AnD OOnP6nrty
October 20,2021
VIA ENCRYPTED ELECTRONIC MAIL
Ms. Jan Noriyuki, Secretary
ldaho Public Utilities Commission
P.O. Box 83720
11331 W. Chinden Boulevard
Building 8, Suite 201-A(83714')
Boise, ldaho 83720-007 4
Re: ldaho Power Company's Confidential ldaho Energy Efficiency Rider
Activity and Balance Report through September 2021
Dear Ms. Noriyuki:
As envisioned by Order No. 33736 issued in Case No. IPC-E-16-33, enclosed
please find ldaho Power Company's Confidential ldaho Energy Efiiciency RiderActivity
and Balance Report for the month-end September 2021. The Rider is a regulatory liability
account and as such, a negative balance indicates that the Rider has collected amounts
in advance of funding energy efficiency programs. Alternatively, a positive balance
indicates the Rider has funded energy efficiency programs in advance of collection.
As noted in the accompanying Certificate of Attorney, the enclosure contains
commercially sensitive and potentially material non-public information under Regulation
FD.
lf you have any questions, please contact Quentin Nesbitt, Customer Research
and Analysis Leader, at 208-388-2519.
Very truly yours,
Connie Aschenbrenner
Rate Design Senior Manager
casche n bren ner@ida hopowe r.com
CGA:sg
Enclosure
cc W encl:Terri Carlock
Donn English
Connie Aschenbrenner
CERTIFICATE OF ATTORNEY
ASSERTION THAT MATERIALS
ARE PROTECTED FROM PUBLIC INSPECTION
The undersigned attorney, in accordance with RP 67, believes that the
attachments produced in ldaho Power Company's Confidential ldaho Energy Efficiency
Rider Activity and Balance Report for the month-end September 202'l contain information
that ldaho Power Company claims is a trade secret as described in Idaho Code S 74-101,
et seq., and $ 48-801, et seq., or otherwise protected from public disclosure, and as such
is exempt from public inspection, examination, or copying.
DATED this 20th day of October 2021
X*!.ff,,*t,.*,
Lisa D. Nordstrom
Counselfor ldaho Power Company
SI
An IDACORP ComOany
Cogeneration and Smal! Power Production
As of October 13,2021
Thls report ls only for "PURPA' quallfylng taclllUes and does not Include "Net f,eterlng" or "Non-PURPA PPA" Prolects.
Net kwh Eneroy Payment Mills/klM
September 2021
2021 Year to Date
lnception to Date
2273m.8il $15,626,179 68.75
2,430,114,529 $152,286,836 62.67
43,823,ri0331 $2,705,713,610 61.74
of h/MW
0
133
32
2
0
22
Under Contract Onllne
Wood Waste
Biomass
Hydro
Wnd
Geothermal
Solar
Combined Heat and Porrer
lndustdal Waste/Natural Gas
Total ProJects undercontr ct:
2 I
It2
0
3t 3l
92
t9
0
Cutrtnt Gontract Parametert Avallable
Published Avoided Cost
Solar and Wind Up to 100 kW units
Schedule 86. uo to 10 aMW
Price = 85 % of Martet
No generation commitment
\Mnd and Solar greater than 100 kW and other resources over 10 aMW are negotiated individually
146.64
Number lvfw
974.66State
22
2_Tr 2 16.50T--i;iflEd'16.50
1,212.91
106
25
975.47 105
under Contract Onllne
Fighting Creek Landfill Gas to Energy Station is a projecl located
in lD, but has an OR Schedule 85 contract. lt is counted as an
OR Project.