HomeMy WebLinkAbout20261125City of Boise City Comments.pdf RECEIVED
November 25, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
JAYME SULLIVAN
BOISE CITY ATTORNEY
Ed Jewell ISB No. 10446
Deputy City Attorney
BOISE CITY ATTORNEY'S OFFICE
150 N. Capitol Blvd.
P.O. Box 500
Boise, ID 83701-0500
Telephone: (208) 608-7950
Facsimile: (208) 384-4454
Email: BoiseCityAttomey(ic,,cityofboise.org
ei ewellgcityof boise.org
Attorneys for Intervenor
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER Case No. IPC-E-26-07
COMPANY'S PETITION TO EVALUATE
CLASS COST-OF-SERVICE CITY OF BOISE CITY'S
METHODOLOGY, CONSIDER COMMENTS
ALTERNATIVE CLASS COST-OF-
SERVICE STUDIES, AND DETERMINE
COST OF SERVICE CONSIDERATIONS
FOR NEW LARGE-LOAD CUSTOMERS
The city of Boise City("City") submits these comments on the petition submitted by Idaho
Power Company ("Company") to evaluate its class cost-of-service ("CCOS") methodology,
consider alternative CCOS studies, and determine cost-of-service considerations for new large-
load customers. The City,pursuant to the Commission's Rules of Procedure,IDAPA 31.01.01.000
et seq., and pursuant to the Notice of Schedule, Order No. 37170, issued on September 16, 2026,
hereby submits its formal written comments and states as follows:
CITY OF BOISE CITY'S COMMENTS - 1
INTRODUCTION
The City thanks the Company, Commission Staff, and the intervening parties for their
engagement on this important topic. The decisions made in this docket will shape how costs are
shared among Idaho Power's customers well beyond the next General Rate Case ("GRC"). The
City's overarching interest is development of an enduring, evergreen CCOS framework, with
particular attention to ensuring that the CCOS framework produces fair results under today's
conditions and will continue to do so through the next period of expected and unprecedented new
large load("NLL") growth the Company forecasts.
The City understands the logic and intent of the Company's proposed CCOS framework.
Combined usage of the Peak and Average Embedded Method ("PAEM") with the new Growth
Responsibility Method ("GRM") appears, based on the Company's modeling, to move cost
allocation closer to cost causation in a manner that is transparent and could be applied consistently
without creating undue rate shock. Generally, the City recognizes that this is a new area of
exploration for utilities and commends Idaho Power for developing a tailored approach for
evaluation in this docket.
However, the City believes the Company's approach may not go far enough or be fully
responsive to House Bill 911 ("HB 911"). Importantly, the City reserves judgment on the
Company's proposal until questions can be answered sufficiently regarding: (1) opportunities for
use of hourly-informed data to better inform cost of service; (2) additional explanation of the
GRM's weighting methodology; (3) examination of whether the outcomes of the PAEM/GRM
framework go far enough to ensure that growth pays for the costs it causes; and (4) consideration
of standardized NLL tariff provisions—whether in this docket or another—that would complement
individual special contracts.
CITY OF BOISE CITY'S COMMENTS - 2
BACKGROUND
This docket is the product of a conversation that began well before the 2026 legislative
session. In the Company's 2025 GRC, the settling parties "did not agree on any particular class
cost-of-service (`COOS') methodology," and the Company agreed to initiate a single-issue case
on CCOS methodology "in no event later than the end of the first quarter of 2026." Order No.
36892 at 3-4. The City supported that continued evaluation. Id. at 8.
The Commission found that a dedicated proceeding would be"the most effective forum to
collaborate, develop a robust record, and fully examine the CCOS methodology," and stated that
it "remains mindful of the potential for cost-shifting among customer classes" and "will review
and determine the appropriate cost of service for NLL customers." Id. at 12-13. The Company
filed this petition on March 31, 2026, as directed. Notice of Petition, Order No. 36998 at 1.
Additionally,the Company now asks the Commission to direct it to use the resulting methodology
in its next GRC. Anderson Direct at 4.
