HomeMy WebLinkAbout20261119Staff Comments.pdf RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
JEFFREY R. LOLL
DEPUTY ATTORNEY GENERAL
IDAHO PUBLIC UTILITIES COMMISSION
PO BOX 83720
BOISE, IDAHO 83702
(208) 334-0357
IDAHO BAR NO. 11675
Attorney for the Commission Staff
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER )
COMPANY'S APPLICATION FOR ) CASE NO. IPC-E-26-27
APPROVAL OF MODIFICATIONS TO THE )
COMPANY'S INTERCONNECTION RULES )
FOR CUSTOMER DISTRIBUTED ENERGY ) COMMENTS OF THE
RESOURCES, SCHEDULE 68 ) COMMISSION STAFF
COMMISSION STAFF ("STAFF") OF the Idaho Public Utilities Commission
("Commission"), by and through its attorney of record, Jeffrey R. Loll, Deputy Attorney General,
submits the following comments.
BACKGROUND
On September 25, 2026, Idaho Power Company ("Company") applied to the Commission
requesting an order approving proposed modifications to its Schedule 68, Interconnections to
Customer Distributed Energy Resources ("Schedule 68") for rules and procedures governing
customer-owned distributed energy resource interconnections ("Application"). The Company
requests an order approving the proposed modifications by December 31, 2026.
Specifically, the Company proposed modifications to Schedule 68 that would establish a
technology-neutral, streamlined optional registration process("ORP") for certain small distributed
energy resource ("DER") systems. Application at 5.
The proposed ORP would be available to residential and small general service customers
with inverter-based DER systems that: (1) have an aggregate nameplate capacity not exceeding
STAFF COMMENTS 1 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
400 Volt-Amps Alternating Current ("watts-AC"); (2) do not include an energy storage device;
(3) comply with applicable nationally recognized safety and interconnection standards, as well as
other applicable Company technical requirements; and (4) take service on a standard service
schedule, under which energy exports are not eligible for compensation. Customers participating
in the ORP would remain subject to the provisions of Schedule 68 necessary to maintain the safety
and reliability of the Company's electric system, including requirements governing disconnection
equipment, system modifications, unauthorized installations and expansions, and unauthorized
inadvertent exports. Id. at 5-6, 8.
The ORP would also be available for like-for-like inverter replacements,where a customer
replaces an existing inverter with one of the same make, model, and capacity without modifying
the underlying generation system. Id. at 8-9.
The Company also proposed adding Schedule 5 customers to the category of non-exporting
systems with a Total Nameplate Capacity of less than 25 kilovolt-amps. This revision clarifies the
applicability of Schedule 68 and aligns the tariff with the Company's intended treatment of
Schedule 5 customers. Application,Attachment 1,Proposed Schedule 68 (Clean and Legislative),
at 68-15.
Finally, the Company proposed several conforming revisions to Schedule 68 to align the
requirements applicable to both customers using the ORP and those using the existing Customer
Generator Application process. In addition, the Company proposed minor clarifying and clerical
revisions, including non-substantive pagination, numbering, and formatting updates identified
during preparation of the Application. Application at 8-9.
STAFF ANALYSIS
Staff reviewed the Application and the responses to Production Requests. To inform its
review, Staff also examined legislation recently enacted in other states related to small residential
Plug-in Photovoltaic ("PIPV") DER systems and publicly available information regarding the
evolving market for these systems.
ORP Eligibility Criteria
In its proposed revisions to Schedule 68, the Company referred to the ORP as the
"Customer Generator Registration Process" and proposed specific eligibility criteria that
STAFF COMMENTS 2 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
customers must satisfy to utilize the streamlined process. The specific language proposed by the
Company is:
"Customers with DERs that meet one of the following eligibility requirements may
use the Customer Generator Registration Process:
• Inverter based systems without Energy Storage Devices where the aggregate
Total Nameplate Capacity of all DERs behind the Customer's meter does not
exceed 400 [watts-AC] and where the Customer has active and continues to
take metered service under Schedules 1, 5, or 7.
