BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
DETERMINATION REGARDING A FIRM
ENERGY SALES AGREEMENT
BETWEEN IDAHO POWER AND
MURPHY FLAT MESA, LLC
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
DETERMINATION REGARDING A FIRM
ENERGY SALES AGREEMENT
BETWEEN IDAHO POWER AND
MURPHY FLAT ENERGY, LLC
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
DETERMINATION REGARDING A FIRM
ENERGY SALES AGREEMENT
BETWEEN IDAHO POWER AND
MURPHY FLAT WIND, LLC
)
) CASE NO. IPC-E-10-56
)
) IDAHO POWER COMPANY'S
) RESPONSE TO THE FIRST
) PRODUCTION REQUEST OF THE
) COMMISSION STAFF
) TO IDAHO POWER COMPANY
)
)
) CASE NO. IPC-E-10-57
)
) IDAHO POWER COMPANY'S
) RESPONSE TO THE FIRST
) PRODUCTION REQUEST OF THE
) COMMISSION STAFF
) TO IDAHO POWER COMPANY
)
)
) CASE NO. IPC-E-10-58
)
) IDAHO POWER COMPANY'S
) RESPONSE TO THE FIRST
) PRODUCTION REQUEST OF THE
) COMMISSION STAFF
) TO IDAHO POWER COMPANY
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 1
e e
COMES NOW, Idaho Power Company ("Idaho Powet'), and in response to the
First Production Request of the Commission Staff to Idaho Power company dated
March 9, 2011, herewith submits the following information:
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 2
REQUEST NO.1: Please provide a map showing the following for the three
projects:
. project boundaries,
. location of individual wind turbine generators,
. location of nearest cities, towns and major roads,
. location of nearest transmission lines of the purchasing utilty, and
. planned or existing utilty substations to be utilized by the projects.
Please provide the map at a scale suitable to clearly distinguish the locations and
approximate distances between individual wind turbine generators.
RESPONSE TO REQUEST NO.1: Idaho Power does not possess all of the
information requested above. However, Idaho Power forwarded Staffs Production
Request NO.1 to each project, see Attachment NO.1. In response to Idaho Power's
request, the projects provided the hard copy maps included herein as Attachment NO.2.
Electronic versions of the maps are also being simultaneously provided to Kris Sasser
and Rick Sterling for Commission Staff.
The response to this Request was prepared by Randy Allphin, Senior Energy
Contracts Coordinator, Idaho Power Company, in consultation with Donovan E. Walker,
Lead Counsel, Idaho Power Company.
DATED at Boise, Idaho, this 16th day 0
OVAN E. WALKER
Attorney for Idaho Power Company
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 3
CERTIFICATE OF MAILING
I HEREBY CERTIFY that on the 16th day of March 2011 I served a true and
correct copy of the within and foregoing IDAHO POWER COMPANY'S RESPONSE TO
THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO
POWER COMPANY upon the following named parties by the method indicated below,
and addressed to the following:
Commission Staff
Kristine Sasser
Deputy Attorney General
Idaho Public Utilties Commission
472 West Washington
P.O. Box 83720
Boise, Idaho 83720-0074
Murphy Flat Mesa, Murphy Flat
Energy, & Murphy Flat Wind, LLCs
Brian D. Jackson
American Wind Group LLC- Manager
2792 Desert Wind Road
Oasis, Idaho 83647-5020
Hand Delivered
-- U.S. Mail
_ Overnight Mail
FAX
-- Email Kris.Sasser~puc.idaho.gov
Hand Delivered
-- U.S. Mail
_ Overnight Mail
FAX
-- Email brian~americanwind.net
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 4
BEFORE THE
ILITIES COMMISSION
ATT MENT NO. 1
*SIDA""PO~
An IDACORP Comny
March 10, 2011
Randy C. Alphin
Senior Energy Contrct Coordiator
Wintercamp Rach Trust
Att: Don Baril
P.O. Box I
Murhy, Idao 83650
Email: kr(!gscwireless.net
Telephone: (208) 867-6863
Orginal- U SMail
E-mail: DonBarll-kr(!gscwieless.net
Re: Idaho Public Utilities Commssion Staff First Production Request
Case No: IPC-E-IO-56 Murhy Flat Mesa
Case No: IPC-E-IO-57 Murhy Flat Energy
Case No: IPC-E-IO-58 Murhy Flat Wind
On March 9, 2010 the Idaho Public Utilities Commssion (IPUC) staff issued the First
Production Request to Idaho Power in the above referenced IPUC cases. A copy of that
Production Request is attched.
This production requests asks Idao Power to provide a map showing the following for each
project:
. Project boundaes,
. Location of individual wind generators
. Location of nearest cities, towns and major roads
. Location of nearest tranmission lines of the purchasing utility, and
. Planed or existing utility substations to be utilized by the projects
The requests also ask to please provide ths map at a scale suitable to clearly distigush the
location and approximate distaces between individua wind tubine generators.
P.O. Sox 70 (83707)
1221 W.ldaho St.
Boise. 10 83702
Idaho Power does not have a map of ths project, nor possess the specific information
requested by IPUC Staff. Please provide a map indentifyg these requested items to Idaho
Power no later than 5 PM, Tuesday March 15,2011 so that we can comply with the IPUC
Staff s request to supply ths data no later than March 16, 2011.
Your cooperation with this information request is appreciated. If you have any questions please
do not hesitate to contact me at (208) 388-2614 or rallphin(iidaopower.com.
Sincerely,
~ e ôJ'
Randy C. Allphi
Senior Energy Contract Coordiator
Cc: (IPCo) Donovan Walker