Loading...
HomeMy WebLinkAbout20261125Direct Gorman.pdf RECEIVED November 25, 2026 IDAHO PUBLIC UTILITIES COMMISSION BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER ) COMPANY'S PETITION TO EVALUATE ) CLASS COST-OF-SERVICE ) METHODOLOGY, CONSIDER ) CASE NO. IPC-E-26-07 ALTERNATIVE CLASS COST-OF-SERVICE ) STUDIES,AND DETERMINE COST OF ) SERVICE CONSIDERATIONS FOR NEW ) LARGE-LOAD CUSTOMERS ) Direct Testimony and Exhibits of Michael P. Gorman On behalf of Micron Technology, Inc. November 25, 2026 BRUBAKER&ASSOCIATES,INC. Project12055 Table of Contents to the Direct Testimony of Michael P. Gorman I. INTRODUCTION ........................................................................................................ 1 II. SUMMARY OF CONCLUSIONS AND RECOMMENDATIONS ........................... 2 III. IPC APPLICATION AND PROPOSED COSS........................................................... 7 IV. MICRON RECOMMENDS THE COMMISSION ADOPT THE AED METHOD AS OPPOSED TO THE PAEM METHOD OR, AT A MINIMUIM A MODIFIED VERSION OF THE PAEM METHOD.............. 14 A. THE COMMISSION SHOULD ADOPT AED-4CP RATHER THAN PAEM.. 14 B. IF THE COMMISSION ADOPTS THE PAEM, IT SHOULD ADJUST THE WAY IDAHO POWER IMPLEMENTS THAT METHOD TO MORE CLOSELY MATCHCOSTS................................................................................................... 27 V. MICRON'S CONCERNS WITH THE COMPANY'S PROPOSED GRM.............. 38 VI. HOURLY-INFORMED METHOD............................................................................ 41 VII. CONCLUSION........................................................................................................... 44 Qualifications of Michael P. Gorman..................................................... ...Appendix A Exhibits: Exhibit MPG-1 Comparison of Hourly-Informed Allocator to an Energy Allocator Exhibit MPG-2 Class Monthly Peak Demands Exhibit MPG-3 NARUC Gas Manual Excerpt Exhibit MPG-4 NARUC Electric Manual Excerpt Exhibit MPG-5 Idaho Power Discovery Responses Gorman, Di i Micron Technology, Inc. BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER ) COMPANY'S PETITION TO EVALUATE ) CLASS COST-OF-SERVICE ) METHODOLOGY, CONSIDER ) CASE NO. IPC-E-26-07 ALTERNATIVE CLASS COST-OF-SERVICE ) STUDIES,AND DETERMINE COST OF ) SERVICE CONSIDERATIONS FOR NEW ) LARGE-LOAD CUSTOMERS ) Direct Testimony of Michael P. Gorman 1 I. INTRODUCTION 2 Q PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. 3 A Michael P. Gorman. My business address is 16690 Swingley Ridge Road, Suite 140, 4 Chesterfield, MO 63017. 5 Q WHAT IS YOUR OCCUPATION? 6 A I am a consultant in the field of public utility regulation and a Managing Principal with 7 the firm of Brubaker & Associates, Inc. (`BAI"), energy, economic and regulatory 8 consultants. 9 Q PLEASE DESCRIBE YOUR EDUCATIONAL BACKGROUND AND 10 EXPERIENCE. 11 A This information is included in Appendix A to my testimony. 12 Q ON WHOSE BEHALF ARE YOU APPEARING IN THIS PROCEEDING? 13 A I am appearing on behalf of Micron Technology, Inc. ("Micron"), a large customer of 14 Idaho Power Company("IPC," "Idaho Power," or the "Company"). Gorman, Di 1 Micron Technology, Inc. I Q WHAT IS THE PURPOSE OF YOUR TESTIMONY? 2 A The purpose of my testimony is to respond to the Company's filing regarding the 3 proposed Class Cost of Service ("CCOS") studies and subsequent proposed allocation. 4 Q. ARE YOU SPONSORING ANY EXHIBITS IN THIS PROCEEDING? 5 A. Yes. I am sponsoring the exhibits listed below: 6 Exhibit Description 7 MPG-1 Comparison of Hourly-Informed Allocator to an Energy 8 Allocator 9 MPG-2 Class Monthly Peak Demands 10 MPG-3 NARUC Gas Manual Excerpt 11 MPG-4 NARUC Electric Manual Excerpt 12 MPG-5 Idaho Power Discovery Responses 13 Q DOES THE FACT THAT YOU DO NOT ADDRESS EVERY ISSUE RAISED IN 14 THE COMPANY'S TESTIMONY MEAN THAT YOU AGREE WITH ITS 15 TESTIMONY ON THOSE ISSUES? 16 A No, it merely reflects that I chose not to address all those issues in my testimony. My 17 silence on any issue should not be construed as an endorsement of, or agreement with, 18 IPC's position on such issues. 19 II. SUMMARY OF CONCLUSIONS AND RECOMMENDATIONS 20 Q PLEASE SUMMARIZE YOUR CONCLUSIONS AND RECOMMENDATIONS. 21 A In my testimony I respond to the Company's findings on CCOS studies, proper 22 classification of base, intermediate, and peaking production facilities, and the proper 23 demand allocation factors to assign demand-classified fixed production costs across rate 24 classes based on the customer usage characteristics that cause the Company to incur Gorman, Di 2 Micron Technology, Inc. I production costs to serve customers' energy and reliability demands. These 2 classification weights and demand allocation factors also align with the customer class 3 benefits provided by the utility for use of these infrastructure assets. 4 Absent my recommendations, the Company's recommended approach on these 5 issues moves away from cost-of-service principles and will create, not reduce, the 6 subsidies in Idaho Power rates that benefit some rate classes and harm others. 7 Specifically,my testimony makes the following findings and recommendations: 8 • I recommend the Idaho Public Utilities Commission ("Commission") 9 authorize or direct IPC to use an Average and Excess Demand ("AED") 10 methodology in its next rate case to allocate production capacity or demand 11 costs. This will ensure that costs are allocated across rate classes to reflect 12 how production and transmission costs are incurred by IPC to serve its 13 customer classes' peak demands and hourly energy usage. 14 o The AED method properly classifies fixed production costs into two 15 separate factors that are weighted to produce a composite allocation 16 factor: (1) capacity costs associated with serving average energy 17 demand; and (2) demand capacity costs incurred to ensure IPC can 18 reliably serve system coincident peak demands of customers, i.e., 19 provide service reliability. 20 o Within the AED method, I support IPC's use of a 4 Coincident Peak 21 ("CP") demand allocator for all demand classified production costs 22 because it most accurately aligns with the resource planning customer 23 demands used by the Company to identify the need to invest or procure 24 additional production resource capacity that is needed to provide 25 reliable firm service to its Idaho customers. This is commonly known 26 as the AED-4CP methodology. 27 • I support the 4 CP methodology because it is sustainable over time and can 28 track the changes in system load characteristics driving the Company's 29 investment in production resource capacity requirements. For example, if 30 IPC's load changes from a 4 CP summer-peaking utility to a 4 CP combined 31 seasonal peak demand in both the winter and the summer seasons, the 4 CP 32 can be adjusted in rate cases to track the system loads and demands that 33 cause needed investments in additional production and transmission 34 capacity. 35 • I recommend the Commission reject IPC's proposed use of the Peak & 36 Average Embedded Method ("PAEM") because it unreasonably Gorman, Di 3 Micron Technology, Inc. I double-counts capacity needed to serve average energy demands in the 2 development of a composite production capacity cost allocator, and thus 3 over-allocates production fixed capacity cost on the basis of class energy 4 consumption. 5 • The PAEM overweights energy consumption in the development of a 6 production capacity cost allocator. This overweight of energy consumption 7 in the composite capacity cost allocator does not accurately reflect the 8 customer demands and energy load considered by IPC in its Integrated 9 Resource Plan ("IRP") used to identify when and the amount of additional 10 production and transmission capacity is needed to provide reliable firm 11 service to customer classes. However, contrary to my primary position to 12 reject the PAEM, if the Commission adopts the Company's proposal to use 13 the PAEM methodology, I also recommend several adjustments to its 14 proposed PAEM to more accurately reflect the customers' load that causes 15 production capacity costs to be incurred. 16 o 1) The Company's proposed classification of the base and intermediate 17 eligible production resources should be changed to 25% energy and 18 75% demand, rather than the Company's proposed weights of 35% 19 energy and 65% demand. 20 o 2)Base and intermediate production resource cost classified as demand 21 should be allocated using a 4 CP rather than a 12 CP demand allocator. 22 A 4 CP allocator more accurately reflects the system and class 23 coincident demands that align with IPC production capacity or resource 24 adequacy requirements. 25 o 3) I support the 4 CP methodology because it is sustainable over time 26 and can track the changes in system load characteristics driving the 27 Company's investment in production resource capacity requirements. 28 For example, if IPC's load changes from a 4 CP summer-peaking utility 29 to a 4 CP combined seasonal peak demand in both the winter and the 30 summer seasons, the 4 CP can be adjusted in rate cases to track the 31 system loads and demands that cause needed investments in additional 32 production and transmission capacity. 33 • I recommend that the Commission reject Idaho Power's proposed Growth 34 Responsibility Model ("GRM") because it is unsubstantiated at this time 35 and could negatively impact both existing and New Large Load ("NLL") 36 customers. 37 o The supply contract or contracts for NLL customers are not yet known. 38 Thus, it is unclear whether IPC will serve the new customers with 39 system resources or incremental resources priced specifically to assign 40 their costs to the NLL customer. Gorman, Di 4 Micron Technology, Inc. I o Therefore, it is unclear today whether such customers will create costs 2 that could be borne by existing customers. In addition,the methodology 3 ignores load growth from existing customers, and fails to recognize that 4 existing customer growth is also a cost driver for new investments. 5 o Because of the potential unique nature of NLL customers and their 6 service contracts, I recommend the Commission address this issue on a 7 case-by-case basis at this time. 8 Q CAN YOU SHOW THE DIFFERENCE BETWEEN THE CLASS 9 ALLOCATIONS BASED ON YOUR RECOMMENDED USE OF THE AED 10 METHOD AND THE COMPANY'S PROPOSED USE OF THE PAEM 11 METHODOLOGY? 12 A Yes. This is shown below on Table MPG-1. Importantly, the Commission should 13 implement a cost allocation methodology that most accurately reflects how customer 14 classes use and impact the system and cause system investment. If the methodology 15 results in rate shocks to customer classes, the Commission can address such rate shock 16 through rate mitigation methods implemented in the ultimate revenue allocation. Rate 17 mitigation does not belong in the cost allocation methodology itself. Gorman, Di 5 Micron Technology, Inc. Table MPG-1 Company CCOS Model Comparison of Revenue Increase by Class 2025 CCOS' Company PAEM` Company AED3 Description Percent Revenue Percent Revenue Percent Revenue Increase/(Decrease) Increase/(Decrease) Increase/(Decrease) (1) (2) (3) Uniform Tariff Schedules Total Residential Service 14.4% 12.6% 12.5% Total Small General Service 10.8% 11.3% 4.5% Large General Service(9S) (0.4%) 0.7% (8.9%) Large General Service(P/T) (1.2%) 0.4% (11.7%) Large Power Service 0.6% 3.4% (12.3%) Irrigation Service 10.4% 10.7% 52.7% Total Uniform Tariff Schedules 8.4% 8.2% 9.2% Special Contracts Micron (0.7%) 2.5% (13.3%) Simplot-Donn (6.9%) (1.6%) (17.7%) DOE/INL 3.8% 7.2% (16.6%) Simplot-Caldwell (16.1%) (11.3%) (25.6%) Lamb Weston (13.8%) (9.0%) (23.2%) Total Special Contract (8.3%) (4.5%) (20.7%) System Total 7.5% 7.5% 7.5% Sources: 120260331Attachment 4-2025 CCOS Model.xlsx. 220260923Direct Allen Exhibit No.2-PAEM Model.xlsx. 320260331Attachment 8-AED-4CP Model.xlsx. 1 As demonstrated in Table MPG-1 above, the use of AED and PAEM produces 2 a comparable cost of service for the residential rate class, but has a more significant 3 impact on high load factor classes such as large power service, the special contract 4 classes, and the seasonal use rate class such as the Irrigation class. The class with the 5 greatest impact is the Irrigation class, which has seasonal usage that places very large 6 demands on the company during its peak demand season, thus causing the company to 7 invest in additional production and transmission capacity to reliably serve this class 8 during the summer peak period, but then this class demands energy usage drops to a de 9 minimis level during the off-peak season. Hence, the use of a production allocator that 10 overweights energy consumption and one that measures a demand allocator based on a Gorman, Di 6 Micron Technology, Inc. 1 12 CP-month period of the year rather than the 4 CP-month peak season significantly 2 under allocates IPC's cost of providing firm service to this rate class. 3 III. IPC APPLICATION AND PROPOSED COSS 4 Q WHAT IS IPC REQUESTING THE COMMISSION APPROVE IN THIS CASE? 5 A Witness Grant Anderson, Idaho Power's Pricing and Tariff Manager, asks the 6 Commission to approve the following:' 7 1. Establish a consistent framework for evaluating CCOS methodologies; 8 2. Direct the Company to use the PAEM, with the GRM layered on top, for the 9 CCOS study in its next general rate case; and 10 3. Recognize that applying GRM supports implementation of Idaho Code 11 § 61-335, which addresses NLL customers. 12 Mr. Anderson recommends the COSS methodology should be judged on its 13 overall reasonableness based on the following tests:2 14 • Whether the COSS reflects cost causation; 15 . Whether it supports full cost-of-service responsibility; 16 . Whether it avoids undue preference, discrimination, or cost shifting; and 17 • Whether it recognizes the shared benefits of the integrated system. 18 As secondary tests, Mr. Anderson opines that the COSS should be 19 transparent, repeatable, stable, and administratively practical.3 1 Direct Testimony of Grant T.Anderson,p.4(Sept.23,2026)("Anderson Direct"). 2 Id. at pp. 9-10. 3 Id. at p. 10. Gorman, Di 7 Micron Technology, Inc. I Q HOW DO THE COMPANY'S PROPOSED TESTS ASSESSING COSS 2 REASONABLENESS COMPARE TO THOSE PROPOSED BY THE IDAHO 3 COMMISSION STAFF? 4 A The Company's recommended COSS reasonableness tests are very similar to the Staff s 5 "Principles Important to Class Allocation," as included in the February 27, 2026 Staff 6 Memo to IPC, and included in Attachment 1 to the Company's Petition in this case.4 7 Staff listed the important class allocation principles as: 1) Cost Causation, 2) Cost 8 Follows Benefit, and 3)Avoidance of Undue Discrimination.5 9 Q WITH THOSE GOALS IN MIND,WHAT APPROACH DOES IDAHO POWER 10 RECOMMEND? 11 A The PAEM methodology supplemented by the GRM approach. 12 Q WHY IS IPC ASKING THE COMMISSION TO APPROVE THE PAEM 13 METHODOLOGY? 14 A Based on its COSS evaluations,the Company proposes the Commission approve its use 15 of a PAEM. Mr. Anderson claims the PAEM is a "targeted refinement" of the 2025 16 General Rate Case ("GRC")methodology("2025 COSS"),where production plant was 17 allocated based on coincident-peak demands.6 18 He argues that a PAEM separates eligible production plant classifications and 19 allocates it based on a split between demand-related costs and energy-related cost 20 components.' Mr. Anderson maintains that this production plant classification a Idaho Power Company's Petition to Evaluate Class Cost-of-Service Methodology, Consider Alternative Class Cost-of-Service Studies, and Determine Cost of Service Considerations for New Large-Load Customers, Attachment 1,pp.2-5 (Feb.27,2026)("Staff s Memorandum"). 5 Staffs Memorandum,p. 1. 6 Anderson Direct,p. 14. 