HomeMy WebLinkAbout20110803Staff 12-18 to IPC.pdfKRISTINE A. SASSER
DEPUTY ATTORNEY GENERAL
IDAHO PUBLIC UTILITIES COMMISSION
PO BOX 83720
BOISE, IDAHO 83720-0074
(208) 334-0357
BARNO. 6618
RECEIVED
201 l AUG -3 PH 2= 29
UTIL
Street Address for Express Mail:
472 W. WASHINGTON
BOISE, IDAHO 83702-5918
Attorney for the Commission Staff
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION OF )
IDAHO POWER COMPANY FOR A ) CASE NO. IPC-E-11-10
DETERMINATION REGARDING THE FIRM )
ENERGY SALES AGREEMENT FOR THE ) SECOND PRODUCTION
SALE AND PURCHASE OF ELECTRIC ) REQUEST OF THE
ENERGY BETWEEN IDAHO POWER ) COMMISSION STAFF TO
COMP ANY AND INTERCONNECT SOLAR ) IDAHO POWER COMPANYDEVELOPMENT LLC. )
)
The Staff of the Idaho Public Utilties Commission, by and through its attorney of record,
Kristine A. Sasser, Deputy Attorney General, requests that Idaho Power Company (Company)
provide the following documents and information on or before WEDNESDAY, AUGUST 24, 2011.
This Production Request is to be considered as continuing, and Idaho Power Company is
requested to provide, by way of supplementary responses, additional documents that it or any person
acting on its behalf may later obtain that wil augment the documents produced.
Please provide answers to each question and any supporting workpapers that provide detail or
are the source of information used in calculations. The Company is reminded that responses pursuant
to Commission Rules of Procedure must include the name and phone number of the person preparing
the document, and the name, location and phone number of the record holder and if different the
witness who can sponsor the answer at hearing if need be. Reference IDAP A 31.01.01.228.
SECOND PRODUCTION REQUEST
TO IDAHO POWER COMPANY 1 AUGUST 3, 2011
In addition to the wrtten copies provided as response to the questions, please provide all
Excel and electronic fies on CD with formulas activated.
REQUEST NO. 12: Please explain why the capacity portion ofthe prices in the Firm Energy
Sales Agreement (FESA) were calculated based on a combined cycle combustion turbine (CCCT)
rather than a simple cycle combustion turbine (SCCT). Please re-calculate the rates in the FESA
using a SCCT for the capacity portion of the prices. Please provide a copy of all spreadsheets and
analysis used to re-calculate the rates.
REQUEST NO. 13: Please provide a copy of all spreadsheets and analysis used to compute
the capacity portion of the prices in the FE SA. Please cite the source of any CCCT or SCCT cost
data and clearly identify and explain any cost escalation factors used in the analysis.
REQUEST NO. 14: For each ofIdaho Power's gas-fired generation plants included in the
Aurora analysis performed to derive the rates in the FESA, please list by plant and by year the anual
capacity factor beginning in 2012 through the end of the analysis period.
REQUEST NO. 15: Wind integration charges were identified and quantified in Idaho
Power's 2007 wind integration study for penetration levels of 300 MW, 600 MW and 900 MW.
Recognizing that solar integration costs are likely to be different than wind integration costs, can
Idaho Power acknowledge that solar integration costs would not be zero for the Interconnect Solar
project? If Idaho Power acknowledges that solar integration charges are not zero, and recognizing
that the Company has not performed a solar integration study, can the Company conservatively
estimate a reasonable range of solar integration costs? If so, what is that range?
REQUEST NO. 16: The Aurora analysis performed to compute the energy value component
of the prices contained in the FESA generated hourly prices for all hours of the analysis period.
Using the hourly Aurora data, please "re-shape" the FESA prices by year, by season, and by flat,
light, heavy, and heavy load peak hours similar to the format used in the attached table. Please
provide a copy of the Aurora hourly data and any spreadsheets used to reshape the prices.
SECOND PRODUCTION REQUEST
TO IDAHO POWER COMPANY 2 AUGUST 3, 2011
REQUEST NO.1 7: Please provide a copy of the data and analysis used to derive the 90
percent exceedance value for hours ending 4:00 pm to 7:00 pm during July 2010 which, in turn, was
used to determine the 21 percent capacity factor assumed for the Interconnect Solar capacity value
analysis.
