HomeMy WebLinkAbout20090410Nondisclosure Agreements.pdfl
RECr:¡
NONDISCLOSURE AGREEMENT
Regarding Use of
Transmission or Generation System Documentation
2009 APR 10 At1 9: 37
Application for a Certfication of Public Convenience and Necessity
For the Langley Gulch Power Plant
Case No. IPC-E-09-03
,~o ~ 55ro .. (company/entity/individual) ("Recipient") has
requested transmission and/or generation system information ("Information") from Idaho Power
Company ("IPC").
The requested Information contains non-public information about Idaho Power's transmission or
generation system that may be considered Critical Energy Infrastrcture Information as defined
by the Code of Federal Regulations, Title i 8 Section 388. As a precaution against the misuse of
this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and
believes that Recipient has a valid business purose for the Information. Accordingly, the
Information requested is being disclosed to Recipient strctly subject to the following terms and
conditions.
i. Critical Energy Infrastrcture Information ("CEIl") - As used herein, CEIl shall mean
information that:
a. Relates detail about the production, generation, transmission, or distribution of
energy;
b. Could be useful to a person planing an attck on critical infrastructue;
c. Is exempt from mandatory disclosure under the Freedom of. Information Act; and
d. Gives strategic information beyond the location of the critical infrastrcture.
CEIl includes but is not necessarily limited to: transmission conductor details, transmission
strcture design details, planed or expected trasmission outages critical to the system,
substation design details, control center locations or design details, power plant facilty design
details,and geographic coordinates more specific than line routes.
2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purose other
than that related to the current proceeding before the Idaho Public Utilties Commission
("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley
Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall tae all reasonable measures to
avoid improper disclosure or unauthorized use of CEIl.
3. Recipient's Personnel - Recipient, if a business entity, shall restrct the possession,
knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other
entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection
Page 1 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E~09-03
with the above-referenced IPUC case and who have been informed by Recipient of the
restrictions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use
the CEIl in conformity with the requirements of this Nondisclosure Agreement.
4. Recipient Responsibilty - ReCipient shall be wholly responsible for maintaining the
confdentiality of the CEIl disclosed by Idaho Power to Recipient or otherwse obtained by
Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL.
5. Disclosures to Governental Entities - If Recipient becomes legally obligated to disclose
confdential Information to any governenta entity, Recipient shall use its reasonable best
efforts to obtain confidential treatment for any CEIl that is so disclosed.
6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign
on behalf of the Recipient and have the authority to bind the Recipient to the terms of this
Nondisclosure Agreement.
7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's
successors and assigns.
RECIPIENT~cl.C~~~ .
5c 'D. ~'í ~/€f5 C58
Print Name
~7Y /fIaAJEV 6eLJ~4L-Tit ~ d~ /hi $S /'t: ç~¡:
~~,k9
Dae
Page 2 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E-09~03
NONDISCLOSURE AGREEMENT
Rega~ding Use of
Transmission or Generation System Documentation
Application for a Certification of Public Convenience and Necessity
For the Langley Gulch Power Plant
Case No. IPC-E-09-03
IdAh. Q\J SM£.f .. (company/entity/individual) ("Recipient") has
requested transmission and/or generation system information ("Information") from Idaho Power
Company ("IPC").
The requested Information contains non-public information about Idaho Power's transmission or
generation system that may be considered Critical Energy Infrastrctue Information as defined
by the Code of Federal Regulations, Title i 8 Section 388. As a precaution against the misuse of
this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and
believes that Recipient has a valid business purose for the Information. Accordingly, the
Information requested is being disclosed to Recipient strictly subject to the following terms and
conditions.
i . Critical Energy Infrastructure Information ("CEIl") - As used herein, CEIl shall mean
information that:
a. Relates detail about the production, generation, transmission, or distrbution of
energy;
b. Could be useful to a person planing an attck on critical infrastructue;
c. Is exempt from mandatory disclosure under the Freedom of Information Act; and
d. Gives strategic information beyond the location of the critical infrastructue.
CEIl includes but is not necessarly limited to: transmission conductor details, transmission
structue design details, planed or expected transmission outages critical to the system,
substation design details, control center locations or design details, power plant facilty design
details,and geographic coordinates more specific than line routes.
2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purpose other
than that related to the current proceeding before the Idaho Public Utilties Commission
("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley
Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall tae all reasonable measures to
avoid improper disclosure or unauthorized use of CEIl.