• Like-For-Like Inverter Replacements."
Application, Attachment 1, Proposed Schedule 68 (Clean and Legislative) at 68-11.
Staff reviewed the proposed eligibility criteria for inverter-based DER systems and
recommends modifications to two of the requirements. Specifically, Staff recommends permitting
the use of Energy Storage Devices("ESD")behind the inverter and increasing the Total Nameplate
Capacity threshold to 880 watts-AC. Staff is concerned that retaining the proposed limitations
may significantly limit customer participation in the ORP and reduce the potential benefits of the
program. Staff s recommendations are discussed in the sections below.
Energy Storage Devices
The Company proposes to allow the ORP to be used for"[i]nverter based systems without
Energy Storage Devices . . . ." Id. (emphasis added). Staff believes this prohibition will limit the
ability of PIPV systems to offset grid imports and is unnecessarily restrictive.
An ESD allows energy to be stored when it is plentiful and used later when energy is scarce.
Because PIPV systems generate electricity only when sunlight is available, customers can offset
their electricity consumption only during periods when the system is producing energy. But if the
customer adds an ESD to a PIPV system, the surplus energy from periods of solar production can
be stored in the ESD and then used to offset consumption when the system is not producing
electricity. Figure No. 1 below portrays this concept.
STAFF COMMENTS 3 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
Figure No. I —How an ESD Can Maximize Energy Offset'
Atypical day
12:00 am
Night the grid covers what is left,as before.
s
Your home's use
Extra solar
charges tho battery
Grid
From the grin
12 am 6am 12 pm 6pm 12 am
This principle holds true regardless of the system size. The important idea is that ESDs
give a customer the opportunity to more effectively consume their solar production and offset a
greater portion of their electricity consumption.
Staff also believes that there is no meaningful difference to the grid whether the power
source is a PIPV or an ESD, as long as the power source feeds through a smart inverter. Both
sources produce 12-volt direct current ("DC") that the smart inverter converts to 120-volt
alternating current ("AC"). The smart inverter will provide the same protection to the grid,
regardless of the two types of sources.
When asked why it did not allow ESDs for the ORP, the Company replied that elsewhere
in Schedule 68, it prohibits ESDs from exporting onto its system unless taking service under
Schedules 6,8,or 84.Response to Staff Production Request No. 12. Staff believes that the relevant
language in Schedule 68 can be amended, so the primary question is whether it is reasonable to
allow small ESDs to export energy just as small PIPVs are being allowed to export energy. The
Company did not address this issue. Staff believes there is no meaningful difference between a
12-volt DC PIPV and a 12-volt DC ESD with respect to the small, infrequent exports that might
occur from these systems. Behind the smart inverter, both energy sources look the same from the
grid's perspective.
'Figure No. 1 obtained from Craftstrom,a PIPV and ESD product vendor,How Plug-In Solar Works, Section: Your
Home Uses Solar First at hitps:Hcraftstrom.com/how-it-works/(last visited November 16,2026).
STAFF COMMENTS 4 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
The Company also said that an ESD would require additional review (i.e., greater review
than for a standalone PIPV). Id. The Company did not provide an explanation. Staff also could
not identify any reasons why a small system that combines PIPV and ESD technologies behind a
common inverter should be subject to a materially different review process than a similarly sized
PIPV-only system.
Staff also surveyed the current PIPV marketplace, such as Craftstrom Solar Idaho, and
observed that PIPV systems are sold with and without ESDs.2 Staff believes the option of
combining PIPV with an ESD adds meaningful benefit to customers purchasing a PIPV and that
this option will continue to be offered widely. Therefore, Staff recommends that the Schedule 68
language be amended to allow small plug-in ESDs, or PIPV-ESD combinations, to be eligible for
the ORP.