7 Id. at p. 15. Gorman, Di 8 Micron Technology, Inc. I allocation is intended to allocate costs consistent with the cost/benefits of eligible 2 production plant investments. These customers'benefits include serving the customers' 3 peak demands (reliability) and economically serving customers' hourly energy load. 4 Mr. Anderson maintains that this production plant classification is consistent 5 with the National Association of Regulatory Utility Commissioners ("NARUC") 6 Electric Cost Allocation Manual recommended use of the Peak&Average methodology 7 and the classification of production cost as both demand and energy.8 8 Q DO YOU AGREE THAT THE PAEM METHODOLOGY ACHIEVES THE 9 GOALS OF A COSS? 10 A No. 11 Q WHY NOT? 12 A The core goal of a COSS should be to allocate costs in accordance with the customer 13 actions that cause the costs to be incurred by the utility. Under the PAEM, costs that 14 are caused because of customer usage during system peak periods will be allocated 15 across rate classes in large part based on customer usage during off-peak periods. This 16 creates a fundamental mismatch between the customer actions that cause costs to be 17 incurred and the allocation of those costs to the various customers. As a result, the 18 Company's recommended approach moves away from cost-of-service principles and 19 will create, not reduce, the subsidies in Idaho Power rates that operate to the benefit of 20 some and the detriment of others. Indeed, even NARUC recognizes that that the PAEM 21 deviates from cost causation principles because it "...tempers the apportionment of 8 Id. at p. 14. Gorman, Di 9 Micron Technology, Inc. I costs between the high and low load factor customers."9 In other words, the PAEM 2 limits the measurement of cost of service because it attempts to moderate the assignment 3 of cost to low load factor classes, like residential class, and over-allocates cost to high 4 load factor classes. I recommend the Commission rely on a cost-of-service 5 methodology that best reflects IPC cost of serving rate classes, and then employ 6 moderation, if necessary, based on its movement of rate classes toward cost of service. 7 Q DID IPC CONSIDER OTHER COSS METHODOLOGIES? 8 A Yes. IPC considered four alternative COSS methodologies, plus the 2025 rate-case 9 study, which it used as the baseline for comparison. Mr. Allen's testimony presents an 10 Energy&Fixed Allocation Classification("EFAC") study,AED, and Hourly-Informed 11 studies. The Company used these studies to test individual choices in supporting its 12 proposed PAEM, but it did not treat them as equal recommendations; each study tested 13 one specific question.10 These alternative COSS are described as follows: 14 1. EFAC 15 • EFAC is similar to the PAEM but it allocates eligible plant demand cost 16 using the 4 CP and classifies energy and demand production capacity 17 cost based on the system load factor. 18 2. AED 19 • The AED COSS classifies production capacity cost as demand and 20 energy related, and applies separate weight to cost classified as energy 21 and demand. It does not double count the production cost classified as 22 energy in developing a weighted average production capacity cost 23 allocator. Demand costs are allocated using a 4 CP and energy costs are 24 allocated using energy at generation. 9 NARUC Gas Distribution Rate Design Manual, p. 28 (Jun. 1989) (provided as Exhibit MPG-3). While this statement is from the gas rate design manual,the same concept applies to electric utility cost allocation. io Allen Direct,p. 17:20-24. Gorman, Di 10 Micron Technology, Inc. 1 3. Hourly-Informed Method 2 • The Company considered an Hourly-Informed allocation method that 3 allocates production and transmission costs based on hourly energy 4 usage. The Company rejected this methodology because it does not 5 measure each class's responsibility for the generation and transmission 6 capacity that is needed to serve customers.11 7 • The Company was also critical of the Hourly-Informed method because 8 it needs a large amount of hourly data and modeling assumptions.12 9 Q PLEASE SUMMARIZE THE CLASSIFICATION AND ALLOCATORS USED 10 BY IPC IN THE COSS METHODOLOGIES CONSIDERED BY THE 11 COMPANY. 12 A A summary of the classifications and allocators for the 2025 COSS, including both the 13 PAEM and the alternative COSSs, is outlined below in Table MPG-2. Anderson Direct,p.18. 12 Id. Gorman, Di 11 Micron Technology, Inc. Table MPG-2 Production and Transmission Allocation/Classification Demand Energy Description 12 CP 4 CP Generation (1) (2) (3) 2025 CCOSS' Eligible Production Base and Intermediate 100.0% - - Eligible Production Peaking - 100.0% - Energy Storage-Batteries 100.0% - - Purchased Power-Contracts - - 100.0% Purchased Power-Demand Response - 100.0% - Transmission(Excluding Direct Assignment) 100.0% - - PAEM2 Eligible Production Base and Intermediate 65.4% - 34.6% Eligible Production Peaking - 65.4% 34.6% Energy Storage-Batteries 100.0% - - Purchased Power-Contracts - - 100.0% Purchased Power-Demand Response - 100.0% - Transmission(Excluding Direct Assignment) 100.0% - - AED3 Eligible Production Base and Intermediate - 45.4% 54.6% Eligible Production Peaking - 45.4% 54.6% Energy Storage-Batteries - 45.4% 54.6% Purchased Power-Contracts - - 100.0% Purchased Power-Demand Response - 45.4% 54.6% Transmission(Excluding Direct Assignment) 100.0% - - Hourly-Informed Model Eligible Production Base and Intermediate - - 100.0% Eligible Production Peaking - - 100.0% Energy Storage-Batteries - - 100.0% Purchased Power-Contracts - - 100.0% Purchased Power-Demand Response - - 100.0% Transmission(Excluding Direct Assignment) - - 100.0% Sources: 120260331Attachment 4-2025 CCOS Model.xlsx. 220260923Direct Allen Exhibit No.2-PAEM Model.xlsx,&20260923Direct Allen Exhibit No.3-PAEM Model Allocation Factor Derivation Workpapers.xlsx. 320260331Attachment 8-AED-4CP Model.xlsx,&20260331Attachment 9-AED-4CP Allocation Factor Derivation Workpapers.xlsx. 420260331Attachment 10-Hourly-Informed Model.xlsx. 1 The important distinction between various cost of service models is the demand 2 allocator used to allocate demand classified costs and classification of production and Gorman, Di 12 Micron Technology, Inc. I transmission costs between demand and energy related costs. The classes' contribution 2 to coincident peak demands are critical elements in describing how the company plans 3 its system and invests in transmission and production capacity costs that are needed to 4 provide customers reliable firm service and are the demands that drive reliability cost 5 on the system. The customer class demands that drive cost causation should also be 6 used to develop demand-classified costs allocators. 7 As shown in Table MPG-2, both the PAEM and the AED methods classified 8 production costs based on the benefits they provide to customers to meet peak demand 9 for reliability purposes, and to serve hourly energy demands. The PAEM and AED 10 methods are reasonably similar to the 2025 COSS in their allocation of non-eligible 11 plant costs, but these methodologies classify eligible production capacity costs into 12 energy and demand classification. This is intended to allocate production capacity cost 13 in line with the customers'benefits from production service. 14 The Hourly-Informed method,in significant contrast,results in a production and 15 transmission capacity cost allocation that is essentially classified and allocated based on 16 energy usage alone. A comparison of the production plant allocation under the 17 Hourly-Informed method and an energy-based allocator is shown on my 18 Exhibit MPG-1. Gorman, Di 13 Micron Technology, Inc. I IV. MICRON RECOMMENDS THE COMMISSION ADOPT 2 THE AED METHOD AS OPPOSED TO THE PAEM METHOD OR, 3 AT A MINIMUM A MODIFIED VERSION OF THE PAEM METHOD 4 A. THE COMMISSION SHOULD ADOPT AED-4CP RATHER THAN 5 PAEM 6 Q WHAT COSS METHODOLOGY DO YOU RECOMMEND THE 7 COMMISSION DIRECT THE COMPANY TO USE IN ITS NEXT RATE CASE? 8 A I recommend the Commission direct the Company to use the AED methodology in its 9 next rate case because it would reduce the subsidies in Idaho Power's rates that operate 10 to the benefit of some customers and the detriment of others. As outlined above, the 11 AED methodology most accurately allocates production cost across rate classes based 12 on class energy demands,and additional capacity for reliability or to serve peak demand. 13 Further,this allocation is also reasonable in measuring cost causation across rate classes 14 for the following reasons: 15 1. The amount of production capacity needed to serve weather-sensitive or low- 16 load factor classes in the on-peak period is not needed or used by the Company 17 to serve other rate classes during non-peak periods. Rather,this capacity output 18 is scaled down and operated at a low- to no-capacity factor output during 19 non-peak periods. Hence, during the off-peak period, the capacity necessary to 20 serve low-load factor or weather-sensitive customer demand during the on-peak 21 period is simply a fixed cost incurred by the system and does not provide 22 capacity benefits to any customer. However, these capacity costs are prudent 23 and reasonable because they are necessary to serve peak demands during the 24 peak period. 25 2. Each rate class's need for capacity to serve energy demand, and for capacity to 26 provide reliability or serve peak demand, is measured in a consistent, 27 repeatable, and transparent manner, that aligns with customer demands that 28 cause IPC's production capacity investment decisions. 29 Q DID THE NARUC MANUAL DISCUSS THE AED METHODOLOGY? 30 A Yes. The NARUC Manual provides a detailed description of the Average and Excess 31 ("A&E") Method, or AED. NARUC describes the AED method as a compromise Gorman, Di 14 Micron Technology, Inc. I between practitioners that believe production capacity costs should be allocated on 2 demand and those that believe these capacity cost should be allocated on energy.13 The 3 AED method develops a weighted allocator for production capacity based on two 4 factors: a factor weighted by capacity cost to serve energy, and a factor based on the 5 production capacity cost needed for system reliability, or to serve peak demands. The 6 two weighted components of the AED allocation factor are distinct and do not overlap. 7 Q HOW DO THE PAEM AND AED METHODOLOGIES DIFFER? 8 A The PAEM and AED differ based on weighting of energy in developing the production 9 demand allocator. Both methodologies use two factors to develop the weighted 10 allocation factor, but the PAEM gives far more weight to energy usage in developing 11 the production capacity cost allocator. This results in the PAEM being developed based 12 on an over-classification weight for average demand or energy usage. 13 The AED includes two factors weighted by demand and energy classification to 14 produce the AED production cost allocator. The AED Factor 1 includes the amount of 15 capacity cost necessary to serve average demands, or energy usage. The AED Factor 2 16 is based on the "additional" capacity cost needed to provide service reliability, or to 17 serve demands in excess of the average demand up to the system peak demand. The 18 two factors included in the AED allocator sum to the total utility production capacity 19 and capacity cost. 20 In contrast,the PAEM is also based on two factors,but the PAEM double-counts 21 production capacity incurred to serve average demands or energy by including that 22 capacity in each of the two factors used to produce the weighted PAEM production i3 NARUC Electric Manual,pp.49-51, 57(Jan. 1992)(excerpts provided as Exhibit MPG-4). Gorman, Di 15 Micron Technology, Inc. I capacity cost allocator. Hence, the PAEM overweights energy-related capacity and 2 related costs in developing the combined PAEM production capacity cost allocator. 3 This overweighted energy usage allocator over-allocates capacity cost to high load 4 factor classes and under-allocates costs to low load factor classes. 5 Q CAN YOU ILLUSTRATE THE PAEM'S DOUBLE-COUNTING OF 6 ENERGY-RELATED CAPACITY AND RELATED COST VERSUS THE AED 7 CAPACITY COST ALLOCATOR? 8 A Yes. As discussed above, the AED accurately classifies total production costs into one 9 of two separate cost classification categories: (1) a Factor 1 that includes capacity 10 necessary to serve average demand; and (2) a Factor 2 composed of the additional 11 production capacity cost, in excess of the energy-classified production cost, that is 12 needed for service reliability during peak periods. The production capacity costs used 13 to develop the AED allocators sum to total production costs, and align production class 14 benefits with class cost allocations. 15 In significant contrast, PAEM does not separate total production costs into two 16 separate cost factors ultimately summed to calculate total production costs. Rather, the 17 PAEM includes the capacity cost incurred to serve average demand in both the average 18 demand Factor 1 and the reliability demand Factor 2. Hence, the PAEM allocation 19 factor double-counts the capacity cost incurred to serve the average energy demand 20 Factor 1 by also including this same capacity in the reliability demand Factor 2. As a 21 result, the PAEM allocation factor is based on more than 100% of the total production 22 capacity costs,because the average demand factor is double counted. Gorman, Di 16 Micron Technology, Inc. I This double counting of the cost to serve average demand in the PAEM and 2 avoidance of the double count in the AED is illustrated in Figure MPG-1 below. Figure MPG-1 PAEM AED Peak Demand Peak Demand Excess Factor 2 Demand Factor 2 Peak Demand NO NAM ............. ... ............. Factor I Factor I Average Demand ...........111- Energy NAM /iiiiiiiii ............ PAEM— AED (35%x Factor 1)+(65%)x Factor 2 (35%x Factor 1)+(65%)x Factor 2 3 In the figure above, the left side illustrates the split of production cost into the 4 two factors that comprise the weights used to produce the PAEM production cost 5 allocator. As shown above,under the PAEM,Factor I is the production capacity needed 6 to serve"average demand",and Factor 2 is the capacity needed to serve"peak demand." 7 As shown under the PAEM, Factor I production capacity and costs are also 8 included in Factor 2. Therefore, the sum of Factor I and Factor 2 exceeds the total 9 production capacity(kW)and capacity costs of the system. This double counting results 10 in the PAEM allocation factor overweighting the production capacity and related cost Gorman, Di 17 Micron Technology, Inc. I to serve system energy, and underweighting the production cost needed for system 2 reliability. 3 This energy double-count and over-weighting is not present in the 4 AED-weighted allocation methodology shown on the right side of the figure. The AED 5 method separates total production costs into two separate factor weights: (1) Factor 1 6 capacity and related costs associated with serving average demand; and (2) Factor 2 7 demand cost, or additional production capacity cost needed above the cost to serve 8 average demand that is incurred for service reliability during peak periods. The sum of 9 Factor 1 and Factor 2 equals the total system production capacity and related costs. 10 Hence, the AED avoids the PAEM's double-counting limitation. 11 Separating these two production cost components is critical. Indeed, the utility 12 must design its system with adequate capacity to serve peak demands, and to 13 economically serve hourly energy demands. The cost to provide customers these 14 benefits is not redundant, but rather classified as one or the other. Hence, the AED is a 15 more accurate allocation factor that assigns production capacity cost across rate classes 16 based on the energy and demand (reliability)benefits provided to customers. 