Re:Case No. IPC-06-
In The Matter Of The Application Of Idaho Power Company For
Approval Of An Agreement Between Avimor, LLC Idaho Power To
Provide Electric Transmission And Substation Facilities To The
Avimor Multi-Use Development
Dear Ms. Jewell:
Please find enclosed for filing an original and seven (2) copies of Idaho Power
Company s Response to the First Production Request of the Commission Staff;
I would appreciate it if you would return a stamped copy of this transmittal letter in
the enclosed self-addressed , stamped envelope.
Very truly yours
(b.
Monica B. Moen
MBM:sh
Enclosures
Telephone (208) 388-2692 Fax (208) 388-6936 E-mail mmoenlfflidahopower.com
MONICA MOEN , ISB # 5734
BARTON KLINE , ISB # 1526
Idaho Power Company
1221 West Idaho Street
P. 0, Box 70
Boise , Idaho 83707
Telephone: (208) 388-2692
FAX Telephone: (208) 388-6936
Attorney for Idaho Power Company
"""'-
\/r-
. I-i'. \i V'-, , -'-
ZO05 DEC - I P~1~: 41
ID/\HCJ F U;,1!..1G
UTILITiES COivHAISSIOl',
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR
APPROVAL OF AN AGREEMENT
BETWEEN AVIMOR , LLC AND IDAHO
POWER TO PROVIDE ELECTRIC
TRANSMISSION AND SUBSTATION
FACILITIES TO THE AVIMOR MULTI-USE
DEVELOPMENT
) CASE NO. IPC-06-
IDAHO POWER COMPANY'
RESPONSE TO THE FIRST
PRODUCTION REQUEST OF THE
COMMISSION STAFF
COMES NOW , Idaho Power Company ("Idaho Power" or "the Company ), and
in response to the First Production Request of the Commission Staff to Idaho Power
Company dated November 17, 2006 , herewith submits the following information:
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF -
REQUEST NO.Does the Company have other transmission and
substation facilities agreements, similar to the Avimor Facilities Agreement , that are
currently being drafted or out for signature? If the answer is yes , please provide those
agreements with a description of the stage of the negotiations.
RESPONSE TO REQUEST NO.1: The Company is currently in negotiations
with a development company in the Donnelly area that proposes to construct a new
residential and commercial development. That development is expected to require
approximately 20 MW of power. Construction of a new feeder for the development would
fall under the Company s Rule H. Discussions between the parties have also included
estimated costs for constructing a new substation on the property that would eliminate the
need for the new feeder. The Company would enter into a separate agreement with the
development company for construction of the substation.It is anticipated that the
substation agreement would be similar to the Avimor Facilities Agreement.
The response to this request was prepared by Tom Barber, Engineering
Project Leader, Idaho Power Company, in consultation with Monica Moen , Attorney II
Idaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF - 2
REQUEST NO.2: In the Avimor Agreement the facilities cost is estimated to
be $4.3 million, Please divide those costs into transmission line and distribution substation
costs.
RESPONSE TO REQUEST NO.Transmission line costs are
approximately $2 100 000 and substation costs are approximately $2 200 000.
The response to this request was prepared by Tom Barber, Engineering
Project Leader, Idaho Power Company, in consultation with Monica Moen, Attorney II
Idaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF - 3
REQUEST NO.3: Under Company design criteria how many residential
customers could the 10 MW substation serve?
RESPONSE TO REQUEST NO.3: Given the nature of the development , the
size of homes anticipated in the development and the fact that natural gas would be
available in the development , each home will require between 5 and 15 kW of substation
capacity. The 10 MW substation would support between 1 300 and 1 500 homes in the
Avimor project.
The response to this request was prepared by Tom Barber, Engineering
Project Leader, Idaho Power Company, in consultation with Monica Moen , Attorney II
Idaho Power Company,
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF - 4
REQUEST NO.4: Without changes in the voltage or size of the transmission
line , to what capacity could the substation be expanded? How many residential customers
could be served from the expanded substation? Approximately what would be the
substation expansion cost?