The enactment of HB 911, codified at Idaho Code § 61-335 and effective July 1, 2026,
made these questions more time sensitive, but it did not start them. Parties had raised concerns
about how growth-driven investment is allocated across classes for years, including in the
Company's 2025 Integrated Resource Plan ("IRP") proceeding, where Staff recognized that the
Company"is facing challenges related to large load growth beginning in 2026." Order No. 36937
at 4 (Case No. IPC-E-25-23). The Commission has also identified this docket as the designated
forum for CCOS questions raised in related proceedings. Order No. 37018 at 13 (Case No. IPC-
E-26-03). As potential new service entrants with massive electricity demand—such as data
centers—seek to locate in Idaho, it is incumbent on the Commission to proactively establish a fair
CITY OF BOISE CITY'S COMMENTS - 3
cost allocation framework before other customer classes are required to absorb costs attributable
to the NLLs.
The idea for this CCOS review began before HB 911 was enacted and, therefore, was not
designed solely as a tool for implementing the new law. Considering this, the City points out that
CCOS does not by itself address the full scope of the risks that large, concentrated load growth
presents. HB 911 requires Commission-approved service contracts, a no-harm test, and financial
security for NLLs. Idaho Code § 61-335(2)—(4), (6). The City therefore views the outcome of this
docket as one part of a broader set of decisions and offers additional considerations below on the
kinds of additional regulatory tools that could be transparently and consistently applied to NLLs
that naturally fall outside the scope and purview of CCOS.
SUMMARY OF THE CITY'S POSITION &DESIRED DOCKET OUTCOMES
The City appreciates the Company for developing a new approach to allocating growth-
driven costs in CCOS. Traditional embedded cost-of-service methods allocate the cost of existing
plant according to how classes use the system today; they do not measure whether a particular
class's growth drove the need for a particular investment. This worked when the growth was
modest in scale and diffuse in grid impacts but leaves a gap in cost allocation when the new load
coming online is concentrated and extremely large. The Company's GRM attempts to fill that gap.
It is the kind of flexible thinking needed for the scale of large-load growth Idaho now faces. While
appreciative of the Company's proposal and recognizing it is an improvement over the status quo,
the City is unsure whether it is sufficiently robust and withholds final opinion on the Company's
framework,pending responses to questions posed below.
The City itself is a large customer of Idaho Power across many different rate classes. As a
result, the City has a direct financial interest in an outcome that is fair,just, and reasonable, and a
CITY OF BOISE CITY'S COMMENTS - 4
balanced perspective that is not tied to the interests of any single class. The City is also broadly
concerned about adverse economic impacts and increases in utility prices for Boise residents and
businesses that are not supported by cost causation. The City considers its participation in this
docket important to advocate for smaller customers and ensure they are not harmed by the arrival
of new large customers, and, where possible, that they receive bill relief through more accurate
allocation of costs. Fair allocation means, at minimum, no preferential rates or sweetheart deals
for customers with concentrated negotiating power.
The City seeks clarification on several design choices and offers additional considerations
for compliance with HB 911. The City also urges the Commission to evaluate the Company's
CCOS proposal against the growth trajectory reflected in the Company's IRP, not only the
conditions of the next GRC, and to consider this docket alongside the related IRP, resource
procurement, and NLL contract proceedings so the whole picture is not lost. Consistent with these
broader thoughts, the City hopes this proceeding will result in an enduring and replicable CCOS
framework that fairly allocates costs to all customers, including NLLs, and eases or at least
carefully manages the risk of shifting costs to existing customers as the Company's load grows.
Because this framework is, according to the Company, intended to govern the next GRC, as well
as other matters — such as the future marginal cost proceeding and the determination of the
Company's selected avoided resources in setting marginal cost—the City recognizes the decisions
in this docket will be impactf il.
BOISE CITY'S ASSESSMENT OF THE COMPANY'S PROPOSAL
In its direct testimony,the Company asks the Commission to(1) establish a framework for
evaluating cost-of-service methods; (2) direct the Company to use the Peak and Average
CITY OF BOISE CITY'S COMMENTS - 5
Embedded Method ("PAEM") with the GRM in its next GRC; and (3) recognize that the GRM
supports implementation of HB 911 and Idaho Code § 61-335. Anderson Direct at 4.
