Loading...
HomeMy WebLinkAbout20090416IPC to Staff 33-35.pdf$SIDA~POR~ An IDACORP Company BARTON L. KLINE Lead Counsel April 15, 2009 VIA HAND DELIVERY Jean D. Jewell, Secretary Idaho Public Utilities Commission 472 West Washington Street P.O. Box 83720 Boise, Idaho 83720-0074 Re: Case No. IPC-E-09-03 LANGLEY GULCH POWER PLANT Dear Ms. Jewell: Enclosed for filing are an original and three (3) copies of the fourth portion of Idaho Power Company's responses to the Commission Staffs First Production Request. Also, enclosed are four (4) copies of a disk containing critical energy infrastructure information and other confidential information in response to Staffs production requests. Please note, this information should be handled in accordance with the Protective Agreement.ve~~ Barton L. Kline BLK:csb Enclosures P.O. Box 70 (B3707) 1221 W. Idaho St. Boise..ID 83702 D ç: r l= 1 f_-~Ji ~ _._ "1 ._ . BARTON L. KLINE, ISB #1526 LISA D. NORDSTROM, ISB #5733 Idaho Power Company P.O. Box 70 Boise, Idaho 83707 Telephone: 208-388-2682 Facsimile: 208-338-6936 bkline(gidahopower.com Inordstrom(gidahopower.com Z003 APR l 5 PM~: 46 Attorneys for Idaho Power Company Street Address for Express Mail: 1221 West Idaho Street Boise, Idaho 83702 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE LANGLEY GULCH POWER PLANT. ) ) CASE NO. IPC-E-09-03 ) ) IDAHO POWER COMPANY'S ) RESPONSE TO THE COMMISSION ) STAFF'S FIRST PRODUCTION ) REQUEST TO IDAHO POWER ) COMPANY COMES NOW, Idaho Power Company ("Idaho Power" or "the Company"), and in response to the First Production Request of the Commission Staff to Idaho Power Company dated March 25, 2009, herewith submits the following information: IDAHO POWER COMPANY'S RESPONSE TO THE COMMISSION STAFF'S FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY - 1 REQUEST NO. 33: Please describe the transmission constraints that made it desirable or necessary for Idaho Power to specify in the 2012 Baseload RFP that Idaho Power is interested in proposals that can provide electric capacity to the Treasure Valley load center. Provide copies of any analysis or transmission system studies in which these constraints were identified and described. RESPONSE TO REQUEST NO. 33: Idaho Powets 2006 Integrated Resource Plan contains descriptive information and IRP analysis regarding Idaho Powets transmission constraints. A description of the transmission constraints are located on pages 20-23, a description of the IRP Transmission Forecast analysis are located on pages 32-33, and the results are located on pages 41-42, each of which are included on the enclosed CD. The Langley Gulch project transmission system impact study report, provided in Response to Staffs Request No. 36, provides an analysis of the transmission system upgrades required to reliably integrate the project into the transmission system. The Company is also providing recently performed system impact studies for generation interconnection projects that demonstrate the inability to interconnect additional generation both east and west of the Treasure Valley without transmission upgrades. These system impact studies contain Critical Energy Infrastructure Information ("CEil") and are being provided to those parties that have executed both the Nondisclosure Agreement and the Protective Agreement. The response to this Request was prepared by Dave Angell, Manager, Delivery Planning, Idaho Power Company, in consultation with Barton L. Kline, Lead Counsel, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE COMMISSION STAFF'S FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY - 2 REQUEST NO. 34: Please describe in detail any transmission system improvements, upgrades or additions that have recently been made or are planned in the general vicinity of the proposed Langley Gulch plant that are not contingent upon or considered a part of the Langley Gulch plant. Provide a copy of any study or analysis completed that recommended such improvements, additions or upgrades. For any upgrades that have recently been completed, please provide records showing the total costs for the improvements, additions or upgrades. RESPONSE TO REQUEST