Please find enclosed an original and two (2) copies of Idaho Power's Response to
the Fifth Production Request of the Industrial Customers of Idaho Power in the above-
referenced matter. Please be advised that the attachment to this request is confidentiaL.
i would appreciate it if you would return a stamped copy of this transmittal letter
in the enclosed self-addressed, stamped envelope.
Very truly yours,(l~
Barton L. Kline
BLK:sh
Enclosure
P.O. Box 70 (83707)
1221 W. Idaho St.
Boise, ID 83702
BARTON L. KLINE ISB #1526
LISA D. NORDSTROM ISB #5733
Idaho Power Company
P.O. Box 70
Boise, Idaho 83707
Telephone: (208) 388-2682
FAX Telephone: (208) 388-6936
201n DEC' 3 Pl'Î 4: 44
Attorney for Idaho Power Company
Street Address for Express Mail:
1221 West Idaho Street
Boise, Idaho 83702
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR
AUTHORITY TO INCREASE ITS RATES
AND CHARGES FOR ELECTRIC
SERVICE TO ELECTRIC CUSTOMERS
IN THE STATE OF IDAHO
)
) CASE NO. IPC-E-07-8
)
) RESPONSE OF IDAHO POWER TO
) THE FIFTH PRODUCTION REQUEST
) OF THE INDUSTRIAL CUSTOMERS
) OF IDAHO POWER
COMES NOW, Idaho Power Company ("Idaho Powet' or "the Company") and, in
response to the Fifth Production Request of the Industrial Customers of Idaho Power to
Idaho Power Company dated December 3, 2007, herewith submits the following
information:
RESPONSE OF IDAHO POWER TO THE FIFTH PRODUCTION REQUEST OF
THE INDUSTRIAL CUSTOMERS OF IDAHO POWER, Page 1
REQUEST FOR PRODUCTION NO. 12: Please describe in detail the efforts
Idaho Power has made with respect to connecting customer owned emergency
generators to its electric distribution system. Such description should include copies of
all correspondence with customers regarding the program as well as a list of companies
participating in the program and a list of companies who were approached about the
program.
RESPONSE TO REQUEST FOR PRODUCTION NO. 12:
Idaho Power objects to this request for production on the grounds that the
request was made long after the cutoff date for additional discovery. The cutoff date
was agreed to by all of the parties, including the ICIP, and was memorialized in the
Scheduling Order issued by the Commission on August 8,2007. Without waiving the
objection, Idaho Power is willng, in a spirit of cooperation, to provide the requested
information.
To gauge customer interest in the Virtual Peaking Program, Idaho Power's
Delivery Service Representative's (DSRs) in spring 2007 contacted those customers
whom they knew had existing generation, those who had expressed an interest in
adding generation, and those they thought might have generation. After soliciting
customer interest utilizing the DSRs, the Company held numerous customer meetings
and conference calls in May and June 2007 detailing the potential program.
Additionally, in an effort to gain more awareness of the program, the Company asked
the Industrial Customers of Idaho Power to forward the names of any customers who
might be interested in participating. The Company also described the program during
RESPONSE OF IDAHO POWER TO THE FIFTH PRODUCTION REQUEST OF
THE INDUSTRIAL CUSTOMERS OF IDAHO POWER, Page 2
customer meetings held in June to explain the recently filed general rate case and
energy efficiency opportunities.
In addition to gauging customer interest in the program, the Company performed
an initial feasibility analysis, identifying the various costs involved in the interconnection
of back-up generators as well as operations and maintenance costs. Both initial
generator installations and existing retrofits were considered. Because of the
investment size and the potential complexity of the interconnection of some generators,
the Company determined it was necessary to do an in-depth analysis of the
interconnection costs, targeting generators of different sizes, ages, and locations in
order to refine its initial analysis.
The Company contracted with Power Engineers to conduct the in-depth
interconnection cost analysis. Five Idaho Power customers committed to taking part in
this study and allowed Idaho Power and Power Engineers personnel on site to inspect
their equipment or site plans for future generators. The on-site interconnection
analyses were performed in September 2007. Upon receipt of the interconnection cost
data from Power Engineers, the Company updated its financial analysis. Results from
this updated analysis indicate there is enough potential benefit associated with the
program to continue pursuing its investigation.
Idaho Power is now undertaking the next phase of the project in which air quality
and permitting issues with respect to diesel generators wil be investigated. The
Company has had initial discussions with the Department of Environmental Quality to
better understand the permitting process and requirements. Currently, Idaho Power is
RESPONSE OF IDAHO POWER TO THE FIFTH PRODUCTION REQUEST OF
THE INDUSTRIAL CUSTOMERS OF IDAHO POWER, Page 3
gathering information on diesel generator emissions to better assess the potential
permitting costs and air qualiy issues.
Idaho Power has talked to fort-five customers about the potential for a "virtual
peaket' program. Of those customers, twelve expressed an interest to have more in-
depth talks, with five committing to the on-site interconnection cost analysis. Attached
is a confidential list of the customers the Company talked with regarding the Virtual
Peaker Program. Idaho Power takes its obligation to protect the privacy of its
customers seriously and appreciates the parties' efforts to also protect the privacy of our
customers by ensuring that the attached information is securely maintained in
accordance with the Protective Agreement.