400 watts AC Capacity Limit
Staff also disagrees with the Company's proposed 400 watts-AC limit for "the aggregate
Total Nameplate Capacity of all DERs behind the Customer's meter." Application, Attachment
1,Proposed Schedule 68 (Clean and Legislative) at 68-11. (Note: Because volt-amps and watts are
essentially interchangeable at this scale, Staff will generally refer to the units as watts for the
balance of these comments.) Staff believes a better threshold would be 880 watts.
The 400-watt threshold is a significant issue, because it affects the practical usefulness of
the streamlined ORP to customers. Thresholds from 391 watts to 1,920 watts are being considered
by other states and regulatory authorities. Response to Staff Production Request No. 3. The high
thresholds put more emphasis on reducing the regulatory burden on customers, while the low
thresholds err on the side of customer safety and grid safety. The Company provided four reasons
why it proposed a 400-watt limit:
1. emerging safety standards;
2. approaches used in other jurisdictions;
3. industry opinion; and
4. products currently available on the market.
Id.
2 Craftstrom Idaho, The Products, The Smart Battery, https://www.craftstromidaho.com/products (last visited Nov.
16,2026).
STAFF COMMENTS 5 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
Staff reviewed these justifications and believes the Company's position is too conservative
based on: (1) product availability, (2) the underlying safety principles, and (3) the thresholds
chosen by other jurisdictions.
Regarding product availability,the Company provided a list of companies currently selling
residential PIPV systems. Response to Staff Production Request No. 3 — Attachment 2. After
reviewing the websites of these companies, 3,4,5,6,7 most of the products available in the market
exceed the proposed 400-watt threshold. This review suggests that the market may be trending
toward systems which are consistent with the higher PIPV capacity thresholds adopted by several
state legislatures in 2026. Staff believes there is very little value in the Company creating the ORP
to reduce regulatory burden for customers, if most PIPV systems available for prospective
customers to purchase will not qualify. Therefore, to better align the ORP with products currently
available on the market, Staff recommends an eligibility threshold of 880 watts-AC, equivalent to
a typical two-panel configuration$. Staff believes this threshold better aligns with current market
offerings and supports broader customer participation in the ORP.
Regarding safety principles, Staff believes it's important to distinguish between the grid
backfeed risk, and all the other risks, which are downstream of the meter and primarily affect the
homeowner, not the Company. Every generator attached to the home can potentially backfeed
onto the grid and endanger Company linemen. However, smart inverters are able to sense if the
grid is de-energized, and can quickly disconnect power from the generator to the grid, eliminating
the backfeed risk. Smart inverters are standard on DERs now, and Schedule 68 requires smart
inverters for all customer generator systems. Application, Attachment 1, Proposed Schedule 68
(Clean and Legislative) at 68-7. Staff believes this adequately resolves this safety concern.
3 Rowkin Energy,Plug-In Solar Kits,https://rowkin.com/shop/rowkin-solo-420w-plug-in-solar-kit(last visited Nov.
12,2026).
4 Craftstrom Solar,https:Hcraftstrom.com/product/800-watt-eco-line-plugplay-solar/,800 Watt Eco-Line I Plug&Play
Solar,(last visited Nov. 12,2026).
5 PluggedSolar, Grid-Tie Solar, Plug and Play Solar Panel Power with 800 DC-Watt Inverter,
https://pluggedsolar.com/,(last visited Nov. 12,2026).
6 US Solar Supplier, Plug In Solar Kits, htt2s://ussolarsUj2lier.com/collections/pluiz-in-solar-kits (last visited Nov.
12,2026).
Mango Power, Mango Power S 120V 120OW Plug-In Solar Kit with Zero-Export Gateway,
https://www.mangopower.coM products/mango-power-s-pipv-1200w-kit?srsltid=AYCX9vK3oGdPSGpmwBugAo-
JSyB1CpeiMRw,ugEbJRitt4SMumE0dFHnP,(last visited Nov. 12,2026).
