Loading...
HomeMy WebLinkAbout20130910Staff 49-61 to IPC.pdfKRISTINE A. SASSER ;-.;1,- , , DEPUTY ATTORNEY GENERAL rDAHO PUBLTC UTTLTTTES COMMTSSTON ?il:i SIp I 3 ,:,ii ll: ?gPOBOX 83720 _^^ AA_t ,BOISE,IDAHO 83720-0074 r,.,.,,i,,,,,r -.i l(208)334-0357 i; rr BAR NO. 6618 Street Address for Express Mail: 472W, WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION rN THE MATTER OF IDAHO POWER ) COMPANY'S APPLICATION FOR A ) CASE NO. rPC-E-13-16 CERTIFICATE OF PUBLIC CONVENIENCE ) AND NECESSITY F'OR INVESTMENT IN ) FIFTH PRODUCTION SELECTIVE CATALYTIC REDUCTION ) REQUEST OF THE CONTROLS ON JIM BRTDGER UNrTS 3 AND 4. ) COMMTSSTON STAFF TO ) rDAHO POWER COMPANY ) The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Kristine A. Sasser, Deputy Attorney General, requests that Idaho Power Company (Idaho Power; Company) provide the following documents and information on or before TUESDAY, SEPTEMBER 24, 2013. This Production Request is to be considered as continuing, and Idaho Power Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question and any supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules and Procedure must include the name and phone number of the person preparing the document, and the name, location and phone number of the record holder and, if different, the witness who can sponsor the answer at hearing. Reference IDAPA 31.01.01.228. FIFTH PRODUCTION REQUEST OF THE COMMISSION STAFF SEPTEMBER 10,2013 In addition to the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 49: Please provide a justification for the $333,333 difference in the contingency budget for Jim Bridger Units 3 and 4 (see Staff Production Request No. l). REQUEST NO. 50: Please provide copies of all Aurora input and output files, analysis, and worksheets (with all formula intact) used to develop the total portfolio costs for Jim Bridger Unit 3 and Jim Bridger Unit 4 shown in Figure 4 (page 16) of the Coal Unit Environmental Investment Analysis. REQUEST NO. 51: Please provide the resource portfolio used as a baseline to conduct the Total Portfolio Cost analysis for each of the three alternatives (install SCR, retire and replace with CCCT, and natural gas conversion) contained in the Coal Unit Environmental Investment Analysis. Please provide the name, type, and net dependable capacity in MW for each resource in the portfolio. REQUEST NO. 52: Please provide the resource portfolio used to determine the Projected Generation Forecast contained in Table 4-26 of the SAIC Coal Environmental Compliance Upgrade Investment Evaluation. Please provide the name, type, and net dependable capacity in MW for each resource in the portfolio. REQUEST NO. 53: Power plant and coal mine reclamation/decommissioning costs will eventually be incurred for all three alternatives (install SCR, retire and replace with CCCT, and natural gas conversion). Were these costs amortized and included in the Net Present Value (NPV) Total Portfolio Cost analysis for each of the three altematives for Jim Bridger Units 3 and 4 as reflected in Figure 4 of the Coal Unit Environmental Investment Analysis? If not, please provide the incremental NPV cost impact for each alternative and natural gas/carbon future. REQUEST NO. 54: Please describe what the Company believes are the mercury, acid gas and other hazardous air emissions limits applicable for each Bridger unit pursuant to the final FIFTH PRODUCTION REQUEST OF THE COMMISSION STAFF SEPTEMBER 10,2013 Mercury and Air Toxics Standards (MATS) and a description of the controls and investments needed to meet compliance for each limit (l.lote: this request can be combined with Staffs Request No. 39 but seeks more detailed clarification for the specific types of controls and costs for each). REQUEST NO. 55: The EPA has proposed amendments to the effluent limitations guidelines and standards for steam electric power generation plants on June 7,2013 (40 CFR Part 423). What additional investments would be needed to comply with