Loading...
HomeMy WebLinkAbout200503231st Request of Staff to Idaho Power.pdfDONALD L. HOWELL, II DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0312 IDAHO BAR NO. 3366 F(ECEIVED II t:li,nLf,..c 0 2DuS . liAR 2 3 pro"~ J: . f~). I,U ;c!ULiC u fiLl " I t=" ~~ f~rp~MjI,-v vU111 II.).;) n Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5983 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF IDAHO POWER COMPANY FOR AUTHORITY TO INCREASE ITS RATES AND CHARGES FOR ELECTRIC SERVICE DUE TO THE INCLUSION OF THE BENNETT MOUTAIN PROJECT INVESTMENT IN REVENUE REQUIREMENT. CASE NO. IPC-05- FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY The Staff of the Idaho Public Utilities Commission, by and through its attorney of record Donald L. Howell, II, Deputy Attorney General, requests that Idaho Power Company (Company; IPC) provide the following documents and information as soon as possible, but no later than FRIDAY, APRIL 8, 2005. This Production Request is to be considered as continuing, and Idaho Power Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. For each item, please indicate the name of the person(s) preparing the answers, along with the job title of such person(s) and the witness who can sponsor the answer at hearing. FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY MARCH 23 , 2005 REQUEST NO.1: Please provide a detailed cost breakdown for the following: a) all costs for the Bennett Mountain Project that are above the Mountain View contract amount of $44.6 million, and b) all costs for transmission and interconnection facilities required to integrate the Bennett Mountain Power Plant into the Company s system. REQUEST NO.2: Please list and describe all significant change orders (in excess of 000) associated with the Bennett Mountain project. Please list the added cost for each significant change order. REQUEST NO.3: Please provide a description of the transmission construction or upgrades and costs made for the following: a) transmission between the Bennett Mountain Plant switchyard and Idaho Power existing 230 kV line located approximately four miles north of the project site and b) transmission on the existing 230 kV line north of the project site (between Mountain Home and Boise). Include a description of all new equipment added, any modifications made to existing equipment, any new or replaced conductors, any new equipment or modifications to substations and any operational changes that have been made to integrate the Bennett Mountain Project into Idaho Power s system. REQUEST NO.4: Please quantify the increase in transmission capacity (if any) made available as a result of upgrades to the existing 230 kV transmission line located north of the project site (between Mountain Home and Boise). If there is additional transmission capacity that is over and above the capacity needed for the Bennett Mountain plant (as currently built), what is the intended use of the additional capacity? Can Idaho Power identify any additional revenues associated with the additional capacity? FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY MARCH 23, 2005 REQUEST NO.5: For that portion of the transmission line connecting the Bennett Mountain plant to Idaho Power s existing 230 kV line, was that line built with additional capacity over and above that needed for Bennett Mountain (as currently built)? If yes, please quantify the over capacity and the intended use of the additional capacity. REQUEST NO.6: Did Idaho Power elect to oversize the gas supply pipeline that interconnects the project with the Williams NW pipeline (greater than the 8-inch pipeline included in Mountain View s bid)? If so , what size of pipeline was installed and what was the incremental cost incurred to install the larger size pipeline? REQUEST NO.7: Has ownership of the Bennett Mountain plant been transferred to Idaho Power? If so, what was the Provisional Acceptance Date, what was the Final Acceptance Date, and when was title transferred? REQUEST NO.9: What is the cost of the capitalized start-up fuel? Specify the account number where it is booked, the volume and dollar amount of fuel and its purchase price per thermo REQUEST NO. 10: Has Idaho Power completed its performance tests for the plant? , did the plant meet the testing criteria contained in the purchase agreement? REQUEST NO. 11: When will the Company distribute "bill stuffers" concerning the proposed base rate increase to its customers? DATED at Boise, Idaho, this 23 day of March 2005. Donald L. Howel , I Deputy Attorney General Technical Staff: Rick Sterling i :umisc :prodreq/ipceO5.1 Odhrps FIRST PRODUCTION REQUEST TO IDAHO POWER COMPANY MARCH 23, 2005 CERTIFICATE OF SERVICE HEREBY CERTIFY THAT I HAVE THIS 23RD DAY OF MARCH 2005 SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER, IN CASE NO. IPC-05-, BY MAILING A COpy THEREOF POSTAGE PREPAID TO THE FOLLOWING: BARTON L KLINE MONICA MOEN IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 GREGORY W SAID JOHN R GALE IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070 SECRETARY CERTIFICATE OF SERVICE