproval, and the l-ast sentence says, line 18 says: A review of part of the investment in this docket and part of the investment at a later unspecif ied t j-me j-s simply not prudent. Can you explain what about a partial preapproval 351 83701 1 2 3 4 5 6 7 I 9 10 11 1,2 13 74 l_5 t6 L7 18 L9 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD READING (X) ICIP is imprudent, to you? A. o. question that A. Mr. Louis's A. What line is it? Let me Line 18 and L9, the last begins on line 20. That the prudence review sentence prior to the I do not see why the prudence revj-ew shoul-dn't occur s j-mul-taneously when they put it into rates. I see this as a hearing for a certificate and the Company is asking for preapprovalr so we're going through a prudence review. Then we go to the next stage when it goes into rates and, as we heard on some of the cross-examj-nation here, that there will be another prudence review. What my experience is and what I heard in the explanation was the next stage was more an accounting prudence review, which I consider different than prudence on whether this is this is a investment that shoul-d be made or shouldn't be made. If there is preapproval, my understanding of the process j-s the accountants make sure the money is spent correctl-y and invoiced correctly and those kinds of things, which is a different anj-mal; and what I'm asking for is rather than having two parts, let's just do it all- at once when it goes into rate base. o.Would it change your opinion at all We11, f should first ask have you reviewed testimony? Yes, I have. 3s2 83701 1 2 3 4 5 6 7 I 9 10 l-1 t2 13 t4 15 t6 L7 18 19 20 2t 22 23 24 25 HEDRTCK COURT REPORTING P. O. BOX 578, BOTSE, rD READTNG (X) rCI P O. So does it change your opini-on at aII about the imprudence of preapproval if you utilize known and measurable if you only preapprove known and measurable amounts such as Mr. Louis is recommending? A. Okay, wj-thout stringing the answer out too 1ong, in some ways Mr. Louis and I are getting to the same place in different ways. I'm saying that none of it should be preapproved at thls point, and then due to the lowering of risksr dfl adjustment could be made on the rate of return. Mr. Louj-s is saying, wel-l-, it's okay to preapprove part of it, and not the other part of it. So I disagree with Mr. Louis to the extent that any should be preapproved at this particular stage, but if it is, I like I like part of it better than all of it, I guess is a better way to put it. A. Okay. Thank you, Dr. Reading. That's all I have. COMMISSIONER SMITH: Mr. Miller, did you have questions? MR. MILLER: I have no guestions, thank you. COMMISSIONER SMITH: And from the Company. 3s3 83701 1 2 3 4 5 6 7 I 9 10 1_1 L2 13 t4 15 16 L7 18 1,9 20 2t 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD READING (X) ICI P CROSS-EXAMINATION BY MS. NORDSTROM: O. Good afternoon, Dr. Reading. A. Good afternoon. O. Werve been talking about when is the appropriate time to do a prudence review, and would you agree that regional and natj-onal policj-es rel-ated to coal-fired generation have been and are currently undergoing significant change? A. Yes. a. Then woul,dn't it be wj-se for a1I parties, including investors and ratepayers that rely upon access to cheap capital and for the Company and partj-es here today, to know whether the Commission will al-low these investments to be recovered in rates before the investments actually occur? A. No. 0. Thank you. I have no further questions. COMMISSIONER SMITH: Are there questions from the Commission? COMMISSIONER REDFORD: No. COMMISSIONER KJELLANDER: NO. 354 83701 l- 2 3 4 5 6 1 8 9 10 11 L2 13 t4 15 16 l1 l_8 79 20 2T 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD READING (Com) ICI P EXAMINATION BY COMM]SSIONER SMITH: O. So if it was pre-2009, Dr. Reading, would we even be here? A. Pre-2009 what? I didn't O. Would we even been here, before this A. Oh, before the mel-tdown and the passing of the law? Yeah, we wou.l-dn't