17 Q ARE YOU AWARE OF ANY OTHER JURISDICTIONS THAT HAVE 18 AGREED THAT THE A&E METHOD RESOLVES THE ISSUE OF DOUBLE 19 COUNTING AVERAGE DEMAND? 20 A Yes. In PECO Energy Gas's 2020 base rate case, the Pennsylvania Public Utility 21 Commission approved the utility's proposed A&E cost allocation method, and cited the 22 issue of double counting as evidence for support of the A&E methodology. Specifically, 23 the Pennsylvania Public Utility Commission stated the following: Gorman, Di 18 Micron Technology, Inc. I "Moreover, we are also persuaded by PECO's argument regarding the 2 implicit double counting of Average Demand in the P&A methodology. 3 Again, the A&E methodology allocates mains costs based, in part, on 4 Average Demand, and, in part, on the portion of Peak Demand that 5 exceeds Average Demand. Alternatively, mains costs are allocated 6 under the P&A methodology based, in part, on Average Demand, and, 7 in part, on the total Peak Demand. Consequently, Average Demand is 8 included in the Average Demand component and in the Peak Demand 9 component, which includes Average Demand. Accordingly, due to 10 residential customers having temperature sensitive demand and 11 corresponding low-load factors, double-counting Average Demand 12 understates the residential cost of service while overstating the cost of 13 service of more efficient gas users."14 14 In addition, the Missouri Public Service Commission on several occasions has 15 found that the double counting of Average Demand in the P&A method is a flaw. The 16 Missouri Public Service Commission in its Order, at page 85 for Case 17 No. ER-2010-0036, an AmerenUE electric rate case, found that: 18 "The Peak and Average method, in contrast, initially allocates average 19 costs to each class, but then, instead of allocating just the excess of the 20 peak usage period to the various classes to the cost causing classes, the 21 method reallocates the entire peak usage to the classes that contribute to 22 the peak. Thus, the classes that contribute a large amount to the average 23 usage of the system but add little to the peak, have their average usage 24 allocated to them a second time. Thus, the Peak and Average method 25 double counts the average system usage, and for that reason is 26 unreliable."'5 27 In 2011,the Missouri Public Service Commission again found the P&A method 28 to be unreliable in Case No. ER-2011-0028, and rejected the use of the P&A method in 29 Case No. ER-2014-0258 because of the double counting of Average Demand. la Case No.R-2020-3018929,Opinion and Order,pp.229-30(Jun.22,2021). is File No.ER-2010-0036,Report and Order,p. 85 (May 28,2010). Gorman, Di 19 Micron Technology, Inc. I Q DOES IPC ARGUE THAT THE PAEM REASONABLY ALLOCATES COSTS 2 BASED ON CUSTOMERS' RELATIVE PEAK AND OFF-PEAK USAGE? 3 A Yes. IPC witness Anderson argues that the PAEM recognizes that eligible production 4 resources serve two purposes:16(1)provide capacity necessary to meet customers' peak 5 demand; and (2) provide energy service to customers throughout the year. He states 6 that the PAEM classifies production plant as either demand-related or energy-related, 7 which aligns with the customer benefits derived from the production resources. 8 Q DO YOU AGREE? 9 A. No. While I agree that it is critical to allocate costs to customers based on their 10 contribution to system peak, I disagree that the PAEM achieves that objective as I 11 discussed above. 12 Q CAN YOU ILLUSTRATE THE IMPORTANCE OF PRODUCTION CAPACITY 13 COSTS NEEDED TO SERVE CUSTOMERS' RELIABILITY DEMANDS AND 14 ENERGY REQUIREMENTS? 15 A Yes. Properly classifying production costs between demand and energy is important to 16 fairly allocate the cost because production resource adequacy costs are (1) incurred 17 regardless of the energy load; but (2) directly related to customers' peak demands. In 18 its IRP, IPC states that it measures resource adequacy based on having sufficient 19 production resource capacity to serve system peak demands.17 It then operates that 16 Anderson Direct,p. 15. 17 Case No.IPC-E-25-23,Idaho Power Company's 2025 Integrated Resource Plan,Attachment 1,pp.99-100(Jun. 27,2025)("IPC's IRP")(noting the IRP model's"objective[]is to meet a pre-determined Planning Reserve Margin (PRM). The PRM can be defined as the percentage of expected capacity resources above forecasted peak demand. PRM and ELCC values are derived from the LOLE methodology and are a direct input to the Aurora LTCE model. After Aurora solves for and produces portfolios,the resource buildouts and their corresponding data are analyzed with the LOLE methodology and tested to ensure they meet the pre-designated reliability hurdle throughout the calculation of annual capacity positions"). Gorman, Di 20 Micron Technology, Inc. I resource portfolio to balance costs and risk in serving customers' energy load, including 2 demand-side management tools to assist customers in managing energy usage.18 This 3 results in significantly varying levels of resource portfolio capacity output, or monthly 4 capacity factor. For example, the annual load factor of the IPC system in 2025 was 5 53%, but the capacity factor during the 4 CP peak period was 60% and the load factor 6 for the other 8 months of the year was 48%. 7 The monthly variability in the IPC system demand relative to the peak season 8 and resource portfolio capacity is illustrated in Figure MPG-2 below. Figure MPG-2 System Monthly Coincident Net Peak Demands 4,000,000 3,500,000 3,000,000 2,500,000 2,0009000 -- -- -- -- -- -- - - - - - - - - - - 195009000 1,000,000 500,000 0 January February March April May June July August September October November December Source: �Special Contracts Irrigation Direct Allen Exhibit No.-3-PAEM Model Allocation Factor Derivation Workpapers,tab'D10_D13_E10 Allocators. �Rest of System ———System Average Demand *Idaho Power's 2025 Integrated Resource Plan,Table 4.2. Existing Capacity* is IPC's IRP,Application,pp.4-5. Gorman, Di 21 Micron Technology, Inc. I As shown in the Figure above, annual average system demands are lower than 2 the monthly peak demand in every month of the year,albeit April is close. In all months 3 of the year, the Company's resource portfolio capacity is in excess of the peak demand, 4 which,by design, ensures that the system has sufficient capacity to serve peak-demand 5 plus reserve capacity in case unexpected events occur. 6 The amount of production resource capacity is designed to serve demand during 7 the peak season period (June through September). The capacity designed to serve 8 demand during the peak season is operated throughout the year but at a reduced capacity 9 factor output. Significantly,designing resource adequacy to serve peak demands results 10 in the following customer benefits: 11 1. The system will have sufficient capacity to provide all classes reliable service 12 throughout the year, 13 2. The system production portfolio will operate at a lower capacity factor during 14 non-peak season and a higher capacity factor output during the peak season, 15 3. The capacity installed to serve low load factor classes' demands during the peak 16 season is not fully used by the low load factor classes during the off-peak 17 season. But this capacity is not needed to serve high load factor classes' 18 demands during the non-peak season, because the capacity IPC acquires to 19 serve the high load factor classes' peak-period demands is already available to 20 serve them throughout the year. Hence, the capacity needed to serve low load 21 factor classes during the peak season operates at reduced capacity factor output 22 during the non-peak season, 23 4. The customer class peak period demands cause IPC to acquire sufficient 24 capacity, or resource adequacy, to serve those customer classes' peak-period 25 demands and provide these classes reliable service, and 26 5. Use of a 4 CP reliability demand allocation factor reflects IPC's cost of 27 providing firm service throughout the year and the benefit each customer class 28 receives from reliable firm service. 29 Importantly, if the Company allocates capacity costs based on off-peak 30 demands and/or energy usage, those customers that drive peak capacity costs will Gorman, Di 22 Micron Technology, Inc. I not be allocated demand costs appropriately and their rates will be subsidized by 2 other customers. 3 Q HOW DOES IPC'S SYSTEM CAPACITY FACTOR VARY THROUGH THE 4 PEAK AND NON-PEAK SEASONS? 5 A IPC's resource portfolio is operated at varying capacity factor levels during the annual, 6 peak season and non-peak season as summarized in Table MPG-3 below. Table MPG-3 Load Factors Remaining Total Peak Season Months System* 52.87% 62.00% 48.29% Irrigation 31.31% 73.85% 9.96% Special Contracts 95.09% 91.79% 96.74% Source: Direct Allen Exhibit No.-3-PAEM Model Allocation Factor Derivation Workpapers,tab'Imported Customer and Load Data'. *Excludes Meta data to match the Company's analysis. 7 The Irrigation and Special Contracts class load factors are also shown in 8 Table MPG-3 above to illustrate why IPC system production capacity resources operate 9 at varying capacity factor outputs based on the class seasonal load differences. The 10 Irrigation class makes a large contribution to the system peak demand that drives IPC's 11 need to invest in production capacity to maintain its ability to provide reliable service. 12 However, this highly variable seasonal demand class makes very large demands during 13 IPC system peak periods but then scales down demands during the non-peak season. 14 These seasonally varying demands contribute to the reduced system capacity factor of Gorman, Di 23 Micron Technology, Inc. I the IPC production resource portfolio because capacity investments made to serve peak 2 period demands are not fully utilized to serve demands during the non-peak monthly 3 periods, nor are they used to serve energy demands during the non-peak periods. 4 Q PLEASE EXPAND ON HOW CLASS CONTRIBUTIONS TO THE SYSTEM 5 PEAK DEMAND AND SYSTEM ENERGY DEMANDS IMPACT IPC'S COST 6 OF PROVIDING SERVICE FROM ITS PRODUCTION PORTFOLIO? 7 A The distinction in annual monthly demands,peak season monthly demands, and annual 8 energy has material impacts on how IPC incurs production costs to provide reliable 9 service, and how those costs should be allocated across rate classes based on the benefit 10 received by each rate class. To illustrate,based on Table MPG-3 above and as detailed 11 in the class annual monthly peaks on Exhibit MPG-2, the class with the most extreme 12 contributions to the system peak include the Irrigation class and the Special Contracts 13 Customer class. 14 The Irrigation class is a seasonal customer that has a low annual load factor and 15 is a seasonal operating class that places its peak demand on the system during the 4 CP 16 system peak demand season,but then places minimal demand on the system during the 17 non-peak season. Hence, this class has a high 4 CP allocator during the summer peak 18 season of 19.9%19 but has a much lower 12 CP demand allocator of 10.1 p20 because of 19 its de minimis demands during the remaining 8-month non-peak period of the full 20 12-month calendar year. This class makes large contributions to the system 4 CP peak 19 Idaho Power's Petition to Evaluate Class Cost-of-Service Methodology, Consider Alternative Class Cost-of- Service Studies, and Determine Cost of Service Considerations for New Large-Load Customers, Attachment 9 - AED-4CP Allocation Factor Derivation Workpapers.xlsx, Tab D10_D13_E10 Allocators, Row 45 (Mar. 31, 2026). 20Id. at Attachment 9-AED-4CP Allocation Factor Derivation Workpapers.xlsx,Tab D10_D13_E10 Allocators, Row 23. Gorman, Di 24 Micron Technology, Inc. I which are the demands that are a major factor that drives IPC resource adequacy 2 investment requirement needed to maintain system reliability. 3 If eligible production capacity costs are allocated on a 12 CP basis,this rate class 4 will not be allocated production demand capacity costs that align with IPC's cost of 5 providing the class with service reliability. Importantly, IPC must make production 6 investment to serve the Irrigation class peak contribution to the system peak period 7 demands,the 4 CP period,because these demands occur during the system summer peak 8 season, which is the seasonal period where IPC resource capacity is constrained by 9 coincident system peak demands from all rate classes. This outcome, in turn, causes 10 IPC to invest in production capacity needed for system reliability. Hence,the Irrigation 11 class peak contributes to the system 4 CP and contributes to the demands that drive 12 IPC's resource adequacy requirements and investment costs. But these demand 13 resources are used at a much lower capacity utilization during the non-peak period. 14 In contrast, the Special Contracts Customer class is a relatively high load factor 15 class with relatively consistent usage around the year. The Special Contracts Customer 16 class's demands during the 4 CP peak period and the 12 CP period are similar. 17 However, because other classes' demands in the non-peak months are moderate 18 compared to their summer peak demands, if production reliability demand costs are 19 allocated using a 12 CP allocator, the Special Contracts class will be allocated 20 significantly more production reliability demand costs than are needed to serve this rate 21 class, and the Special Contracts class will pay a subsidy for production reliability 22 demand costs that are needed to serve other rate classes. In this instance, the other rate Gorman, Di 25 Micron Technology, Inc. I classes do not fully pay for the reliability demand cost—but do receive the benefits of 2 reliable service. 3 Again, on my Exhibit MPG-2, I show the annual monthly peaks and average 4 annual demand for all IPC major rate classes. 5 Q WHY DO YOU MAINTAIN THAT PEAK SEASON DEMANDS REFLECT THE 6 CLASS DEMAND THAT DRIVE IPC PRODUCTION CAPACITY 7 INVESTMENT DECISIONS? 8 A This is clearly stated in IPC's 2025 IRP under the section"Resource Procurement." IPC 9 identifies the need for production capacity based on a Loss of Load Expectation 10 ("LOLE") criterion,which requires IPC to add generating capacity if its LOLE exceeds 11 0.1 event-days per year (a one-day-in-ten-years probability of failing to serve load).21 12 When the LOLE increases above 0.1, additional generating capacity is added if 13 necessary to meet IPC's reliability requirements.22 IPC describes this planning tool in 14 the Figure MPG-3 below which is copied from its 2025 IRP. The 2025 IRP also stated: 15 "The first deficiency was determined to be the first month that exceeded a 16 0.0083 event-days per year LOLE (or 0.1 divided by 12) on the first year of 17 capacity deficiency(2027). For this IRP,the first month over that threshold 18 was June 2027, as shown in [Figure MPG-3 below]." 21 IPC's IRP,Attachment 1,Appendix D,p.2. 22 IPC's IRP,Application,p. 7. Gorman, Di 26 Micron Technology, Inc. Figure MPG-3 �MonthlyiLOLE ---Shortfall Threshold 0.07 0 0.06 V a 0.05 X W 0 0.04 0 0 N N 0.03 2- t Y c0 0.02 G N � 0.01 0.00 -� 0-7t W x6 a� cr Q�� av Jre ,J� Jew c x c ze sec 1acJ 4e�sJ era P V- �eF p��0 oae� ecetc l eQ � O Source:Idaho Power Company's 2025 Integrated Resource Plan, Section 11:Preferred Portfolio and Near-Term Action Plan,Figure 11.1: First Month Capacity Shortfall.21 1 IPC's LOLE analysis demonstrates that demand during the peak period of 2 June through September is predominantly the months when its production capacity 3 supply is constrained to serve the system peak demands. Hence, demand during 4 this peak season is the demand that drives the need for production resource 5 capacity. 