HomeMy WebLinkAbout20060712IPC to Staff 18.pdfIDAHO POWER COMPANY
O. BOX 70
BOISE, IDAHO 83707
RECEIVED
2006 JUL '2 PH 2:
IDAHO Purj! IC
UTILITIES COI\4r.1/SSION
An IDACORP Company
July 12, 2006
Jean D. Jewell, Secretary
Idaho Public Utilities Commission
472 West Washington Street
P. O. Box 83720
Boise, Idaho 83720-0074
Re:Case No. IPC-06-
Idaho Power Company s First Supplemental Response to the First
Production Request of Commission Staff
Dear Ms. Jewell:
Please find enclosed for filing an original and two (2) copies of Idaho Power
Company s First Supplemental Response to the First Production Request of Commission
Staff regarding the above-described case.
I would appreciate it if you would return a stamped copy of this transmittal letter
to me in the enclosed self-addressed stamped envelope.
Very truly yours
q(~ (fi.
Monica B. Moen
MBM:sh
Enclosures
Telephone (208) 388-2692 Fax (208) 388-6936, E-mail MMoenriY;dahopower.com
BARTON L. KLINE ISB #1526
MONICA B. MOEN ISB #5734
Idaho Power Company
P. O. Box 70
Boise, Idaho 83707
Telephone: (208) 388-2682
FAX Telephone: (208) 388-6936
RECEIVED
2006 JUL 12 PH 2= 25
IDAHO PUBLIC
UTILITIES COMMISSION
Attorney for Idaho Power Company
Street Address for Express Mail
1221 West Idaho Street
Boise, Idaho 83702
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
CERTIFICATE OF PUBLIC CONVENIENCE
AND NECESSITY FOR THE RATE BASING
OF THE EVANDER ANDREWS POWERPLANT.
CASE NO. IPC-06-
IDAHO POWER COMPANY'S FIRST
SUPPLEMENTAL RESPONSE TO
THE FIRST PRODUCTION REQUEST
OF COMMISSION STAFF
COMES NOW , Idaho Power Company ("Idaho Power" or "the Company
and , in response to the First Production Request of the Commission Staff to Idaho Power
Company dated June 16, 2006, herewith submits the following supplemental information:
IDAHO POWER COMPANY'S FIRST SUPPLEMENTAL RESPONSE TO FIRST
PRODUCTION REQUEST OF COMMISSION STAFF Page
REQUEST NO. 18: Please perform the following computer simulation
runs for Idaho Power s system using the AURORA model. Before making any runs
however, review all assumptions for the transmission interconnections to Idaho Power
system , all assumptions for Idaho Power s existing generating plants, power purchase
and sales contracts , load shape and any other necessary input assumptions and make
any necessary adjustments so that the-model corresponds as closely as possible to
actual conditions. Insure that the load , and fuel price forecasts assumed in the modeling
runs are consistent with those of the 2006 IRP. It may be desirable to use the AURORA
Portfolio" feature to model Idaho Power for purposes of the following analyses.
Perform an hourly simulation beginning June 1 , 2007 and extending
through December 2032 (running five years beyond the conclusion of the
period of interest as recommended by EPIS) under an operating mode in
which no new capacity can be added within the Idaho Power system and
supply deficiencies are met through power imports from outside Idaho
Power s system. Based on the results of this run , identify the number and
timing of any hours in which transmission constraints limit the amount of
power that can be imported. In addition , identify those transmission
interconnections on which constraints occur. Identify the timing and
duration of any load curtailment predicted by the model. Report the
results in graphical format, including any narrative necessary to interpret
the results.
IDAHO POWER COMPANY'S FIRST SUPPLEMENTAL RESPONSE TO FIRST
PRODUCTION REQUEST OF COMMISSION STAFF Page 2
Perform a long-term optimization (capacity addition) study for the period
June 1 , 2007 through December 2032. Use hourly dispatch to fully capture
peak load hours. Confirm that the new resource choices available match
those identified in the Company s 2006 IRP and that the Evander Andrews
project is also available as a choice at the prices and terms assumed in
the RFP analysis. Assume also that market purchases are an available
option. Based on the results of this run, identify the type , timing and
location of new resources added along with the amount of capacity and
energy associated with each new resource. Confirm whether the Evander
Andrews project is chosen as an alternative to meet load. Summarize the
months and the hours within each month when the Evander Andrews plant
would be used to meet load. Identify any other resources selected by the
model.
