Loading...
HomeMy WebLinkAbout20080710ICIP to IPC 1-10.pdf,,""'¡. ~fJ ~~r..((~lt l'UCAT T 0 llN EYSA T LAW 3: 01 Peter Richardson Tel: 208-938-7901 Fax: 208-938-7904 p eter~ richardson andoleary. co m P.O. Box 7218 Boise, lD 83707 - 515 N. 27th St. Boise, lD 83702 9 July 2008 Ms. Jean Jewell Commission Secretary Idaho Public Utilities Commission 472 W. Washington Boise, 1083702 RE: IPC-E-08-10 Dear Ms. Jewell: We are enclosing an three copies of the FIRST PRODUCTION REQUEST OF THE INDUSTRIAL CUSTOMERS OF IDAHO POWER, in the above case. The original has been served on Idaho Power Company. Sincerely,~ Richardson & O'Leary PLLC ., .," Peter J. Richardson ISB # 3195 RICHASON & O'LEARY PLLC 515 N. 27th Street Boise, Idaho 83702 Telephone: (208) 938-7901 Fax: (208) 938-7904 peter~chardsonandolear.com Attorneys for the Industral Customers of Idao Power 01 BEFORE THE IDAHO PUBLIC UTILITIES COMMSSION IN THE MATTER OF THE , APPLICATION OF IDAHO POWER COMPANY FOR AUTHORITY TO INCREASE ITS RATES AN CHAGES FOR ELECTRC SERVICE. ) CASE NO. IPC-E-oS-IO ) ) FIRST PRODUCTION REQUEST OF ) THE INUSTIAL CUSTOMERS OF ) IDAHO POWER ) Pursuat to Rule 225 of the Rules of Procedure of the Idaho Public Utilties Commssion (the "Commssion"), The Industral Customers of Idaho Power ("ICIP") by and though their attrney of record, Peter J. Richardson, hereby requests that Idaho Power Company ("Compay") provide the following documents. This production request is to be considered as contiuing, and the Company is requested to provide by way of supplementa responses additional documents tht it or any person acting on its behalf may later obta that will augment the documents produced. Pleas provide one physical copy and one electonic copy, if available, of your anwer to Mr. Richardson at the address noted above. Please provide an additional electronic copy, or if unvailable a physical copy, to Dr. Don Readig, at: 6070 Hil Road Boise, Idaho 83703 (208) 342-1700 Tel FIRST PRODUCTION REQUEST OF ICIP - IPC-E-QS-l 0 -,," (208) 384-1511 Fax dreadig(gindspring.com For each item, pleae indicate the name of the person(s) preparing the answers, along with the job title of such person(s) and the witness at hearg who can sponsor the answer. REOUEST FOR PRODUCTION NO.1: Please provide a copy for each of the thee (3) cost of servce studies presented in Mr. Tatu's'Direct Testimony in electronic format, CD-ROM with instrctions on how to use them. REQUEST FQR PRODUCTION NO.2: Please provide Mr. Tatu's Exhbits No. 59 and Exhbits No. 68 in electronic format with instctions on how to use each. REQUEST FOR PRODUCTION NO.3 The Company's April 22, 2008 Marginal Cost Analysis, provided in Mr. Tatu's workpapers states, "The 2008 test year gas prices were used, adjusted for each of the year using the Utility Natual Gas Index from the Global Insight 30-year US Economic Outlook, Febru 2008." Pleae provide the 2008 test year gas prices used in the 2008 Marginal Cost Analysis and show the adjustment used for each year. REQUEST FOR PRODUCTION NO.4 Ms. Nemnch on page 3 of her direct testimony detaling the proposed rate design for industral and commercial customers states: "I gathered customer input on proposed rate design chages durg a meeting held on May 8, 2008, that included several of the Company's Large General Servce customers. A sumar of ths meeting is included later in my testimony." Please provide the full details of ths meeting includig: paricipants, maters discussed, FIRT PRODUCTION REQUEST OF ICIP - IPC-E-OS-IO 2 ., documents distrbuted or received, a ful description of the topics discussed, and a detaled explanation of how any information gained though ths meeting inuenced the proposed rate design. REQUEST FOR PRODUCTION NO.5 Please detal the allocation to schedule 19 customers of the transmission and distrbution costs associated with the company's combustion tubine generation facilties. REQUEST FOR PRODUCTION NO.6. Mr. Lamont Keen, on page 6, lines 11-13 of his direct testimony states "we have experienced an increase in average anual energy usage by residential customers in four or the last five years". Please provide the average anua usage of electrcity for each customer class for the previous five years. REQUEST FOR PRODUCTION NO.7. Ms. Smith's direct testimony includes Exhbit 33 which detals the varous methodologies used to convert the 2007 actual date to the 2008 test year data. Please provide a detailed accounting which compares the 2008 test year data with the actu 2008 data collected though Julyl, 2008 for any line item identified in Exhbit 33 which utilizes the 3 year compounded, 5 year compounded, or normalized methodologies. REQUEST FOR PRODUCTION NO.8. In argug for the use of the 2008 test year Mr. Gale refers to the Company's experence with the forecast component of the PCA mechansm on page 15, lines 1-6 of his diect testimony. Please provide a detaled analysis that compares the forecasted component of the PCA with the actul data found for the years 2000-2007 REQUEST FOR PRODUCTION NO.9. FIRST PRODUCTION REQUEST OF ICIP ~ IPC-E-OS-l 0 3 .., Ms. Drake, on page 4, lines 2-7 refers to the Company's Demand-Side Management 2007 Anua Report which covers all demand response programs. Please provide ths report along with any and alI documents, reports, studies, data, or analysis used in developing this report. REQUEST FOR PRODUCITON NO 10. Please provide any and all documents, reports, studies, data, or analysis used in the all aspects of the Company's investigation of the Virt Peaker Program. DATED ths 1 th day of July 2008. RICHASON & O'LEARY PLLC .. By: fJ¿/ft Peter J. Richardson, ISB #3195 Attorneys THE INDUSTRL CUSTOMERS OF IDAHO POWER FIRST PRODUCTION REQUEST OF ICIP - IPC-E-08.10 4 1 CERTIFICATE OF SERVICE I HEREBY CERTIFY tht on the 9th day of July, 2008, a tre and correct copy of the with and foregoing FIRST PRODUCTION REQUEST OF THE INDUSTRAL CUSTOMERS OF IDAHO POWER, was served in the maner shown to: Ms. Jean Jewell Comnsion Seceta Idao Public Utilities Comnsion POBox83720 Boise ID 83720-0074 _ Hand Delivery .A U.S. Mail, postage pre-paid Facsimile Electronic Mail JohnR. Gale Vice President, Regulatory Affairs Idao Power Company PO Box 70 Boise, Idao 83707-0070 . _ Hand Delivery XU.S. Mail, postae pre-paid Facsimle Electronic Mail Baron L. Kline Senior Reguatory Attorney Idaho Power Company PO Box 70 Boise, Idao 83707.0070 _ Hand Delivery X U.S. Mail, postae pre-paid Facsimle Electronic Mail Randall C. Budge Eric L. Olsen Racine, Olson, Nye, Budge & Bailey, Chrd. PO Box 1391 Pocatello, Idao 83204-1391 _ Hand Delivery -XU.S. Mail, postage pre-paid Facsimile Electronic Mail Anthony Yanel 29814 Lake Road Bay Vilage, Ohio 44140 _ Hand Delivery X U.S. Mail, postae pre-paid Facsimle Electronic Mail Qj~w-T Nina Curis Admstrative Assistat