6 B. IF THE COMMISSION ADOPTS THE PAEM, IT SHOULD ADJUST 7 THE WAY IDAHO POWER IMPLEMENTS THAT METHOD TO 8 MORE CLOSELY MATCH COSTS 9 Q IF THE COMMISSION ACCEPTS IDAHO POWER'S PROPOSAL TO USE 10 PAEM, SHOULD IT ACCEPT PAEM AS PROPOSED BY THE COMPANY? I I A No. The Commission should modify the Company's proposed PAEM as follows: "IPC's IRP,Attachment 1,p. 143. More information on the LOLE-derived capacity position calculation can be found in the System Reliability Modeling —Portfolio Analysis section of Appendix D—System Reliability and Regulating Reserves. Gorman, Di 27 Micron Technology, Inc. 1 1. Eligible production plant should be classified as 25% energy-related and 75% 2 demand-related, rather than the Company's proposed 35% energy-related and 65% 3 demand-related. The Company classifies 100% of purchased power as 4 energy-related, yet it measures the energy contribution of eligible plant using an 5 average system energy demand figure that does not account for the Company's 6 position that purchased power delivers a large part of the system energy benefit. 7 Hence, the energy benefit to customers from eligible plant is reduced by the energy 8 delivered by purchased power contract supply, and the demand benefit attributable 9 to the eligible plant increases.24 Removing purchased power energy from the 10 average system demand will produce a more accurate classification of the energy 11 and demand benefits of eligible production plant. 12 2. All eligible plant classified as demand-related should be allocated using a 4 CP 13 allocator rather than the 12 CP allocator proposed by the Company. 14 Q ARE YOU AWARE OF ANY IDAHO UTILITY THAT CLASSIFIES 15 PRODUCTION COST BASED ON A 75% DEMAND AND 25% ENERGY 16 BASIS? 17 A Yes. Rocky Mountain Power classifies production plant base as 75% demand and 25% 18 energy. It is my understanding that the Commission has approved this classification for 19 this utility for many years.25 20 Q CAN YOU SHOW THE DIFFERENCE BETWEEN YOUR PROPOSED 21 ALTERNATIVE PAEM METHODOLOGY AND THE COMPANY'S 22 PROPOSED PAEM METHODOLOGY? 23 A Yes. The comparison of the results on the Cost of Service ("COS") across rate classes 24 is shown below in Table MPG-4. 2'Allen Direct,pp. 11-12;IPC Response to Micron's Second Production Request No.7(confirming that purchased power agreements provide both demand-related and energy-related benefits,while purchased power is classified as 100 percent energy-related)(provided in Exhibit MPG-5). 25 See Case No.PAC-E-10-07,Order No.32196,pp.41-44(Feb.28,2011). Gorman, Di 28 Micron Technology, Inc. Table MPG-4 Company CCOS Model Comparison of Revenue Increase by Class Company PAEM' Revised PAEM` Description Percent Revenue Percent Revenue Increase/(Decrease) Increase/(Decrease) (1) (2) Uniform Tariff Schedules Total Residential Service 12.6% 12.1% Total Small General Service 11.3% 8.6% Large General Service(9S) 0.7% (2.9%) Large General Service(P/T) 0.4% (4.2%) Large Power Service 3.4% (2.4%) Irrigation Service 10.7% 28.8% Total Uniform Tariff Schedules 8.2% 8.6% Special Contracts Micron 2.5% (3.2%) Simplot-Donn (1.6%) (9.4%) DOE/INL 7.2% (5.7%) Simplot-Caldwell (11.3%) (17.2%) Lamb Weston (9.0%) (17.3%) Total Special Contract (4.5%) (11.7%) System Total 7.5% 7.5% Sources: 120260923Direct Allen Exhibit No.2-PAEM Model.xlsx. RRevised 2026092313irect Allen Exhibit No.2-PAEM Model.xlsx. 1 The differences largely relate to the energy/demand classification weights and 2 demand allocator for the eligible base and intermediate production resources. The 3 changes to classification weights and allocation of these resources are shown in 4 Table MPG-5 below. Gorman, Di 29 Micron Technology, Inc. Table MPG-5 Production and Transmission Allocation/Classification Demand Energy Description 12 CP 4 CP Generation (1) (2) (3) Company PAEM1 Eligible Production Base and Intermediate 65.4% - 34.6% Eligible Production Peaking - 65.4% 34.6% Energy Storage-Batteries 100.0% - - Purchased Power-Contracts - - 100.0% Purchased Power-Demand Response - 100.011/0 - Transmission(Excluding Direct Assignment) 100.0% - - Revised PAEM2 Eligible Production Base and Intermediate - 75.0% 25.0% Eligible Production Peaking - 100.0% - Energy Storage-Batteries 100.0% - - Purchased Power-Contracts - - 100.0% Purchased Power-Demand Response - 100.0% - Transmission(Excluding Direct Assignment) 100.0% - Sources: I20260923Direct Allen Exhibit No.2-PAEM Model.xlsx,&20260923Direct Allen Exhibit No.3-PAEM Model Allocation Factor Derivation Workpapers.xlsx. 2Revised 20260923Direct Allen Exhibit No.2-PAEM Model.xlsx. 1 Q HOW DOES THE COMPANY DERIVE ITS 65/35 CLASSIFICATION OF 2 ELIGIBLE PRODUCTION PLANT? 3 A The Company developed its energy and demand weighting based on the system average 4 annual demand and the annual system peak demand. The Company's methodology is 5 shown in Column 1 of the Table MPG-6 below. Gorman, Di 30 Micron Technology, Inc. Table MPG-6 Demand and Energy Classification of Eligible Production Resources Line Description Amount Source/Notes Idaho Power Proposed Classification 1 Gross Annual System Peak Demand(MW) 3,599 Allen Ex.3,Imported Customer&Load Data 2 Idaho Retail Energy at Generation(MWh) 16,653,765 Allen Ex.3,Imported Customer&Load Data 3 Average Demand(MW) 1,901 Line 2/8760 4 Energy Percent 34.6% Line 3/(Line 3+Line 1) 5 Demand Percent 65.4% 1 -Line 4 Energy Classification using Energy Produced by IPC- Owned Plant;Peakers classified as 100%Demand 6 Net Annual System Peak Demand(MW) 3,469 Allen Ex.3,Imported Customer&Load Data 7 Average Demand Served by IPC-Owned Resources(MW) 1,277 Line 3 x 67.15%;see note 1 8 Energy Percent Using Net Peak 26.9% Line 7/(Line 6+Line 7) 9 Energy Percent Using Gross Peak 26.2% Line 7/(Line 1+Line 7) 10 Non-Peaker Share of Eligible Plant Cost 89.32% 1 -($222,378,668/$2,082,842,456);see note 2 11 Composite Energy Percent(Gross Peak) 23.39% Line 10 x Line 9 12 Composite Energy Percent(Net Plant) 24.03% Line 10 x Line 8 Micron Proposed Classification 13 Energy Percent 25.00% Rounded based range of Lines 8-9 and 11-12 14 Demand Percent 75.00% 1 -Line 13 Sources: 1 The 67.15%ratio reflects IPC's net generation relative to total system output from the 2025 FERC Form-1,pages 401a and 401b. 2 Reflects gross plant in service data from Allen Ex.2,AS Table 1. 1 I propose to adjust the Company's system weighting to reflect its judgment to 2 classify purchased power energy as 100% energy. The purchased power contract's 3 energy should then offset the total system average energy in the Company's weighting 4 methodology to gauge the energy benefit from eligible plant. This adjustment is shown 5 in Column 2 in Table MPG-6 above. This results in an eligible plant energy and demand 6 classification weighting of 25% energy and 75% demand. Gorman, Di 31 Micron Technology, Inc. I Q DO OTHER FACTORS SUPPORT WEIGHTING THE CLASSIFICATION 2 TOWARD DEMAND? 3 A Yes, other factors include: 4 • Idaho Power plans to an LOLE of 0.1 event-days per year and does not plan to a 5 standalone energy requirement that determines the type, size, or timing of 6 production resources.26 7 • Capacity is built to serve the peak plus reserves. The Reliability and Capacity 8 Assessment Tool ("RCAT") develops seasonal planning reserve margin targets.27 9 Illustratively, grossing the net peak up by a 20% reserve margin lowers the energy 10 share to about 21%, with both corrections above applied.28 11 Energy-classified production plant is a fixed cost that does not vary with kWh and 12 stays fixed in the Fixed Cost Adjustment("FCA").29 13 Q HOW DOES IDAHO POWER PROPOSE TO ALLOCATE THE PRODUCTION 14 PLANT CLASSIFIED AS DEMAND UNDER PAEM? 15 A The Company's proposed PAEM keeps most of the production plant allocators used in 16 the 2025 CCOS, except for eligible plant,which will be classified as energy-related and 17 demand-related.30 18 The demand-related portion of base and intermediate eligible plant will be 19 allocated on each class's average contribution to the twelve monthly system net 20 coincident peak demands (a "12 CP" allocator). Base and intermediate eligible plant 21 includes hydro, coal, and the Langley Gulch combined cycle. The Danskin and Bennett 22 Mountain simple-cycle plants are peaking resources. The demand-related portion of 26 IPC Responses to Micron's First Production Request Nos. 1 and 2(b) (provided in Exhibit MPG-5). 27 IPC Response to Micron's First Production Request No.2(b)(provided in Exhibit MPG-5). 26 Case No.IPC-E-25-23,IPC Response to Staff s Production Request No.24(provided in Exhibit MPG-5). 29 IPC Response to Micron's First Production Request No.3(a)(provided in Exhibit MPG-5);Anderson Direct,p. 19. 31 IPC Response to Micron's First Production Request No.7(provided in Exhibit MPG-5). Gorman, Di 32 Micron Technology, Inc. I this peaking plant will be allocated on the four summer net coincident peak demands, 2 June through September(a 4 CP allocator).31 3 The Company proposes to classify battery storage as 100% demand-related and 4 allocate this plant using a 12 CP allocator.32 As discussed below, the 12 CP allocator 5 does not reflect the system peak demands that drive Idaho Power's resource adequacy 6 investment decisions. The 4 CP allocator more accurately reflects the customer 7 demands that drive IPC's investment decisions and therefore better reflects production 8 capacity cost causation. 9 Q DO YOU AGREE THAT 12 CP IS A REASONABLE ALLOCATOR FOR BASE 10 AND INTERMEDIATE ELIGIBLE PLANT? 11 A No. A demand allocator should measure each class's contribution to the system 12 conditions that require the utility to build or acquire production capacity. On Idaho 13 Power's system, the system load condition that drives the need for production capacity 14 is peak demand during the summer peak season.33 Hence, a 4 CP allocator for the 15 demand-related portion of all eligible production plant aligns with the customer 16 demands that drive Idaho Power's production capacity investments. 17 In contrast to the 4 CP allocator,which is based on the summer peaking season, 18 the 12 CP allocator gives equal weight to peak demands in all 12 months. This equal 19 monthly demand weighting does not capture the system demands that drive the need to 31 Allen Direct,pp. 11, 13;Id. at Exhibit No. 1,pp. 14-15; IPC Response to Micron's First Production Request Nos. 5(a)and 7(provided in Exhibit MPG-5). 32 Allen Direct,pp. 10-11;IPC Response to Micron's First Production Request No. 7(provided in Exhibit MPG- 5). 33 See IPC Response to Micron's First Production Request No. 1 (provided in Exhibit MPG-5)(Idaho Power"does not plan to a standalone energy requirement, distinct from its resource adequacy and reliability criteria, that independently determines the type,size,or timing of a production resource"). Gorman, Di 33 Micron Technology, Inc. I invest in production capacity and is, therefore, inconsistent with the Company's 2 planning studies, which cause the need to invest in production capacity. 3 Q HOW DOES IDAHO POWER MEASURE WHETHER IT HAS THE 4 PRODUCTION CAPACITY NEEDED TO RELIABLY SERVE ITS 5 CUSTOMERS? 6 A Idaho Power describes its resource adequacy criterion as follows: 7 "The resource adequacy criterion used by Idaho Power in the 2025 IRP 8 is an annual [LOLE] threshold of 0.1 event-days per year, which the 9 Company implements through its [RCAT]. Planning Reserve Margin 10 (`PRM') was not used as a separate or independent resource adequacy 11 criterion. Rather, RCAT was used to develop seasonal PRM targets and 12 Effective Load Carrying Capability(`ELCC')values for use as inputs to 13 the Aurora Long-Term Capacity Expansion(`LTCE')model. Please see 14 the 2025 IRP, Appendix D, section `Portfolio Analysis.' The LOLE 15 criterion is not a standalone energy-based criterion."34 16 Idaho Power's 2025 IRP states: 17 "The Aurora model selects resources based on set criteria—primarily, 18 resources that most cost-effectively meet future demand for electricity 19 and maintain Idaho Power's reliability criteria. Generally, resources in 20 the model are `selectable,' meaning the model can pick a given 21 resource—such as adding solar or batteries—if doing so will help 22 achieve the objective of building the lowest-cost, reliable portfolio."35 34 IPC Response to Micron's First Production Request No.2(b) (provided in Exhibit MPG-5). 35 IPC's IRP,Application,p. 3. Gorman, Di 34 Micron Technology, Inc. Table MPG-7 Monthly Net Coincident Peaks and LOLE Percent 2025 Weight Net CP of Annual LOLE under Line Month AM Net Peak Share 12 CP (1) (2) (3) (4) 1 Jan 2,435 70% 0.5% 8.3% 2 Feb 2,552 74% 0.0% 8.3% 3 Mar 2,020 58% 0.0% 8.3% 4 Apr 1,904 55% 0.0% 8.3% 5 May 2,707 78% 0.0% 8.3% 6 Jun 3,079 89% 2.3% 8.3% 7 Jul 3,466 100% 65.7% 8.3% 8 Aug 3,329 96% 19.4% 8.3% 9 Sep 2,923 84% 2.4% 8.3% 10 Oct 2,014 58% 0.7% 8.3% 11 Nov 2,222 64% 4.7% 8.3% 12 Dec 2,282 66% 4.4% 8.3% Sources: 1Direct Allen Exhibit 3,tab labeled"D10_D13_E10 Allocators." 2Direct Allen Exhibit 3,tab labeled"Gen&Transmission Factors WP." Reflects 2025 monthly LOLE as a percent of the total annual LOLE. 1 The summer months of June through September account for about 90%of 2025 2 LOLE and are the months that make up the 4 CP allocator. By contrast, the six months 3 of January through May and October together account for only about 1% of LOLE,yet 4 under the 12 CP allocator they carry half of the total weight of the demand allocation 5 factor, despite these months posing little impact on the need for additional production 6 capacity. Conversely, the 12 CP gives only about one-third weight to the peak months 7 of June through September,even though these months drive about 90%of LOLE. These 8 non-summer months do not reflect the peak demands that drive Idaho Power's need to Gorman, Di 35 Micron Technology, Inc. I incur production capacity costs. For these reasons, the demand allocation factor for all 2 eligible plants should be a 4 CP summer demand. 3 Q WHY IS IDAHO POWER PROPOSING TO USE A 12 CP ALLOCATION 4 FACTOR FOR BASE AND INTERMEDIATE PRODUCTION RESOURCES? 5 A Mr. Allen states that the Company allocates base and intermediate resources on 12 CP 6 because those resources provide capability throughout the year.36 7 Q IS YEAR-ROUND CAPABILITY A REASONABLE BASIS FOR DEVELOPING 8 AN ALLOCATION FACTOR FOR BASE AND INTERMEDIATE 9 PRODUCTION RESOURCES? 10 A No. The allocation factor should reflect the system load that created the need to invest 11 in production resources. Idaho Power plans its production resources to provide reliable 12 firm service. This requires it to invest in the production capacity necessary to serve the 13 system peak demand. After its capacity has been sized to reliably serve peak demand, 14 the production resources can be operated at less than full capacity to economically serve 15 customers' demands during non-peak periods. Therefore, resource adequacy is a direct 16 function of customers' contribution to the system peak demands. 17 Also, all system generating resources, including the peaking Combustion 18 Turbines ("CT") and battery storage, are able to operate in all months of the year, but 19 not all of the system's production capacity is needed during non-peak months and likely 20 could not be justified as a prudent resource investment based on non-peak period 21 demands. What determines how much capacity the Company must build or buy is the 36 Allen Direct,p. 13;IPC Response to Micron's First Production Request No. 6(provided in Exhibit MPG-5). Gorman, Di 36 Micron Technology, Inc. I load it has to serve at the peak, plus the capacity reserves needed to meet an LOLE of 2 0.1 event-days per year.37 3 The Company's discovery response confirms that the year-round use of these 4 resources is already captured in the energy classification. When asked what aspect of 5 cost causation the energy classification captures that 12 CP does not, the Company 6 stated that the energy-related portion"reflects each class's energy usage across all hours 7 of the year,"and that this"sustained use of the production resources is the aspect of cost 8 causation captured by the energy-related classification that is not captured by 12 CP 9 allocation."38 10 Q DOES THE ANNUAL ENERGY THESE RESOURCES PRODUCE JUSTIFY 11 ALLOCATING THE DEMAND-CLASSIFIED COST OF BASE AND 12 INTERMEDIATE RESOURCES USING A 12 CP ALLOCATION FACTOR? 