Loading...
HomeMy WebLinkAbout20100621Staff 1-4 to IPC.pdfSCOTT WOODBURY DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0312 IDAHO BAR NO. 1895 RECEf:'lEO ZUlÐJUN 21 PH 2: 40 Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF APPLICATION OF IDAHO POWER COMPANY FOR THE APPROVAL OF A FIRM ENERGY SALES AGREEMENT WITH GRAND VIEW SOLAR PV ONE, LLC, FOR THE SALE AND PURCHASE OF ELECTRIC ENERGY. ) ) CASE NO. IPC-E-I0-19 ) ) FIRST PRODUCTION ) REQUEST OF THE ) COMMISSION STAFF TO ) IDAHO POWER COMPANY ) The Staff of the Idaho Public Utilties Commission, by and through its attorney of record, Scott Woodbur, Deputy Attorney General, requests that Idaho Power Company (Company; IPC) provide the following documents and information as soon as possible, but no later than MONDAY, JULY 12,2010. This Production Request is to be considered as continuing, and Idaho Power Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that wil augment the documents produced. For each item, please indicate the name of the person(s) preparing the answers, along with the job title of such person(s) and the witness who can sponsor the answer at hearing. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules of Procedure must include the name and phone number of the FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY 1 JUNE 21, 2010 person preparing the document, and the name, location and phone number of the record holder and if different the witness who can sponsor the answer at hearng if need be. Reference IDAP A 31.01.01.228. In addition to the wrtten copies provided as response to the questions, please provide all Excel and electronic fies on CD with formulas activated. REQUEST NO.1: On pages 5 and 6 of its Application, Idaho Power states, With respect to the power purchase agreement criteria, Grand View and Idaho Power had resolved all material outstanding contract issues prior to March 16, 2010. However, the Company was also evaluating an alternative, non-PURPA power purchase agreement with Grand View regarding this Facilty. Idaho Power completed this evaluation and review on or about May 6,2010, and elected not to proceed with a non-PURP A contract for this project. Please provide copies of any draf agreements, spreadsheets, analysis, correspondence or other documentation that relates to the "evaluation and review" referred to in the Company's statement above. REQUEST NO.2: Please explain in greater detail why Idaho Power was considering a non-PURP A power purchase agreement with Grand View. Had the Grand View project been bid in any formal request for proposals or other solicitation issued by Idaho Power? Under what circumstances might Idaho Power enter into non-PURP A power sales agreements with small renewable energy projects? REQUEST NO.3: Please explain why Idaho Power "elected not to proceed with a non- PURP A contract" for the Grand View project. REQUEST NO.4: On page 5 of its Application, Idaho Power lists criteria that it believes should be satisfied in order for projects to be eligible for grandfathering under the rates in Order No. 30744. Those criteria state, in par: FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY 2 JUE 21, 2010 a. Interconnection and Transmission 1. Filed an interconnection application; and 11. Received and accepted an interconnection feasibilty study report for the project and paid any requested study deposits (or established credit) for the next phase of the interconnection process in accordance with Schedule 72; and ll. Received confirmation from Idaho Power that transmission capacity is available for the project and/or received and accepted transmission capacity study results and cost estimates. In reference to the above criteria, please provide the following: a) The date on which an interconnection application was received by Idaho Power; b) A copy of the interconnection feasibilty report that was received and accepted by Grand View; c) A copy of written documentation from Idaho Power confirming that transmission capacity is available for the project and/or documentation that Grand View received and accepted transmission capacity study results and cost estimates, and d) A summar of the amounts and dates on which Grand View paid any requested study deposits (or established credit). DATED at Boise, Idaho, this di ~ay of June 2010. ~,v~ Scott Woodbur Deputy Attorney General Technical Staff: Rick Sterling i: umise: prodreq/ipce i o.i 9swrps ipc 1 FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY 3 JUNE 21,2010 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 21sT DAY OF JUE 2010, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY, IN CASE NO. IPC-E-IO-19, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: DONOV AN E WALKER LISA D NORDSTROM IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 E-MAIL: dwalker(fidahopower.com lnordstrom(fidahopower .com RANDY C ALLPHIN ENERGY CONTRACT ADMINISTRATOR IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 E-MAIL: rallphin(fidahopower.com ,b~ SECRETAR CERTIFICATE OF SERVICE