Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 8.pdfForm ApprovalU.S.Department of Energy Energy Information Administration Month.j Year 2015 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 City/State/Zip Boise chobbs@idahopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Address Box 70 City/State/Zip Boise ID 83707 Email rhenderson@idahopower.com Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Plant Name Idaho Power Co Evander Andrews Power Complex \°Plant ID 7953 Plant County 1 862 NW Mt Home Hwy Dist Rd AtPlantAddress Plant City Mountain Home Plant State ID 6 4^VI '?Yes NoRegulated A V/#For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?mYes No 4* CHP a CHP Efficiency 9^11^p-\ Form ApprovalU.S.Department of Energy Energy Information Administration Month.j Year; Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) ??Was Fuel purchased this month?Yes No Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date Energy Source Liquids:Barrels Gases:MCF (MMYY) r\/£VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S 1,106NG 352.4 349.4 I-Y>1,S NG 8,062 295.9 241.7 r \/ Form ApprovalU.S.Department of Energy Energy Information Administration Mon[h. Monthly EIA923 Power Plant Operations Report 1 Year:2015 p|ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Ash Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Predominant SecondaryChloride Unavailable Mode Mode Percent weight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% ,) VARIOUS (NATURAL GAS SPOT PURCHASES S NG 1106 I PL F F?Yes Q Yes [x]No |^|No ONLY) \8062VARfOUSSNG 1 PL F F«?Yes I I Yes(NATURAL GAS SPOT PURCHASES ONLY) fx]No |~x]No ftI N) Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants SO megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Quantity Source Coal Mine Coal Mine State Coal Mine Coal Mine Name Coal Mine County Fuel Supplier Type MSHA ID Type Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION If you are an annual respondent with a generator nnmepiate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers andgeneratorsatthisplant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Prime Mover Boiler Id Boiler StatusReport Month Quantity Consumed Energy Source Units Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.01%) AshCodeContent, (coal only,to nearest 0.1%) Specify other fuel: h S) Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/20 1 7FonnEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Gross GenerationGenerator Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) 43\667GTNG9,168 Mcf 1 .0000 GT Y 822f Specify other fuel: A Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 PIant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status EIA USE ONLY Quantity Consumed Energy Source Units Average Heal Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation(Group code)Code ID Code (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 plant;7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormE1A-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all wind turbines. Prime Mover Unit Code (nuclear units) Energy Gross Generation (MWh)NetGeneration (MWh) Source Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up.and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column C:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/ Year Stocks Fuel Balance Comments for AdjustmentsSource A B C D E F G H V 9,168NGMcf9,168 0 0I 'A\ / "3 Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormE1A-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A.as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity ofFuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant A B C D \\ I Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant;7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 6 Approximately 764k of transport/reservation fees for all three plants.2 Changes in Ownership (Provide name of purchaser and date sold.) \J \ <3 Form ApprovalMonthlyEIA923PowerPlantOperationsReport I Year:2015 plant:7953 Evander Andrews Power Complex U.S.Department of Energy Energy Information Administration Month-OMB No.1905-0129 Approval Expires 05/3 1/201 7FormEIA-923 ERRORS Prime Equipment Fuel Schedule Mover ID Purchase Ranges Override CommentErrorNumber&DescriptionSupplierRptMonthType \5/ Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 3 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:i Year:2015 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 City/State/Zip Email Boise ID 83707 chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor ofContact Person for Survey Contact Title Randy Henderson Operations Finance Leader Address Box 70 City/State/Zip Email Boise ID 83707 rhenderson@idahopower com Phone (208)388-2290 Fax (208)388-2521 Report For Idaho Power CoCompanyName Plant Name Bennett Mountain Plant ID Plant Address 55733 Plant County Elmore 1015 West Hays St. Plant City Mountain Home Plant State ID *Yes ?NoRegulated )0 4Forcontactdetailgotohttp://www.eia.doe.goV/oss/forms.html#eia-923n*Yes No CHP A0CHPEfficiency V A% Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Monih:j Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) ??Was Fuel purchased this month?Yes No Contract Information Purchases Costper Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Contract Expiration Date (MMYY) Energy Source Liquids:BarrelsTypeorGases:MCFtolling Agreement r Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract ContractChloride Unavailable Mode Mode Percent weight to nearest Type TypeMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% ?Yes ?Yes ?No ?No 3 9 Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Quantity Source Coal Mine Coal MineCoalMine State Coal Mine Name Coal Mine County Fuel Supplier Type MSHA ID Type ft Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 1 