HomeMy WebLinkAbout20060816IPC to Staff 76-80.pdfIDAHO POWER COMPANY
O. BOX 70
BOISE, IDAHO 83707
RECEIVED
200G AUG \ 6 PH 4: 32
IO,o.HO P.l!BUC . i
UTILITIES CONIN11SSION
An IDACORP Company
August 16, 2006
Jean D. Jewell, Secretary
Idaho Public Utilities Commission
472 West Washington Street
P. O. Box 83720
Boise, Idaho 83720-0074
Re:Case No. IPC-06-
Idaho Power Company s Response to the Second Production
Request of the Commission Staff
Dear Ms. Jewell:
Please find enclosed for filing an original and two (2) copies of Idaho Power
Company s Response to the Second Production Request of the Commission Staff
regarding the above-referenced matter.
I would appreciate it if you would return a stamped copy of this transmittal letter
to me in the enclosed self-addressed stamped envelope.
Very truly yours
(/J.
Monica B. Moen
MBM:sh
Enclosures
Telephone (208) 388-2692, Fax (208) 388-6936, E-mail MMoen(g)idahopower.com
BARTON L. KLINE ISB #1526
MONICA B. MOEN ISB #5734
Idaho Power Company
P. O. Box 70
Boise, Idaho 83707
Telephone: (208) 388-2682
FAX Telephone: (208) 388-6936
RECEIVED
200G AUG \ 6 PH 4: 33
IDAHO PUBLIC
UTILITIES COMMISSION
Attorney for Idaho Power Company
Street Address for Express Mail
1221 West Idaho Street
Boise, Idaho 83702
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
CERTIFICATE OF PUBLIC CONVENIENCE
AND NECESSITY FOR THE RATE BASING
OF THE EV ANDER ANDREWS POWERPLANT.
CASE NO. IPC-06-
IDAHO POWER COMPANY'
RESPONSE TO THE SECOND
PRODUCTION REQUEST OF
COMMISSION STAFF
COMES NOW , Idaho Power Company ("Idaho Power" or "the Company"),
and , in response to the Second Production Request of the Commission Staff to Idaho
Power Company dated July 19 , 2006, herewith submits the following information:
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF COMMISSION STAFF Page
REQUEST NO. 76: Please provide data or analysis to support the
required Idaho Power Company gas supply construction costs added by Idaho Power to
each bid.
RESPONSE TO REQUEST NO. 76: The gas analysis worksheet is
attached hereto and identified as "Response to Request No. 76." This worksheet was
developed by Power Engineers at the request of Idaho Power s Peaking Resource RFP
Evaluation Team.
Power Engineers reviewed the gas supply available at each site and the
gas pressure requirements of the generation equipment proposed at each site. Power
Engineers verified the gas pressure availability and performed engineering calculations
to determine the size of the gas line required and whether compression equipment
would be needed to accommodate the proposed equipment. The cost of the gas
connection was supplied by Power Engineers with input from Idaho Power. Careful
consideration for consistency in the gas analysis of each Respondent's proposal was
maintained.
The response to this request was prepared by F. Gregory Hall , Principal
Engineer, Idaho Power Company, in consultation with Monica B. Moen, Attorney II
Idaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF COMMISSION STAFF Page 2
REQUEST NO. 77: Please provide data or analysis to support the costs
added by Idaho Power to each bid for capitalized property taxes.
RESPONSE TO REQUEST NO. 77: The amounts added to each bid for
estimated capitalized property taxes were based on an assumption that Idaho Power
would capitalize the property taxes for that portion of the tax year that the plant was still
under construction. This period was assumed to be January through March of 2008.
The plant cost amount was multiplied by the estimated tax levy rate for the site and then
divided by four to determine the amount of taxes that would be capitalized for the three-
month period of January-March 2008. See also the document attached to the
Response to Request No. 78 for the capitalized property tax amounts attributed to each
proposal.
The response to this request was prepared by Randy Henderson
Business Analyst, Idaho Power Company, in consultation with Monica B. Moen
Attorney II , Idaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF COMMISSION STAFF Page 3
REQUEST NO. 78: Please provide data or analysis to support the costs
added by Idaho Power to each bid for air and use permitting costs.
RESPONSE TO REQUEST NO. 78: Please refer to the document
attached hereto and identified as "Response to Request No. 78." The costs that were
used are based on the Company s experience with past projects and ongoing air
permitting costs at the existing gas turbine plants. As stated in the RFP, Idaho Power
would provide all air permitting costs for the Bennett Mountain and Evander Andrews
sites. The developer would be responsible for the costs of air permitting any other
sites.