13 A No. That reasoning conflicts with the purpose of splitting eligible production cost 14 between energy and demand. The energy allocation reflects how the resources are used 15 to serve energy load. The demand-classified cost should reflect the system demand that 16 drives the need for resource adequacy investments to serve peak demands. Recognizing 17 year-round use is what the energy classification under PAEM is for.39 The Company 18 already moves 35%of eligible production plant to energy and allocates it on year-round 19 seasonal energy factors. Once the year-round use of the plant is recognized there, the 37 IPC Response to Micron's First Production Request No.2(b)(provided in Exhibit MPG-5). 36 IPC Response to Micron's First Production Request No. 6(provided in Exhibit MPG-5). 39 See IPC Response to Micron's First Production Request No. 3(b) (provided in Exhibit MPG-5) ("The energy- related classification reflects the sustained use of production resources to serve customer energy usage throughout the year"). Gorman, Di 37 Micron Technology, Inc. I demand portion should measure the capacity requirement, which is the summer peak. 2 Using 12 CP on top of a 35% energy classification counts year-round use twice. 3 V. MICRON'S CONCERNS 4 WITH THE COMPANY'S PROPOSED GRM 5 Q PLEASE DESCRIBE IPC'S PROPOSED GRM METHODOLOGY THAT IT 6 PROPOSES TO USE IN COMBINATION WITH THE PAEM. 7 A IPC witness Mr. Anderson states that the GRM provides additional treatment for 8 identified growth-related portions of generation and transmission costs by including 9 both embedded cost responsibility and measured customer class growth.ao 10 Mr.Anderson opines that a PAEM along with GRM operate together to combine I I customer-related cost treatments supported by applicable cost of service requirements 12 in recognition that NLL customers may require customer-specific treatment to prevent 13 harm to embedded customers and to accurately measure cost of service. He states the 14 PAEM and GRM together represent complementary forms of cost responsibility 15 assignment, and the approach is consistent with Idaho Code 61-335 which prescribes a 16 customer-specific treatment for a NLL customer service and to reflect the no harm 17 statute for existing IPC customers.41 18 Q WHAT DOES IDAHO CODE 61-335 SPECIFY REGARDING THE 19 DEVELOPMENT OF A CLASS COST OF SERVICE STUDY? 20 A Idaho Code 61-335 does not specifically address CCOSS, but it does outline certain 21 protections for existing customers if the utility proposes to serve an NLL customer. 22 Idaho Code 61-335 specifies that anew large load(an increase of 50 megawatts("MW") ao Anderson Direct,pp.7-8. ai Id.at p. 8. Gorman, Di 38 Micron Technology, Inc. I or more in any consecutive 60-month period) must be served under a Commission- 2 approved service contract that provides adequate financial protections for the utility, 3 existing customers, and requires the customer to pay its incremental cost of service. 4 Other customer protections also include a provision that ensures that service quality and 5 reliability to the existing customers should remain reasonably consistent with what it 6 would have been had the NLL not taken service. Idaho Code 61-335 also provides that 7 NLL customers are responsible for funding their full cost of service, including their 8 share of investments that would not be required but for the NLL customer and that such 9 investments may be directly assigned or allocated in part to the NLL customer. 10 Q DO EXISTING CUSTOMERS CONTRIBUTE TO SYSTEM GROWTH, OR IS 1 1 ALL GROWTH RELATED ONLY TO NEW CUSTOMERS? 12 A. Load growth is caused by both adding new customers and by the increase in electricity 13 use of existing customers. This is evident in the Company's 2025 IRP,which indicates 14 the system load forecast annual growth rate, from 2026 to 2045, averages at 2.3% per 15 year,42 while the number of customers,in the same time period,is only expected to grow 16 by approximately 1.4%per year.43 17 Q IS THE COMPANY'S PROPOSED GRM REASONABLE? 18 A No. The Company's intent is to assign incremental costs that Idaho Power asserts are 19 associated with serving an NLL in an attempt to ensure that no harm is done to existing 20 customers. However, developing a generic growth-oriented cost of service 21 methodology to accomplish this objective is not warranted at this time because there 12 IPC's IRP,Attachment 1,Appendix A,p.7. "IPC forecasts current customer count of—647,793 to increase to 867,000 in 2045. Growth of 1.4%calculated as follows: (867,000/647,793)^(1/21). See IPC's IRP,Attachment 1,Appendix A,pp. 1-2. Gorman, Di 39 Micron Technology, Inc. I remains huge uncertainty around how NLL contracts will work and how Idaho Power 2 will actually acquire new resources to serve NLL customers. Therefore, if the GRM is 3 adopted here in combination with unknown NLL contracts,you could easily end up with 4 unintended consequences that could negatively impact both existing and NLL 5 customers. 6 Mr. Anderson acknowledges that a GRM focuses on system production and 7 transmission resources that will be needed to serve rate classes with load growth. This 8 implies that the growth-related resources will be included in the production and 9 transmission costs and allocated across rate classes with the COSS. This assumption is 10 not backed by a specific understanding of how Idaho Power will acquire resources to 11 serve NLL customers because that is not known.44 Indeed,Mr.Anderson acknowledges 12 that the service contracts that will underlie service to NLL customers are not yet 13 known.45 Therefore, the system COSS should not be adjusted at this time until it is 14 known how system costs are used to serve NLL customers. 15 For example, it is not known whether the production resources needed to serve 16 NLL customers will be included in the COSS, or whether the NLL costs of service will 17 be directly assigned to an electric service contract, or reflected in pricing in some other 18 way. If a resource is directly assigned to an NLL customer and on top of that the 19 customer pays a higher cost for existing resources the end result could be to over- 20 allocate costs to the NLL customer and under-allocate costs to others. Conversely, if a 21 new customer fully relies on the existing system and that customer's growth is assigned 22 to a particular class of existing customers, that one customer could cause all of that Anderson Direct,p.21. as See id. at pp. 8-9. Gorman, Di 40 Micron Technology, Inc. I class's customer rates to increase through this mechanism even if the other customers 2 within the class did not grow. 3 Given these uncertainties, to ensure full compliance with Idaho's requirements 4 that the NLL customers are not subsidized by other or existing customers, I do not 5 recommend that the Commission approve the GRM in this proceeding. Rather, the 6 Commission should acknowledge the goal and then apply that goal on a case-by-case 7 basis going forward in consideration of the specific terms of service and pricing for each 8 NLL customer. Because these arrangements can be unique, a unique solution is 9 appropriate for each to fairly charge the NLL customers for the costs they cause while 10 ensuring existing customers will not be harmed. 11 Q DOES THE GRM REASONABLY ACCOUNT FOR THE COSTS INCURRED 12 TO SERVE LOAD GROWTH FROM EXISTING CUSTOMERS? 13 A No. Each MW of load growth from a NLL is charged a higher cost than each MW of 14 load growth from existing customers even if the incremental costs to serve new growth 15 are the same. That is not a reasonable or sustainable approach. 16 VI. HOURLY-INFORMED METHOD 17 Q PLEASE DESCRIBE THE COMPANY'S HOURLY-INFORMED METHOD IN 18 DEVELOPING THE PRODUCTION CAPACITY COST ALLOCATOR. 19 A The Company describes its hourly-informed method as follows: 20 Under the Hourly-Informed method, the model modifies the classification 21 and allocation of Production and Transmission costs using full-year hourly 22 data. The method converts annual Production costs into hour-specific 23 values (using weighted hourly dispatch when hourly prices apply and 24 simple hourly dispatch when they do not) and converts Transmission Plant 25 costs into a single annual $/MWh-served by dividing Transmission Plant 26 cost by total served MWh; it then allocates Production based on each class's Gorman, Di 41 Micron Technology, Inc. I hourly MWh consumption and applies the annual Transmission Plant 2 $/MWh-served to each class's metered hourly MWh.46 3 As described by the Company above, the development of the production 4 capacity cost allocator was based entirely on the dispatch of the production resource 5 portfolio based on hourly operations. This methodology does not reflect the material 6 production costs incurred to provide service reliability which does not relate to the 7 dispatch of the production portfolio. Hence,the Hourly-Informed method does not track 8 customers' benefits with the Company's production resource portfolio costs,because it 9 does not recognize the production cost needed to provide reliable firm service (demand 10 benefits) and to serve hourly energy. 11 Q IS THE COMPANY'S HOURLY-INFORMED METHOD FOR THE 12 PRODUCTION CAPACITY COST ALLOCATOR REASONABLE? 13 A No. The hourly-informed methodology has been rejected by the Company on sound 14 reasons because it does not track production and transmission capacity cost in 15 proportion to how these costs benefit customers through: (1) service reliability or 16 demand benefits; and(2)serving hourly energy or energy benefits.47 Indeed,the hourly- 17 informed method allocates production and transmission capacity essentially on a 100% 18 energy basis as illustrated on my Exhibit MPG-1, which compares the allocation of 19 production and transmission class allocation based on the Hourly-Informed method and 20 a pure energy class allocation. a6 Idaho Power Company's Petition to Evaluate Class Cost-of-Service Methodology, Consider Alternative Class Cost-of-Service Studies, and Determine Cost of Service Considerations for New Large-Load Customers, Attachment 2,pp.3-4(Mar.31,2026). a�Anderson Direct,p. 18;Allen Direct,pp.21-22. Gorman, Di 42 Micron Technology, Inc. I This distinction is material because there are significant production and 2 transmission capacity costs associated with system reliability that are unrelated to the 3 hourly dispatch of the production resource portfolio. The hourly-informed method 4 simply does not reasonably or accurately classify the benefits of production costs based 5 on the benefits provided to customers from the production portfolio, and it therefore 6 does not track cost causation. 7 More specifically, the hourly-informed methodology does not properly 8 recognize the cost and benefits to customers for the following reasons: 9 • To provide system reliability, IPC invests in production and transmission capacity 10 based on the amount of capacity needed to serve its peak demand, plus a capacity 11 reserve as a contingency against unexpected outages or unavailability of production 12 and transmission resources. The cost of this reserve capacity is significant and is 13 not related to the resources dispatched to meet hourly load. Hence, these are fixed 14 costs that are unrelated to the dispatch of production resource portfolio generation. 15 • On a resource adequacy basis,IPC designs its system to meet peak demand and have 16 adequate reserve capacity to ensure it can provide reliable firm service. This reserve 17 capacity is a material investment cost. In its 2025 IRP, IPC projected growth in 18 peak demand of 1,700 MW but planned to add 4,071 MW to align with its resource 19 adequacy objectives over a 20-year planning period.48 Hence, a significant 20 investment in production capacity was proposed to both serve projected peak 21 demand and maintain reserve capacity to ensure IPC can provide firm reliable 22 service. The hourly-informed method does not properly allocate this reliability cost 23 across rate classes and falsely assumes reliability investment in production capacity 24 resources is there for dispatch-purposes only. It is not—it is there for reserves to 25 backup generation outages when production resources are unavailable or if 26 transmission constraints limit IPC's ability to serve its customers' peak demands. 27 These production reserve cost are not driven by the dispatch of the Company's 28 production portfolio. 29 • The hourly-informed methodology allocates fixed production cost on a basis of 30 energy generation dispatch, noting that capacity costs are higher in high-demand 31 periods and lower in low-demand periods (summer). However, this allocation of 32 production fixed cost is not symmetrical with how production energy costs, or 33 variable costs, are allocated to IPC customers. Energy costs for IPC are allocated 34 based on the production resource portfolio economic operation and the cost of that 35 operation is recovered from customers based on the average annual energy cost as IPC's IRP,Application,pp.2-3. Gorman, Di 43 Micron Technology, Inc. I stated as $/MWh. Hence the hourly-informed methodology allocates production 2 fixed cost based on hourly variation of costs per hour,but production variable costs 3 are allocated based on an annual average cost per kWh. The hourly-informed fixed 4 cost allocator is not symmetrical with the allocation of production variable costs, 5 and is therefore imbalanced and unreasonable. This imbalance will harm some 6 customers by creating subsidies to other customers. 7 VII. CONCLUSION 8 Q WHAT DO YOU RECOMMEND? 9 A I recommend that the Commission reject the Company's proposed, unjust and 10 unreasonable CCOS methodology (the PAEM methodology) because it departs from 11 cost-of-service principles by exasperating,not reducing,the subsidies in Idaho Power's 12 rates that benefit some rate classes and harm others. Instead, I recommend that the 13 Commission direct Idaho Power to use the AED methodology,with production demand- 14 related costs allocated on a 4 CP basis, in its next rate case, because it more justly and 15 reasonably assigns the costs to cost causers and does not similarly create interclass 16 subsidies. 17 If the Commission instead adopts the PAEM methodology, I recommend that 18 the Commission direct Idaho Power to allocate all demand-related production costs 19 other than battery storage on the 4 CP allocator. Battery storage would remain on 12 20 CP, as the Company proposes. This aligns the allocator with the summer peak 21 conditions that drive production capacity requirements. It is consistent with the 22 Company's own use of the annual peak in PAEM classification and its summer 23 treatment of peaking resources and demand response. It also avoids counting year- 24 round energy use twice. I also recommend that eligible production plant be classified 25 75%demand and 25%energy rather than the Company's 65%/35%split, for the reasons 26 discussed in Section IV.B. That classification reflects, among other things, the Gorman, Di 44 Micron Technology, Inc. I combined classification of production resources as all energy-related, and 2 demand-related, and combined energy-related and demand-related costs. 