HomeMy WebLinkAbout20110112Staff 1 to IPC.pdfKRISTINE A. SASSER
DEPUTY ATTORNEY GENERAL
IDAHO PUBLIC UTILITIES COMMISSION
PO BOX 83720
BOISE, IDAHO 83720-0074
(208) 334-0357
BARNO. 6618
i~\\ jMi \2 tt\ 4: 21
Street Address for Express Mail:
472 W. WASHINGTON
BOISE, IDAHO 83702-5918
Attorneys for the Commission Staff
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR
APPROVAL OF A FIRM ENERGY SALES
AGREEMENT WITH HIDDEN HOLLOW
ENERGY 2, LLC FOR THE SALE AND
PURCHASE OF ELECTRIC ENERGY.
)
) CASE NO. IPC-E-10-44
)
) FIRST PRODUCTION
) REQUEST OF THE
) COMMISSION STAFF
) TO IDAHO POWER COMPANY
)
The Staff of the Idaho Public Utilties Commission, by and through its attorney of record,
Kristine A. Sasser, Deputy Attorney General, requests that Idaho Power Company (Company;
Idaho Power) provide the following documents and information on or before FRIDAY,
JANUARY 21, 2011.
This Production Request is to be considered as continuing, and Idaho Power is requested to
provide, by way of supplementary responses, additional documents that it or any person acting on
its behalf may later obtain that wil augment the documents produced.
Please provide answers to each question and any supporting workpapers that provide detail
or are the source of information used in calculations. The Company is reminded that responses
pursuant to Commission Rules of Procedure must include the name and phone number of the
person preparing the document, and the name, location and phone number of the record holder and
FIRST PRODUCTION REQUEST TO
IDAHO POWER 1 JANUARY 12,2011
if different the witness who can sponsor the answer at hearing if need be. Reference IDAPA
31.01.01.228.
In addition to the written copies provided as response to the questions, please provide all
Excel and electronic fies on CD with formulas activated.
REQUEST NO.1: The attched Form 556 (in pertinent par), Certification of Qualifying
Facilty (QF) Status for a Small Power Production or Cogeneration Facility, was filed with FERC
on January 5, 2011 in Docket No. QFll-97 to obtain self-certification as a QF of the Hidden
Hollow Energy 2 LLC facility. Question 8a of the attached Form 556 requires the applicant to
identify any facilities with electrical generating equipment located within 1 mile of the electrical
generating equipment of the instant facility, and for which any of the entities identified in lines 5a
or 5b, or their affiiates, holds at least a 5 percent equity interest. Hidden Hollow has identified the
existing Ada County Hidden Hollow generating facilty as located within 1 mile and with common
ownership by Fortistar LLC. ~ 3.2 of the Firm Energy Sales Agreement between Idaho Power and
Hidden Hollow Energy 2 LLC requires the facility to maintain QF status throughout the term of the
Agreement.
a. Does Idaho Power believe that the self-certification application fied with FERC
for the Hidden Hollow Energy 2 facilty complies with FERC's one-mile separation
rule as contained in 18 C.F.R. 292.204(a)(2)?
b If not, is Idaho Power aware as to whether Hidden Hollow Energy 2 has requested
a waiver pursuant to 18 C.F.R. 292.204(a)(3)?
c. If not, does Idaho Power intend to contest Hidden Hollow 2's QF status?
Dated at Boise, Idaho, this I;iTt day of January 2011.
~Lu..(l~
Kri me A. Sasser
Deputy Attorney General
Technical Staff: Rick Sterling
i:umisc:prodreq/ipcelO.44ksrps pr l.doc
FIRST PRODUCTION REQUEST TO
IDAHO POWER 2 JANUARY 12,2011
FERC Form 556 Page 3 -Instructions
Filing Fee
No filing fee is required if you are submitting a self-certification or self-recertification of your facility as a QF pursuant to 18
CF.R. § 292.207(a).
A filing fee is required if you are filing either of the following:
(1) an application for Commission certification or recertification of your facility as a QF pursuant to 18 CF.R. § 292.207(b), or
(2) a petition for declaratory order granting waiver pursuant to 18 CF.R. §§ 292.204(a)(3) and/or 292.205(c).
The current fees for applications for Commission certifications and petitions for declaratory order can be found by visiting the
Commission's QF website at www.ferc.gov/QF and clicking the Fee Schedule link.