RESPONSE TO REQUEST NO.4: This substation is designed for 40 MW of
total load. It will be originally constructed to accommodate a load of 10 MW. When that
load is approached , the substation can be expanded to accommodate a load of 20 MW at
a cost of between $150 000 to $200 000 (2006 dollars). After the 20 MW load is reached
the facility could be expanded to its final design load of 40 MW. This final expansion would
also cost between $150 000 and $200 000 (2006 dollars). Although this substation could
be expanded to 80 MW of capacity, the developer s plan forecasts a need for
approximately 35 MW total build-out load, The conductor of the transmission line can
handle up to 143.5 MW and is the minimum sized conductor that we use at this voltage
(138 kV),
Once the substation is expanded to a capacity of 40 MW of total load and
assuming an average load of 10 kW per household and that development characteristics of
the subdivision remain the same, the expanded substation could serve between 5 200 and
6000 residential customers,
The response to this request was prepared by Tom Barber , Engineering
Project Leader, Idaho Power Company, in consultation with Monica Moen , Attorney II
Idaho Power Company,
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF - 5
REQUEST NO.It is the Staff's understanding that the proposed
substation is initially to be served by a single transmission line. Does the Company
currently have plans to extend a second transmission line to the substation for reliability or
other reasons? If the area around Avimor builds out , would the Company extend a second
transmission line to the substation?
RESPONSE TO REQUEST NO.5: There will only be one transmission line
into the substation at this time. If future development occurs in the nearby area , the
Company may need to build a second transmission line from this substation to the north or
to the west. Actual conditions at the time of that development would dictate how future
growth could be served most cost-effectively.
The response to this request was prepared by Tom Barber, Engineering
Project Leader, Idaho Power Company, in consultation with Monica Moen , Attorney II
Idaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF - 6
REQUEST NO.6: The facilities included in the Avimor Agreement include a
transmission line and a distribution substation. What rate base cost per customer for these
types of facilities is currently included in residential rates? Please show the calculation of
the two parts, transmission line and distribution substation, separately.
RESPONSE TO REQUEST NO.6: The following table provides the rate
base amount for transmission lines and distribution substation facilities allocated to the
residential class according to the Company s class cost of service study prepared in the
2005 general rate case (Case No. IPC-05-28) adjusted in conformance with the
Commission s Order No. 30035.
Idaho Power Company
Transmission Lines and Distribution Substation - Residential Rate Base
Case No. IPC-05-28 (Adjusted per Order No. 30035)
Test Year - 2005
Rate Base Averaqe Customers
Rate Base per
CustomerResidential
Distribution -Substation
$ 125 040 370
708 348
345 176
345 176
$ 362.
$141.
Transmission Lines
Total $ 173 748 718 $ 503.
The response to this request was prepared by Tim E. Tatum , Senior Analyst
Pricing and Regulatory Services , Idaho Power Company, in consultation with Monica
Moen , Attorney II , Idaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF - 7
REQUEST NO.7: Please provide the calculations in Request No.6 above
but base those calculations on date from the Company s IPC-03-13 case.
RESPONSE TO REQUEST NO.7: The following table provides the rate
base amount for transmission lines and distribution substation facilities allocated to the
residential class according to the Company s class cost of service study prepared in the
2003 general rate case (Case No, I PC-03-13) adjusted in conformance with the
Commission s Order No. 29505.
Idaho Power Company
Transmission Lines and Distribution Substation - Residential Rate Base
Case No. IPC-03-13 (Adjusted per Order No. 29505)
Test Year - 2003
Residential Rate Base Averaqe Customers
Rate Base per
Customer
Transmission Lines
Distribution -Substation
$ 102 987 004
516 437
334 917
334 917
$ 307.
$ 112.
Total $ 140 503,441 $ 419.
The response to this request was prepared oy Tim E. Tatum , Senior Analyst
Pricing and Regulatory Services, Idaho Power Company, in consultation with Monica
Moen , Attorney II , Idaho Power Company.
Respectfully submitted this 151 day of December 2006,
MONICA B, MOEN
Attorney for Idaho Power Company
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF - 8
CERTIFICATE OF MAILING
I HEREBY CERTIFY that on the 1 5t day of December 2006, I served a true and
correct copy of the within and foregoing document upon the following named parties by the
method indicated below, and addressed to the following:
Weldon B. Stutzman
Deputy Attorney General
Idaho Public Utilities Commission
472 W. Washington Street
Boise , Idaho 83702
) U.S. Mail, Postage Prepaid
(X) Hand Delivered
) Overnight Mail
) Facsimile
(X) Email weldon.stutzman(Q)puc,idaho.qov
Duane Black
Executive Senior VP & C.
SunCor Development Company
80 E. Rio Salado Parkway, Suite 410
Tempe, AZ 85281
(X) U.S. Mail , Postage Prepaid
) Hand Delivered
) Overnight Mail
) Facsimile
) Email
(13.
MONICA B. MOEN
IDAHO POWER COMPANY'S RESPONSE TO THE FIRST PRODUCTION
REQUEST OF THE COMMISSION STAFF - 9