8 For purposes of these Staff Comments,a"two-panel configuration"refers to a photovoltaic("PV")system
consisting of two solar modules electrically connected together and functioning as a single PV array.See National
Fire Protection Association,NFPA 70,National Electrical Code,Article 100,definition of"Photovoltaic Array."
STAFF COMMENTS 6 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
Regarding all the other safety risks downstream of the meter, the primary concern is
whether the PIPV system will overload a typical 15-amp house circuit. The Company estimates
that a 420-watt PIPV will generate a maximum current of 3.5 amps. Response to Staff Production
Request No. 3. This is well below the safe current-carrying capacity of the 15-amp circuit. Staff
believes that doubling the DER capacity threshold to 880 watts would still keep the maximum
current to less than 7.5 amps,which is still well below the circuit limit. For a perspective reference,
Staff notes that a typical electric teapot or hair dryer uses 1,500 watts and draws approximately
12.5 amps. Therefore, with regard to safety, Staff believes it is reasonable to elevate the DER
capacity threshold to 880 watts.
All the other safety concerns described by the Company, including the still-pending
National Electric Code ("NEC") and Underwriters Laboratory standards, are actively being
resolved and will address issues that are primarily the homeowners' concern, not the Company's.
The Company has also modified Schedule 68 to include additional language to indemnify itself
from liability if the customer DER causes loss or injury. Application, Attachment 1, Proposed
Schedule 68 (Clean and Legislative) at 68-7.
Finally, Staff notes that many other state jurisdictions are setting the DER capacity
threshold at 1,200 watts or higher. Staff s research determined that at least eight states have
enacted plug-in solar laws that set the upper threshold at 1,200 watts, and a ninth state, Colorado,
has enacted a 1,920-watt cap.9
In summary, considering the product availability,the abundant safety, and the limits being
set by other states, Staff believes it is too conservative for the Company to set the cap at 400 watts,
and proposes that the Commission approve an 880-watt threshold.
Continue Metered Service Under Schedules 1, 5, or 7
Staff agrees with the Company's proposal to require users of the ORP to continue metered
service on Schedules 1, 5, and 7. Application at 8. For reference, Schedule 1 is the Standard
Residential Service plan, Schedule 5 is the Residential Time-Of-Use plan, and Schedule 7 is the
Small General Service plan. These plans are distinguished from Schedules 6 and 8,which are the
Residential and Small General Service On-Site Generation schedules. Participation in Schedules
9 Colorado Revised Statutes§40-2-140(1)(e)(I).
STAFF COMMENTS 7 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
6 and 8 includes the right to be compensated for energy exports in accordance with the Export
Credit Rate.
If a customer wants to be compensated for energy exports to the grid, the customer must
forego the streamlined ORP and instead use the current application process for on-site generation
systems. Staff believes this is reasonable and consistent with the purpose of each interconnection
process.
Like-For-Like Inverter Replacement
Staff agrees with the Company's proposal to allow the ORP to be used when a customer
wants to replace an existing inverter with a like-for-like inverter. Schedule 68 defines this as "an
inverter of the same make, model, and capacity, without making any additional system
modifications." Application, Attachment 1, Proposed Schedule 68 (Clean and Legislative) at 68-
3. Staff believes this situation typically occurs when an on-site generator's inverter fails and the
inverter must be replaced,usually via manufacturer's warranty. As currently written, Schedule 68
considers the inverter replacement a "system modification" and requires that the full application
process be followed. Staff believes the Company's proposal reasonable and supports allowing use
of the ORP in these circumstances.
Additional Modifications to Schedule 68
The Company proposed several additional modifications to Schedule 68 to facilitate
implementation of the ORP and ensure the consistent application of safety and reliability
requirements regardless of whether a customer interconnects through the ORP or the existing
Customer Generator Application process. The proposed revisions addressed requirements related
to disconnection equipment, system modifications,unauthorized installations and expansions, and
unauthorized inadvertent exports. Application at 8. Staff reviewed these proposed modifications
and did not identify any concerns regarding their implementation. Accordingly, Staff recommends
approval of the proposed alignment revisions to Schedule 68.