You will be prompted to submit your filing fee, if applicable, during the electronic filing process described on page 2.
Required Notice to Utilities and State Regulatory Authorities
Pursuant to 18 CF.R. § 292.207(a)(ii), you must provide a copy of your self-certification or request for Commission certification
to the utilities with which the facility will interconnect and/or transact, as well as to the State regulatory authorities of the
states in which your facility and those utilities reside. Links to information about the regulatory authorities in various states
can be found by visiting the Commission's QF website at www..grW.Q.Y1QEand clicking the Notice Requirements link.
What to Expect From the Commission After You File
An applicant filng a Form 5S6 electronically will receive an email message acknowledging receipt of the filing and showing
the docket number assigned to the filing. Such email is typically sent within one business day, but may be delayed pending
confirmation by the Secretary of the Commission of the contents of the filing.
An applicant submitting a self-certification of QF status should expect to receive no documents from the Commission, other
than the electronic acknowledgement of receipt described above. Consistent with its name, a self-certification is a
certification by the applicant itself that the facility meets the relevant requirements for QF status, and does not involve a
determination by the Commission as to the status of the facility. An acknowledgement of receipt of a self-certification, in
particular, does not represent a determination by the Commission with regard to the QF status of the facility. An applicant
self-certifying may, however, receive a rejection, revocation or deficiency letter if its application is found, during periodic
compliance reviews, not to comply with the relevant requirements.
An applicant submitting a request for Commission certification wil receive an order either granting or denying certification of
QF status, or a letter requesting additional information or rejecting the application. Pursuant to 18 CF.R. § 292.207(b)(3), the
Commission must act on an application for Commission certification within 90 days of the later of the filing date of the
application or the fiing date of a supplement, amendment or other change to the application.
Waiver Requests
18 CF.R. § 292.204(a)(3) allows an applicant to request a waiver to modify the method of calculation pursuant to 18 CF.R. §
292.204(a)(2) to determine if two facilities are considered to be located at the same site, for good cause. 18 CF.R. § 292.205(c)
allows an applicant to request waiver ofthe requirements of 18 CF.R. §§ 292.205(a) and (b) for operating and efficiency upon
a showing that the facility will produce significant energy savings. A request for waiver of these requirements must be
submitted as a petition for declaratory order, with the appropriate filing fee for a petition for declaratory order. Applicants
requesting Commission recertification as part of a request for waiver of one of these requirements should electronically
submit their completed Form 556 along with their petition for declaratory order, rather than fiing their Form 556 as a
separate request for Commission recertification. Only the filing fee for the petition for declaratory order must be paid to
cover both the waiver request and the request for recertification if such requests are made simultaneously.
18 CF.R. § 292.203(d)(2) allows an applicant to request a waiver of the Form 556 filing requirements, for good cause.
Applicants filing a petition for declaratory order requesting a waiver under 18 CF.R. § 292.203(d)(2) do not need to complete
or submit a Form 556 with their petition.
()Fi/- j7 FEDERAL ENERGY REGULATORY COMMISSION
WASHINGTON, DC
Certification of Qualifying Facility (QF) Status for a Small Power
Production or Cogeneration Facility
OMS Control #1902-0075
Expiration 5/3112013
Form 556
1 a Full name of applicant (legal entity on whose behalf qualifying facility status is sought for this facility)
HIDDEN HOLLOW ENERGY 2 LLC
1 b Applicant street address
5087 JUNCTION ROAD
1c City 1 d State/province
LOCKPORT NEW YORK
1 e Postal code 1 f Country (if not United States)1 9 Telephone number
14094 716-439-1004
1 h Has the instant facility ever previously been certified as a QF?Yes 0 No rg
1i If yes, provide the docket number of the last known QF filing pertaining to this facility:QF --
._...._._M..._._......_...-_..~.................._...