even be here. O. Section 54L? A. Yeah, if that law hadn't been I'l-l- be tactful lobbied through the legislature, we wouldn't be here. O. What would be the process without this statute? A. The Commission wou]d be asked to issue a certificate, and then at the time of it went into rate base, there woul-d be a discussion on whether or not that is a prudent, rational, intelligent thing to be put into rate base. O. And assuming that the legislature's action in giving us Section 541 was a prudent and intelligent action, how do you think the Commission should approach this, because there must have been a purpose for it. A. Certaj-nl-y there was a purpose, and the purpose that was lobbied through the Legisl-ature was the assurity i-f the Commj-ssion so thought to preapprove a expenditure. 355 83701 l- 2 3 4 5 6 1 8 9 10 11 1,2 13 L4 15 L6 L7 18 19 20 2L 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD READING (Com) IC] P I rm not a lawyer but I can read, and when I read the statute, it is very explicit that it gives the Commission the ability to the Commission may accept in who1e, accept in part r ox modify. So, to me, the 1aw is passed. It is there for the Company to come in and -- and do their requesting. Reading the Commissionrs order in Langley Gu1ch, the reason one of the major reasons at least in the section where you rejected what we recommended was the need for financing was a big part of it; and it's clear in this case that that is not in the forefront. In fact, Mr. Youngblood says thatfs not one of the major reasons. So I think the Commj-ssion i-n many ways is i-n the same positi-on before that law was passed because as I read the statute, you certainl-y have the ability to thumbs up, thumbs down, cut it in half, mutate it, come up with a new solutj-on based on your best judgment. O. Thank you. COMMISSIONER SMITH: Do you have any redirect, Mr. Richardson? MR. RICHARDSON: I do not, Madam Chair. COMMISSIONER SMITH: Thank you for your he1p, Dr. Reading. THE WITNESS: Thank you. (The wi-tness l-eft the stand.) 356 83701 1 2 3 B 9 10 4 5 6 7 11 L2 13 14 15 1_6 L7 18 L9 20 21- 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD MR. RICHARDSON: That concludes the Industrial Customers' case. COMMISSfONER SMITH: So, werre at the end. Mr. Otto, did you give any thought to your preferred course of action for your witness? MR. OTTO: I have, and I | 11 add one more fact into this and I apologize if I hand-fisted this whole process a Iittle bit: I had sent to the other parties an affidavit of the veracity of Ms. Whiters testimony. I neglected to provide that to the Commission. I don't know if that woul-d be helpful or not, but thatrs there. I'm inclined to choose option one, which is to submit it as a public comment, unless the Commission woul-d find val-ue in havj-ng a conversation wj-th Ms. White. COMMISSIONER SMITH: I think itrs up to you, but I think public comment would work weII. And so we'l-I treat the prefiled testimony of Ms. White as a written public comment submitted in this matter. Okay. MR. OTTO: Thank you for those opti-ons. COMMISSIONER SMITH: Sure. Mr. Miller mentioned briefs. MR. MILLER: Yes, Madam Chairman. I believe the existing schedule provides for briefs I believe a week from today. Is that right? 357 83701 COLLOQUY 1 2 3 4 5 6 1 I 9 10 1l- L2 13 L4 15 L6 77 1B 19 20 2L 22 23 24 25 HEDRICK COURT REPORTINGP. O. BOX 578, BOTSE, rD COMMISSIONER SMITH: I donrt see it. Let me l-ook. MS. REINHARDT_TESSMER:I believe it's one week from tomorrow. COMMISSIONER SMITH: One week from tomorrow. MS. REINHARDT-TESSMER: On the 15th. COMMISSIONER SMITH: Ah, there it is, November l-sth, one week from tomorrow. MR. MILLER: And we had welcomed the opportunity for a brief and structured our evidentiary presentation with that in mind to keep the hearing as short as possible, and so we do l-ook forward to that opportunity. I think there are a number of j-nteresting topics for briefing: That is, what, exactly, is the scope and effect of