REQUEST NO. 18: Please provide summary tables, one for the Aurora analysis with the
Interconnect Solar project included and one without it, showing the kWhs generated by month and
year by each new and existing resource in Idaho Power's portfolio throughout the study period.
Please also include monthly off-system purchases and sales in the summar tables. The purpose of
the summar tables is to determine which resources in the portfolio would be displaced or deferred by
the addition of the Interconnect Solar project.
Dated at Boise, Idaho, this 3/Ù day of August 2011.
£w. a . ~4I AeKri tine A. Sasser
Deputy Attorney General
Technical Staff: Rick Sterling
i: umisc:prodreq/ipce i i. i Oksrps prod req 2
SECOND PRODUCTION REQUEST
TO IDAHO POWER COMPANY 3 AUGUST 3, 2011
oo
:
;
o
)
:
..
.
n
i
r
1
o
o
i
r
1
W
(
¡
H
I
)
n
i
~~
z
g
.
1-
1
1
0
3
1-
.
(
J
1-
.
:
:
::
H
r
1
u:
~
i
(J
t
%
r1
,
ni
I
-
H'
I
-
H'
I
I-o
Id
a
h
o
P
o
w
e
r
C
o
m
p
a
n
y
Co
g
e
n
e
r
a
t
i
o
n
a
n
d
Sm
a
l
l
P
o
w
e
r
P
r
o
d
u
c
t
i
o
n
So
l
a
r
P
r
o
j
e
c
t
P
r
o
p
o
s
e
d
E
n
e
r
g
y
P
r
i
c
i
n
g
S
c
h
e
d
u
l
e
Mu
r
p
h
y
F
l
a
t
s
S
o
l
a
r
P
r
o
j
e
c
t
Se
a
s
o
n
a
l
i
z
t
i
o
n
F
a
c
t
o
r
s
Se
a
s
o
n
1
73
.
5
0
0
/
.
(A
p
p
l
i
e
d
t
o
M
a
r
c
h
.
A
p
r
i
l
a
n
d
M
a
y
)
Se
a
s
o
n
2
A
12
0
.
0
0
%
(A
p
p
l
i
e
d
t
o
N
o
v
e
m
b
e
r
a
n
d
D
e
c
e
m
b
e
r
)
Se
a
s
o
n
2
B
12
0
.
0
0
%
(A
p
p
l
i
e
d
t
o
J
u
l
y
a
n
d
A
u
g
u
s
t
)
Se
a
s
o
n
3
10
0
.
0
0
%
(A
p
p
l
i
e
d
t
o
J
u
n
e
,
S
e
p
t
e
m
b
e
r
.
O
c
o
b
e
r
.
J
a
n
u
a
r
y
a
n
d
F
e
b
r
u
a
r
y
)
He
a
v
y
L
o
a
d
d
i
f
f
e
r
e
n
t
a
t
i
o
n
a
p
p
l
i
e
d
t
o
S
e
a
o
n
2
B
o
n
l
y
He
a
v
y
L
o
a
d
P
e
a
k
H
o
u
r
P
r
e
m
i
u
m
5.
0
0
%
He
a
v
y
L
o
a
d
S
t
a
n
d
a
r
d
h
o
u
r
d
i
s
c
o
u
n
t
-2
.
0
0
%
Co
n
t
r
c
t
P
r
i
c
e
En
e
r
g
y
P
r
i
c
i
n
g
Se
a
s
o
n
1
P
r
i
c
i
n
g
(
7
3
.
5
0
%
)
Se
a
s
o
n
2
A
P
r
i
c
i
n
g
(
1
2
0
.
0
0
%
)
Se
a
s
o
n
2
B
P
r
i
c
i
n
g
(
1
2
0
.
0
0
%
)
Se
a
s
o
n
3
P
r
i
c
i
n
g
(
1
0
0
.
0
0
%
)
He
a
v
y
an
d
$7
.
2
8
Ma
r
c
h
,
A
p
r
i
l
a
n
d
M
a
y
No
v
e
m
b
e
r
a
n
d
D
e
c
e
m
b
e
r
Ju
l
y
a
n
d
A
u
g
u
s
t
Ju
n
e
,
S
e
p
t
e
m
b
e
r
,
O
c
t
o
b
e
r
.
Lig
h
t
Lo
a
d
Ja
n
u
a
r
y
a
n
d
F
e
b
r
u
a
r
y
Ho
u
r
Di
f
f
e
r
e
n
t
i
a
$3
.
2
4
($
4
.
0
4
)
.
