HomeMy WebLinkAbout20090410Nondisclosure Agreements.pdfl RECr:¡ NONDISCLOSURE AGREEMENT Regarding Use of Transmission or Generation System Documentation 2009 APR 10 At1 9: 37 Application for a Certfication of Public Convenience and Necessity For the Langley Gulch Power Plant Case No. IPC-E-09-03 ,~o ~ 55ro .. (company/entity/individual) ("Recipient") has requested transmission and/or generation system information ("Information") from Idaho Power Company ("IPC"). The requested Information contains non-public information about Idaho Power's transmission or generation system that may be considered Critical Energy Infrastrcture Information as defined by the Code of Federal Regulations, Title i 8 Section 388. As a precaution against the misuse of this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and believes that Recipient has a valid business purose for the Information. Accordingly, the Information requested is being disclosed to Recipient strctly subject to the following terms and conditions. i. Critical Energy Infrastrcture Information ("CEIl") - As used herein, CEIl shall mean information that: a. Relates detail about the production, generation, transmission, or distribution of energy; b. Could be useful to a person planing an attck on critical infrastructue; c. Is exempt from mandatory disclosure under the Freedom of. Information Act; and d. Gives strategic information beyond the location of the critical infrastrcture. CEIl includes but is not necessarily limited to: transmission conductor details, transmission strcture design details, planed or expected trasmission outages critical to the system, substation design details, control center locations or design details, power plant facilty design details,and geographic coordinates more specific than line routes. 2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purose other than that related to the current proceeding before the Idaho Public Utilties Commission ("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall tae all reasonable measures to avoid improper disclosure or unauthorized use of CEIl. 3. Recipient's Personnel - Recipient, if a business entity, shall restrct the possession, knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection Page 1 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E~09-03 with the above-referenced IPUC case and who have been informed by Recipient of the restrictions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use the CEIl in conformity with the requirements of this Nondisclosure Agreement. 4. Recipient Responsibilty - ReCipient shall be wholly responsible for maintaining the confdentiality of the CEIl disclosed by Idaho Power to Recipient or otherwse obtained by Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL. 5. Disclosures to Governental Entities - If Recipient becomes legally obligated to disclose confdential Information to any governenta entity, Recipient shall use its reasonable best efforts to obtain confidential treatment for any CEIl that is so disclosed. 6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign on behalf of the Recipient and have the authority to bind the Recipient to the terms of this Nondisclosure Agreement. 7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's successors and assigns. RECIPIENT~cl.C~~~ . 5c 'D. ~'í ~/€f5 C58 Print Name ~7Y /fIaAJEV 6eLJ~4L-Tit ~ d~ /hi $S /'t: ç~¡: ~~,k9 Dae Page 2 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E-09~03 NONDISCLOSURE AGREEMENT Rega~ding Use of Transmission or Generation System Documentation Application for a Certification of Public Convenience and Necessity For the Langley Gulch Power Plant Case No. IPC-E-09-03 IdAh. Q\J SM£.f .. (company/entity/individual) ("Recipient") has requested transmission and/or generation system information ("Information") from Idaho Power Company ("IPC"). The requested Information contains non-public information about Idaho Power's transmission or generation system that may be considered Critical Energy Infrastrctue Information as defined by the Code of Federal Regulations, Title i 8 Section 388. As a precaution against the misuse of this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and believes that Recipient has a valid business purose for the Information. Accordingly, the Information requested is being disclosed to Recipient strictly subject to the following terms and conditions. i . Critical Energy Infrastructure Information ("CEIl") - As used herein, CEIl shall mean information that: a. Relates detail about the production, generation, transmission, or distrbution of energy; b. Could be useful to a person planing an attck on critical infrastructue; c. Is exempt from mandatory disclosure under the Freedom of Information Act; and d. Gives strategic information beyond the location of the critical infrastructue. CEIl includes but is not necessarly limited to: transmission conductor details, transmission structue design details, planed or expected transmission outages critical to the system, substation design details, control center locations or design details, power plant facilty design details,and geographic coordinates more specific than line routes. 2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purpose other than that related to the current proceeding before the Idaho Public Utilties Commission ("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall tae all reasonable measures to avoid improper disclosure or unauthorized use of CEIl. 3. Recipient's Personnel;. Recipient, if a business entity, shall restrict the possession, knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection Page 1 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E-09-03 with the above-referenced IPUC case and who have been informed by Recipient of the restrctions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use the CEIl in conformity with the requirements of this Nondisclosure Agreement. 