Loading...
HomeMy WebLinkAboutTable_dh.doc Case Case No. Approving Order No. Eligible or Participating Customers End Date Tariff or Contract Approved Rates Penalty System Non-System Recovery Astaris Load-Reduction IPC-E-01-9 28695 1 March 2003 Contract Avg. 15.9( No PCA IPCo Irrigation Load-Reduction IPC-E-01-3 28676 (Intrloc) 28699 (Final) 446 November 2001 Contract 15¢ kW Yes dbl rate; then No PCA IPCo Industrial Load-Reduction IPC-E-01-4 28707 ?0 March 2002 Tariff & Contract To Be Determined Interruptible Acct.555 PCA IPCo IRP IOU IPC-E-01-6 Tariff % of Sch. 24 PacifiCorp Irrigation Load-Reduction PAC-E-01-4 28702 400-500 estimate September 2001 Contract 13.5¢ not disc 15¢ disc Yes 27¢ kWh PCA PacifiCorp 20/20 Challenge PAC-E-01-7 28743 residential customers September 2001 Tariff 20% rate for 20% reduction; 10% rate reduction for 10-20% load reduction No Acct. 557 (Other Exp.) PacifiCorp Demand Exchange TA 01-1 On-going Contract 50% of market Sch. 71 Rates Avista Irrigation Load-Reduction AVU-E-01-4 28698 68 October 2001 Tariff >50,000=10¢ kW 25-50,000=5¢ kW 0-25,000=0 No, because no carry chrg on deferral Put in Acct. 555 Avista Industrial Large Customer Buy-Back AVU-E-00-10 28595 Contract Rule 26 Avista All Cost AVU-E-01-6 AVU-E-01-15 28849 No Contract Sch. 92