A. The City Finds Areas of Agreement with the Company's Proposal but Concerns Remain
With the qualifications noted in these comments,the City supports pairing the PAEM with
the GRM. The PAEM is an improvement over the Company's prior CCOS methodology because
it looks more closely at how the system actually operates and dispatches, and it assigns costs to
customer classes based on their interaction with the grid. It recognizes that production plant serves
both peak demand and year-round energy needs. Anderson Direct at 7. The GRM, in turn,
recognizes the role of growth in new investment while keeping shared system costs shared. Id. at
8. Together, and with appropriate customer-specific cost treatment, the two methods provide a
reasonable framework for addressing the full cost of serving NLLs that Idaho Code § 61-335(4)(b)
requires.
The City also agrees that the GRM's application to all growing classes, not only NLLs, is
a strength. Because it measures growth at the class level, it appears to treat customers consistently
and avoids singling out any one customer type,which supports its durability and defensibility. The
approach also follows the principle of gradualism; it moves classes in the right direction without
the rate shock that an abrupt change in methodology could cause.
Generally, the Company's modeling results with the PAEM + GRM show movement in
the right direction.The residential class's forecasted increase in collected revenues falls from 14.42
percent under the 2025 methodology to 12.78 percent under the PAEM + GRM, and special
contract customers move collectively from an 8.26% reduction to 4.16% reduction in collected
revenues. Figure 3, Allen Errata to Direct at 35. While the outcomes vary by individual special
contract, for two of the Company's largest and higher load factor customers, revenue collection
CITY OF BOISE CITY'S COMMENTS - 6
would increase. Micron would move from a .72% reduction in revenue collection under the 2025
CCOS methodology to a 2.01% increase with the PAEM + GRM method. Similarly, DOE/INL
would move from a 3.84% increase to 6.49% with the PAEM + GRM method. Allen Errata to
Direct at 35. The City views these results as directionally accurate. Not simply because it
represents a comparative decrease to the residential class and an increase to special contracts, but
because it allocates the costs to the classes causing the costs. The hourly-informed model would
result in an increase to the residential class of 7.49% and an increase to the special contracts of
12.79% (compared to a reduction of 8.26%under the 2025 CCOS). See Application at 22, Figure
1.For reasons to be discussed in more depth to follow,the City believes the hourly-informed model
provides an important data point regarding system costs at the time of class consumption.
Therefore, while directionally correct compared to the 2025 CCOS, the PAEM + GRM may not
fully capture and allocate the costs associated with large customers.
B.Additional Customer Protections Warrant Further Discussion & Inclusion
The Company describes the GRM as working alongside, not in place of, the service
contract, no-harm test, and comprehensive cost study required for each NLL. The City agrees that
a CCOS methodology is only one tool but cautions against assuming that these other protections
are sufficient as currently designed. They have not yet been applied to a single NLL contract under
Idaho Code § 61-335, and they will need to be evaluated and refined alongside the CCOS
framework. The City offers specific ideas on this point in its additional considerations below.
C. This Docket Offers a Unique Opportunity to Have Enduring Impact
The City notes that this is not a standard docket. This case asks the Commission to set the
framework that will govern cost allocation through a period of unprecedented growth—and do so
outside the GRC context, where details of CCOS are often one factor among thousands of others
CITY OF BOISE CITY'S COMMENTS - 7
being evaluated,reviewed,and debated. This"study"docket of sorts offers the opportunity to truly
and fully review the issue as an independent matter, and this venue has even more import because
the Company asks the Commission to direct it to use the resulting framework in its next GRC.
Anderson Direct at 4. The Commission infrequently uses stand-alone, issue-focused dockets in the
way other state commissions use "investigative" dockets to establish new policy or frameworks,
which makes the record developed here particularly important.