1j Under which certification process is the applicant making this filing?
rg Notice of self-certification o Application for Commission certification (requires filing
C (see note below)fee; see "Filing Fee" section on page 3)
0 Note: a notice of self-certification is a notice by the applicant itself that its facility complies with the requirements for+-QF status. A notice of self-certification does not establish a proceeding, and the Commission does not review aCO
E notice of self-certification to verify compliance. See the "What to Expect From the Commission After You File"~section on page 3 for more information.~C 1k What type(s) of QF status is the applicant seeking for its facility? (check all that apply)-
C k8 Qualifying small power production facility status o Qualifying cogeneration facility status0.-11 What is the purpose and expected effective date(s) ofthis filing?+-
COU k8 Original certification; facility expected to be installed by 9/5/11 and to begin operation on 10/3/11.-
0.0.Change(s) to a previously certified facility to be effective on
c:(identify type(s) of change(s) below, and describe change(s) in the Miscellaneous section starting on page 19)
o Name change and/or other administrative change(s)
Change in ownership
Change(s) affecting plant equipment, fuel use, power production capacity and/or cogeneration thermal output
Supplement or correction to a previous filing submitted on
(describe the supplement or correction in the Miscellaneous section starting on page 19)
1 m If any of the following three statements is true, check the box(es) that describe your situation and complete the form
to the extent possible, explaining any special circumstances in the Miscellaneous section starting on page 19.
o The instant facility complies with the Commission's QF requirements by virtue of a waiver of certain regulationspreviously granted by the Commission in an order dated (specify any other relevant waiver
orders in the Miscellaneous section starting on page 19)
o The instant facility would comply with the Commission's QF requirements if a petition for waiver submittedconcurrently with this application is granted
The instant facility complies with the Commission's regulations, but has special circumstances, such as the
o employment of unique or innovative technologies not contemplated by the structure of this form, that make
the demonstration of compliance via this form difficult or impossible (describe in Mise. section starting on p. 19)
FERC Form 556 Page 6 - All Facilities
2a Name of contact person 2b Telephone number
DAVID B JOHNSON 518-465-9319
2c Which of the following describes the contact person's relationship to the applicant? (check one)
i:D Applicant (self)D Employee, owner or partner of applicant authorized to represent the applicant
0 D Employee of a company affliated with the applicant authorized to represent the applicant on this matter.-+-
CO r8 Lawyer, consultant, or other representative authorized to represent the applicant on this matterE2d Company or organization name (if applicant is an individual, check here and skip to line 2e)lo~READ AND LANIADO LLPi:-
+-2e Street address (if same as Applicant, check here and skip to line 3a)C.:U
CO 25 EAGLE STREET+-i:0U
2f City 2g State/province
ALBANY NEW YORK
2h Postal code 2i Country (if not United States)
10072
3a Facility namei:HIDDEN HOLLOW ENERGY 2 LLC0
+-3b Street address (if a street address does not exist for the facility, check here and skip to line 3c) LJCOu010300SEAMENS GULCH ROAD..
""i:
CO 3c Geographic coordinates: If you indicated that no street address exists for your facility by checking the box in line 3b,i:then you must specify the latitude and longitude coordinates of the facility in degrees (to three decimal places). Use0the following formula to convert to decimal degrees from degrees, minutes and seconds: decimal degrees =.-+-
CO degrees + (minutes/60) + (seconds/3600).See the "Geographic Coordinates" section on page 4 for help. If you u provided a street address for your facility in line 3b, then specifying the geographic coordinates below is optionaL.~
+-D East (+)r8 North (+)i:Longitude 116.286 degrees Latitude 43. 698 degrees(J r8 West (-)D South (-)""~3d City (if unincorporated, check here and enter nearest city) D 3e State/province
+-IDAHO-BOISE
U
CO 3f County (or check here for independent city)3g Country (if not United States)u.
ADA
Identify the electric utilities that are contemplated to transact with the facility.