3. Recipient's Personnel;. Recipient, if a business entity, shall restrict the possession,
knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other
entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection
Page 1 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E-09-03
with the above-referenced IPUC case and who have been informed by Recipient of the
restrctions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use
the CEIl in conformity with the requirements of this Nondisclosure Agreement.
4. Recipient Responsibility - Recipient shall be wholly responsible for maintaining the
confidentiality of the CEIl disclosed by Idaho Power to Recipient or otherwise obtaned by
Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL.
5. Disclosures to Governental Entities - If Recipient becomes legally obligated to disclose
confdential Information to any governenta entity, Recipient shall use its reasonable best
efforts to obtain confidential treatment for any CEIl that is so disclosed.
6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign
on behalf of the Recipient and have the authority to bind the Recipient to the terms of this
Nondisclosure Agreement.
7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's
successors and assigns.
RECIPIENT
s~c!
ít t( vi l '1 I-crb
Print Name
vl:¿-!": ~5 Ù, ViS; PM Clt4If~ôfyq /-V'
Title
~/ /; OIL? 2
Date
Page 2 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E-09-03
NONDISCLOSURE AGREEMENT
Regarding Use of
Transmission or Generation System Documentation
Application for a Certifcation of Public Convenience and Necessity
For the Langley Gulch Power Plant
Case No. IPC-E-09-03
ltltl\î Pl£ :Skl (company/entity/individual) ("Recipient") has
requested trsmission and/or generation system information ("Information") from Idaho Power
Company ("IPC").
The requested Information contans non-public information about Idaho Power's transmission or
generation system that may be considered Critical Energy Infrastrctue Information as defined
by the Code of Federal Regulations, Title 18 Section 388. As a precaution against the misuse of
this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and
believes that Recipient has a valid business purose for the Information. Accordingly, the
Information requested is being disclosed to Recipient strictly subject to the following terms and
conditions.
1. Critical Energy Infrastrctue Information ("CEIl") - As used herein, CEIl shall mean
information that:
a. Relates detail about the production, generation, transmission, or distribution of
energy;
b. Could be useful to a person planing an attck on critical infrastrcture;
c. Is exempt from mandatory disclosure under the Freedom of Information Act; and
d. Gives strategic information beyond the location of the critical infrastrcture.
CEIl includes but is not necessarily limited to: transmission conductor details, transmission
structure design details, planned or expected transmission outages critical to the system,
substation design details, control center locations or design details, power plant facilty design
details,and geographic coordinates more specific than line routes.
2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purose other
than that related to the curent proceeding before the Idaho Public Utilities Commission
("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley
Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall take all reasonable measures to
avoid improper disclosure or unauthorized use of CEIl.
3. Recipient's Personnel - Recipient, if a business entity, shall restrict the possession,
knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other
entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection
Page 1 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E-09-03
with the above-referenced IPUC case and who have been informed by Recipient of the
restrictions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use
the CEIl in conformity with the requirements of this Nondisclosure Agreement.
4. Recipient Responsibilty - Recipient shall be wholly responsible for maintaining the
confdentiality of the CEIl disclosed by Idaho Power to Recipient or otherwse obtained by
Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL.
5. Disclosures to Governental Entities - If Recipient becomes legally obligated to disclose
confidential Information to any governental entity, Recipient shall use its reasonable best
efforts to obtain confidential treatment for any CEIl that is so disclosed.
6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign
on behalf of the Recipient and have the authority to bind the Recipient to the terms of this
Nondisclosure Agreement.
7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's
successors and assigns.
RECIPIENT
~CwrR
Signatue
Tur-i Colock
Print Name
Jlu,ivlJ.m1 nìsfæ:tor 1i ft-he0J) ~ ìSìOI1Title .
lJ!e¡)dC09Date '
Page 2 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC~E-09-03
"
NONDISCLOSURE AGREEMENT
Regarding Use of
Transmission or Generation System Documentation
Application for a Certification of Public Convenience and Necessity
For the Langley Gulch Power Plant
Case No. IPC-E-09-03
(company/entity/individual) ("Recipient") has
requested transmission and/o generation system information ("Information") from Idaho Power
Company ("IPC").
The requested Information contains non-public information about Idaho Power's transmission or
generation system that may be considered Critical Energy Infrastrcture Information as defined
by the Code of Federal Regulations, Title 1 8 Section 388. As a precaution against the misuse of
this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and
believes that Recipient has a valid business purose for the Information. Accordingly, the
Information requested is being disclosed to Recipient strictly subject to the following terms and
conditions.
