Loading...
HomeMy WebLinkAbout20130821Staff 25-44 to IPC.pdfKRISTINE A. SASSER DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-03s7 BAR NO. 6618 Street Address for Express Mail: 472 W , WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff IN THE MATTER OF IDAHO POWER COMPANY'S APPLICATION FOR A llf i tr:a.ll t-" .)..t1i:'l ri:.l i:-. I i:i /--..J1 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION )) CASE NO. rPC-E-13-r6 CERTIFICATE OF PUBLIC CONVENIENCE ) AND NECESSITY FOR INVESTMENT IN ) THIRD PRODUCTION SELECTIVE CATALYTIC REDUCTION ) REQUEST OF THE CONTROLS ON JIM BRTDGER UNITS 3 AND 4. ) COMMTSSTON STAFF TO ) IDAHO POWER COMPANY ) The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Kristine A. Sasser, Deputy Attorney General, requests that Idaho Power Company (Idaho Power; Company) provide the following documents and information for Request Nos. 25 - 38 on or before WEDNESDAY, SEPTEMBER 4, 2013, and Request Nos. 39 - 44 on or before WEDNESDAY, SEPTEMBER 11, 2013. This Production Request is to be considered as continuing, and Idaho Power Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question and any supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules and Procedure must include the name and phone number of the person preparing the document, and the name, location and phone number of the THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF AUGUST 2I,2OI3 record holder and, if different, the witness who can sponsor the answer at hearing. Reference rDAPA 3t.01.0t.228. In addition to the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 25: Please provide a list of any new facility investments subject to this filing that will be shared between any of the Jim Bridger generation units. If a facility is shared, please provide the total cost of the facility (broken down by capital, operation, or maintenance) and a percentage ofcost allocated to each unit. REQUEST NO. 26: Please provide a copy of all the worksheets (with all formulas intact) used to develop the SAIC "static" analysis including: all the output, operational forecasts, input data, and assumptions. REQUEST NO. 27: Please explain why Idaho Power applied a Sumas basis, rather than a Rockies or AECO basis to develop its natural gas forecast for the Coal Unit Environmental Investment Analysis. Please provide the Sumas differentials and the Henry's Hub forecast that were used to develop the natural gas forecast. REQUEST NO.28: Please provide the cost assumptions and basis used to estimate decommissioning costs for Jim Bridger Unit 3 and Unit 4 in the gas conversion and retire/replace scenarios of the Coal Unit Environmental Investment Analysis. Please provide a cost breakdown by generating unit and timing of costs. REQUEST NO.29: Was the sale of the Bridger Coal Company mining operation considered in the gas conversion and retire/replace scenarios of the Coal Unit Environmental Investment Analysis? Hypothetically, what would the Company estimate as its market value at the end of years 2015 and 2016 as share of the coal no longer used for Units 3 and 4? THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF AUGUST 2I,2OI3 REQUEST NO. 30: Did the Company adjust its natural gas price forecast based on different CO2 prices by assuming that natural gas prices and CO2 prices are positively correlated in its Coal Unit Environmental Investment Analysis? REQUEST NO. 31: Please describe the method and factors used to develop the projected generation forecast contained in Table A-26 inthe SAIC study. Please provide all worksheets used to derive them with all formulas intact. REQUEST NO.32: Referring to Idaho Power's response to Staff Production Request No. 1, please provide a cost breakdown of all individual items listed in the Development Phase cost category (Permitting, Wyoming and Utah docket proceeding cost, completion of design basis and project concept studies, baseline performance testing, etc.). Please show the cost for each generation unit (Jim Bridger Unit 3 and Unit 4) and by actual vs. remaining forecast. For forecasted items, please provide the basis/method for developing the estimate (i.e., actual quotes, contracts, historical comparable cost, etc.) and all documents and worksheets (with formulas intact) used to develop the estimate. REQUEST NO.33: Referring to Idaho Power's response to Staff Production Request No. 1, please provide the basis/method for developing the Boiler and Air Preheater Reinforcement Work estimate (i.e., actual quotes, contracts, historical comparable cost, etc.) and all documents and worksheets (with formulas intact) used to develop the estimate. REQUEST NO.34: Referring to Idaho Power's response to Staff Production Request No. 1, please provide the basis/method for developing the Economizer Upgrade estimate (i.e., actual quotes, contracts, historical comparable cost, etc.) and all documents