The City looks forward to considering other parties' input. Based on what the Company
has presented, the PAEM and GRM appear to more fairly allocate growth-related costs to the
classes causing the growth than the current method,but the framework will likely need evaluation
and refinement in future GRCs as conditions diverge from what the Company modeled. The City
encourages the Commission to have a clear sense of those tradeoffs, and of the consequences for
each rate class when actual growth departs from the forecast, before approving a framework.
QUESTIONS AND REQUESTS FOR CLARIFICATION
The City requests that the Company address the following questions in its January 13,
2027, written testimony. For each topic, the City explains why the answer matters to the
Commission's decision.
A. Hourly-Informed Analysis as a Supplemental Tool
The City generally agrees that the PAEM is a reasonable way to allocate production costs.
The City raises hourly analysis not to advocate for a stand-alone Hourly-Informed method, but
because of what hourly data can add. The Company presented an Hourly-Informed study as one
of four alternatives in its petition, and stakeholders raised the need for hourly or more granular
data in the Company's pre-filing discussions. Notice of Petition, Order No. 36998; Petition at 14-
19, 27-29. Parties in the Company's last GRC likewise urged development of an hourly CCOS.
CITY OF BOISE CITY'S COMMENTS - 8
Order No. 36892 at 7. The Company now declines to adopt the Hourly-Informed method on a
stand-alone basis because it allocates capacity costs by energy use and requires extensive data and
modeling. Allen Direct at 21.
The value of hourly analysis is that it reduces the need for judgment calls when classifying
demand and energy and when applying allocation factors. Any classification of production costs
between demand and energy, whether 50150, 70/30, or otherwise, reflects a judgment about how
the system functions. The hourly-informed method can show how the system actually dispatches,
hour by hour, and so can ground those judgments in evidence. Metering and modeling capabilities
have evolved to a point where the justifications for using proxies such as energy and demand
classifications or coincident peak allocators have been reduced. The City appreciates the concern
about modeling burden, but notes that the Company already manages large, complex data sets in
its IRP modeling, and that a CCOS study is performed at most once a year. The City asks:
1. Could some more targeted application of hourly data be used within the PAEM, for
example to inform the split between demand- and energy-classified production costs,
or in another hybrid form, rather than as a stand-alone method?
2. Could hourly analysis help allocate costs to large, high-load-factor customers whose
usage patterns differ sharply from those of existing classes?
3. Would the Company support preparing an hourly-informed study as a supplemental
check in future GRCs, so the Commission can see whether the PAEM's classification
remains consistent with how the system operates as NLLs come online?
B. GRM Design
While generally intrigued by development of the GRM approach, the City has concerns
with its use of blended growth-weighted factors. As the City understands the proposal, growth-
CITY OF BOISE CITY'S COMMENTS - 9
related costs are not assigned directly to the classes whose growth drove them; instead, they are
allocated through factors that blend embedded and growth weightings.Allen Direct at 32.Blending
dilutes the growth signal that is the GRM's reason for being. In the Company's hypothetical 300
MW NLL example,the NLL does not bear the full $219 million of incremental generation-related
cost it would add. Id. at 38. HB 911,by contrast, requires that an NLL fund its full cost of service,
including its share of generation,transmission, substation, and distribution investments that would
not be required but for the new large load. Idaho Code § 61-335(4)(b).
Other jurisdictions have adopted more direct approaches. In Oregon, the Public Utility
Commission ("OPUC") created a dedicated rate class for large-load data centers served by
Portland General Electric ("PGE") so that those customers' rates reflect the costs their growth
drives, and, as such, the OPUC authorized PGE to implement minimum generation and
transmission demand charges at 90 percent of contracted capacity. Order No. 26-154, OPUC
Docket No. UM 2377 (May 7, 2026). The City does not ask the Commission to adopt any other
state's method, but these examples show that growth-driven costs can be assigned more directly
than the GRM proposes. The City inquires as follows:
1. The City understands that the blending may be intended to ensure gradualism but is
not yet persuaded that this rationale justifies departing from more direct assignment.
Why, then, are growth-related costs allocated through blended growth-weighted
factors rather than assigned directly to the classes whose growth drove them? The
City asks so the Commission can judge whether the blending reflects cost causation
or a policy choice, and so that the Commission can ensure it is in full compliance
with the intent and spirit of HB 911.