the new standards? Has a proxy cost of these investments been factored into the Net Present Value Total Portfolio Cost analysis for each of the three alternatives (install SCR, retire and replace with CCCT, and natural gas conversion) for Jim Bridger Units 3 and 4 as reflected in Figure 4 of the Coal Unit Environmental Investment Analysis? If not, please provide a basis for the incremental cost and the incremental NPV cost impact for each alternative and natural gas/carbon future. REQUEST NO. 56: Please describe Idaho Power's role and specific responsibilities in the following: (l) developing the Engineering, Procurement, and Construction (EPC) contractor Request for Proposal (RFP); (2) evaluating the proposals; (3) selecting the contractor; and (a) developing the final contract. REQUEST NO. 57: For the EPC contract, what was the basis for the $2 million additional cost using a Limited Notice to Proceed type of contract? Please provide a breakdown of the specific costs and a description of each. REQUEST NO. 58: The boiler and air pre-heater reinforcement work, the economizer upgrades, the low-load economizer exit gas temperature control systems, and the flue gas reinforcement are listed to be contracted at a later date separate from the EPC contract in the EPC contractor's proposal as if the need was still under evaluation. How certain is the Company that each of these additional parts of the project will be needed for each Jim Bridger unit? Please explain. FIFTH PRODUCTION REQUEST OF THE COMMISSION STAFF SEPTEMBER 10,2013 REQUEST NO. 59: How would the Company run Bridger Units 3 and 4 if converted to be fueled by natural gas (e.g., baseload, intermediate, peaking)? What capacity factor is anticipated for each unit? REQUEST NO. 60: Please explain the difference in minimum Net Present Value Total Cost outcomes for Jim Bridger Units 3 and 4 (Table 4.1) between the final SAIC report and the draft report dated 811312012. Specifically, why did the lowest cost alternative for (1) low gas/high carbon change from retire and replace to natural gas conversion; and (2) for base gas/high carbon change from retire and replace to the upgrade alternative. REQUEST NO. 61: Please explain the difference in minimum Total Portfolio Cost Net Present Value outcomes for Jim Bridger Units 3 and 4 between the 1012612012 final draft of the Coal Unit Environmental Investment Analysis (Figure 6) and the final report (Figure 4). Specifically, why did the lowest cost altemative for (1) base gas/high carbon change from natural gas conversion to the upgrade alternative; (2) high gas/high carbon change from natural gas conversion to the upgrade altemative; and (3) low gas/high carbon change from natural gas conversion to retire and replace. Dated at Boise, Idaho, this day of September 2013. Technical Staff: Mike Louisl49 - 6l i:umisc:prodreq/ipcel 3. I 6ksml prod req 5 FIFTH PRODUCTION REQUEST OF THE COMMISSION STAFF Deputy Attorney General SEPTEMBER IO,2013 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 1OTH DAY OF SEPTEMBER 2013, SERVED THE FOREGOING FIFTH PRODUCTION REQUEST OF TIIE COMMISSION STAFF TO IDAHO POWER, IN CASE NO. IPC-E-I3-16, BY E-MAILING AND MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: LISA D NORDSTROM JENNIFER REINHARDT-TES SMER IDAHO POWER COMPANY PO BOX 70 BOrSE rD 83707-0070 E-MAIL: lnordstrom@idahopower.com j reinhardt@idahopower. com dockets@idahopower. com C B earry@ idahopower. com PETER J RICHARDSON GREGORY M ADAMS RICHARDSON ADAMS 515 N 27TH ST BOISE ID 83616 E-MAIL: peter@richardsonadams.com gre g@richardsonadams.com BENJAMIN J OTTO ID CONSERVATION LEAGUE 710 N 6TH ST BOISE ID 83702 E-MAIL: botto@idahoconservation.org KEN MILLER SNAKE RIVER ALLIANCE BOX 1731 BOISE ID 83701 E-MAIL: kmiller@snakeriveralliance.org DR DON READING 6070 HILL ROAD BOISE ID 83703 E-MAIL: dreading@mindspring.com DEAN J MILLER McDEVITT & MILLER LLP 420 W BANNOCK BOISE ID 83702 E-MAIL: j oe@mcdevitt-miller.com CERTIFICATE OF SERVICE