and worksheets (with formulas intact) used to develop the estimate. THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF AUGUST 2I,2OI3 REQUEST NO.35: Referring to Idaho Power's response to Staff Production Request No. l, please provide the basis/method for developing the Low Temp Economizer Control System estimate (i.e., actual quotes, contracts, historical comparable cost, etc.) and all documents and worksheets (with formulas intact) used to develop the estimate. REQUEST NO. 36: Referring to Idaho Power's response to Staff Production Request No. 1, please provide the basis/method for developing the Flue Gas Reinforcement estimate (i.e., actual quotes, contracts, historical comparable cost, etc.) and all documents and worksheets (with formulas intact) used to develop the estimate. REQUEST NO.37: Refening to Idaho Power's response to Staff Production Request No. 1, please provide the basis/method for developing the Spare Parts Allowance estimate (i.e., actual quotes, contracts, historical comparable cost, etc.) and all documents and worksheets (with formulas intact) used to develop the estimate. REQUEST NO.38: Referring to Idaho Power's response to Staff Production Request No. 1, please provide a cost breakdown of all individual items listed in the Other Cost category (PacifiCorp's engineer performance requested work through the project implementation phase, initial fills of lubricants and ammonia reagent, etc.) by the cost for each generation unit (Jim Bridger Unit 3 and Unit 4). Please provide the basisimethod for developing the category estimate (i.e., actual quotes, contracts, historical comparable cost, etc.) and all documents and worksheets (with formulas intact) used to develop the estimate. REQUEST NO.39: Please explain how cost estimates for mercury controls (MATs), Clean Water Act compliance, and Coal Combustion Residual compliance used in the Coal Unit Investment Analysis were derived and explain what means (benchmarks, price quotes, etc.) were used to ensure accuracy. THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF AUGUST 27,2013 REQUEST NO. 40: Please provide the Request for Proposal (RFP), competitive bidding documentation, and RFP evaluation results used to select the static coal study consultant (sArc). REQUEST NO. 41: Please provide the basis and assumptions used to estimate transportation costs to arrive at an Idaho city-gate price used to develop the natural gas forecast for the Coal Unit Environmental Investment Analysis. REQUEST NO. 42: How close is Idaho Power to the two million gallon per dayl25 percent withdrawal for cooling purpose limit proposed in 3 16(b) of the federal Clean Water Act? Please base your answer on historical usage compared to the standard. REQUEST NO. 43: Please provide the amount carbon prices would need to increase on an average percentage basis (from the base planning CO2 prices) to make the emission control upgrade option uneconomic in terms of total portfolio cost expressed in net present value when compared to gas conversion and Combined Cycle Combustion Turbine (CCCT) replacement alternative cases using base planning assumptions for all other variables. REQUEST NO. 44: Please provide the amount natural gas prices would need to decrease on an a'verage percentage basis (from the base planning natural gas price) to make the emission control upgrade option uneconomic in terms of total portfolio cost expressed in net present value when compared to gas conversion and CCCT replacement alternative cases using base planning assumptions for all other variables. Dated at Boise, Idaho, tni, bl{day of August 2013. Technical Staff: Mike Louisl2s - 44 i:umisc:prodreq/ipcel3.l6ksml prod req 3 THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF itine A. Sasser Deputy Attorney General AUGUST 27,2013 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 21ST DAY OF AUGUST 2013, SERVED THE FOREGOING THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER, IN CASE NO. IPC-E-13-16, By E-MAILING AND MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: LISA D NORDSTROM JENNIFER REINHARDT-TES SMER IDAHO POWER COMPANY PO BOX 70 BOISE rD 83707-0070 E-MAIL: lnordstrom@idahopower.com i reinhardt@ idahopower. com dockets@idahopower.com CBearry@idahopower. com PETER J RICHARDSON GREGORY M ADAMS RICHARDSON ADAMS 515 N 27TH ST BOISE ID 83616 E-MAIL: peter@richardsonadams.com gre g@richardsonadams. com BENJAMIN J OTTO ID CONSERVATION LEAGUE 710 N 6TH ST BOISE ID 83702 E-MAIL: botto@idahoconservation.org KEN MILLER SNAKE RIVER ALLIANCE BOX 1731 BOISE ID 83701 E-MAIL: kmiller@snakeriveralliance.org DR DON READING 6070 HILL ROAD BOISE ID 83703 E-MAIL: dreading@mindsprins.com DEAN J MILLER CHAS F McDEVITT CELESTE K MILLER McDEVITT & MILLER LLP PO BOX 2564 BOISE ID 83701 E-MAIL: joe@mcdevitt-miller.com chase@mcdevitt-mil ler.com ck@mcdevitt-miller. com SECRETARY CERTIFICATE OF SERVICE