CITY OF BOISE CITY'S COMMENTS - 10
2. If the blending is intended to moderate rate impacts, how was the balance between
embedded and growth weighting chosen, and could gradualism instead be achieved
through rate spread, leaving the allocation itself to reflect cost causation?
3. How does the 300 MW NLL example, in which the NLL does not bear the full $219
million of incremental generation cost, comport with the "but for" standard in Idaho
Code § 61-335(4)(b)?
4. How sensitive are the results to the measurement period, the $2 million project
threshold, and the share of investment classified as growth-related(about 24 percent
in the historical analysis)? The City asks the Company to provide sensitivity runs,
because a framework intended to last must hold up under the far higher growth the
IRP forecasts.
ADDITIONAL CONSIDERATIONS FOR THE COMMISSION
A. Transparency and Repeatability
The Company states that its framework reconciles to the revenue requirement and is
documented well enough for parties to review and test in future cases. The City agrees that this
level of transparency is essential so that the framework can be applied consistently from one GRC
to the next and asks the Commission to make it a condition of any approval. The Company should
file the GRM growth calculations, allocation factor workpapers, and reconciliation to revenue
requirement in each GRC. This will support the review of NLL rates and cost recovery that Idaho
Code § 61-335(7)requires in each general rate case.
B. Terms of Service for NLLs
The GRM addresses cost allocation. Full compliance with HB 911,however, also depends
on the terms of service for NLLs,because the risks that large loads present extend beyond cost of
CITY OF BOISE CITY'S COMMENTS - 11
service: loads may ramp more slowly than contracted, never materialize, or leave before the
investments made to serve them are recovered. HB 911 requires financial security to cover the risk
of stranded or unrecoverable costs, in a form and amount the Commission sets. Idaho Code § 61-
335(6). Today,those terms are negotiated contract by contract.A standardized tariff—which could
set terms while leaving precise rates to special contracts — would set the baseline in advance, so
that protections do not depend on the negotiating leverage of any single customer.
Other states have adopted or are actively considering standardized large-load tariff
provisions that protect both customers and the utility while preserving the option of individual rate
classes for the largest customers. In Ohio, for example, the Public Utilities Commission approved
a data center tariff that requires new data centers above 25 MW to pay for at least 85 percent of
their contracted capacity for up to 12 years, including a four-year ramp period, with an exit fee
equal to three years of minimum charges and collateral requirements. PUCO Case No. 24-508-EL-
ATA, Opinion and Order(July 9, 2025).
In Indiana, the Indiana Utility Regulatory Commission approved a settlement among
Indiana Michigan Power, the state consumer counselor, data center developers, and consumer
advocates that applies to new loads of 70 MW or more (or 150 MW in aggregate). It requires
contracts of at least 12 years plus up to a five-year ramp, a minimum monthly demand charge of
80 percent of contract capacity, exit fees for reductions above 20 percent, and collateral for
customers that do not meet credit requirements. That Commission added that any reduction of
more than 20 percent must come to it for approval. IURC Cause No.46097, Order(Feb. 19,2025).
Virginia's State Corporation Commission created a separate GS-5 rate class for Dominion
customers of 25 MW or more, effective January 1, 2027. GS-5 customers must sign 14-year
contracts with minimum charges of 85 percent of contracted transmission and distribution demand
CITY OF BOISE CITY'S COMMENTS - 12
and 60 percent of generation demand, and post collateral. Va. SCC Case No. PUR-2025-00058,
Final Order(Nov. 25, 2025).
Oregon's order for PGE,discussed above,likewise includes minimum demand charges and
long-term contract commitments. Similar proposals are pending elsewhere. In Colorado, Xcel
Energy has proposed a large-load tariff for new loads of 50 MW or more that would include
minimum monthly bills and early-termination charges. Colorado PUC Proceeding No. 26AL-
0137E.
Drawing on these models, a standard NLL tariff could include:
1. Minimum contract terms and exit fees;
2. Minimum billing demand(take-or-pay)provisions;
3. Load ramp schedules and minimum service requirements;
4. Collateral and credit requirements; and
5. Revisions or additions to contributions in aid of construction("CIAC") for customer-
specific facilities.
