Loading...
HomeMy WebLinkAbout20110829DOE to IPC 5.1-5.3.pdfDepartment of Energy Washington, DC 20585 ~:- .1- \,/rO¥vi: ,,':: ZUL I 2a 8: 27 Ms. Jean D. Jewell, Secretary Idaho Public Utilties Commission 472 West Washington Street P.O. Box 83720 Boise, Idaho 83720-0074 August 17,2011 Re: Case No. IPC-E-II-08 Dear Ms. Jewell: Two copies of the United States Department of Energy's fifth requests for information and production of documents in the above-captioned proceeding are enclosed herewith for filing. Than you for your kind attention. Very truly yours,~~-- .. Arthur Perry Brude~ Attorney for United States Department of Energy 1000 Independence Avenue SW Washington, DC 20585 arhur.bruder~hq .doe.gov phone: (202) 586-3409 cell: (202) 329-4966 fax: (202) 586-7479 RECEIVED BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION f ~11G 29 AM 8= 27 IN THE MATTER OF THE APPLICATION OF ) IDAHO POWER COMPANY FOR AUTHORITY ) TO INCREASE ITS RATES AND CHARGES ) FOR ELECTRIC SERVICE TO ITS ) CUSTOMERS IN THE STATE OF IDAHO. ) ) CASE NO. IPC-E-11-08 U.S. DOE's Fifth Interrogatories and Production Requests to Idaho Power Company The United States Deparment of Energy, by and through its attorney of record, Arthur Perr Bruder, hereby requests that Idaho Power Company ("the Company" or "Idaho Power") provide the following documents and information as soon as possible, but no later than MONDAY, AUGUST 22, 2011. As per the Commission's Rules of Procedure, responses must include the name(s) and phone number of the person(s) who prepared the document, and the name(s), job title(s), location(s) and phone number(s) of the record holder(s) and, if different, the witness( es) who can sponsor the answer at hearing if need be. These Interrogatories and Production Requests are to be considered as continuing, and the Company is requested to provide, by way of supplementar responses, additional documents that it or any person acting on its behalf may later obtain that constitute relevant augmentation of the documents produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of the person preparng the documents. Please provide all Excel and electronic files on CD with formulas activated. IDAHO POWER COMPANY CASE No. IPC-E-11-08 DOE's FIFTH REQUEST FOR INFORMATION AND PRODUCTION OF DOCUMENTS DOE-5-1.The Company has provided the parties with various documents that list the date and time of Idaho Power's system peak. The timing of the system peak conflcts in several of these documents. Please respond as quickly as possible to the following clarification questions regarding the timing of hourly loads and resources shown in documents previously provided by the Company to the paries. (a) In response to lIPA No.9, the Company provided the magnitude and date and time of the system peak for the period Januar 2006 through May 2011. For example, the Company listed its system peak às 2,215 MW on January 8, 2010 at 8 am, and as 2,914 MW on July 17,2010 at 7 pm. (Both of these times are consistent with the system peaks reported on page 401b ofIdaho Power Company's 2010 FERC Form 1.) However, in response to DOE l-11(a), the Company provided information that shows its system peak on Janua 8, 2010 as 2,215 MW at "HR 7", not 8 am. In that same response, the Company shows its July 17,2010 system peak as 2,914 MW at "HRI8", or 6 pm, not 7 pm. Please reconcile the apparent conflct between the information provided in response to DOE 1-11(a) and lIPA NO.9. (b) Please explain how to correctly interpret the times associated with all hourly information provided in response to DOE 1-11, including hourly system loads and all hourly sources of supply provided in Idaho Power's response. (c) Please explain exactly how Idaho Power accounted for daylight savings time in the information provided in response to DOE 1-11. (d) In response to lIPA No.8, the Company provided hourly system loads and hourly sources of supply for the years 2008 through the present. The system peak listed in Attachment 3 (cell AF1277) for Januar 8, 2010 is 2,215 MW at "HR7". This conflcts with Idaho Power's representation in lIPA No.9, where that peak is listed as having occurred at 8 am. The system peak listed in Attachment 3 (cell AQ1340) for July 17, 2010 is 2,914 MW at "HRI8", or 6 pm. This too conflcts with Idaho Power's representation in LIP A NO.9. Please explain how to correctly interpret the times associated with all information provided in response to lIPA Nos. 8 and 9. 