Loading...
HomeMy WebLinkAbout20110317IPC to Staff 1.pdf~~.: ¡~': e:1DAII POR~ An IDACORP Company "l'll IBn i "1'1 ¡ .~.:i ", r'.'._~" it¡ld\ '.1 Pt. i' ¡ 7ii \ . ~ DONOVAN E. WALKER Lead Counsel dwalker~idahopower.com March 16, 2011 VIA HAND DELIVERY Jean D. Jewell, Secretary Idaho Public Utilties Commission 472 West Washington Street P.O. Box 83720 Boise, Idaho 83720-0074 Re: Case Nos. IPC-E-10-61 - Grouse Creek Wind Park, LLC IPC-E-10-62 - Grouse Creek Wind Park Ii, LLC Dear Ms. Jewell: Enclosed for filng please find an original and three (3) copies of Idaho Power Company's Response to the First Production Request of the Commission Staff to Idaho Power Company in the above matter. i:~aJCz Donovan E. Walker DEW:csb Enclosures 1221 W. Idaho St. (83702) P.O. Box 70 Boise, ID 83707 DONOVAN E. WALKER (ISB No. 5921) LISA D. NORDSTROM (ISB No. 5733) Idaho Power Company P.O. Box 70 Boise, Idaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 dwalkerCâidahopower.com InordstromCâidahopower.com Attorneys for Idaho Power Company Street Address for Express Mail: 1221 West Idaho Street Boise, Idaho 83702 '~ ~ 'O!/5 PM 4: 47 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A DETERMINATION REGARDING A FIRM ENERGY SALES AGREEMENT BETWEEN IDAHO POWER AND GROUSE CREEK WIND PARK, LLC IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A DETERMINATION REGARDING A FIRM ENERGY SALES AGREEMENT BETWEEN IDAHO POWER AND GROUSE CREEK WIND PARK II, LLC ) ) CASE NO. IPC-E-10-61 ) ) IDAHO POWER COMPANY'S ) RESPONSE TO THE FIRST ) PRODUCTION REQUEST OF THE ) COMMISSION STAFF ) TO IDAHO POWER COMPANY ) ) ) CASE NO. IPC-E-10-62 ) ) IDAHO POWER COMPANY'S ) RESPONSE TO THE FIRST ) PRODUCTION REQUEST OF THE ) COMMISSION STAFF ) TO IDAHO POWER COMPANY ) COMES NOW, Idaho Power Company ("Idaho Powet'), and in response to the First Production Request of the Commission Staff to Idaho Power company dated March 9, 2011, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 1 REQUEST NO.1: Please provide a map showing the following for the two projects: . project boundaries, . location of individual wind turbine generators, . location of nearest cities, towns and major roads, . location of nearest transmission lines of the purchasing utilty, and . planned or existing utilty substations to be utilzed by the projects. Please provide the map at a scale suitable to clearly distinguish the locations and approximate distances between individual wind turbine generators. RESPONSE TO REQUEST NO.1: Idaho Power does not possess all of the information requested above. However, Idaho Power forwarded Staffs Production Request No. 1 to each project, see Attachment NO.1. In response to Idaho Powets request, the projects provided the hard copy map included herein as Attachment NO.2. An electronic version of the map is also being simultaneously provided to Kris Sasser and Rick Sterling for Commission Staff. The response to this Request was prepared by Randy Allphin, Senior Energy Contracts Coordinator, Idaho Power Company, in consultation with Donovan E. Walker, Lead Counsel, Idaho Power Company. DATED at Boise, Idaho, this 1:if~ ~ DONOVAN E. WALKER Attorney for Idaho Power Company IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 2 CERTIFICATE OF MAILING I HEREBY CERTIFY that on the 16th day of March 2011 I served a true and correct copy of the within and foregoing IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Kristine Sasser Deputy Attorney General Idaho Public Utilties Commission 472 West Washington P.O. Box 83720 Boise, Idaho 83720-0074 Hand Delivered ~ U.S. Mail _ Overnight Mail FAX ~ Email Kris.SasserCâpuc.idaho.gov Grouse Creek Wind Park, LLCs Brett Woodard Wasatch Wind Intermountain, LLC 2700 Homestead Road, Suite 210 Park City, Utah 84098 Hand Delivered ~U.S.Mail _ Overnight Mail FAX ~ Email bwoodardCâwasatchwind.com ¿fzaDonovan E. Walker IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 3 BEFORE THE IDAHO PUBLIC UTiliTIES COMMISSION CASE NOS. IPC-E-10-61 and IPC-E-10-62 IDAHO POWER COMPANY ATTACHMENT NO.1 *SIDA""POe An IOACRP Compay March 10,2011 Randy C. Alphi Senior Energy Contract Coordinator Brett Woodard Wasatch Wind Intermountain, LLC 2700 Homestead Rd, Suite 210 Park City, UT 84098 Orgina1- U SMail E-mail: BrettWoodard-bwoodad~wasatchwind.com Peter Richardson - Peter~chardsonadolear.com Re: Idaho Public Utilities Commssion Staff Firt Production Request Case No: IPC-E-1O-61 Grouse Creek Wind Park Case No: IPC-E-1O-62 Grouse Creek Wind Park II On March 9, 2010 the Idaho Public Utilities Commission (IPUC) staff issued the First Production Request to Idao Power in the above referenced IPUC cases. A copy of that Production Request is attached. This production requests asks Idao Power to provide a map showing the following for each project: · Project boundares, . Location of individual wind generators · Location of nearest cities, towns and major roads · Location of nearest trsmission lines of the purchasing utility, and · Planed or existing utility substations to be utilized by the projects The requests also ask to please provide ths map at a scale suitable to clearly distinguish the location and approximate distaces between individual wind tubine generators. P.O. Box '10 (83101) 1221 W. Idaho St. Boise 10 83702 Idaho Power does not have a map of ths project, nor possess the specific information requested by IPUC Staff. Please provide a map indentifyg these requested items to Idaho Power no later than 5 PM, Tuesday March 15,2011 so tht we can comply with the IPUC Staff s request to supply this data no later th March 16, 2011. Your cooperation with this information request is appreciated. If you have any questions please do not hesitate to contact me at (208) 388-2614 or rallphitIidahopower.com. Sincerely, 8 e ti' Randy C. Allphi Senior Energy Contract Coordinator Cc: (IPCo) Donovan Walker BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NOS. IPC-E-10-61 and IPC-E-10-62 IDAHO POWER COMPANY ATTACHMENT NO.2