Loading...
HomeMy WebLinkAbout20070119Staff to IPC 1-36.pdfDONOVAN E. WALKER DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0312 IDAHO BAR NO. 5921 nECE \\1 L::') ZGG1J~\N \9 1\\,\\\:32 lCf;\" ;,j :~(" \Jl )"::I .!' l- \ i _ ~ " ..' "."" Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5983 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR APPROV AL ) OF A POWER PURCHASE AGREEMENT WITH) TELOCASET WIND POWER PARTNERS, LLC AND TO INCLUDE THE ASSOCIATED EXPENSES IN THE COMPANY'S ANNUAL POWER COST ADJUSTMENT. CASE NO. IPC-06- FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY The Staff of the Idaho Public Utilities Commission, by and through its attorney of record Donovan E. Walker, Deputy Attorney General, requests that Idaho Power Company (Idaho Power; Company) provide the following documents and infonnation as soon as possible, but no later than FRIDAY, FEBRUARY 9, 2007. This Production Request is to be considered as continuing, and Idaho Power is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. For each item, please indicate the name of the person(s) preparing the answers, along with the job title of such person(s) and the witness who can sponsor the answer at hearing. FIRST PRODUCTION REQUEST TO IDAHO POWER JANUARY 19 2007 REQUEST NO.1: Please provide a copy of the 2005 RFP Evaluation Manual. REQUEST NO.2: Please provide a summary list showing those persons or finns who submitted Notices of Intent to Bid fonns. REQUEST NO.3: Please make available for review all proposals submitted in response to the 2005 RFP. REQUEST NO.4: Please provide a copy of any preliminary cost estimate summaries used for PP A comparisons. REQUEST NO.5: Please provide the Short-listed Bids PPA Comparisons. Include a summary showing for each short-listed bid the capacity, the annual energy output, the assumed transmission cost, the quoted PP A price and any associated pricing details, and the totallevelized cost per MWh reflecting updated pricing. REQUEST NO.6: Please provide a copy of any wind evaluation summaries used to compare bids. REQUEST NO.7: Please provide any bid evaluation summaries prepared by Garrad- Hassan. Provide any reports prepared by Garrad-Hassan for each short-listed proposal reviewing the predicted energy production of each project. REQUEST NO.8: Please provide an electronic copy of all spreadsheets used to compute levelized costs and to make a cost comparison of the bids. REQUEST NO.9: Please provide a summary of the Stage 1 Screening scores for all of the proposals. Include any written explanation for the scores that were awarded to each proposal. Identify all proposals eliminated from further consideration as a result of Stage Screening scores. FIRST PRODUCTION REQUEST TO IDAHO POWER JANUARY 19 2007 REQUEST NO. 10: Please provide a summary of the Stage 2 Screening scores for all of the proposals considered in Stage 2. Include any written explanation for the scores that were awarded to each proposal. Include scores, and written explanations and spreadsheets if any, for all non-price categories. In addition, include scores awarded to each proposal for wind energy evaluation criteria. REQUEST NO. 11: Please provide a copy (electronic if available) of any sensitivity analysis that was perfonned to evaluate proposals in the Stage 2 Screening. REQUEST NO. 12: Please provide infonnation showing the amount and date of any updated prices that may have been considered in the proposal analysis. .For any updated prices that may have been considered, show or explain how any evaluation scores may have changed. REQUEST NO. 13: Please provide a copy of any analysis perfonned as part of the bid evaluation comparing the expected seasonal generation output for short-listed proposals to Idaho Power s seasonal load shape. REQUEST NO. 14: If any short-listed bidders voluntarily withdrew projects from further consideration, please state the reasons for withdrawal. REQUEST NO. 15: Please provide analysis to support continued use in this agreement of the same seasonalization adjustment factors as are currently being used for PURP A agreements. In the analysis, provide support or justification for each of the months included in each of the three seasons. REQUEST NO. 16: Please provide a copy of any transmission studies (Interconnection Feasibility Study, System Impact Study, or Facilities Study) completed for short-listed projects to assess the Company