Loading...
HomeMy WebLinkAbout20110317IPC to Staff 1.pdfDONOVAN E. WALKER (ISB No. 5921) LISA D. NORDSTROM (ISB No. 5733) Idaho Power Company P.O. Box 70 Boise, Idaho 83707 Telephone: (208) 388-5317 Facsimile: (208) 388-6936 dwalker~idahopower.com Inordstrom~idahopower.com Attorneys for Idaho Power Company Street Address for Express Mail: 1221 West Idaho Street Boise, Idaho 83702 i~'., ',-. . !1 Î!lJ t ttr,'-U ì I);:R 17 i!',. hi 8: 30 ! , ";,",:/ BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A DETERMINATION REGARDING A FIRM ENERGY SALES AGREEMENT BETWEEN IDAHO POWER AND MURPHY FLAT MESA, LLC IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A DETERMINATION REGARDING A FIRM ENERGY SALES AGREEMENT BETWEEN IDAHO POWER AND MURPHY FLAT ENERGY, LLC IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A DETERMINATION REGARDING A FIRM ENERGY SALES AGREEMENT BETWEEN IDAHO POWER AND MURPHY FLAT WIND, LLC ) ) CASE NO. IPC-E-10-56 ) ) IDAHO POWER COMPANY'S ) RESPONSE TO THE FIRST ) PRODUCTION REQUEST OF THE ) COMMISSION STAFF ) TO IDAHO POWER COMPANY ) ) ) CASE NO. IPC-E-10-57 ) ) IDAHO POWER COMPANY'S ) RESPONSE TO THE FIRST ) PRODUCTION REQUEST OF THE ) COMMISSION STAFF ) TO IDAHO POWER COMPANY ) ) ) CASE NO. IPC-E-10-58 ) ) IDAHO POWER COMPANY'S ) RESPONSE TO THE FIRST ) PRODUCTION REQUEST OF THE ) COMMISSION STAFF ) TO IDAHO POWER COMPANY IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 1 e e COMES NOW, Idaho Power Company ("Idaho Powet'), and in response to the First Production Request of the Commission Staff to Idaho Power company dated March 9, 2011, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 2 REQUEST NO.1: Please provide a map showing the following for the three projects: . project boundaries, . location of individual wind turbine generators, . location of nearest cities, towns and major roads, . location of nearest transmission lines of the purchasing utilty, and . planned or existing utilty substations to be utilized by the projects. Please provide the map at a scale suitable to clearly distinguish the locations and approximate distances between individual wind turbine generators. RESPONSE TO REQUEST NO.1: Idaho Power does not possess all of the information requested above. However, Idaho Power forwarded Staffs Production Request NO.1 to each project, see Attachment NO.1. In response to Idaho Power's request, the projects provided the hard copy maps included herein as Attachment NO.2. Electronic versions of the maps are also being simultaneously provided to Kris Sasser and Rick Sterling for Commission Staff. The response to this Request was prepared by Randy Allphin, Senior Energy Contracts Coordinator, Idaho Power Company, in consultation with Donovan E. Walker, Lead Counsel, Idaho Power Company. DATED at Boise, Idaho, this 16th day 0 OVAN E. WALKER Attorney for Idaho Power Company IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 3 CERTIFICATE OF MAILING I HEREBY CERTIFY that on the 16th day of March 2011 I served a true and correct copy of the within and foregoing IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Kristine Sasser Deputy Attorney General Idaho Public Utilties Commission 472 West Washington P.O. Box 83720 Boise, Idaho 83720-0074 Murphy Flat Mesa, Murphy Flat Energy, & Murphy Flat Wind, LLCs Brian D. Jackson American Wind Group LLC- Manager 2792 Desert Wind Road Oasis, Idaho 83647-5020 Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email Kris.Sasser~puc.idaho.gov Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email brian~americanwind.net IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY - 4 BEFORE THE ILITIES COMMISSION ATT MENT NO. 1 *SIDA""PO~ An IDACORP Comny March 10, 2011 Randy C. Alphin Senior Energy Contrct Coordiator Wintercamp Rach Trust Att: Don Baril P.O. Box I Murhy, Idao 83650 Email: kr(!gscwireless.net Telephone: (208) 867-6863 Orginal- U SMail E-mail: DonBarll-kr(!gscwieless.net Re: Idaho Public Utilities Commssion Staff First Production Request Case No: IPC-E-IO-56 Murhy Flat Mesa Case No: IPC-E-IO-57 Murhy Flat Energy Case No: IPC-E-IO-58 Murhy Flat Wind On March 9, 2010 the Idaho Public Utilities Commssion (IPUC) staff issued the First Production Request to Idaho Power in the above referenced IPUC cases. A copy of that Production Request is attched. This production requests asks Idao Power to provide a map showing the following for each project: . Project boundaes, . Location of individual wind generators . Location of nearest cities, towns and major roads . Location of nearest tranmission lines of the purchasing utility, and . Planed or existing utility substations to be utilized by the projects The requests also ask to please provide ths map at a scale suitable to clearly distigush the location and approximate distaces between individua wind tubine generators. P.O. Sox 70 (83707) 1221 W.ldaho St. Boise. 10 83702 Idaho Power does not have a map of ths project, nor possess the specific information requested by IPUC Staff. Please provide a map indentifyg these requested items to Idaho Power no later than 5 PM, Tuesday March 15,2011 so that we can comply with the IPUC Staff s request to supply ths data no later than March 16, 2011. Your cooperation with this information request is appreciated. If you have any questions please do not hesitate to contact me at (208) 388-2614 or rallphin(iidaopower.com. Sincerely, ~ e ôJ' Randy C. Allphi Senior Energy Contract Coordiator Cc: (IPCo) Donovan Walker BEFORE THE PUBLIC UTILITIES ATTAC ENT NO.2