Loading...
HomeMy WebLinkAbout20131101IPC to Staff 7-8.pdfS!ffi*.. : - An IDACORP Company 4ll!" it.-i!' - I [., t: l. ILlsAD.NORDSTROM -i: i,:. I i:;L:---I Lead Counsel I nordstrom@idahopower.com ..; November 1,2013 VIA HAND DELIVERY Jean D. Jewell, Secretary ldaho Public Utilities Commission 47 2 W esl Washington Street Boise, ldaho 83702 Re: Case No. IPC-E-13-15 ldaho Power Company's 2013 lntegrated Resource Plan - ldaho Power Company's Response to the Second Production Request of the Commission Staff Dear Ms. Jewell: Enclosed for filing in the above matter are an original and three (3) copies of ldaho Power Company's Response to the Second Production Request of the Commission Staff ("Staff') to ldaho Power Company. Also, enclosed are four (4) copies of a non-confidential disk containing information responsive to Staffs Production Request Nos. 7 and 8. Sincerely, € f ozzt,hA- L 7(d4r4vh4-- Lisa D. Nordstrom LDN:evp Enclosures 1221 W. ldaho St. (83702) P.O. Box 70 Boise, lD 83707 LISA D. NORDSTROM (lSB No. 5733) JENNIFER M. REINHARDT-TESSMER (lSB No. 7432) ldaho Power Company 1221 West ldaho Street (83702) P.O. Box 70 Boise, Idaho 83707 Telephone: (208)388-5825 Facsimile: (208) 388-6936 I no rd strom @ idahopower. co m i rei n ha rdt@ id aho power. co m Attorneys for ldaho Power Company IN THE MATTER OF IDAHO POWER COMPANY'S 201 3 INTEGRATED RESOURCE PLAN l:. : .", l-rir i-;1-- -; '--i tlr.iii-.-,;. CASE NO. !PC-E-13-15 IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY .., :- .)nl4 !ti1t, I nl! n_ r IC,i.ii.: il._: ; - 1 i', i J: tt I BEFORE THE IDAHO PUBLIC UTILITIES COMM]SSION COMES NOW, ldaho Power Company ("ldaho Powe/' or "Compohy"), and in response to the Second Production Request of the Commission Staff ("Staff') to ldaho Power Company dated October 11, 2013, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 1 REQUEST NO. 7: Please provide the total NEEA energy savings estimate for Idaho Powe/s service territory based on actua! sales (not funding share) for 2009-2012, which is availabb by request through NEEA. The energy savings should be broken down by initiative and year, and should cite a source for the measure savings. RESPONSE TO REQUEST NO. 7: ldaho Power asked Northwest Energy Efficiency Alliance ('NEEA") for the information to respond to this request. Please see the PDF (Attachment 1) located on the enclosed CD for NEEA's response and the Excel file (Attachment 2) also located on the enclosed CD for the supporting documentation. The response to this Request is sponsored by Pete Pengilly, Customer Research and Analysis Leader ldaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 2 REQUEST NO. 8: Please provide forecasted energy savings for ldaho Power (by funding share) in the next NEEA funding cycle, assuming that the Company continues funding under NEEA's existing methodology, which is available by request through NEEA. Please indicate which initiatives are likely to generate most of the savings. RESPONSE TO REQUEST NO. 8: ldaho Power requested from NEEA the information to respond to this request. Please see the PDF (Attachment 1) located on the enclosed CD for NEEA's response and the Excel file (Attachment 2) also located on the enclosed CD for the supporting documentation. The response to this Request is sponsored by Pete Pengilly, Customer Research and Analysis Leader ldaho Power Company. DATED at Boise, ldaho, this 1" day of November 2013. IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REOUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 3 t// lra/v K' , LISA D. NORDS Attorney for ldaho Power Company CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 1't day of November 20131 served a true and correct copy of IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Karl Klein Deputy Attorney General ldaho Public Utilities Commission 472 West Washington (83702) P.O. Box 83720 Boise, ldaho 83720-007 4 ldaho Conservation League Benjamin J. Otto ldaho Conservation League 710 North Sixth Street Boise, Idaho 83702 Snake River Alliance Ken Miller, Clean Energy Program Director Snake River Alliance P.O. Box 1731 Boise, ldaho 83701 J.R. Simplot Gompany Peter J. Richardson RICHARDSON ADAMS, PLLC 515 North 27th Street (83702) P.O. Box 7218 Boise, ldaho 83707 Dr. Don Reading 6070 Hill Road Boise, ldaho 83703 Hand Delivered U.S. Mail Ovemight Mail FAX Email karl.klein@puc.idaho.oov Hand Delivered U.S. Mail Overnight Mail FAXX Email botto@idahoconservation.orq Hand Delivered U.S. Mai! Overnight Mail FAX Emai! kmiller@snakeriveralliance.oro Hand Delivered U.S. Mail Overnight Mail FAX Email peter@richardsonadams.com Hand Delivered U.S. Mail Overnight Mail FAX Email d readinq@mindsprino.com IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 4 Renewable Energy Goalition Thomas H. Nelson P.O. Box 1211 Welches, Oregon 97067 John Lowe, Director Renewable Energy Coalition 12050 SW Tremont Street Portland, Oregon 97225 Nancy Esteb, Ph.D. P.O. Box 490 Carlsborg, Washington 98324 Hand Delivered U.S. Mail Overnight Mai! FAXX Email nelson@thnelson.com Hand Delivered U.S. Mail Overnight Mail FAX Email iravenesanmarcos@vahoo.com Hand Delivered U.S. Mail Overnight Mail FAXX Email betseesteb@qwest.net IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 5