The only correspondence sent regarding the Virtual Peaker Program was a copy
of the report that was filed with the Idaho Public Utilities Commission on June 1, 2007;
all other communication with customers has been verbaL. This report was sent to one
customer at their request.
The response to this request was prepared by Maggie Brilz, Pricing Director,
Idaho Power Company, in consultation with Barton L. Kline, Senior Attorney and/or Lisa
D. Nordstrom, Attorney Ii, Idaho Power Company.
~
DATED at Boise, Idaho, this l~ day of December, 2007.
w~
BARTON L. KLINE
Attorney for Idaho Power Company
LISA D. NORDSTROM
Attorney for Idaho Power Company
RESPONSE OF IDAHO POWER TO THE FIFTH PRODUCTION REQUEST OF
THE INDUSTRIAL CUSTOMERS OF IDAHO POWER, Page 4
CERTIFICATE OF SERVICE
~
I HEREBY CERTIFY that on this ~ day of December, 2007, I served a true
and correct copy of the within and foregoing document upon the following named
parties by the method indicated below, and addressed to the following:
Commission Staff
Weldon Stutzman
Deputy Attorney General
Idaho Public Utilties Commission
472 W. Washington (83702)
P.O. Box 83720
Boise, Idaho 83720-0074
Donovan Walker
Deputy Attorney General
Idaho Public Utilties Commission
472 W. Washington (83702)
P.O. Box 83720
Boise, Idaho 83720-0074
Industrial Customers of Idaho Power
Peter J. Richardson, Esq.
Richardson & O'Leary
515 N. 2yth Street
P.O. Box 7218
Boise, Idaho 83702
Don Reading
Ben Johnson Associates
6070 Hill Road
Boise, Idaho 83702
Idaho Irrigation Pumpers
Association, Inc.
Eric L. Olsen
Racine, Olson, Nye, Budge & Bailey
P.O. Box 1391
201 E. Center
Pocatello, Idaho 83204
-2Hand Delivered
U.S. Mail
_ Overnight Mail
FAX
-- Email Weldon. stutzman Ci puc.idaho.gov
-2Hand Delivered
U.S. Mail
_ Overnight Mail
FAX
-- Email Donovan.walkerCipuc.idaho.gov
Hand Delivered
-LU.S.Mail
_ Overnight Mail
FAX
X Email peterCirichardsonandolearv.com
Hand Delivered
-LU.S.Mail
_ Overnight Mail
FAX
-X Email dreadingCimindspring.com
Hand Delivered
-LU.S.Mail
_ Overnight Mail
FAX
X Email eloCiracinelaw.net
RESPONSE OF IDAHO POWER TO THE FIFTH PRODUCTION REQUEST OF
THE INDUSTRIAL CUSTOMERS OF IDAHO POWER, Page 5
Anthony Yankel
29814 Lake Road
Bay Village, OH 444140
Kroger Co. I Fred Meyer and Smiths
Michael L. Kurtz
Kurt J. Boehm
Boehm, Kurtz & Lowry
36 East Seventh Street, Suite 1510
Cincinnati, Ohio 45202
The Kroger Co.
Attn: Corporate Energy Manager (G09)
1014 Vine Street
Cincinnati, Ohio 45202
Micron Technology
Conley Ward
Michael C. Creamer
Givens Pursley
601 W. Bannock Street
P.O. Box 2720
Boise, Idaho 83701
Dennis E. Peseau, Ph.D.
Utilty Resources, Inc.
1500 Libert Street SE, Suite 250
Salem, OR 97302
Department of Energy
Lot Cooke
Arthur Perry Bruder
Office of the Attorney General
United States Department of Energy
1000 Independence Ave., SW
Washington, DC 20585
Routing Symbol GC-76
Hand Delivered
-LU.S.Mail
_ Overnight Mail
FAX
-X Email tonyCiyankel.net
Hand Delivered
-LU.S.Mail
_ Overnight Mail
FAX
-X Email mkurtzCibkllawfirm.com
kboehm Ci bkllawfirm .com
Hand Delivered
-LU.S.Mail
_ Overnight Mail
FAX
Email
Hand Delivered
-LU.S. Mail
_ Overnight Mail
FAX
X Email cewCigivenspursley.com
mcc Ci givenspursley.com
Hand Delivered
-LU.S.Mail
_ Overnight Mail
FAX
-- Email dpeseauCiexcite.com
Hand Delivered
U.S. Mail
-2 Overnight Mail
FAX
-- Email lot.cookeCi hq.doe.gov
arthur.bruderCi hq.doe.gov
RESPONSE OF IDAHO POWER TO THE FIFTH PRODUCTION REQUEST OF
THE INDUSTRIAL CUSTOMERS OF IDAHO POWER, Page 6
Dennis Goins
Potomac Management Group
5801 Westchester Street
P.O. Box 30225
Alexandria, VA 22310-8225
Hand Delivered
-LU.S.Mail
_ Overnight Mail
FAX
-- Email DGoinsPMGCicox.net
Dale Swan
Exeter Associates
5565 Sterrett Place, Suite 310
Columbia, MD 20904
Hand Delivered
-1 U.S. Mail
_ Overnight Mail
FAX
-1 Email dswanCiexeterassociates.com
aansari Ci exeterassociates.com
(JL
Barton L. Kline
RESPONSE OF IDAHO POWER TO THE FIFTH PRODUCTION REQUEST OF
THE INDUSTRIAL CUSTOMERS OF IDAHO POWER, Page 7