The Company also corrected several minor clerical errors in Schedule 68 that it identified
during preparation of the Application. The Company stated that the revisions address minor
clerical errors identified during preparation of the Application and are non-substantive in nature.
Application at 9. Staff s review did not identify any clerical error corrections that appear to affect
STAFF COMMENTS 8 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
the substantive provisions of Schedule 68. Accordingly, Staff recommends approval of the
proposed clerical corrections.
Customer Education
The Company intends to create customer awareness for the new residential PIPV ORP
through its website, application materials, and direct assistance from Company representatives.
Response to Staff Production Request No. 2. The Company's website will describe the eligibility
criteria, outline the process, and explain key considerations to help customers determine whether
their on-site generation system qualifies for the ORP or another interconnection option. Id.
The Company also plans to update its online application form to incorporate the ORP. Id.
The form will use information provided by customers to help identify the appropriate
interconnection pathway and notify eligible customers of the registration option. The updated
online application is anticipated to be available late in the first quarter or early second quarter of
2027. Id.
Until the updated application form is available, the Company will provide interim
registration guidance through its website and registration form. Id. Company representatives will
also be available to assist customers in identifying the appropriate interconnection pathway,
obtaining the required form, and completing the process. Id.
As portable solar technology continues to evolve and gain public attention, the Company
will update its website and other customer-facing materials 10 to explain the current state of the
technology,applicable safety considerations,and the requirements these systems must meet before
interconnecting with the Company's electric system. Response to Staff Production Request No.
1. The Company will continue to provide customers who inquire about plug-in solar with a copy
of the 2014 Product Safety Bulletin,issued by the Idaho Division of Occupational and Professional
Licenses (formerly the Idaho Division of Building Safety). Id. The bulletin cautions consumers
about potential hazards of "devices [that] are generally marketed as Plug and Play Grid Tie
Inverters". Response to Staff Request No. 1, Attachment 1. Additionally, it advises customers to
consult with their utilities, electrical inspector, and to employ a licensed electrician or certified
10 Customer-facing materials include presentations the Company provides to various groups and an installer
newsletter. If the state of Idaho issues updated guidance, Idaho Power will revise its website and customer-facing
materials accordingly and provide the updated guidance directly to customers,as appropriate.
STAFF COMMENTS 9 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
installer to ensure their on-site generation systems meet applicable electrical codes and safety
requirements. Id.
Staff supports the Company's proposed customer awareness strategy because it will
provide customers with information regarding eligibility criteria and key considerations to help
the customer determine whether their on-site generation system qualifies for the ORP or another
interconnection option.
ORP and PIPV DER Reporting
The Company acknowledged it would be beneficial to monitor developments in small
PIPV DER technology,applicable codes and standards,market availability,and customer adoption
to determine whether future revisions to Schedule 68 may be appropriate. Specifically, the
Company intends to monitor:
a. codes and standards, including developments related to Underwriters Laboratories
Outline of Investigation 3700 ("UL 3700") and revisions to the NEC;
b. product specifications and technology, including portable solar system size, UL 3700
Listing, integrated power control systems, and other technological developments that
may affect customers or the electric system;
c. market availability of portable solar products and changes in how these products are
packaged, marketed, and installed;
d. unauthorized systems, including the number of portable solar systems identified and,
when known, their make, model, and size; and
e. authorized systems and use of the ORP, including the number and capacity of
authorized portable solar systems and the number of customers utilizing the ORP.
Response to Staff Request for Production No. 7.