VI 4a Identify utilty interconnecting with the facility(J
+-IDAHO POWER CORPORATION
+-~4b Identify utilities providing wheeling service or check here if none 0
C'IDAHO POWER CORPORATIONi:
+-4c Identify utilties purchasing the useful electric power output or check here if noneU
CO IDAHO POWER CORPORATIONVIi:
CO 4d Identify utilities providing supplementary power, backup power, maintenance power, and/or interruptible powerloi-service or check here if none IZ
FERC Form 556 Page 7 - All Facilities
Sa Direct ownership as of effective date or operation date: Identify all direct owners of the facility holding at least 10
percent equity interest. For each identified owner, also (1) indicate whether that owner is an electric utility, as
defined in section 3(22) of the Federal Power Act (16 U.S.C 796(22)), or a holding company, as defined in section
1262(8) of the Public Utility Holding Company Act of 2005 (42 U.s.C 16451 (8)), and (2) for owners which are electric
utilities or holding companies, provide the percentage of equity interest in the facility held by that owner. If no
direct owners hold at least 10 percent equity interest in the facility, then provide the required information for the
two direct owners with the largest equity interest in the facility.Electric utility or If Yes,
holding % equity
Full legal names of direct owners company interest
1 )HIDDEN HOLLOW ENERGY 2 LLC Yes IZ No 0 100 %
2)Yes 0 No 0 %
3)Yes 0 No 0 %
4)Yes 0 No 0 %
5)Yes 0 No 0 %
6)Yes 0 No 0 %
7)Yes 0 No 0 %
8)Yes 0 No 0 %
C0 9)Yes 0 No 0 %
+-ro 10)Yes 0 No 0 %i-
OJa.o Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed0
'"Sb Upstream (Le., indirect) ownership as of effective date or operation date: Identify all upstream (Le., indirect) ownersCof the facility that both (1) hold at least 10 percent equity interest in the facility, and (2) are electric utilities, asroa.defined in section 3(22) of the Federal Power Act (16 U.s.C 796(22)), or holding companies, as defined in section
..1262(8) of the Public Utilty Holding Company Act of 2005 (42 U.S.C 16451 (8)). Also provide the percentage of
Vl equity interest in the facility held by such owners. (Note that, because upstream owners may be subsidiaries of onei-
OJ another, total percent equity interest reported may exceed 100 percent.)
C
Š Check here if no such upstream owners exist.0 0/ equity
Full legal names of electric utility or holding company upstream owners interest
1 )HIDDEN HOLLOW ENERGY LLC 100 %
2)FORITSTAR METHANE GROUP LLC 100 %
3)FORTISTAR RENEWABLES LLC 100 %
4)FORTISTAR PROJECTS LLC 100 %
5)FORTISTAR LLC 100 %
6)%
7)%
8)%
9)%
10)%
o Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed
Sc Identify the facility operator
FORTISTAR SERVICES LLC
FERC Form 556 Page 8 - All Facilities
6a Describe the primary energy input: (check one main category and, if applicable, one subcategory)
IZ Biomass (specify)
IZ Landfill gas
o Manure digester gas
o Municipal solid waste
o Sewage digester gas
o Wood
D Renewable resources (specify)
o Hydro power - river
o Hydro power - tidal
o Hydro power - wave
o Solar - photovoltaic
o Solar - thermal
D Geothermal
D Fossil fuel (specify)
o Coal (not waste)
o Fuel oil/diesel
o Natural gas (not waste)
Other fossil fuel
o (describe on page 19)
o Other biomass (describe on page 19) 0 Wind
o Other renewable resource D Other (describe on page 19)(describe on page 19)
6b If you specified "waste" as the primary energy input in line 6a, indicate the type of waste fuel used: (check one)
D Waste (specify type below in line 6b)
..:Ja.C
~O'~(JCW
D Waste fuel listed in 18 CF.R. § 292.202(b) (specify one of the following)
o Anthracite culm produced prior to July 23, 1985
o Anthracite refuse that has an average heat content of 6,000 Btu or less per pound and has an averageash content of 45 percent or more
o Bituminous coal refuse that has an average heat content of 9,500 Btu per pound or less and has ànaverage ash content of 25 percent or more
Top or bottom subbituminous coal produced on Federal lands or on Indian lands that has been
determined to be waste by the United States Department of the Interior's Bureau of Land Management
o (BLM) or that is located on non-Federal or non-Indian lands outside of BLM's jurisdiction, provided that
the applicant shows that the latter coal is an extension of that determined by BLM to be waste
Coal refuse produced on Federal lands or on Indian lands that has been determined to be waste by the
o BLM or that is located on non- Federal or non-Indian lands outside of BLM's jurisdiction, provided that
applicant shows that the latter is an extension of that determined by BLM to be waste
o Lignite produced in association with the production of montan wax and lignite that becomes exposedas a result of such a mining operation
o Gaseous fuels (except natural gas and synthetic gas from coal) (describe on page 19)
Waste natural gas from gas or oil wells (describe on page 19 how the gas meets the requirements of 18
o CF.R § 2.400 for waste natural gas; include with your fiing any materials necessary to demonstrate
compliance with 18 CF.R. § 2.400)
o Materials that a government agency has certified for disposal by combustion (describe on page 19)
o Heat from exothermic reactions (describe on page 19) 0 Residual heat (describe on page 19)
o Used rubber tires 0 Plastic materials 0 Refinery off-gas 0 Petroleum coke
Other waste energy input that has little or no commercial value and exists in the absence of the qualifying
D facility industry (describe in the Miscellaneous section starting on page 19; include a discussion ofthe fuel's
lack of commercial value and existence in the absence of the qualifying facility industry)
6c Provide the average energy input, calculated on a calendar year basis, in terms of Btu/h for the following fossil fuel
energy inputs, and provide the related percentage of the total average annual energy inputto the facility (18 CF.R. §
292.202(j). For any oil or natural gas fuel, use lower heating value (18 CF.R. § 292.202(m)).