NO. 34: In 2008, one project was completed in the general vicinity of Langley Gulch. It increased the ampacity rating of the Ontario- Brownlee 230 kV line series capacitor as identified in the Elkhorn Wind Project system impact study report. The project increased the nominal rating from 1430 to 1589 amperes at a cost of $124,294. The above-referenced system impact study report contains CEil and is being provided to only those parties that have executed both the Nondisclosure Agreement and the Protective Agreement. The response to this Request was prepared by Dave Angell, Manager, Delivery Planning, Idaho Power Company, in consultation with Barton L. Kline, Lead Counsel, Idaho Power Company. IDAHO POWER COMPANY'S RESPONSE TO THE COMMISSION STAFF'S FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY - 3 REQUEST NO. 35: Please provide information supporting. the transmission costs assumed by Idaho Power for each of the bids considered (Interconnection Feasibility studies, System Impact studies, etc.).Include cost assumptions, transmission losses, and any other transmission factors considered. RESPONSE TO REQUEST NO. 35:The RFP bidders' generation interconnection feasibility study reports and cost estimate spreadsheets contain CEil and are being provided to those parties that have executed both the Nondisclosure Agreement and the Protective Agreement. The response to this Request was prepared by Dave Angell, Manager, Delivery Planning, Idaho Power Company, in consultation with Barton L. Kline, Lead Counsel, Idaho Power Company. DATED at Boise, Idaho, this 15th day of April 2009. , BARTON L. KLINE Attorney for Idaho Power Company IDAHO POWER COMPANY'S RESPONSE TO THE COMMISSION STAFF'S FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY - 4 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 15th day of April 2009 I served a true and correct copy of IDAHO POWER COMPANY'S RESPONSE TO THE COMMISSION STAFF'S FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY upon the following named parties by the method indicated below, and addressed to the following: Commission Staff Scott Woodbury Deputy Attomey General Idaho Public Utilties Commission 472 West Washington P.O. Box 83720 Boise, Idaho 83720-0074 Industrial Customers of Idaho Power Peter J. Richardson, Esq. RICHARDSON & O'LEARY PLLC 515 North 2th Street P.O. Box 7218 Boise, Idaho 83702 Dr. Don Reading Ben Johnson Associates 6070 Hil Road Boise, Idaho 83703 Invenergy Thermal Development LLC Dean J. Miler McDEVITT & MILLER LLP 420 West Bannock Street P.O. Box 2564 Boise, Idaho 83701 Wiliam Borders Assistant General Counsel Invenergy Thermal Development LLC One South Wacker Drive, Suite 1900 Chicago, Ilinois 60606 Snake River Allance Ken Miler Snake River Allance P.O. Box 1731 Boise, Idaho 83701 -- Hand Delivered U.S. Mail _ Overnight Mail FAX -- Email Scott.Woodburv(gpuc.idaho.gov Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email peter(grichardsonandoleary.com Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email dreading(gmindspring.com Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email joe(gmcdevitt-miler.com Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email wborders(ginvenergyllc.com Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email kmiler(gsnakeriverallance.org IDAHO POWER COMPANY'S RESPONSE TO THE COMMISSION STAFF'S FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY - 5 Idaho Irrigation Pumpers Association, Inc. Eric L. Olsen RACINE, OLSON, NYE, BUDGE & BAILEY, CHARTERED P.O. Box 1391 201 East Center Pocatello, Idaho 83204-1391 Anthony Yankel Yankel & Associates, Inc. 29814 Lake Road Bay Vilage, Ohio 44140 Idaho Conservation League Betsy Bridge Idaho Conservation League 710 North Sixth Street P.O. Box 844 Boise, Idaho 83701 Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email elo(gracinelaw.net Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email tony(gyankel.net Hand Delivered -- U.S. Mail _ Overnight Mail FAX -- Email bbridge(gwildidaho.org Qk~ Barton L. Kline IDAHO POWER COMPANY'S RESPONSE TO THE COMMISSION STAFF'S FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY - 6