The City encourages the Commission to consider the merits and value of a standardized
NLL tariff with broader protections that would complement individual special contracts and
associated pricing, rather than leaving these elements to be negotiated contract by contract.
Idaho Code § 61-335(4) requires the Commission to approve or deny each NLL service
contract within 270 days. Settling the baseline terms before those contracts arrive would make
each review faster and more consistent. The Commission could explore these elements in this
docket or in a separate one, as a reasonable path to ensuring compliance with HB 911.
CITY OF BOISE CITY'S COMMENTS - 13
CONCLUSION
The City appreciates the opportunity to comment on the Company's petition and testimony
and looks forward to reviewing the comments and proposals of other parties. Generally, the City
supports the direction of the Company's proposal to pair the PAEM with the GRM,but its support
is preliminary and depends on the answers to the questions above, which the City hopes the
Company will address in its January 13, 2027, written testimony.
The City looks forward to ongoing work and discussion in this proceeding,and summarizes
its desire for this matter to result in:
1. An enduring and replicable CCOS framework that fairly allocates costs to all customers,
including NLLs, and carefully manages the risk of shifting costs to existing customers;
2. Continued consideration of alternatives, including hourly-informed analysis as a
supplemental tool and more direct alternatives to the GRM's blended factors;
3. Ongoing transparency and the ability to refine the framework over time, supported by the
Company's filing of the GRM calculations, workpapers, and reconciliation to revenue
requirement in each GRC; and
4. A process, in this docket or a separate one, to consider standardized NLL tariff provisions
in advance of the NLL service contracts that Idaho Code § 61-335 will bring before the
Commission.
Finally, the City emphasizes that the outcome of this case carries particular weight. The
Company asks the Commission to direct it to use the PAEM with the GRM in the next GRC, so
the framework approved here will not remain a theoretical study result. Rather, it will shape the
CITY OF BOISE CITY'S COMMENTS - 14
rates that every customer class pays during a period of unprecedented load growth. As such, it is
essential that the outcome in this case be fair,just, reasonable, and grounded in cost causation.
The City of Boise City is grateful to the Commission, Commission Staff, the Company,
and all parties for their thoughtful engagement in this important process and looks forward to
continuing to work together toward an outcome that serves all of Idaho Power's customers.
DATED this 25th day of November 2026.
Ed Jewell, Deputy City Attorney
CITY OF BOISE CITY'S COMMENTS - 15
CERTIFICATE OF SERVICE
I hereby certify that I have on this 25th day of November 2026, served the foregoing
documents on all parties of record as follows:
Monica Barrios-Sanchez ❑ U.S. Mail
Commission Secretary ❑ Personal Delivery
Idaho Public Utilities Commission ❑ Facsimile
11331 W. Chinden Blvd., Ste. 201-A Q Electronic
Boise, ID 83714 ❑ Other:
secretga&puc.Idaho.gov
Erika K. Melanson ❑ U.S. Mail
Deputy Attorney General ❑ Personal Delivery