Fuel
Natural gas
Oil-based fuels
Coal
Annual average energy
input for specified fuel
Percentage of total
annual energy input
0%
0%
0%
c
o Btu/h
o Btu/h
o Btu/h
FERC Form 556 Page 9 - All Facilities
co+-ro
E~~C
.ç
uroLL
rouc..u(Ji-
Indicate the maximum gross and maximum net electric power production capacity of the facility at the point(s) of
delivery by completing the worksheet below. Respond to all items. If any of the parasitic loads and/or losses identified in
lines 7b through 7e are negligible, enter zero for those lines.
7a The maximum gross power production capacity at the terminals of the individual generator(s)
under the most favorable anticipated design conditions
7b Parasitic station power used at the facility to run equipment which is necessary and integral to
the power production process (boiler feed pumps, fans/blowers, offce or maintenance buildings
directly related to the operation of the power generating facility, etc.). If this facility includes non-
power production processes (for instance, power consumed by a cogeneration facility's thermal
host) , do not include any power consumed by the non-power production activities in your
reported parasitic station power.
3,200 kW
200 kW
7c Electrical losses in interconnection transformers
o kW
7d Electrical losses in Ac/DC conversion equipment, if any
o kW
7e Other interconnection losses in power lines or facilities (other than transformers and AC/DC
conversion equipment) between the terminals of the generator(s) and the point of interconnection
with the utilty
7f Total deductions from gross power production capacity = 7b + 7c + 7d + 7e
o kW
200.0 kW
7g Maximum net power production capacity = 7a - 7f
3, OOG. 0 kW
7h Description of facility and primary components: Describe the facility and its operation. Identify all boilers, heat
recovery steam generators, prime movers (any mechanical equipment driving an electric generator), electrical
generators, photovoltaic solar equipment, fuel cell equipment and/or other primary power generation equipment
used in the facility. Descriptions of components should include (as applicable) specifications of the nominal
capacities for mechanical output, electrical output, or steam generation of the identified equipment. For each piece
of equipment identified, clearly indicate how many pieces of that type of equipment are included in the plant, and
which components are normally operating or normally in standby mode. Provide a description of how the
components operate as a system. Applicants for cogeneration facilities do not need to describe operations of
systems that are clearly depicted on and easily understandable from a cogeneration facility's attached mass and
heat balance diagram; however, such applicants should provide any necessary description needed to understand
the sequential operation of the facilty depicted in their mass and heat balance diagram. If additional space is
needed, continue in the Miscellaneous section starting on page 19.
THE FACILITY UTILIZES LANDFILL GAS FOR ITS HEAT INPUT. THE LANDFILL GAS IS
COLLECTED BY A PIPELINE GATHERING SYSTEM AT A COUNTY LANDFILL. THE LANDFILL GAS
IS THE HEAT INPUT FOR TWO INTERNAL COMBUSTION RECIPROCATING ENGINE-GENERATORS.
THE GENERATORS ARE CONNECTED TO THE LOCAL UTILITIES DISTRIBUTION SYSTEM.
FERC Form 556 Page 10- Small Power Production
Information Required for Small Power Production Facility
If you indicated in line 1 k that you are seeking qualifying small power production facility status for your facility, then you
must respond to the items on this page. Otherwise, skip page 10.
Pursuant to 18 CF.R. § 292.204(a), the power production capacity of any small power production facility, together
with the power production capacity of any other small power production facilities that use the same energy
resource, are owned by the same person(s) or its affliates, and are located at the same site, may not exceed 80
megawatts. To demonstrate compliance with this size limitation, or to demonstrate that your facility is exempt
from this size limitation under the Solar, Wind, Waste, and Geothermal Power Production Incentives Act of 1990
(Pub. L. 101-575, 104 Stat. 2834 (1990) as amended by Pub. L. 102-46, 105 Stat. 249 (1991)), respond to lines 8a
through 8e below (as applicable).