s ability to transmit power from the project site to Idaho Power s system to identify any transmission constraints, and to identify and estimate the costs of any necessary transmission system upgrades. FIRST PRODUCTION REQUEST TO IDAHO POWER JANUARY 19 2007 REQUEST NO. 17: Has a System Impact Study been completed for the Telocaset Project? If so, please provide a copy. If not, when is the study expected to be completed? REQUEST NO. 18: Has a Large Generator Interconnection Agreement been negotiated and signed for the project? If so, please provide a copy. REQUEST NO. 19: Please explain why no network upgrades are required for the 34 MW increment of capacity and why Telocaset shall have no obligation to contract for or pay for upgrade costs associated with the 34 MW increment. REQUEST NO. 20: Please explain why Telocaset is only responsible for network upgrade costs for the first 66 MW of capacity. REQUEST NO. 21: Will any of the network upgrade payments to be made by Telocaset be subject to refund or reimbursement? Is so, please describe how the reimbursement will be made. REQUEST NO. 22: Please provide any estimates of interconnection costs that were made for the short-listed proposals. REQUEST NO. 23: Please list and describe any pennits that must be obtained for the Telocaset project to be constructed and describe the status ofthose pennits. REQUEST NO. 24: Will there be any costs that Idaho Power will incur in order to make use of the forecasts provided for the Telocaset project? If so, please describe and estimate those costs. REQUEST NO. 25: Please discuss any consequences or implications if Telocaset Wind Power Partners LLC or Horizon Wind Energy is sold to another owner. FIRST PRODUCTION REQUEST TO IDAHO POWER JANUARY 19 2007 REQUEST NO. 26: What is Idaho Power s most recent forecast of expected finn wholesale electric energy prices for the next five and ten-year periods for heavy and light load hours? Please identify the source and date on which the forecasts were made. REQUEST NO. 27: Please provide estimates of the timing, frequency and duration of expected curtailmeni under Section 9.22 of the Telocaset Agreement for: a) the first 66 MW of generation capacity, and b) the next 34 MW increment of generation capacity. Also provide copies of any written or electronic communications between Idaho Power and Horizon concerning the timing, frequency and duration of expected curtailment due to transmission constraints. REQUEST NO. 28: Please provide the estimate generation amounts by month for each year of the Agreement. REQUEST NO. 29: What does Idaho Power intend to do with the Environmental and Renewable Energy credits from the project? What is the estimated value of the credits? REQUEST NO. 30: Please discuss the basis for the damages and cap amounts for net energy shortfall as shown in Appendix F. REQUEST NO. 31: Please explain the basis for the Aggregate Price Adjustment limit associated with Appendix E and the limit on the aggregate amount of an Aggregate Price Adjustment when combined with any Net Energy Shortfall Damages. REQUEST NO. 32: Please discuss the basis for the required Perfonnance Assurance amounts as contained in Section 12.2 of the Agreement. REQUEST NO. 33: Please discuss the basis for the Delay Damage amounts as contained in Section 21.4 of the Agreement. FIRST PRODUCTION REQUEST TO IDAHO POWER JANUARY 19 2007 REQUEST NO. 34: Please discuss the basis for the Limitations on Sellers Damages amounts as contained in Section 21.5 of the Agreement. REQUEST NO. 35: Please discuss the basis for the tennination payment amounts as contained in Sections 22., 22.2 and 22.3 of the Agreement. REQUEST NO. 36: Please describe what happens to the perfonnance assurance guaranty if Horizon is sold by Goldman Sachs. DATED at Boise, Idaho, this 1% day of January 2007. Deputy Attorney General Technical Staff: Rick Sterling i:umisc:prodreg/ipceO6.31dwrpskls prod reg 1 FIRST PRODUCTION REQUEST TO IDAHO POWER JANUARY 19 2007 CERTIFICATE OF SERVICE HEREBY CERTIFY THAT I HAVE THIS 19TH DAY OF JANUARY 2007 SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY, IN CASE NO. IPC-06-, BY MAILING A COpy THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: MONICA B MOEN BARTON L KLINE IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 JIM MILLER RIC GALE IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 i? 4-rA SECRETARY CERTIFICATE OF SERVICE