4. Recipient Responsibility - Recipient shall be wholly responsible for maintaining the confidentiality of the CEIl disclosed by Idaho Power to Recipient or otherwise obtaned by Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL. 5. Disclosures to Governental Entities - If Recipient becomes legally obligated to disclose confdential Information to any governenta entity, Recipient shall use its reasonable best efforts to obtain confidential treatment for any CEIl that is so disclosed. 6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign on behalf of the Recipient and have the authority to bind the Recipient to the terms of this Nondisclosure Agreement. 7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's successors and assigns. RECIPIENT s~c! ít t( vi l '1 I-crb Print Name vl:¿-!": ~5 Ù, ViS; PM Clt4If~ôfyq /-V' Title ~/ /; OIL? 2 Date Page 2 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E-09-03 NONDISCLOSURE AGREEMENT Regarding Use of Transmission or Generation System Documentation Application for a Certifcation of Public Convenience and Necessity For the Langley Gulch Power Plant Case No. IPC-E-09-03 ltltl\î Pl£ :Skl (company/entity/individual) ("Recipient") has requested trsmission and/or generation system information ("Information") from Idaho Power Company ("IPC"). The requested Information contans non-public information about Idaho Power's transmission or generation system that may be considered Critical Energy Infrastrctue Information as defined by the Code of Federal Regulations, Title 18 Section 388. As a precaution against the misuse of this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and believes that Recipient has a valid business purose for the Information. Accordingly, the Information requested is being disclosed to Recipient strictly subject to the following terms and conditions. 1. Critical Energy Infrastrctue Information ("CEIl") - As used herein, CEIl shall mean information that: a. Relates detail about the production, generation, transmission, or distribution of energy; b. Could be useful to a person planing an attck on critical infrastrcture; c. Is exempt from mandatory disclosure under the Freedom of Information Act; and d. Gives strategic information beyond the location of the critical infrastrcture. CEIl includes but is not necessarily limited to: transmission conductor details, transmission structure design details, planned or expected transmission outages critical to the system, substation design details, control center locations or design details, power plant facilty design details,and geographic coordinates more specific than line routes. 2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purose other than that related to the curent proceeding before the Idaho Public Utilities Commission ("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall take all reasonable measures to avoid improper disclosure or unauthorized use of CEIl. 3. Recipient's Personnel - Recipient, if a business entity, shall restrict the possession, knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection Page 1 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E-09-03 with the above-referenced IPUC case and who have been informed by Recipient of the restrictions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use the CEIl in conformity with the requirements of this Nondisclosure Agreement. 4. Recipient Responsibilty - Recipient shall be wholly responsible for maintaining the confdentiality of the CEIl disclosed by Idaho Power to Recipient or otherwse obtained by Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL. 5. Disclosures to Governental Entities - If Recipient becomes legally obligated to disclose confidential Information to any governental entity, Recipient shall use its reasonable best efforts to obtain confidential treatment for any CEIl that is so disclosed. 6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign on behalf of the Recipient and have the authority to bind the Recipient to the terms of this Nondisclosure Agreement. 7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's successors and assigns. RECIPIENT ~CwrR Signatue Tur-i Colock Print Name Jlu,ivlJ.m1 nìsfæ:tor 1i ft-he0J) ~ ìSìOI1Title . lJ!e¡)dC09Date ' Page 2 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC~E-09-03 " NONDISCLOSURE AGREEMENT Regarding Use of Transmission or Generation System Documentation Application for a Certification of Public Convenience and Necessity For the Langley Gulch Power Plant Case No. IPC-E-09-03 (company/entity/individual) ("Recipient") has requested transmission and/o generation system information ("Information") from Idaho Power Company ("IPC"). The requested Information contains non-public information about Idaho Power's transmission or generation system that may be considered Critical Energy Infrastrcture Information as defined by the Code of Federal Regulations, Title 1 8 Section 388. As a precaution against the misuse of this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and believes that Recipient has a valid business purose for the Information. Accordingly, the Information requested is being disclosed to Recipient strictly subject to the following terms and conditions. 1 . Critical Energy Infrastrcture Information ("CEIl") - As used herein, CEIl shall mean information that: a. Relates detail about the production, generation, transmission, or distrbution of energy; b. Could be useful to a person planing an attack on critical infrastructure; c. Is exempt from mandatory disclosure under the Freedom of Information Act; and d. Gives strategic information beyond the location of the critical infrastructure. CEIl includes but is not necessarily limited to: transmission conductor details, transmission structue design details, planed or expected transmission outages critical to the system, substation design details, control center locations or design details, power plant facilty design details,and geographic coordinates more specific than line routes. 