Loading...
HomeMy WebLinkAbout20060725IPC to Staff 61.pdfIDAHO POWER COMPANY O. BOX 70 BOISE, IDAHO 83707 RECEIVED 2006 JUL 25 AM 8: 01+An IDACORP Company IDAHO PUBLIC UTILITIES COMMISSION July 24, 2006 Rick Sterling Idaho Public Utilities Commission 472 West Washington Street P. O. Box 83720 Boise, Idaho 83720-0074 Re:Case No. IPC-06- Idaho Power Company s Response to the First Production Request of Commission Staff Dear Rick: Please find enclosed the supplemental information that you requested regarding Request for Production No. 61. Please feel free to contact me if you have any questions. Very truly yours (D~ Monica B. Moen MBM:sh Enclosure Telephone (208) 388-2692 Fax (208) 388-6936, E-mail MMoen(g)idahopower.com BARTON L. KLINE ISB #1526 MONICA B. MOEN ISB #5734 Idaho Power Company O. Box 70 Boise , Idaho 83707 Telephone: (208) 388-2682 FAX Telephone: (208) 388-6936 Attorney for Idaho Power Company Street Address for Express Mail 1221 West Idaho Street Boise , Idaho 83702 RECEIVED 200& JUL 25 AM 8: 01+ IDAHO PUBLIC UTILITIES COMMISSION BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE RATE BASING OF THE EV ANDER ANDREWS POWER PLANT. ) CASE NO. IPC-06- ) (To Rick Sterling) IDAHO POWER COMPANY' SECOND SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF COMMISSION STAFF COMES NOW, Idaho Power Company ("Idaho Power" or "the Company") and, in response to the First Production Request of the Commission Staff to Idaho Power Company dated June 16, 2006, herewith submits the following supplemental information: REQUEST NO. 61: Please discuss the status of Idaho Power s plans to upgrade the Borah-West transmission path. Was an upgraded Borah-West transmission path assumed to be available in the evaluation of RFP bids? Were transmission cost estimates for projects east of the Treasure Valley area less in the March 2005 RPF than in previous thermal RFPs due to an assumed upgraded Borah-West transmission path? IDAHO POWER COMPANY'S SECOND SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF COMMISSION STAFF, Page RESPONSE TO REQUEST NO. 61: Idaho Power did not receive any bids in this RFP that would require energy to cross the Borah-West transmission constraint. As a result , upgrades to the Borah-West transmission path did not affect favorably or unfavorably the evaluations of any bids received in this RFP. The response to this request was prepared by F. Gregory Hall , Principal Engineer, Idaho Power Company, in consultation with Barton L. Kline, Senior Attorney, Idaho Power Company. FIRST SUPPLEMENTAL RESPONSE TO REQUEST NO. 61: The Borah West upgrade included in the 2004 IRP is intended to support anticipated renewable generation that will be located in Eastern Idaho. Because this upgrade is required for generation requirements independent of the peaking resource, it cannot be regarded as an alternative to construction of an additional peaking resource to meet electrical demands. The response to this request was prepared by F. Gregory Hall , Principal Engineer, Idaho Power Company, in consultation with Barton L. Kline, Senior Attorney, Idaho Power Company. SECOND SUPPLEMENTAL RESPONSE TO REQUEST NO. 61: The Borah West up rate project will provide a 250 MW increase in East to West transfer capability on the Borah West transmission path. Construction is presently underway all major phases of the project. May 2007 is the anticipated project completion date. The four major components of the project and their corresponding construction status are listed below: IDAHO POWER COMPANY'S SECOND SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF COMMISSION STAFF , Page 2 Brady-Am Falls 138 kV line , Re-conductor 0.4 mile -Construction is Complete. Borah-Hunt 230 kV line , Rebuild 70.0 miles of 138 kV to 230 kV , single 1590 kcmil ACSR - Construction is 7% complete. Borah 345 kV, 175 Mvar Shunt Capacitor - Construction is 50% complete. Midpoint 345 kV , 175 Mvar Shunt Capacitor - - Construction is 65% complete. Adelaide Substation Reconfiguration - Construction 95% complete. Hunt Substation Reconfiguration - Construction 67% complete. The response to this request was prepared by Roger Grim, Engineer Idaho Power Company, in consultation with Barton L. Kline, Senior Attorney, Idaho Power Company. Dated this 24th day of July, 2006. MONICA B. MOEN Attorney for Idaho Power Company IDAHO POWER COMPANY'S SECOND SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF COMMISSION STAFF, Page 3