Perform an hourly simulation beginning June 1 , 2007 and extending
through December 2032 assuming that capacity and energy is available in
accordance with the Evander Andrews project but at zero cost. Compare
the net power supply cost Over the duration of the simulation to the net
power supply cost for the model rim conducted in part "b" above. Compare
the difference in net power supply cost to the cost of the Evander Andrews
project.
IDAHO POWER COMPANY'S FIRST SUPPLEMENTAL RESPONSE TO FIRST
PRODUCTION REQUEST OF COMMISSION STAFF Page 3
RESPONSE TO REQUEST NO. 18: The information requested in
subparts "" and "b" has been provided. Attached hereto as "Response to Request No.
18(c)" is Idaho Power s response to subpart "" of this Request No. 18.
DATED at Boise , Idaho, this 12th day of July 2006.
(13.
MONICA B. MOEN
Attorney for Idaho Power Company
IDAHO POWER COMPANY'S FIRST SUPPLEMENTAL RESPONSE TO FIRST
PRODUCTION REQUEST OF COMMISSION STAFF Page 4
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this 12th day of July, 2006, I served a true and
correct copy of the within and foregoing IDAHO POWER COMPANY'S FIRST
SUPPLEMENTAL RESPONSE TO THE FIRST PRODUCTION REQUEST OF
COMMISSION STAFF upon the following named parties by the method indicated
below, and addressed to the following:
Commission Staff Hand Delivered
Donovan Walker US. Mail
Deputy Attorney General Overnight Mail
Idaho Public Utilities Commission FAX
472 W. Washington (83702)Email: Donovan.walkerCfYpuc.idaho.gov
O. Box 83720
Boise, Idaho 83720-0074
Industrial Customers of Idaho Power Hand Delivered
Peter 1. Richardson, Esq.-1L US. Mail
Richardson & O'Leary Overnight Mail
515 N. 27th Street FAX
O. Box 7218 Email: peterCfYrichardsonandoleary.com
Boise, Idaho 83702
Don Reading
Ben Johnson Associates Hand Delivered
6070 Hill Road US. Mail
Boise, Idaho 83702 Overnight Mail
FAX
Email: dreadingCfYmindspring.com
Mountain View Power, Inc.Hand Delivered
Ronald L. Williams US. Mail
Williams Bradbury, P.Overnight Mail
O. Box 2128 FAX
Boise, Idaho 83701 Email: ron cfy williamsbradbury .com
Robert D. Looper, President Hand Delivered
Mountain View Power, Inc.US. Mail
1015 W. Hays Street Overnight Mail
Boise, Idaho 83702 FAX
Email: rlooperCfYspellc.com
f3.
Monica B. Moen
CERTIFICATE OF SERVICE, Page
IDAHO POWER COMPANY
CASE NO. IPC-O6-
FIRST PRODUCTION REQUEST
OF COMMISSION STAFF
SUPPLEMENTAL RESPONSE TO
REQUEST NO.
Request 18 C - Avoided cost analysis with 170 MW generating resource added to the
portfolio at zero cost. Reduced resources added in 18 B by 170MW (48MW CHP 2009-
2012, and 122 MW Coal in 2012) to account for capacity displacement of 170 MW
resource. Total zero cost MWh over the 25 year study period are 38 060 881 with an
estimated nominal value of $69 per MWh ($2 640 869,220/38 060 881)
Total Portfolio Cost comparison
Idaho Power Co.
Total Portfolio Cost Comparison
Jun 2007 - Dec 2032
170 MW zero cost resource with displaced
RMT capacity
Nominal Dollars
k.";\ffdo:LI(i);-
. '::.
'!:jiil leOl:f;i:;;!/fL.",i:': '!:,,::TotaIJ4ost
027 598.i Total
Evander : Total , $1 386 729.
640,869.