3 I also recommend that the Commission reject the GRM at this time for the 4 reasons discussed in my testimony above. 5 Q DOES THIS CONCLUDE YOUR DIRECT TESTIMONY? 6 A Yes, it does. Gorman, Di 45 Micron Technology, Inc. Oualifications of Michael P. Gorman 1 Q PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. 2 A Michael P. Gorman. My business address is 16690 Swingley Ridge Road, Suite 140, 3 Chesterfield, MO 63017. 4 Q PLEASE STATE YOUR OCCUPATION. 5 A I am a consultant in the field of public utility regulation and a Managing Principal with 6 the firm of Brubaker & Associates, Inc. (`BAI"), energy, economic and regulatory 7 consultants. 8 Q PLEASE SUMMARIZE YOUR EDUCATIONAL BACKGROUND AND WORK 9 EXPERIENCE. 10 A In 1983 1 received a Bachelor of Science Degree in Electrical Engineering from 11 Southern Illinois University, and in 1986, I received a Master's Degree in Business 12 Administration with a concentration in Finance from the University of Illinois at 13 Springfield. I have also completed several graduate level economics courses. 14 In August of 1983, 1 accepted an analyst position with the Illinois Commerce 15 Commission("ICC"). In this position,I performed a variety of analyses for both formal 16 and informal investigations before the ICC, including: marginal cost of energy, central 17 dispatch, avoided cost of energy, annual system production costs, and working capital. 18 In October of 1986, I was promoted to the position of Senior Analyst. In this position, 19 I assumed the additional responsibilities of technical leader on projects, and my areas 20 of responsibility were expanded to include utility financial modeling and financial 21 analyses. Appendix A Gorman, Di 1 Micron Technology, Inc. I In 1987, I was promoted to Director of the Financial Analysis Department. In 2 this position,I was responsible for all financial analyses conducted by the Staff. Among 3 other things, I conducted analyses and sponsored testimony before the ICC on rate of 4 return, financial integrity, financial modeling and related issues. I also supervised the 5 development of all Staff analyses and testimony on these same issues. In addition, I 6 supervised the Staffs review and recommendations to the Commission concerning 7 utility plans to issue debt and equity securities. 8 In August of 1989, I accepted a position with Merrill-Lynch as a financial 9 consultant. After receiving all required securities licenses, I worked with individual 10 investors and small businesses in evaluating and selecting investments suitable to their 11 requirements. 12 In September of 1990,I accepted a position with Drazen-Brubaker&Associates, 13 Inc. ("DBA"). In April 1995, the firm of Brubaker & Associates, Inc. was formed. It 14 includes most of the former DBA principals and Staff. Since 1990, I have performed 15 various analyses and sponsored testimony on cost of capital, cost/benefits of utility 16 mergers and acquisitions, utility reorganizations, level of operating expenses and rate 17 base, cost of service studies, and analyses relating to industrial jobs and economic 18 development. I also participated in a study used to revise the financial policy for the 19 municipal utility in Kansas City, Kansas. 20 At BAI, I also have extensive experience working with large energy users to 21 distribute and critically evaluate responses to requests for proposals ("RFPs") for 22 electric, steam, and gas energy supply from competitive energy suppliers. These 23 analyses include the evaluation of gas supply and delivery charges, cogeneration and/or Appendix A Gorman, Di 2 Micron Technology, Inc. I combined cycle unit feasibility studies, and the evaluation of third-party asset/supply 2 management agreements. I have participated in rate cases on rate design and class cost 3 of service for electric, natural gas, water and wastewater utilities. I have also analyzed 4 commodity pricing indices and forward pricing methods for third party supply 5 agreements, and have also conducted regional electric market price forecasts 6 Q HAVE YOU EVER TESTIFIED BEFORE A REGULATORY BODY? 7 A Yes. I have sponsored testimony on cost of capital, revenue requirements, cost of 8 service and other issues before the Federal Energy Regulatory Commission and 9 numerous state regulatory commissions including: Alaska, Arkansas, Arizona, 10 California, Colorado, Delaware, the District of Columbia, Florida, Georgia, Idaho, 11 Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maryland, Massachusetts, 12 Michigan, Minnesota, Mississippi, Missouri, Montana,Nevada, New Hampshire,New 13 Jersey, New Mexico, New York, North Carolina, North Dakota, Ohio, Oklahoma, 14 Oregon, South Carolina, South Dakota, Tennessee, Texas, Utah, Vermont, Virginia, 15 Washington,West Virginia,Wisconsin,Wyoming, and before the provincial regulatory 16 boards in Alberta, Nova Scotia, and Quebec, Canada. I have also sponsored testimony 17 before the Board of Public Utilities in Kansas City, Kansas; presented rate setting 18 position reports to the regulatory board of the municipal utility in Austin, Texas, and 19 Salt River Project, Arizona, on behalf of industrial customers; and negotiated rate 20 disputes for industrial customers of the Municipal Electric Authority of Georgia in the 21 LaGrange, Georgia district. Appendix A Gorman, Di 3 Micron Technology, Inc. I Q PLEASE DESCRIBE ANY PROFESSIONAL REGISTRATIONS OR 2 ORGANIZATIONS TO WHICH YOU BELONG. 3 A I earned the designation of Chartered Financial Analyst ("CFA") from the CFA 4 Institute. The CFA charter was awarded after successfully completing three 5 examinations which covered the subject areas of financial accounting,economics, fixed 6 income and equity valuation and professional and ethical conduct. I am a member of 7 the CFA Institute's Financial Analyst Society. 40267039_v7 Appendix A Gorman, Di 4 Micron Technology, Inc. I DECLARATION OF MICHAEL P. GORMAN 2 I, Michael P. Gorman, declare under penalty of perjury under the laws of the state 3 of Idaho: 4 1. My name is Michael P. Gorman. I am employed by Brubaker & 5 Associates, Inc. (`BAP') a consultant in the field of public utility regulation. 6 2. On behalf of Micron Technology, Inc., I present this pre-filed direct 7 testimony and exhibits in this matter. 8 3. To the best of my knowledge, my pre-filed direct testimony and 9 exhibits are true and accurate. 10 I hereby declare that the above statement is true to the best of my knowledge I I and belief, and that I understand it is made for use as evidence before the Idaho 12 Public Utilities Commission and is subject to penalty for perjury. 13 SIGNED this 25th day of November 2026, at Chesterfield, Missouri. 14 Signed: 15 16 c" .►a 7 17 40311702 v1 Declaration Gorman, Di I Micron Technology, Inc. On3ite Gen Total On-ii.Gen Total Secs., PrimRrann Sery Sens., Nora4geteretl Trelgc C.-I amb Total Factor Realtlentlal esitlenOal S 1 S $mall Geneal General Street Light SLnPIct DOEONL Simplot Spacial Total SCN 1 R SCN 6 RServeceal may ryenera Servix La SCN 94 rel La$cN gJ'Rral Are5CLi95in9 Sth I-PIT SCM1 2C-S SCM1 40 SCM1 41 SCM1 C2 Sc 26 SCM1 28 SCM1 30 311,32 SCM1 33 SCM1 N Coneacts H-W-Informed Model Allocation PRODUCTION TMal Pmtloclion $1,813,561,069 $705.911,96] $21,652,- $]27.-,414 $ 16,123,857 $ 42,721 69$ 16.166,577 $-.590, 6 $ ]4,013,656 $ 24,553 $-.805,000 $193.680,221 $ 1,688,]18 $2,9.44 $ 366.534 $69,-,176 $I%V0,562 $25 ]95 28], $1],25],]48 $ - $13,931,1- $14584, 5,956 Clans Allocation XOURf 100.0% 30.9% 1.2% 40.1% 0.9% 0.0% 0.9% 21.6% 4.1% 0.0% 14.3% 10.7% 0.1% 0.1% 0.0% 3.8% 1.1% 1.4% 1.0% 0.0% 0.8% 8.0% TRANSMISSION Tnnaminnion Plant $1,215,894,011 $452,785,110 $13,022,fi $465,807,570 $ 11,006,1- $ 27,609 $ 11,-,H2 $267,899,457 $ 50,717,249 $ 151,806 $I],848,093 $144,228,124 $ 1,141,244 $1,633,155 $ 245,233 $47,009,131 $13,324,002 $16,830,613 $11,6]0,40] $ - $9,353,345 $98,187,499 Glass Allocation HOUR-T i00.0% 37.2% 1.1% 251% 0.8% 0.0% 0- 220% 4.2% 00% 144% 11.9% 0.1% 0.1% 00% - 1.1% 1- 10% 00% 08% 54% Enemy Allocation PRODUCTION TMal Protloclion $1,813,561,069 $685,15],904 $23,19],434 $-.355,33] $ 16,637,551 $ 67,196 $ 18,]04,]53 $-.6]4,331 $ ]3,]8%2 $ 227,639 $25&053,85] $20],]68,914 $ 1,716,344 $2,"3.111 $ 366,896 $80,218,541 $1%-,315 $24,29],]08 $1],C7%.6 $ - $14,3]1,565 $143A60,535 Clans Allocation Eio 100.0% 37.8% 1.3% 39.1% 0.9% 0.0% 0.9% 22.1% 4.1% 0.0% 14.2% 11.5% 0.1% 0.1% 0.0% 3.8% 1.1% 1.3% 0.9% 0.0% 0.8% 7.9% TRANSMISSION Trennminnion Plant $1,215,894,011 $459,361,091 $15,552,61] $4]4,913,]OB $ 11,154,5]fi $ 45,052 $ 11,199,628 $260,630,336 $ 49,171,1- $ 152,620 $173,011,069 $I ,29],]51 $ 1,150715 $1,838,031 $ 245,984 $45,]36,820 $13,069,20] $16,290,291 $11,450,812 $ - $9,635,352 $96,182,- GlassAllocatlon E010 i0p.0% 37.8% 1.3% 26.2% O.B% 0.0% Ob% 221% 4.1% 00% 14.2% 11.5% 0.1% 0.1% 00% 38% 1.1% 1.3% 09% 00% 08% 5.3% Exhibit No. 701 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 1 of 1 Net Coincident Peak Demands Residential 1,600,000 1,400,000 1,200,000 1,000,000 x 800,000 600,000 400,000 200,000 0 e c e e Source:Direct Allen Exhibit No.-3 -PAEM Model Allocation Factor Derivation Workpapers,tab'D10 D13_E10 Allocators. Exhibit No. 702 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 1 of 7 Net Coincident Peak Demands Small General 30,000 25,000 20,000 15,000 10,000 5,000 0 Source:Direct Allen Exhibit No.-3 -PAEM Model Allocation Factor Derivation Workpapers,tab'D10_D13_E10 Allocators. Exhibit No. 702 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 2 of 7 Net Coincident Peak Demands Large General 700,000 600,000 500,000 3 400,000 300,000 200,000 100,000 0 e c ¢ Source:Direct Allen Exhibit No.-3 -PAEM Model Allocation Factor Derivation Workpapers,tab'D 10_D 13_E 10 Allocators. Exhibit No. 702 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 3 of 7 Net Coincident Peak Demands Large Power 350,000 300,000 250,000 200,000 150,000 100,000 50,000 0 zi Source:Direct Allen Exhibit No.-3 -PAEM Model Allocation Factor Derivation Workpapers,tab'D10_D13_E10 Allocators. Exhibit No. 702 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 4 of 7 Net Coincident Peak Demands Non-Metered & Lighting 9,000 8,000 7,000 6,000 5,000 x 4,000 — 3,000 — 2,000 — 1,000 — 0 — lb Source:Direct Allen Exhibit No.-3 -PAEM Model Allocation Factor Derivation Workpapers,tab'D10_D13_E10 Allocators. Exhibit No. 702 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 5 of 7 Net Coincident Peak Demands Irrigation 700,000 600,000 500,000 400,000 x 300,000 200,000 100,000 0 — - Source:Direct Allen Exhibit No.-3 -PAEM Model Allocation Factor Derivation Workpapers,tab'D10_D13_E10 Allocators. Exhibit No. 702 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 6 of 7 Net Coincident Peak Demands Special Contracts 200,000 180,000 160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 Od 0 All Source:Direct Allen Exhibit No.-3 -PAEM Model Allocation Factor Derivation Workpapers,tab'D10_D13_E10 Allocators. Exhibit No. 702 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 7 of 7 GAS DISTRIBUTION RATE DESIGN MANUAL Prepared by the NARUC Staff Subcommittee on Gas June 1989 zo ttustf w i NATIONAL ASSOCIATION OF REGULATORY UTILITY COMMISSIONERS 1101 Vermont Avenue NW Washington, D.C. 20005 USA Tel: (202) 898-2200 Fax: (202) 898-2213 www.naruc.ora $17.00 Exhibit No. 703 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 1 of 4 -26- d. Other Costs Other costs, such as those associated with common plant, working capital and administrative and general expenses, cannot be readily categorized as either customer, energy or demand. Thus, they are not normally allocated on the basis of a single classification. These other costs are generally allocated on a com- posite basis of certain other cost categories. For example: common plant may be allocated on the composite allocation of all production, transmission, storage and distribution plant; and administrative and general expenses may be allocated in accordance with the composite allocation of all other operating and main- tenance expense, excluding the cost of gas. 4. Methods of Allocation of Demand or Capacity Costs a. Theory There is a wide variety of alternative formulas for allocating and deter- mining demand costs, each of which has received support from some rate experts. No method is universally accepted, although some definitely have more merit than others. The electric industry has produced more alternatives than the gas industry. . For instance, in an early 1950 case before the Illinois Commerce Commission, an executive of Commonwealth Edison Company noted the existence of 29 different formulas for the apportionment of demand costs. The application of these formulas produced drastically different cost assignments to the several service classifications. As a result, the Illinois Commission refused to direct that the utility present such evidence. The NARUC published in 1955, through its Engineering Committee, a detailed discussion of 16 such methods. The multiplicity of available methods (which in fact reflects the insoluble nature of the problem) has led many recognized experts to express grave doubts about the efficacy of cost of service analyses. Exhibit No. 703 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 2 of 4 -27- The most commonly used demand allocations for natural gas distribution utilities are the coincident demand method, the non_coincident demand method, the average and peak method, or some modification or combination of the three. b. Coincident Demand Method In the coincident demand (peak responsibility) method, allocation is based on the demands of the various classes of customers at the time of system peak. This method favors high load factor customers who take gas at a steady rate all year long by assigning the greater percentage of demand costs to lower load fac- tor heating customers whose consumption is greatest at the time of the system peak. Generally, interruptible customers would receive no allocation of demand costs under this formula since they should be off the system during the peak period. The demand component of the cost of gas is generally allocated on a coincident demand method. c. Noncoincident Demand Method This method would result in all classes of customers being allocated a por- tion of system cost based upon their actual peak, regardless of the time of its occurrence. This method assigns cost to customer classes such as interruptibles, and thereby reduces the costs allocated to the heating customer under the peak demand method. The demand related portion of distribution mains and transmission mains are commonly allocated on a noncoincident demand method. d. Average and peak Demand Method This method reflects a compromise between the coincident and noncoincident demand methods. Total demand costs are multiplied by the system's load factor to arrive at the capacity costs attributed to average use and are apportioned to the various customer classes on an annual volumetric basis. The remaining costs are considered to have been incurred to meet the individual peak demands of the Exhibit No. 703 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 3 of 4 -28- various classes of service and are allocated on the basis of the coincident peak of each class. This method allocates cost to all classes of customers and tem- pers the apportionment of costs between the high and low load factor customers. 