Idaho Public Utilities Commission ❑ Facsimile
11331 W. Chinden Blvd., Ste. 201-A Q Electronic
Boise, ID 83714 ❑ Other:
erika.melanson&puc.idaho.gov
Megan Goicoechea Allen ❑ U.S. Mail
Lisa Lance ❑ Personal Delivery
Idaho Power Company ❑ Facsimile
PO Box 70 Q Electronic
Boise, ID 83707 ❑ Other:
mgoicoecheaallen(k idahopower.com
llance(d),idahopower.com
dockets(kidahopower.com
Timothy Tatum ❑ U.S. Mail
Grant T. Anderson ❑ Personal Delivery
Idaho Power Company ❑ Facsimile
PO Box 70 Q Electronic
Boise, ID 83707 ❑ Other:
ttatum(&,idahopower.com
ganderson&idahopower.com
Eric L. Olson ❑ U.S. Mail
Echo Hawk& Olson, PLLC ❑ Personal Delivery
PO Box 6119 ❑ Facsimile
505 Pershing Avenue, Ste. 100 Q Electronic
Pocatello, ID 83205 ❑ Other:
elo(d),,echohawk.com
taysha(k echohawk.com
CITY OF BOISE CITY'S COMMENTS - 16
Lance Kaufman, Ph.D. ❑ U.S. Mail
Deborah Glosser, Ph.D. ❑ Personal Delivery
2623 NW Bluebell Place ❑ Facsimile
Corvallis, OR 97330 Q Electronic
lance&ae isg insi hg t.com ❑ Other:
deborah. log sser(cgmail.com
Courtney White ❑ U.S. Mail
Mike Heckler ❑ Personal Delivery
Clean Energy Opportunities for Idaho ❑ Facsimile
3778 Plantation River Drive, Suite 102 Q Electronic
Boise, ID 83703 ❑ Other:
courtneygcleanenergyopportunities.com
mike@cleanenergyo]2]2ortunities.com
Kelsey Jae ❑ U.S. Mail
521 E 415t Street#506 ❑ Personal Delivery
Garden City, ID 83714 ❑ Facsimile
kelseykkelseyjae.com Q Electronic
❑ Other:
Northwest Energy Coalition ❑ U.S. Mail
c/o Benjamin J. Otto ❑ Personal Delivery
1407 W Cottonwood Crt. ❑ Facsimile
Boise, ID 83702 Q Electronic
ben(cnwenergy.org ❑ Other:
Lauren McCloy ❑ U.S. Mail
Derek Goldman ❑ Personal Delivery
Northwest Energy Coalition ❑ Facsimile
lauren(a),nwenergy.org Q Electronic
derek(knwenerg_y org ❑ Other:
Peter J. Richardson ❑ U.S. Mail
Richardson Adams, PLLC ❑ Personal Delivery
515 N 271h Street ❑ Facsimile
Boise, ID 83702 Q Electronic
peter(krichardsonadams.com ❑ Other:
Emily W. Medlyn ❑ U.S. Mail
Jelani A. Freeman ❑ Personal Delivery
U.S. Department of Energy ❑ Facsimile
1000 Independence Ave, SW Q Electronic
Washington, DC 20585 ❑ Other:
emily.medly(d),,hq.doe.gov
'elani.freeman h .doe. ov
CITY OF BOISE CITY'S COMMENTS - 17
Dwight Etheridge ❑ U.S. Mail
Exeter Associates, Inc. ❑ Personal Delivery
10480 Little Patuxent Parkway, Suite 300 ❑ Facsimile
Columbia, MD 21044 Q Electronic
detheridgegexeterassociates.com ❑ Other:
Austin Rueschhoff ❑ U.S. Mail
Thorvald A. Nelson ❑ Personal Delivery
Richard A. Arnett ❑ Facsimile
Holland& Hart, LLP Q Electronic
551 17t' Street, Suite 3200 ❑ Other:
Denver, CO 80202
darues chhoff khollandhart.com
tnelson(d,hollandhart.com
raarnett(khollandhart.com
aclee(d),hollandhart.com
tlfriel&hollandhart.com
Thomas J. Budge ❑ U.S. Mail
Racine Olson PLLP ❑ Personal Delivery
PO Box 1391 ❑ Facsimile
Pocatello, ID 83204-1391 Q Electronic
tj&racineolson.com ❑ Other:
Ethan Waltermire ❑ U.S. Mail
Ruveon, LLC ❑ Personal Delivery
PO Box 816 ❑ Facsimile
Soda Springs, ID 83276 Q Electronic
ethan.waltermire&ruveon.com ❑ Other:
Brian C. Collins ❑ U.S. Mail
Greg Meyer ❑ Personal Delivery
Brubaker& Associates ❑ Facsimile
16690 Swingley Ridge Rd#140 Q Electronic
Chesterfield, MO 63017 ❑ Other:
bcollins(d,consultbai.com
gmeyer(k consultbai.com
Michelle Steel,
Paralegal
CITY OF BOISE CITY'S COMMENTS - 18