2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purose other than that related to the current proceeding before the Idaho Public Utilities Commission ("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall take all reasonable measures to avoid improper disclosure or unauthorized use of CEIl. 3. Recipient's Personnel - Recipient, if a business entity, shall restrict the possession, knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection Page 1 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E-09-03 with the above-referenced IPUC case and who have been informed by Recipient of the restrictions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use the CEIl in conformity with the requirements of this Nondisclosure Agreement. 4. Recipient Responsibility - Recipient shall be wholly responsible for maintaining the confidentiality of the CEIl disclosed by Idaho Power to Recipient or otherwse obtained by Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL. 5. Disclosures to Governental Entities - If Recipient becomes legally obligated to disclose confidential Information to any governental entity, Recipient shall use its reasonable best efforts to obtain confidential treatment for any CEIl that is so disclosed. 6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign on behalf of the Recipient and have the. authority to bind the Recipient to the terms of this Nondisclosure Agreement. 7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's successors and assigns. RECIPIENT e~l 1l¿ \\ N¥Æi Signature l8J1ç\L\A PnntName \-~ßMS Qf\I(\Y rAb b()m.o Ai. 2aAb-5í Title Ct.Nl a I cJfi Date Page 2 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E-09-03 NONDISCLOSURE AGREEMENT Regarding Use of Transmission or Generation System Documentation Application for a Certfication of Public Convenience and Necessity For the Langley Gulch Power Plant Case No. IPC-E-09-03 I dt.f StFf . (company/entity/individual) ("Recipient") has requested transmission and/or generation system information ("Inormation") from Idaho Power Company ("IPC"). The requested Information contains non-public information about Idaho Power's transmission or generation system that may be considered Critical Energy Infrastrcture Information as. defined by the Code of Federal Regulations, Title 18 Section 388. As a precaution against the misuse of this Information, IPC, upon reasonable inquiry, has verified the identity of the Recipient and believes that Recipient has a valid business purpose for the Information. Accordingly, the Information requested is being disclosed to Recipient strctly subject to the following terms and conditions. 1. Critical Energy Infrastrcture Information ("CEIl") - As used herein, CEIl shall mean information that: a. Relates detail about the production, generation, transmission, or distrbution of energy; b. Could be useful to a person planning an attck on critical infrastrcture; c. Is exempt from mandatory disclosure under the Freedom of Information Act; and d. Gives strategic information beyond the location of the critical infrastrcture. CEIl includes but is not necessarly limited to: transmission conductor details, transmission strcture design details, planned or expected transmission outages critical to the system, substation design details, control center locations or design details, power plant facility design details, and geographic coordinates more specific than line routes. 2. Use of CEIl - Requestor shall not use, or permit others to use CEIl for a purpose other than that related to the current proceeding before the Idaho Public Utilities Commission ("IPUC"), the Application for a Certificate of Public Convenience and Necessity for the Langley Gulch Power Plant, Case No. IPC-E-09-03. Recipient shall take all reasonable measures to avoid improper disclosure or unauthorized use of CEIL 3. Recipient's Personnel - Recipient, if a business entity, shall restrict the possession, knowledge, development, and use of CEIl to its employees, agents, subcontractors, and other entities controlled by it (collectively, "Personnel") who need to know the CEIl in connection Pagelof2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E-09~03 with the above-referenced IPUC case and who have been infonned by Recipient of the restrctions placed on such CEIl by this Nondisclosure Agreement and who have agreed to use the CEIl in confonnity with the requirements of this Nondisclosure Agreement. 4. Recipient Responsibility - Recipient shall be wholly responsible for maintaining the confidentiality of the CEIl disclosed by Idaho Power to Recipient or otherwise obtained by Recipient, and shall be responsible in this regard for the actions and activities of all its PersonneL. 5. Disclosures to Governmental Entities - If Recipient becomes legally obligated to disclose confidential Infonnation to any governmental entity, Recipient shall use its reasonable best efforts to obtain confidential treatment for any CEIl that is so disclosed. 6. Authorized Signature - Signatory for Recipient covenants that they are authorized to sign on behalf of the Recipient and have the authority to bind the Recipient to the tenns of this Nondisclosure Agreement. 7. Successors and Assigns - This Nondisclosure Agreement shall be binding on Recipient's successors and assigns. RECIPIENT 7?kl~Šignature ~/ Ri Co/( 5fe (" j "J Print Name jfq(f FnjlneerTitle . Page 2 of2 Nondisclosure Agreement - CEIl Langley Gulch Power Plant Case No. IPC-E-09-03