5. Use of Load Studies For Allocation of Demand Costs a. Concepts As previously mentioned, load data are necessary for a cost of service study. These data are the basis for any demand allocation and, if inaccurate, can give misleading results regardless of the case taken with the remainder of the analysis. The load characteristics of each utility's system and each customer class on a system are unique and must be separately surveyed in each case. The purpose of the survey is to determine for relatively homogenous customer groups such information as load pattern, amount and time of occurrence of maximum load, load factor, and diversity or coincidence factor. Arriving at load patterns is not an easy task. Most of the necessary infor= mation is not readily available from the normal record keeping of a utility. To secure the information requires a systematic activity known as load research. It embraces a whole gamut of engineering, statistical , and mathematical methods and procedures, ranging from the simple application of judgments to available data to refined mathematical probes into the significance of sampling tech- niques. The gas industry generally has not devoted the same resources to this area in the past as the electric industry on the whole has, so in most cases more reliance will have to be placed on use of existing records than would be preferred. However, since system peaks in the gas industry are highly weather sensitive, a fairly reliable correlation between temperature versus gas consump- tion can be developed from utility records. By applying a least square fit to Exhibit No. 703 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 4 of 4 �r3 ELECTRIC UTILITY COST ALLOCATION MANUAL January, 1992 ' • ��V -qO ►U1t/Q v o c • G � • • loll • -7 NATIONAL ASSOCIATION OF REGULATORY UTILITY COMMISSIONERS L=' 1102 Interstate Commerce Commission Building Constitution Avenue and Twelfth Street, NW Post Office Box 684 Washington, DC 20044-0684 Telephone No. (202) 898-2200 Facsimile No. (202) 898-2213 Price: $25.00 ,V Exhibit No. 704 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 1 of 5 B. EnerQ, Weighting Methods There is evidence that energy loads are a major determinant of production plant costs. Thus,cost of service analysis may incorporate energy weighting into the treatment of production plant costs. One way to incorporate an energy weighting is to classify part of the utility's production plant costs as energy-related and to allocate those costs to classes on the basis of class energy consumption. Table 4-4 shows allocators for the example utility for total energy,on-peak energy,and off-peak energy use. In some cases,an energy allocator(annual KWH consumption or average de- mand)is used to allocate part of the,production plant costs among the classes,but part or all of these costs remain classified as demand-related. Such methods can be charac- terized as partial energy weighting methods in that they take the fast step of allocating some portion of production plant costs to the classes on the basis of their energy loads but do not take the second step of classifying the costs as energy-related. L Average and Excess Method Objective: The cost of service analyst may believe that average demand rather than coincident peak demand is a better allocator of production plant costs. The average and excess method is an appropriate method for the analyst to use. The method allocates production plant costs to rate classes using factors that combine the classes' average demands and non-coincident peak(NCP)demands. , Data Requirements: The required data are:the annual maximum and average de- mands for each customer class and the system load factor. All production plant costs are usually classified as demand-related. The allocation factor consists of two parts. The first component of each class's allocation factor is its proportion of total average demand (or energy consumption)times the system load factor. This effectively uses an average demand or total energy allocator to allocate that portion of the utility's generating capac- ity that would be needed if all customers used energy at a constant 100 percent load fac- tor.1 The second component of each class's allocation factor is called the"excess demand factor." It is the proportion of the difference between the sum of all classes'non-coinci- dent peaks and the system average demand. The difference may be negative for curtail- able rate classes. This component is multiplied by the remaining proportion of production plant--i.e.,by 1 minus the system load factor--and then added to the first component to obtain the"total allocator." Table 4-10A shows the derivation of the alloca- tion factors and the resulting allocation of production plant costs using the average and excess method. 49 Exhibit No. 704 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 2 of 5 TABLE 4-10B CLASS ALLOCATION FACTORS AND ALLOCATED PRODUCTION PLANT REVENUE REQUIREMENT USING THE AVERAGE AND EKCESS METHOD (SINGLE CP DEMAND FACTOR) Demand Excess Average Excess Allocation Demand Demand Demand Class Factor - (Single Component Component Total Production Single Average CP of or Allocation Plant Rate CP Demand MW - Allocation Allocation Factor Revenue Class NCPMW (NM Avg.MM Factor Factor (%) Requirement DOM 4,735 2,440 2.295 1795 16.89 34.84 369,461.692 LSMP 5.062 Z669 Z393 19.64 17.61 37.25 394 976.787 LP 3347 4459 888 18.09 6.53 24.63 261159.089 AG&P 447 254 193 1.87 lA2 3.29 34 878A32 SL 0 58 -59 0.43 -0.43 0.00 0 TOTAL, 13,591 7,880 5,711 57.98 42.02 100.00 $1,060.476.000 Notes: The system load factor is 57.98 percent,calculated by dividing the average demand of 7,880 MW by the systen coincident peal:demand of 13.591 MW. This example shows all production plant classified as demand-related. Note that the total allocation factors are exactly equal to those derived using the single coincident peak method shown in the thud column of Table 4-3. Some columns may not add to indicated totals due to rounding. Some analysts argue that the percentage of total production plant that is equal to the system load factor percentage should be classified as energy-related and not demand- related. This could be important because,although classifying the system load factor per- centage as energy-related might not affect the allocation amang classes,it could significantly affect the apportionment of costs within rate classes. Such a classification could also affect the allocation of production plant costs to interruptible service,if the utility or the regulatory authority allocated energy-related production plant costs but not demand-related production plant costs to the interruptible class. Table 4-10C presents the allocation factors and production plant revenue requirement allocations for an average and excess cost of service study with the system load factor percentage classified as en- ergy-related. 51 Exhibit No. 704 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 3 of 5 it 4. Judgmental Energy Weightings Some regulatory commissions,recognizing that energy loads are an important determinant of production plant costs,require the incorporation of ' judgmentally-established energy weighting into cost studies. One example is the "peals and average demand"allocator derived by adding together each class's contribution to the system peak demand(or to a specified group of system peak demands;e.g.,the 12 monthly CPs)and its average demand. The allocator is effectively the average of the two numbers: class CP(however measured)and class average demand. Two variants of this allocation method are shown in Tables 4-14 and 4-15. `li( TABLE 4-14 r CLASS ALLOCATION FACTORS AND ALLOCATED I r PRODUC77ON PLANT REVENUE REQUIREMENT USING THE 1 CP AND AVERAGE DEMAND METHOD Demand- Energy- Demand Related Related Total Class Allocation Production Avg. Demand Production Production i! Factor- Plant (Total MWH) Plant Plant 1 Rate 1 CP MW Revenue Allocation Revenue Revenue Class (Percent) Requirement Factor Requirement I Requirement DOM 34.84 233,869,251 30.96 120,512,062 354,381*313 I LSMP 37.25 250.020,306 33.87 131.822.415 381.842,722 I t LP 24.63 165,313,703 31.21 121,450,476 286,764,179 AG&P 3.29 22.078.048 3.22 12,545.108 34,623,156 SL 0.00 0 0.74 2,864,631 2,864,631 FT7A L7 1 100.00 1 671,281,3081 100.00 389,194,692 $1,060,476,000 ` Notes: The portion of the production plant classified as demand-rotated is calculated by dividing the annual system peak demand by the sum of(a)the annual system peal:demand,Table 4-3,col- `! umn 2,plus(b)the average system demand for the test year,Table 4-10A,column 3. Thus,the percentage classified as demand-related is equal to 13591/(13591+7880),or 63.30 percent. The percentage classified as energy-related is calculated similarly by dividing the average de- mand by the sum of the system peak demand and the average system demand. For the exam- pie.this percentage is 36.70 percent. Some columns may not add to indicated totals due to rounding. i 57 Exhibit No. 704 Case No. IPC-E-26-07 ` Gorman, Micron Technology, Inc Page 4 of 5 TABLE 4.15 CLASS ALLOCATION: FACTORS AND ALLOCATED PRODUCTION PLANT REVENUE REQUIREMENT'USING THE l2 CP AND AVERAGE DEMAND METHOD Demand Energy. Allocation Demand- Average Related Total Class Factor - Related Demand Production Productionf. 12 CP Production (Total MWH) Plant Plant Rate 'MW Plant Allocation Revenue Revenue r Class (Percent) Revenue Factor Requirement Requirement DOM 32.09 198,081,400 30.96 137,226,133 335,307,533 LSMP 38.43 237.225.254 33.87 150105 1433 387 330. 97 LP 26.71 164,899,110 31.21 138.294.697 303,193,807 ` { AG&P 142 14,960.151 3.22 14.285,015 29,245,167 SL 0.35 2,137,164 0.74 3,261,933 5,399,097 T7; AL 100.00 j 617,303,'0801 443.172.920 S1.060.476,000 Notes. The portion of production plant classified as demand-related is calculated,by dividing the an- nual system peak demand by the sum of the 12 monthly system coincident peaks(Table 4-3. column 4)by the sum of drat value plus the system average demand(Table 4-10A,column 3). Thus,for example,the percentage classified as demand-related is equal to 10976/(10976+7880),or 58.21 percent. The percentage classified as energy-related is calcu- lated similarly by dividing the average demand by the sum of the average demand and die avcr- age of the twelve monthly peak demands. For the example,41.79 percent of production plant revenue requirements are classified as energy-related. Another variant of the peak and average demand method bases the production plant cost allocators on the 12 monthly CPs and average demand, with 1/13th of produc- tion plant classified as energy-related and allocated on the,basis of the classes'KWH use or average demand, and the remaining 12/13ths classified as demand-related. The result- ing allocation factors and allocations of revenue responsibility are shown in Table 4-16 for the example data. 58 Exhibit No. 704 Case No. IPC-E-26=0,7-d­ Gorman, Micron Technology, Inc Page 5 of 5 MICRON'S REQUEST FOR PRODUCTION NO. 1: Please provide all studies, analyses, or planning documents the Company relied upon showing that energy requirements, as distinct from peak demand, reserve margin, or loss-of-load expectation ("LOLE") criteria, determined the type, size, or timing of any production resource in the test-year rate base. RESPONSE TO MICRON'S REQUEST FOR PRODUCTION NO. 1: Idaho Power does not plan to a standalone energy requirement, distinct from its resource adequacy and reliability criteria, that independently determines the type, size, or timing of a production resource. Accordingly, the Company has not identified studies, analyses, or planning documents in which such a standalone energy requirement determined the type, size, or timing of a production resource included in test-year rate base. The resource adequacy criterion currently used by Idaho Power is to plan to an annual Loss of Load Expectation ("LOLE") threshold of 0.1 event-days per year. Although energy is not treated as a separate planning criterion, the Company's resource evaluations consider the ability of resources to serve customer load. The Aurora Long-Term Capacity Expansion ("LTCE") model, which the Company uses in its Integrated Resource Plan ("IRP") and in its Request for Proposals ("RIFF) resource- selection process, accounts for resource operating characteristics and constraints and develops least-cost portfolios capable of serving load while meeting the applicable reliability criteria. Please see the Company's response to Micron's request for Production No. 2 for additional information regarding the Company's resource adequacy criteria. The response to this Request is sponsored by Jared Ellsworth, Transmission, Distribution and Resource Planning Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY-2 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 1 of 14 MICRON'S REQUEST FOR PRODUCTION NO. 2: Please refer to Connor Allen's Direct Testimony at pages 12-13, where he explains that transmission is classified as 100 percent demand-related based on North American Electric Reliability Corporation planning studies and Corrective Action Plans. a. Please state whether the Company performed any comparable analysis of its generation planning criteria in evaluating the Peak & Average Embedded Method classification of production plant. b. Please identify the resource adequacy criteria used in the 2025 Integrated Resource Plan (e.g., loss-of-load expectation target, planning reserve margin) and explain whether any of those criteria are energy-based. RESPONSE TO MICRON'S REQUEST FOR PRODUCTION NO. 2: a. No. The Company did not perform a comparable analysis of its generation planning criteria in evaluating the Peak & Average Embedded Method ("PAEM") classification of production plant. Mr. Allen's Direct Testimony at pages 12-13 describes the characteristics of the Company's ongoing transmission planning process that informed the Company's evaluation of whether transmission should remain classified as demand-related. It does not reference a separate analysis prepared for this proceeding. The Company evaluated the classification of production plant by comparing PAEM with the 2025 Class Cost of Service ("CCOS") study and the alternative embedded studies presented in this case, as described by Mr. Allen's Direct Testimony at pages 17-19. As explained at pages 8-9 of that testimony, eligible production plant supports both the generation capability required to meet peak system IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 3 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 2 of 14 demand and the ongoing provision of energy throughout the year, and its costs cannot be directly assigned between those functions through cost tracing alone. PAEM therefore uses peak system demand and average system demand as observable measures of those characteristics to establish the classification percentages. b. The resource adequacy criterion used by Idaho Power in the 2025 Integrated Resource Plan ("IRP") is an annual Loss of Load Expectation ("LOLE") threshold of 0.1 event-days per year, which the Company implements through its Reliability and Capacity Assessment Tool ("RCAT"). Planning Reserve Margin ("PRM")was not used as a separate or independent resource adequacy criterion. Rather, RCAT was used to develop seasonal PRM targets and Effective Load Carrying Capability ("ELCC") values for use as inputs to the Aurora Long-Term Capacity Expansion ("LTCE") model. Please see the 2025 IRP, Appendix D, section "Portfolio Analysis." The LOLE criterion is not a standalone energy-based criterion. Please see the Company's response to Micron's Request for Production No. 1 regarding how resource operating characteristics and constraints are considered in portfolio development. The response to this Request is sponsored by Connor Allen, Regulatory Analyst, and Jared Ellsworth, Transmission, Distribution and Resource Planning Director, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY-4 