a certificate of public convenience and necessity, and can that change depending on the facts of particular cases; and I think the legislative hj-story of Section 541 and what it was intended to do was a interesting topj-c for brlefing. So we l-ook forward to the opportunity to submit a brlef on those and rel-ated matters. I would like at this moment to move for the admission of Snake River Alliance hearing Exhibits 401 and 403-4L2, and commend them for your consideratlon. COMMISSIONER SMITH: Thank you, Mr. Mi11er. It's at this point of the hearing where our rules of procedure save 358 83701 COLLOQUY 1 2 3 4 5 6 7 I 9 10 11 L2 13 L4 15 L6 L7 t_8 19 20 2L 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD me from any error and -- but I will say it out loud that all exhibits previously identified are now hereby admitted. (Snake River Al-liance Exhibit Nos. 401- and 403 through 4L2 were admitted into evidence. ) COMMISSIONER SMITH: Mr. Otto. MR. OTTO: Just real-ized an error: We'd entered the page from the IRP as Exhibit 302. It's actually 301-, just so there's no confusi-on. COMMISSIONER SMITH: Okay. r think I labeled it 301, but we'II correct that if we need to. MR. OTTO: ,fust wanted to make sure that that was clear. COMMISSIONER SMITH: Thank you. (Idaho Conservation League previously-marked Exhibit 302 was now marked as Exhibit 301 and admitted into evldence. ) COMMISSIONER SMITH: And f do look forward to the presentatj-on of the partj-es' briefs on the Iega1 issuesr ds you know that this is a relatively new statute in the Commissionrs toolbox, and so I think there are many questions with regard to what it requires, what it means, and how I hate to use this word how conservatively the Commission should exercise its abilities under that statute to provide preapproval. So I do look forward to hearing the part j-es' views', especially on those issues, because I think it's not exactly a first impression, 359 83701- COLLOQUY l_ 2 3 4 5 6 7 B 9 10 11 t2 13 1"4 15 L6 L7 1B 19 20 27 22 23 24 25 HEDRICK COURT REPORTING P. O. BOX 578, BOTSE, rD but it's certainly early; and I think itrs good that the Commission considers those and to the extent it feels comfortable in expressing a long-term view, it shoul-d do so for the benefit of all- of the parties. Are there any other matters to come before the Commission? COMMISSIONER K.JELLANDER: NO . COMMISSIONER SMITH: With that, I thank everyone for their participation and their patience and assj-stance. As we said, we'Il get those briefs on the 15th. We have a public hearing schedu.l-ed at 7:00 p.m. on the 25th. At the close of the public hearing, the record in this case will be closed. The Commission will- delj-berate as speedj-1y as it can, recognizing the deadl-ine the Company has asked for, but of course feeling we arenrt necessarily bound by that depending on how fast we can go. And we appreciate all your heIp, and the hearing is adjourned. (The hearing adjourned at 3:31 p.m.) 360 83701 COLLOQUY 1 2 3 4 5 6 7 B 9 10 11 t2 13 t4 15 t6 L7 18 l-9 20 2L 22 23 24 25 HEDRTCK COURT REPORTING P. O. BOX 578, BOTSE, rD AUTHENTICATION This is to certify that the foregoing Volumes I and II are a true and correct transcript to the best of my ability of the proceedings hel-d in the matter of Idaho Power Company's applicatj-on for a certificate of public convenlence and necessity for the investment in selective catal-ytic reduction controls on .Iim Bridger Units 3 and 4, Case No. IPC-E-L3-L6, commencing on Thursday, November 7, 201"3, dt the Commission Hearj-ng Room, 412 West Washington, Boise, Idaho, and the originals thereof for the file of the Commission. Accuracy of all prefiled testimony as originally submitted to thj-s Reporter and j-ncorporated herein at the direction of the Commj-ssj-on is the sole responsibility of the submitting parties. WENDY J. MURRA otin and for th ate ry Public of Idaho,residing at Meridian, Idaho. My Commission expires 2-8-20L4. Idaho CSR No. 475 361 83701 AUTHENTICATION