Staff recommends that the Commission direct the Company to provide annual reporting on
the topics identified above to support ongoing evaluation of the ORP and to identify trends that
may inform future revisions to Schedule 68. Staff agrees with the Company that such reporting
could be reasonably incorporated into the Company's annual DER Report, which is filed on or
before April 1 of each year. Id.
STAFF COMMENTS 10 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
CUSTOMER COMMENTS
The Commission set a public comment deadline for November 19, 2026. As of noon on
November 19, 2026, twenty-nine (29) public comments had been submitted supporting greater
flexibility in the use of residential plug-in-solar systems. Although some of the comments included
individual introductory statements,twenty-eight(28) of the twenty-nine(29) comments contained
identical pre-written verbiage requesting changes to Idaho Power's proposed Optional Registration
process.11
The commenters support the Company's proposal but believe the proposed requirements
for small systems under 400 watts are too restrictive. They requested three changes:
I. Idaho Power should establish a registration framework that allows plug-in solar
systems up to 1,200 watts,with appropriately higher safety standards for systems above
400 watts. This framework should be established now, even if installation of systems
above 400 watts must wait until state or federal electrical codes are updated.
2. Allow systems under 400 watts to plug into standard household outlets now, as
permitted in other states, without requiring costly electrical modifications or waiting
for state or federal electrical code to be amended.
3. Permit customers to use small batteries with plug-in solar systems to store energy and
use it at different times.
STAFF RECOMMENDATION
In summary, Staff recommends the Commission:
1. Approve the Company's proposed Schedule 68 tariff with two modifications and direct
the Company to submit updates to the Schedule 68 tariff consistent with the
Commission's order as a compliance filing. Specifically, Staff recommends that the
Commission: (1) permit small plug-in ESDs and combined PIPV-ESD systems to
participate in the ORP, and (2) increase the ORP Total Nameplate Capacity eligibility
threshold to 880 watts-AC.
" Twenty-eight(28)comments included the statement that they were"submitted to the Commission through
KnowWho on behalf of individuals associated with the Sierra Club."
STAFF COMMENTS 11 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
2. Direct the Company to provide annual reporting on the topics identified above to
support ongoing evaluation of the ORP. Staff believes that this reporting could
reasonably be incorporated into the Company's annual DER Report, filed on or before
April 1 of each year.
If implemented successfully, the ORP may reduce barriers to customer participation in
small DER installations while preserving the Company's ability to monitor qualifying
interconnections. Over time,information collected through the ORP may provide greater visibility
into customer adoption of small DER systems and support evaluation of trends in customer-sited
generation, particularly where such generation is primarily used to offset a customer's own
electricity consumption.
Respectfully submitted this 19th day of November 2026.
Jeffrey R. Loll
Deputy Attorney General
Technical Staff. Jason Talford, Carl Smith, Matt Suess, Curtis Thaden
I:\Utility\UMISC\COMMENTS\IPC-E-26-27 Comments.docx
STAFF COMMENTS 12 NOVEMBER 19, 2026
RECEIVED
November 19, 2026
IDAHO PUBLIC
UTILITIES COMMISSION
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS I91h DAY OF NOVEMBER 2026,
SERVED THE FOREGOING COMMENTS OF THE COMMISSION STAFF, IN CASE
NO. IPC-E-26-27, BY E-MAILING A COPY THEREOF, TO THE FOLLOWING:
LISA C. LANCE TIM TATUM
MEGAN GOICOECHEA ALLEN CONNIE ASCHENBRENNER
REGULATORY DOCKETS MARY ALICE TAYLOR
IDAHO POWER COMPANY IDAHO POWER COMPANY
PO BOX 70 PO BOX 70
BOISE ID 83707 EMAIL:
E-MAIL: ttatum(d,idahopower.com
llancegidahopower.com caschenbrenner&idahopower.com
mgoicoecheaallen(c idahopower.com mtUlor(&jdahopower.com
dockets&idahopower.com
PATRICIA JORD , SECRETARY
CERTIFICATE OF SERVICE