8a Identify any facilities with electrical generating equipment located within 1 mile of the electrical generating
equipment of the instant facility, and for which any of the entities identified in lines Sa or 5b, or their affiliates, holds
at least a 5 percent equity interest.
OJ Check here if no such facilities exist.L jucVlFacility location Root docket #Maximum net powerCOC(city or county, state)(if any)Common owner(s)production capacity
0. .0
E +-l)ADA COUNTY QF06 128 FORTISTAR LLC 3,000 kW
CO
-
0 +---u E 2)QF -kW4-:.--0 3)kWcOJQF---0 N
+-V'D Check here and continue in the Miscellaneous section starting on page 19 if additional space is needed
CO ..u.:+-8b The Solar, Wind, Waste, and Geothermal Power Production Incentives Act of 1990 (Incentives Act) provides
+-Š exemption from the size limitations in 18 CF.R. § 292.204(a) for certain facilities that were certified prior to 1995.~
OJ Are you seeking exemption from the size limitations in 18 CF.R. § 292.204(a) by virtue ofthe Incentives Act?U
D Yes (continue at line 8c below)I2 No (skip lines 8c through 8e)
8e Was the original notice of self-certification or application for Commission certification of the facility filed on or
before December 31, 1994?Yes No
8d Did construction of the facility commence on or before December 31, 1999?Yes 0 No 0
8e If you answered No in line 8d, indicate whether reasonable dilgence was exercised toward the completion of
the facility, taking into account all factors relevant to construction? Yes 0 No 0 If you answered Yes, provide
a brief narrative explanation in the Miscellaneous section starting on page 19 of the construction timeline (in
particular, describe why construction started so long after the facility was certified) and the diligence exercised
toward completion of the facility.
OJ Vl Pursuant to 18 CF.R. § 292.204(b), qualifying small power production facilities may use fossil fuels, in minimal+-U C amounts, for only the following purposes: ignition; start-up; testing; flame stabilization; control use; alleviation orCOJprevention of unanticipated equipment outages; and alleviation or prevention of emergencies, directly affectingCOE-the public health, safety, or welfare, which would result from electric power outages. The amount offossil fuels0.OJ
E i.used for these purposes may not exceed 25 percent of the total energy input of the facility during the 12-month.-::period beginning with the date the facility first produces electric energy or any calendar year thereafter.0 0-U OJ4-c:9a Certification of compliance with 18 CF.R. § 292.204(b) with respect to uses of fossil fuel:0 OJCVl I2 Applicant certifies that the facility will use fossil fuels exclusively for the purposes listed above.0 ::''¡
CO OJ 9b Certification of compliance with 18 CF.R. § 292.204(b) with respect to amount of fossil fuel used annually:U ::~Ll Applicant certifies that the amount of fossil fuel used at the facility wil not, in aggregate, exceed 25+-..I2 percent of the total energy input of the facility during the 12-month period beginning with the date the~
OJ +-
U Š facility first produces electric energy or any calendar year thereafter.
FERC Form 556 Page 19 - All Facilties
Miscellaneous
Use this space to provide any information for which there was not sufficient space in the previous sections of the form to
provide. For each such item of information clearly identify the line number that the information belongs to. You may also use
this space to provide any additional information you believe is relevant to the certification of your facility.
Your response below is not limited to one page. Additional page(s) wil automatically be inserted into this form if the
length of your response exceeds the space on this page. Use as many pages as you require.
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS 12TH DAY OF JANUARY 2011,
SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE
COMMISSION STAFF TO IDAHO POWER, IN CASE NO. IPC-E-I0-44, BY
MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING:
DONOV AN E WALKER
LISA D NORDSTROM
IDAHO POWER COMPANY
POBOX 70
BOISE ID 83707-0070
E-MAIL: dwalker(fidahopower.com
Inordstrom(fidahopower .com
RANDY C ALLPHIN
ENERGY CONTRACT ADMIN
IDAHO POWER COMPANY
PO BOX 70
BOISE ID 83707-0070
E-MAIL: rallphin(fidahopower.com
THOMAS J GESICKI
PRESIDENT
FORTISTAR METHANE GROUP
5087 JUNCTION ROAD
LOCKPORTNY 14094
SECRETARY
CERTIFICATE OF SERVICE