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 3 of 14 MICRON'S REQUEST FOR PRODUCTION NO. 3: Please refer to Grant Anderson's Direct Testimony ("Anderson, DI") at pages 18-19, and pages 9-10. a. Please confirm that the production plant costs classified as energy-related under the Peak & Average Embedded Method do not vary with the quantity of kilowatt-hours consumed in the test year. If not confirmed, please provide a detailed explanation supporting the response. b. Please explain how classifying those fixed costs as energy-related is consistent with the cost-causation principle described in Anderson, DI at pages 9-10. RESPONSE TO MICRON'S REQUEST FOR PRODUCTION NO. 3: a. Confirmed. The production plant costs classified as energy-related under the Peak & Average Embedded Method ("PAEM") are fixed costs and do not vary with the quantity of kilowatt-hours consumed during the test year. As explained in Mr. Anderson's Direct Testimony at page 19, these costs would continue to be treated as fixed costs for purposes of the Fixed Cost Adjustment mechanism. b. As explained in Mr. Anderson's Direct Testimony at pages 10-11, cost causation refers to the relationship between the characteristics and requirements of utility service and the costs the Company incurs to provide that service. It does not always allow each investment to be traced to a single customer, class, or system requirement. The fact that a cost is fixed does not, by itself, determine whether it is demand-related or energy-related for class cost-of-service purposes. As explained in Mr. Allen's Direct Testimony at pages 8-9, eligible production IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 5 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 4 of 14 plant supports both the generating capability required to meet system peak demand and the ongoing provision of energy throughout the year, and its costs cannot be directly assigned between those functions through cost tracing alone. Peak & Average uses peak system demand and average system demand as observable measures of those characteristics. The energy-related classification reflects the sustained use of production resources to serve customer energy usage throughout the year; it does not treat these fixed investments as variable expenses. PAEM separately identifies energy-related production plant costs from variable-energy costs, as described in Mr. Allen's Direct Testimony at page 10. The response to this Request is sponsored by Grant T. Anderson, Pricing and Tariff Manager, and Connor Allen, Regulatory Analyst, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 6 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 5 of 14 MICRON'S REQUEST FOR PRODUCTION NO. 5: Please refer to ConnorAllen's Direct Testimony, Exhibit 1 , p. 15, which characterizes the Bennett Mountain and Danskin simple-cycle combustion plants ("SCCPs") as peak-serving resources allocated using the peak-load framework. a. Please explain why these resources receive the same energy-related classification percentage (approximately 35 percent) as base and intermediate resources. b. Please state whether the Company evaluated resource-specific classification (for example, classifying each resource or resource group based on its own capacity factor) and, if so, provide the results. RESPONSE TO MICRON'S REQUEST FOR PRODUCTION NO. 5: a. Peak & Average classifies eligible production plant collectively based on the system's peak demand and average demand, rather than the operating characteristics of individual generating resources. Accordingly, Bennett Mountain and Danskin receive the same demand-related and energy-related classification percentages as other eligible production plant. The peaking role of these resources is recognized in the allocation of their demand-related costs, as described in Mr. Allen's Direct Testimony at page 13. The reference in Exhibit No. 1 at page 15 to the peak-load allocation framework applies to the demand-related portion of Bennett Mountain and Danskin costs, which is allocated using the summer coincident peak allocator (D10P) rather than the base and intermediate allocators (D10BS and D10BNS). The energy-related portion is allocated using the fixed energy allocators (EF10S and EF10NS), IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 10 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 6 of 14 consistent with other eligible production plant. Please see the Company's response to Micron's Request for Production No. 7 regarding the treatment of battery storage. b. The Company did not perform a resource-specific classification analysis based on individual resource or resource-group capacity factors and therefore has no such results to provide. The response to this Request is sponsored by Connor Allen, Regulatory Analyst, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 11 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 7 of 14 MICRON'S REQUEST FOR PRODUCTION NO. 6: Please refer to Connor Allen's Direct Testimony at page 13, lines 9-19, which states that base and intermediate demand costs are allocated on 12-month coincident peak (12CF) "because those resources provide capability throughout the year." Please explain what aspect of cost causation for base and intermediate resources is captured by the Peak &Average energy classification that is not already captured by allocating those resources on 12 monthly coincident peaks rather than a single summer peak. RESPONSE TO MICRON'S REQUEST FOR PRODUCTION NO. 6: Peak & Average classification and 12CP allocation address different questions. As explained in Mr. Allen's Direct Testimony at pages 8-9, Peak & Average uses peak system demand and average system demand to establish the relative weights used to classify eligible production plant as demand-related and energy-related. This recognizes that production plant supports both the generating capability required to meet system peak demand and the sustained provision of energy throughout the year. The 12CP methodology addresses how the demand-related portion of base and intermediate production costs is allocated among customer classes. As described in Mr. Allen's Direct Testimony at page 13, the 12CP methodology is used rather than a single summer peak because these resources provide capability throughout the year. However, 12CP measures each class's load only at the hour of each monthly system net peak, as described in Exhibit No. 1 at pages 12-13. It does not reflect each class's energy usage across all hours of the year. The energy-related portion of eligible production plant, allocated using EF10S and EF10NS, reflects each class's energy usage across all hours of the year and the relative IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 12 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 8 of 14 cost of serving that usage, as described in Mr. Allen's Direct Testimony at page 10. That sustained use of the production resources is the aspect of cost causation captured by the energy-related classification that is not captured by 12CP allocation. The response to this Request is sponsored by Connor Allen, Regulatory Analyst, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 13 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 9 of 14 MICRON'S REQUEST FOR PRODUCTION NO. 7: Please refer to Connor Allen's Direct Testimony at page 11, which indicates that battery storage is excluded from Peak & Average because its purpose is to provide capacity during peak-demand periods. Please explain why the same reasoning does not exclude the simple-cycle combustion plants from Peak & Average. RESPONSE TO MICRON'S REQUEST FOR PRODUCTION NO. 7: PAEM is a targeted refinement to the class cost-of-service methodology reflected in the Company's 2025 general rate case. As explained in Mr. Anderson's Direct Testimony at pages 14-16 and Mr. Allen's Direct Testimony at pages 7-8, PAEM changes the classification of eligible production plant while retaining the existing treatment of battery storage, purchased power, demand response, and transmission. Accordingly, the classification of battery storage as 100 percent demand-related, as described at pages 10-11 of Mr. Allen's Direct Testimony, reflects treatment carried forward from the 2025 CCOS rather than a resource-specific classification test applied under Peak & Average. Simple-cycle combustion plants are production plant included in eligible production plant, and Peak & Average classifies eligible production plant collectively based on system peak demand and average demand, rather than the operating characteristics of individual generating resources. The peaking role of the Bennett Mountain and Danskin plants is recognized in the allocation of their demand-related costs, which are allocated using the summer coincident peak allocator (D1OP) rather than the base and intermediate allocators (D10BS and D10BNS), as described in Exhibit No. 1 at pages 14-15. Please also see the Company's response to Micron's Request for Production No. 5. The response to this Request is sponsored by Grant T. Anderson, Pricing and IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 14 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 10 of 14 Tariff Manager, and Connor Allen, Regulatory Analyst, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S FIRST PRODUCTION Exhibit No. 705 REQUESTS TO IDAHO POWER COMPANY- 15 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 11 of 14 MICRON'S REQUEST FOR PRODUCTION NO. 7: At page 11 of Mr. Allen's direct testimony he states that Purchased Power is classified as 100% energy related. With respect to this testimony, please answer: a. In the IPC IRP used to measure production resource adequacy, does IPC include the accredited capacity value of the Purchased Power Agreement ("PPA") in measuring its production resource adequacy? b. If the answer to "a" above is affirmative, confirm that PPAs can provide both demand and energy benefits to IPC's customers. If denied, please explain the answer. RESPONSE TO MICRON'S REQUEST FOR PRODUCTION NO. 7: a. Yes. In evaluating resource adequacy in the 2025 IRP, the Company considered the accredited capacity contribution of purchased-power resources under existing agreements, as applicable. b. Confirmed. PPAs can provide both demand-related benefits through their contribution to system capacity and energy-related benefits through the energy supplied. Purchased power is classified as 100 percent energy-related (except for Demand Response purchased power) because it generally represents an expense incurred to acquire power to serve customer energy requirements, rather than an investment in Company-owned generating facilities. See Mr. Allen's Direct Testimony at pages 11-12. That classification was carried forward from the 2025 CCOS, see Mr. Allen's Direct Testimony at page 7, and is a cost- classification treatment. It does not mean that PPAs lack capacity or demand- related benefits for resource adequacy purposes. IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S SECOND PRODUCTION REQUESTS TO IDAHO POWER COMPANY- 18 Exhibit No. 705 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 12 of 14 The response to this Request is sponsored by Jared Ellsworth, Transmission, Distribution and Resource Planning Director, and Connor Allen, Regulatory Analyst, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO MICRON TECHNOLOGY, INC.'S SECOND PRODUCTION REQUESTS TO IDAHO POWER COMPANY- 19 Exhibit No. 705 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 13 of 14 REQUEST FOR PRODUCTION NO. 24: On Page 8 of Appendix D of the 2025 IRP, the Company states that "[t]o ensure Aurora would recognize similar capacity needs as identified by the RCAT, the company developed minimum seasonal PRM targets for the 20-year planning period." Please provide the minimum seasonal PRM targets and explain how they are determined. RESPONSE TO REQUEST FOR PRODUCTION NO. 24: The minimum seasonal PRM targets were developed utilizing the same process described in the Company's Response to Request for Production No. 13. The table below includes the seasonal PRM targets used in the 2025 IRP Preferred Portfolio after the completion of the Aurora to RCAT calibration: Seasonal PRM Target (%) Year Winter Summer 2026 0 0 2027 0 0 2028 30.28 21.76 2029 38.87 20.7 2030 39.41 20.64 2031 36.89 19.61 2032 33.15 20.19 2033 33.66 19.95 2034 32.56 16.56 2035 32.21 14.61 2036 29.95 14.33 2037 29.7 13.48 2038 29.54 13.45 2039 29.37 12.82 2040 28.39 12.57 2041 28.99 12.15 2042 28.84 11.98 2043 28.74 11.68 2044 27.67 11.46 2045 28.74 8.85 The response to this Request is sponsored by Jared Hansen, Resource Planning Leader, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE SECOND PRODUCTION REQUEST OF THE Exhibit No. 705 COMMISSION STAFF - 25 Case No. IPC-E-26-07 Gorman, Micron Technology, Inc Page 14 of 14 CERTIFICATE OF SERVICE I hereby certify that on November 25, 2026, a true and correct copy of the within and foregoing DIRECT TESTIMONY AND EXHIBITS OF MICHAEL P. GORMAN ON BEHALF OF MICRON TECHNOLOGY, INC. IN CASE NO. IPC-E-26-07 was served in the manner shown to: Electronic Mail Idaho Power Company Micron Technology, Inc. Megan Goicoecha Allen Austin Rueschhoff Lisa Lance Thorvald A. Nelson Timothy Tatum Richard A. Arnett Grant T. Anderson Holland& Hart, LLP 1221 West Idaho Street(83702) 555 17th Street, Suite 3200 PO Box 70 Denver, CO 80202 Boise, ID 83707-0070 darueschhoff(c hollandhart.com mgoicoecheaallen(a�idahopower.com tnelson(&hollandhart.com llance&idahopower.com raarnettghollandhart.com docketsOddahopower.com aclee(abhollandhart.com ttatumkidahopower.com tlfrielghollandhart.com ganderson(a�idahopower.com Commission Staff Northwest Energy Coalition Erika Melanson Benjamin J. Otto Monica Barrios-Sanchez Lauren McCloy Commission Secretary Derek Goldman Deputy Attorney General 1407 W. Cottonwood Ct. Idaho Public Utilities Commission Boise, ID 83702 P.O. Box 83720 benknwenerg_y.org Boise, ID 83720-0074 lauren(cbnwenergy.org erika.melanson&puc.idaho.gov derek&nwenergzy.org secretary�a,puc.idaho.gov Idaho Irrigation Pumpers Association, Inc. Eric L. Olsen Lance Kaufman, Ph.D. ECHO HAWK& OLSEN, PLLC Deborah Glosser, Ph.D. 505 Pershing Avenue, Suite 100 2623 NW Bluebell Place P.O. Box 6119 Corvallis, OR 97330 Pocatello, ID 83205 lance a,ae ism hg t.com elo(ab,echohawk.com deborah. log sserAmmail.com tayshakechohawk.com Clean Energy Opportunities Kelsey Jae Mike Heckler 521 E. 41 st St., #506 Courtney White Garden City, ID 83714 Clean Energy Opportunities for Idaho kelsey(&�kelseyjae.com 3778 Plantation River Dr., Ste. 102 Boise, ID 83703 mike&,cleanenerayopportunities.com courtneygcleanenerg opportunities.com The City of Boise Industrial Customers of Idaho Ed Jewell Peter J. Richardson Katie O'Neil Richardson Adams, PLLC 150 N. Capitol Blvd. 515 N. 27th Street P.O. Box 500 Boise, ID 83702 Boise, ID 83701-0500 peter&,richardsonadams.com ej ewellgcityofboise.org boisecityattorney(&cityofboise.org koneilncityofboise.org Federal Executive Agencies Emily W. Medlyn Dwight Etheridge Jelani A. Freeman Exeter Associates, Inc. U.S. Department of Energy 10480 Little Patuxent Parkway, Suite 300 1000 Independence Ave., S.W. Columbia, MD 21044 Washington, D.C. 20585 detheridgenexeterassociates.com emi ly.medIyn(&,hq.do e.gov j elani.freeman&hq.doe.gov Ruveon, LLC Thomas J. Budge Ethan Waltermire Racine Olson, PLLC Ruveon, LLC P.O. Box 1391 P.O. Box 816 Pocatello, ID 83204-1391 Soda Springs, ID 83276 tj(d),racineolson.com ethan.waltermire(&,ruveon.com Brain C. Collins Greg Meyer Brubaker&Associates 16690 Swingley Ridge Rd., #140 Chesterfield, MO 63017 bcollins gconsultbai.com gmeyer(c consultbai.com s/Adele Lee 39738773_vl