Loading...
HomeMy WebLinkAbout20070904RNP-NWEC to IPC 1-3.pdfWilliam M. Eddie 610 SW Alder St. Suite 910 Portland, OR 97205 Jean Jewell, Commission Secretary Idaho Public Utilities Commission 427 W. Washington St. Boise, ID 83702-5983 Re: IPC-O7- Dear Ms. Jewell: REG!::1 Ph-o . . D .5Q3-fi-f1/)-$2~~ \.; ,'2;.t. ,. r.r-- Fax: 503-225-0276 q;~U:1 Qa8~J4~,4II? OB\ rr!lITiFS COi'iH\AISSIU August 29, 2007 Please find enclosed for filing the three (3) copies of the First Production Requests of Renewable Northwest Project and NW Energy Coalition. I have included a cover page of this document to be conformed and returned to me. Thank you for your attention to this matter. Sincerely, LIL-:::: William M. Eddie I'-..;) ~~~~. - '0- ::::; 0') ~l?l 1::- 3;;- ~ . :=::, ;jz u)() !:,," :li William M. Eddie (ISB #5800) ADVOCATES FOR THE WEST 610 SW Alder St., Suite 910 Portland, OR 97205 Ph: (503) 542-5245 Fax: (503) 225-0276 beddi e(fYad v ocateswest. org H. ~: C r:: j '" '", " Inn-! ~r.P -t. ~i" ; (".. 1:;1LUU, '.if-. ' -, ,.., UTi U dL. C()(,~\VI !SS BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPANY'S PETITION TO INCREASE THE PUBLISHED RATE ELIGIBILITY CAP FOR WIND POWERED SMALL POWER PRODUCTION FACILITIES; AND TO ELIMIN ATE THE 90%/110% PERFORMANCE BAND FOR WIND POWERED) SMALL POWER PRODUCTION FACILITIES CASE NO.IPC- E-07 - PRODUCTION REQUESTS OF RENEWABLE NORTHWEST PROJECT AND NW ENERGY COALITION TO IDAHO POWER COMPANY Intervenors Renewable Northwest Project and NW Energy Coalition, by and through counsel, request that Idaho Power Company ("Idaho Power" or "Company ) provide the following information as soon as possible but no later than September 7, 2007. These Production Requests are considered to be continuing, and the Company is requested to provide, by way of supplementary responses , additional documents or information that it or any person acting on its behalf may later obtain that will augment the information or documents produced. In answering each request, please provide the name of the person(s) preparing the answers, along with the title and function such individual holds with Idaho Power and the witness who can sponsor the answer at the hearing. The term "wind integration study" refers to FIRST PRODUCTION REQUESTS OF RNP AND NWEC -- the study filed with the Idaho Public Utilities Commission on February 7, 2007, in support ofthe Company s application in the above-captioned matter. PRODUCTION REQUEST NO.1: Please provide copies of all written information (including Powerpoint presentations and printed handouts) presented or otherwise provided to attendees of the public workshops in the above-captioned matter held on March 15 and June 20 2007. PRODUCTION REQUEST NO.2: Please identify all corrections, changes, or amendments to the assumptions, data inputs, or methodologies used for the wind integration study which Idaho Power Company believes are appropriate as of the current day, including without limitation corrections, changes, or amendments related to (a) elimination of inappropriate arbitrage opportunities between the west and east sides ofIdaho Power s system; (b) the use of asymmetric up- and down-regulation reserve requirements; (c) regulatory reserve requirements for high-resolution (less than O-minute) variability; (d) use of the Elkhorn (Telocaset) wind project; (e) use of different or refined wind forecast techniques or assumptions; (f) in the wind integration study "base case " any changes in the weighting of wind production in high-load and low-load hours; (g) market price inputs for the low, median, and high water years evaluated in the wind integration study; and (h) use of coal-fired generation units or other generation units for regulation. Please include a brief description of each correction, change, or amendment. PRODUCTION REQUEST NO.3: Please state the estimated impact to wind integration costs caused by each correction, change, or amendment identified in response to Production Request No., above; and please state Idaho Power s net current estimated cost of wind integration. FIRST PRODUCTION REQUESTS OF RNP AND NWEC n 2 DA TED this 29th day of August, 2007. William M. Eddie On behalf of RNP and NW Energy Coalition CERTIFICATE OF SERVICE I hereby certify that on this 29TH day of August 2007, true and correct copies of the foregoing FIRST PRODUCTION REQUESTS OF RNP AND NW ENERGY COALITION were delivered to the following persons via u.s. Mail: Jean Jewell (3 copies) Idaho Public Utilities Commission 472 W. Washington St. Boise, ID 83702 Brian Dickman Rocky Mountain Power 20 I S. Main Street, Suite 2300 Salt Lake City, UT 84111 Barton Kline (email copy also provided) Monica Moen Idaho Power Company O. Box 70 Boise, ID 83707-0070 Rich Rayhill Ridgeline Energy, LLC 720 W. Idaho Street, Suite 39 Boise, ID 83702 Scott Woodbury Deputy Attorney General Idaho Public Utilities Commission 472 W. Washington St. Boise, 10 83702 Robert M. Ellis, Esq. 4 Nickerson, Suite 301 Seattle, W A 98109 Peter Richardson Richardson & O'Leary O. Box 1849 Eagle, ID 83703 Glenn Ikemoto Idaho Windfarrns, LLC 672 Blair Avenue Piedmont, CA 94611 Don Reading 6070 Hill Road Boise, ID 83703 Dean J. Miller, Esq. McDevitt & Miller, LLP PO Box 2564 Boise, 10 83701 Dean Brockbank Rocky Mountain Power 201 S. Main Street, Suite 2300 Salt Lake City, UT 84111 Ronald K. Arrington Associate Chief Counsel John Deere Renewables, LLC 6400 NW 86th Street PO Box 6600 Johnston, IA 50131 FIRST PRODUCTION REQUESTS OF RNP AND NWEC n 3 R. Blair Strong Paine Hamblen, LLP 717 W. Sprague, Suite 1200 Spokane, W A 99220 Michael G. Andrea Staff Attorney A vista Corporation PO Box 3727 Spokane, W A 99220-3727 Ken Miller Snake River Alliance PO Box 1731 Boise, ID 83701 Gerald Fleischman 11535 W. Hazeldale Ct. Boise, ID 83713 Brian D. Jackson Renaissance Engineering & Design 2792 Desert Wind Rd. Oasis, 10 83647-5020 M. 1. Humphries Blue Ribbon Energy, LLC 2630 Central Ave. Idaho Falls, ID 83406 Gary Seifert Kurt Myers INL Biofuels & Renewable Energy Technologies PO Box 1625 , MS 3810 Idaho Falls, ID 83415-3810 William M. Eddie FIRST PRODUCTION REQUESTS OF RNP AND NWEC -- 4