F
l
a
t
Fl
a
t
~
Fl
a
t
He
a
v
y
L
o
a
d
P
e
a
k
Fl
a
t
He
a
v
y
Li
g
h
t
He
a
v
y
Li
g
h
t
He
a
v
y
Ho
u
r
P
r
i
c
i
n
g
He
a
v
y
L
o
a
d
S
t
a
n
d
a
r
d
Li
g
h
t
He
a
v
y
Li
g
h
t
Fl
a
t
Li
g
h
t
Lo
a
d
Lo
a
d
Lo
a
d
Lo
a
d
Lo
a
d
(h
o
u
r
s
b
e
g
i
n
n
i
n
g
a
t
Ho
u
r
P
r
i
c
i
n
g
(
a
l
l
H
L
Lo
a
d
Lo
a
d
Lo
a
d
He
a
v
y
Lo
a
d
Fl
a
t
Ho
u
r
Ho
u
r
Fl
a
t
Ho
u
r
Ho
u
r
Fl
a
t
Ho
u
r
3
p
m
t
h
r
o
u
g
h
h
o
u
r
ho
u
r
s
n
o
t
i
n
c
l
u
d
e
d
I
n
Ho
u
r
Fl
a
t
Ho
u
r
Ho
u
r
Ye
a
r
~
Lo
a
d
H
o
u
r
Ho
u
r
Pr
i
c
l
n
a
Pr
i
c
e
Pr
i
c
e
Pr
i
c
l
n
o
Pr
i
c
e
Pr
i
c
e
Pr
i
c
l
n
a
Pr
i
c
e
en
d
i
n
g
7
P
m
)
HL
p
e
a
k
h
o
u
r
s
)
Pr
i
c
e
Pr
i
c
l
n
a
Pr
i
c
e
Pr
i
c
e
20
1
2
.
.
.
-
..
-
-
-
..
.
-
-
-
..
.
-
-
.
0
0
&
_
_
..
.
.
.
.
.
.
..
.
.
-
-
..
.
-
.
.
.
.
-.
.
_
.
.
..
.
.
.
.
-
--
.
.
.
.
20
1
3
l
20
1
4
20
1
5
20
1
6
20
1
7
20
1
8
20
1
9
20
2
0
20
2
1
20
2
2
20
2
3
20
2
4
20
2
5
20
2
6
...
20
2
7
20
2
8
20
2
9
20
3
0
20
3
1
20
3
2
20
3
3
20
3
4
20
3
5
20
3
6
.2
0
3
7
'-
~.
.
-
..
-
-
-
'
.
-
"
"
.
-
.
_
_
.
"
.
.
.
.
.
.
.
,
-
-
'
.
.
_
'
"
,
.
-
"
.
_
-
-
-
-
-
.
_
-
_
.
,
.
~
-
,
-
~
-
"
'
-
"
-
"
-
'
-
-
-
-
"
,
_._
.
.
_
.
.
.
.
,
.
"
-
-
-
.
.
.
.
.
.
.
.
.
.
- -
-
'
.
.
-
_
.
.
.
.
_
.
. ~
.
.
.
.
.
.
~
~
.
.
20
-
2
5
r
a
t
e
r
e
d
u
c
t
o
n
1
.
0
0
%
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS 3RD DAY OF AUGUST 2011,
SERVED THE FOREGOING SECOND PRODUCTION REQUEST OF THE
COMMISSION STAFF TO IDAHO POWER, IN CASE NO. IPC-E-ll-lO, BY E-
MAILING AND MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE
FOLLOWING:
DONOV AN E WALKER
LEAD COUNSEL
IDAHO POWER COMPANY
PO BOX 70
BOISE ID 83707-0070
E-MAIL: dwalker(iidahopower.com
CBearr~idahopower.com
RANDY C ALLPHIN
ENERGY CONTRACT ADMIN
IDAHO POWER COMPANY
PO BOX 70
BOISE ID 83707-0070
E-MAIL: rallphin(iidahopower.com
RANDY HEMMER MGR
INTERCONNECT SOLAR
DEVELOPMENT LLC
3777 TWILIGHT DR
BOISE ID 83703
E-MAIL: randyhemmer(iclearwre.net
RONALD L WILLIAMS
WILLIAMS BRADBURY PC
1015 W HAYS ST
BOISE ID 83702
E-MAIL: ron(iwiliamsbradbury.com
.k~
SECRETARY
CERTIFICATE OF SERVICE