1 . Critical Energy Infrastrcture Information ("CEIl") - As used herein, CEIl shall mean
information that:
a. Relates detail about the production, generation, transmission, or distrbution of
energy;
b. Could be useful to a person planing an attack on critical infrastructure;
c. Is exempt from mandatory disclosure under the Freedom of Information Act; and
d. Gives strategic information beyond the location of the critical infrastructure.
CEIl includes but is not necessarily limited to: transmission conductor details, transmission
structue design details, planed or expected transmission outages critical to the system,
substation design details, control center locations or design details, power plant facilty design
details,and geographic coordinates more specific than line routes.
2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purose other
than that related to the current proceeding before the Idaho Public Utilities Commission
("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley
Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall take all reasonable measures to
avoid improper disclosure or unauthorized use of CEIl.
3. Recipient's Personnel - Recipient, if a business entity, shall restrict the possession,
knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other
entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection
Page 1 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E-09-03
with the above-referenced IPUC case and who have been informed by Recipient of the
restrictions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use
the CEIl in conformity with the requirements of this Nondisclosure Agreement.
4. Recipient Responsibility - Recipient shall be wholly responsible for maintaining the
confidentiality of the CEIl disclosed by Idaho Power to Recipient or otherwse obtained by
Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL.
5. Disclosures to Governental Entities - If Recipient becomes legally obligated to disclose
confidential Information to any governental entity, Recipient shall use its reasonable best
efforts to obtain confidential treatment for any CEIl that is so disclosed.
6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign
on behalf of the Recipient and have the. authority to bind the Recipient to the terms of this
Nondisclosure Agreement.
7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's
successors and assigns.
RECIPIENT
e~l 1l¿ \\ N¥Æi
Signature
l8J1ç\L\A
PnntName
\-~ßMS
Qf\I(\Y rAb b()m.o Ai. 2aAb-5í
Title
Ct.Nl a I cJfi
Date
Page 2 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E-09-03
NONDISCLOSURE AGREEMENT
Regarding Use of
Transmission or Generation System Documentation
Application for a Certfication of Public Convenience and Necessity
For the Langley Gulch Power Plant
Case No. IPC-E-09-03
I dt.f StFf . (company/entity/individual) ("Recipient") has
requested transmission and/or generation system information ("Inormation") from Idaho Power
Company ("IPC").
The requested Information contains non-public information about Idaho Power's transmission or
generation system that may be considered Critical Energy Infrastrcture Information as. defined
by the Code of Federal Regulations, Title 18 Section 388. As a precaution against the misuse of
this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and
believes that Recipient has a valid business purpose for the Information. Accordingly, the
Information requested is being disclosed to Recipient strctly subject to the following terms and
conditions.
1. Critical Energy Infrastrcture Information ("CEIl") - As used herein, CEIl shall mean
information that:
a. Relates detail about the production, generation, transmission, or distrbution of
energy;
b. Could be useful to a person planning an attck on critical infrastrcture;
c. Is exempt from mandatory disclosure under the Freedom of Information Act; and
d. Gives strategic information beyond the location of the critical infrastrcture.
CEIl includes but is not necessarly limited to: transmission conductor details, transmission
strcture design details, planned or expected transmission outages critical to the system,
substation design details, control center locations or design details, power plant facility design
details, and geographic coordinates more specific than line routes.
2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purpose other
than that related to the current proceeding before the Idaho Public Utilities Commission
("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley
Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall take all reasonable measures to
avoid improper disclosure or unauthorized use of CEIL
3. Recipient's Personnel - Recipient, if a business entity, shall restrict the possession,
knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other
entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection
Pagelof2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E-09~03
with the above-referenced IPUC case and who have been infonned by Recipient of the
restrctions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use
the CEIl in confonnity with the requirements of this Nondisclosure Agreement.
4. Recipient Responsibility - Recipient shall be wholly responsible for maintaining the
confidentiality of the CEIl disclosed by Idaho Power to Recipient or otherwise obtained by
Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL.
5. Disclosures to Governmental Entities - If Recipient becomes legally obligated to disclose
confidential Infonnation to any governmental entity, Recipient shall use its reasonable best
efforts to obtain confidential treatment for any CEIl that is so disclosed.
6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign
on behalf of the Recipient and have the authority to bind the Recipient to the tenns of this
Nondisclosure Agreement.
7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's
successors and assigns.
RECIPIENT
7?kl~Šignature ~/
Ri Co/( 5fe (" j "J
Print Name
jfq(f FnjlneerTitle .
Page 2 of2
Nondisclosure Agreement - CEIl
Langley Gulch Power Plant
Case No. IPC-E-09-03