With that in mind, the Company allocated $300 000 for the costs of
permitting the Evander Andrews and Bennett Mountain proposals. This amount
includes development of the Permit to Construct ($80 000), CEMS certification
($25 000), Relative Accuracy Test Audit ($25 000), Tier 1 Title V Permit Application
($100 000), Performance Testing ($20 000) and miscellaneous consultation ($50,000).
Idaho Power allocated $150 000 for permitting costs for each or the other
sites. This amount includes the Tier 1 Permit Application ($100 000) and miscellaneous
consultation ($50 000). The Tier 1 Title V Permit Application is developed after the
Permit to Construct is issued and was not included in any of the Respondents' bids. To
maintain consistency among each of the proposals with regard to this analysis, the
costs of the Tier 1 Permit Application and miscellaneous consultation were added to
proposals that were located at sites other than Bennett Mountain and Evander Andrews.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF COMMISSION STAFF Page 4
The response to this request was prepared by F. Gregory Hall , Principal
Engineer, Idaho Power Company, in consultation with Monica B. Moen , Attorney
Idaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF COMMISSION STAFF Page 5
REQUEST NO. 79: Please explain the difference between the
$49 999,000 firm contract price shown on line 21 of witness Said's direct testimony and
the plant cost amount shown on the Stage II Price Screening Score Sheets.
RESPONSE TO REQUEST NO. 79: The $49 999,000 firm contract price
resulted from extensive final contract negotiations with Siemens Power Generation, Inc.
while the $50 055,000 figure represents the amount Siemens originally submitted in its
bid. The difference in cost is due to negotiations between the parties concerning
detailed components of Siemens' original bid. Those negotiations resulted in reducing
the final turnkey price slightly. The plant cost used for evaluation of the Siemens bid
was based on the $50 055 000 amount, plus approximately $727 000 of directly
assigned capital costs by Idaho Power for items such as capitalized property taxes, air
use and permitting costs , and required gas construction. Please refer to the document
attached to the Response to Request No. 78.
The response to this request was prepared by Randy Henderson
Business Analyst, Idaho Power Company, in consultation with Monica B. Moen
Attorney II , Idaho Power Company.
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF COMMISSION STAFF Page 6
REQUEST NO. 80: Please provide an electronic copy of all input and
output files used to perform the AURORA analysis requested in Staff Request No. 18.
Please state the version of AURORA used.
RESPONSE TO REQUEST NO. 80: Please refer to the CD files attached
hereto as "Response to Request No. 80.
The response to this request was prepared by Karl Bokenkamp, General
Manager, Power Supply Operations and Planning, Idaho Power Company, in
consultation with Monica B. Moen, Attorney II , Idaho Power Company.
DATED at Boise, Idaho , this 16th day of August 2006.
CB ?J1he-
MONICA B. MOEN
Attorney for Idaho Power Company
IDAHO POWER COMPANY'S RESPONSE TO THE SECOND
PRODUCTION REQUEST OF COMMISSION STAFF Page 7
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this 16th day of August 2006 , I served a true and
correct copy of the within and foregoing IDAHO POWER COMPANY'S RESPONSE TO
THE SECOND PRODUCTION REQUEST OF COMMISSION STAFF upon the following
named parties by the method indicated below, and addressed to the following:
Commission Staff
Donovan Walker
Deputy Attorney General
Idaho Public Utilities Commission
472 W. Washington (83702)
O. Box 83720
Boise, Idaho 83720-0074
~Hand Delivered
- U.S. Mail
Overnight Mail
FAX
--X- Email: Donovan.walker(g)puc.idaho.gov
Industrial Customers of Idaho Power
Peter J. Richardson , Esq.
Richardson & O'Leary
515 N. 2ih Street
O. Box 7218
Boise , Idaho 83702
Hand Delivered
X U.S. Mail
Overnight Mail
FAX
--X- Email: peter(g) richardsonandoleary.com
Don Reading
Ben Johnson Associates
6070 Hill Road
Boise, Idaho 83702
Hand Delivered
X U.S. Mail
Overnight Mail
FAX
Email: dreading(g)mindspring.com
(f;~
Monica B. Moen
CERTIFICATE OF SERVICE, Page
IDAHO POWER COMPANY
CASE NO. IPC-O6-
SECOND PRODUCTION REQUEST
OF COMMISSION STAFF
RESPONSE TO
REQUEST NO. 76
IDAHO POWER COMPANY
CASE NO. IPC-O6-
SECOND PRODUCTION REQUEST
OF COMMISSION STAFF
RESPONSE TO
REQUEST NO. 78
IDAHO POWER COMPANY
CASE NO. IPC-O6-
SECOND PRODUCTION REQUEST
OF COMMISSION STAFF
RESPONSE TO
REQUEST NO. 80