2 IDAHO POWER COMPANY CASE No. IPC-E-11-08 DOE's FIFTH REQUEST FOR INFORMATION AND PRODUCTION OF DOCUMENTS (e) In response to DOE 3.4, Idaho Power provided information that shows that the system load for the first hour of the day on Januar 8, 2010 was 1,706 MW, and that it occured between midnight and 1 am that morning. However, in response to LIP A No.8, Idaho Power lists a system load of 1,706 MW occurng in the last hour on Januar 7, 2010, and a load of 1,700 MW occurng in the firs(hour on Januar 8,2010. Please explain the apparent conflct between the information provided in response to DOE 3.4 and lIPA NO.8. (f) Please explain exactly how to correctly match the hourly customer load information Idaho Power provided in response to DOE 3.9 with hourly system loads provided in response to lIPA No.8 and DOE 1- 11 given the conflct between information presented by Idaho Power in response to lIPA No. 8 and DOE 1.11 with the information provided in response to LIP A No.9 and DOE 3.4. DOE-5-2.In response to DOE 3.9, the Company provided hourly customer load information for multiple customers. The magnitude of loads shown in Attachment 4 to that response does not appear to be correct. It is many times lower than the magnitude of loads shown in other documents, including Idaho Power's response to lIPA No.3, for example. Please provide a corrected response to DOE 3.9 Attachment 4, or please reconcile the information provided with that shown in the Company's response to lIPA No.3. DOE-5-3.Please provide corrected responses, if necessar, to any data requests Idaho Power has responded to in this case involving the dates and times of system peaks or hourly loads or hourly sources of supply, and please respond as quickly as possible. At Washington, D.C., this 1 ih day of August, 2011. ~r3~ Attorney for the United States Deparment of Energy Phone: (202) 586-3409 Fax: (202) 586-4116 Arhur.Bruder~hq.doe.gov 3 IDAHO POWER COMPANY CASE No. IPC-E-11-08 DOE's FIFTH REQUEST FOR INFORMATION AND PRODUCTION OF DOCUMENTS CERTIFICATE OF SERVICE I hereby certify that, this 1 ih day of August, 2011, I served the foregoing fifth production request of the United States Departent of Energy in Case No. IPC-E-11-08, by: (1) mailng two (2) copies of it, postage prepaid, to: Ms. Jean Jewell, Secretar Idaho Public Utilties Commission 472 West Washington St. P.O. Box 83720 Boise, ID 83720-0074; (2) electronically transmitting it as an attachment to an email, to the following persons at the email addresses shown: Idaho Power Company (Exh. Nos. 001-100) Lisa Nordstrom, Gregory Said, Donovan E. Walker, Jason B. Wiliams 1221 W. Idaho St. 83702 PO Box 70 Boise, ID 83707-0070 Inordstrom(fidahopower.com; dwalker~idahopower.com jwillams(fidahopower.com; gsaid~dahopower.com Idaho Public Utilties Commission (Exh. Nos. 101-200) Deputy Attorneys General Donald L. Howell, II, Karl Klein 472 W, Washington (83702) PO Box 83720 Boise, ID 83720-0074 don.howell(fpuc,idaho.gov; karl.klein~puc.idaho.gov Idaho Irrigation Pumpers Association (Exh. Nos. 201-300) Eric L. Olsen Racine, Olson, Nye, Budge & Bailey, Charered 201 E. Center PO Box 1391 Pocatello, ID 83204-1391 elo~racinelaw.net 4 IDAHO POWER COMPANY CASE No. IPC-E-11-08 DOE's FIFTH REQUEST FOR INFORMATION AND PRODUCTION OF DOCUMENTS Anthony Yanel 29814 Lake Road Bay Vilage, OH 44140 tony~yanel.net Industrial Customers of Idaho Power (Exh. Nos. 301-400)(Simplot and Rate 19 Group) Peter J. Richardson, Gregory M. Adams Richardson & O'Lear, PLLC 515 N. 2ih Street PO Box 7218 Boise, ID 83702 peter~richardsonandolear.com greg~richardsonandolear.com Don Reading 6070 Hil Road Boise, ID 83703 dreading~mindspring.com United States Department of Energy (Exh. Nos. 401-500) Dwight Etheridge Exeter Associates, Inc. 10480 Little Patuxent Pkwy Suite 300 Columbia, MD 21044 detheridge(fexeterassociates.com; dgoinsPM G(fverizon.net Steven A. Porter Assistat General Counsel Electricity and Fossil Energy United State Deparment of Energy steven.porter~hq.doe.gov The Kroger Company. (Exh. Nos. 501-600) Kur J. Boehm Boehm, Kurz & Lowery 36 E. Seventh St., Suite 1510 Cincinnati, OH 45202 kboehm~bkllawfrr.com Kevin Higgins 5 IDAHO POWER COMPANY CASE No. IPC-E-11-08 DOE's FIFTH REQUEST FOR INFORMATION AND PRODUCTION OF DOCUMENTS Energy Strategies 2155. State St., Suite 200 Salt Lake City, UT 84111 mail:khiggins~energystrat.com John R. Hamond, Jr. Batt Fisher Pusch & Alderman, LLP U.S. Ban Plaza, 5th Floor 1015. Capitol Blvd., Suite 500 (83702) PO Box 1308 Boise, iD 83701 jrh~battfisher .com Community Action Partnership Association of Idaho (Exh. Nos. 601-700) Brad M. Purdy, Attorney at Law 2019 N.l7 St. Boise, iD 83702 brnpurdy~hotmail.com Micron Technology Inc. (Exh. Nos. 701-800) MarV. York Holland & Har, LLP 101 S. Capital Blvd., Suite 1400 Boise, ID 83702 myork~hollandhart.com Richard E. Malmgren Sr. Asst. General Counsel Micron Technology, Inc. 800 South Federal Way Boise, ID 83716 rernalmgren~micron.com Thorvald A. Nelson Mark A. Davidson Fred Schmidt Holland & Har, LLP 6380 S. Fiddlers Green Circle Suite 500 Greenwood Vilage, CO 80111 tnelson(fhollandhar.com; madavidson(fhollandhart.com; fschmidt(fhollandhar.com; inbuchanan~hollandhart.com dennytempc!ahoo.com; gccarer~ur-inc.com 6 IDAHO POWER COMPANY CASE No. IPC-E-11-08 DOE's FIFTH REQUEST FOR INFORMATION AND PRODUCTION OF DOCUMENTS Idaho Conservation League (Exh. Nos. 801-900) Benjamin J. Otto 710 N. Sixth Street 83702 PO Box 844 Boise, ID 83701 botto~idahoconservation.org Snake River Allance (Exh. Nos. 901-1000) Ken Miler PO Box 1731 Boise, ID 83701 kmiler~snakeriverallance.org NW Energy Coalition (Exh. Nos. 1001-1100) Nancy Hirsh, Policy Direètor 811 1st Ave. Suite 305 Seattle, W A 98104 nancy(fnwenergy.org ~;;~) Attorney for the United States Deparment of Energy Phone: (202) 586-3409 Fax: (202) 586-4116 Arthur.Bruder(fhg .doe.gov August 17,2011 7