Year.2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and generators at this plant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Prime Mover Boiler Id Boiler Status Quantity Consumed Units Sulfur Content, (petroleum and coal only,to nearest 0.01%) Report Month Energy Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mel) Ash Code Source Content, (coal only,to nearest 0.1%) Specify other fuel: /r\D v) Form ApprovalU.S.Department ofEnergy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Net GenerationGrossGenerationGeneratorReport Month (MWh)Td (MWh) 9t Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:j Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Quantity Consumed Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net GenerationSource Code (Yes/No)(MWh)(MWh) £V fGTNG16,096 Mcf 1 .0000 GT Y 1,539 1,415£ Specify other fuel: A Form ApprovalU.S.Department ofEnergy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report X Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or AbovFuelConsumption Generation EIA USE ONLY (Group code) Prime Boiler/Boiler Mover Generation Status Quantity Consumed Prime Mover Energy Source Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Generator Generator Status Gross Generation NetReport Month Report Month ID GenerationCodeIDCode(MWh)(MWh) i Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form E1A-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Prime Mover Energy Source A\V Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column C:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that camiot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/Fuel Balance Comments for AdjustmentsSourceYearStocks A B C ED F G H INGMcf 16,096 0 16,096 Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Quantity of Fuel Shipped to PlantPlantIDPlantNameFuelType CAB D I/ Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 1 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 2 Approximately 764k of transport/reservation fees for all three plants.6 Changes in Ownership (Provide name of purchaser and date sold.) f Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/20 1 7FormEIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover ID RangesRptMonthSupplierErrorNumber&Description Override CommentType / U.S.Department of Energy Energy Information Administrati Monthly EIA923 Power Plant Operations Report 1 Year:2015 Plant:55733 Bennett Mountain Form Approval on Month:OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 3 0 / Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 1 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 City/State/Zip Boise ID 83707 chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Address Box 70 City/State/Zip Boise ID 83707 Email rhenderson@idahopower.com Phone (208)388-2290 Fax (208)388-2521 Report For 0CompanyName Plant Name Plant ID Idaho Power Co K <Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth 5\'Au57028PAYETTE :V r Plant Address I*QPlantCityPlantStateID .£-c?NoYesRegulated rvoForcontactdetailgotohttp://www.eia.doe.goV/oss/forms.html#eia-923?NoYes jCHP Lt)0*CHP Efficiency \V z Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants SO megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) ??Was Fuel purchased this month?Yes No Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date Energy Liquids:BarrelsSourceGases:MCF (MMYY) i< f 349.4'ARIOUS (NATURAL GAS SPOT PURCHASES INLY) NG 169,298 352.4 1 i'ARIOUS (NATURAL GAS SPOT PURCHASES INLY) NG 1,233,697 295 9 241.7 y v Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract ContractChlorideModeModeUnavailablePercentweight to nearest Type Type Million Btus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% AVARIOUS (NATURAL GAS SPOT NG 169298 I PL F F?Yes I I Yes fx]No [71 NoPURCHASES ONLY)\ FVARIOUSNG 1233697 I PL F F?Yes ?Yes(NATURAL GAS SPOT PURCHASES ONLY) [7|No 71 No ) V Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 1 Year:2015 p,ant;57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Coal Mine Coal Mine State Coal Mine Coal Mine Name Coal Mine County Purchase Energy QuantityFuelSupplierTypeSource MSHA ID Type ,\ V Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Ifyou are an annual respondent with a generator nameplatc capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and generators at this plant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Report Month Prime Mover Boiler Td Boiler Status Energy Quantity Consumed Units Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0 01%) Ash Content, (coal only,to nearest 0.1%) Code Source Specify other fuel: / v Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/20 1 7FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Net GenerationGrossGenerationReport Month Generator (MWh)(MWh)Id k V Form ApprovalU.S.Department ofEnergy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 1 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Peaking UnitPrimeMover Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) Specify other fuel: A Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017 Month: Form E1A-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or AbovFuelConsumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Energy Source Quantity Consumed Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation Net Generation Report Month Report Month ID (Group code)Code ID Chide.(MWh)(MWh) Tjfi 203,566(3CTI1CAOPNG0Met'1 1.000 I GTGI OP 207,265 (_y \i GTGI NG 1402995 Mcf 1.000 I I CA STG OP 0 0 s Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Prime Mover Energy Source V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column C:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Source Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks Fuel BalanceEndofMonth/ Year Stocks Comments for Adjustments A B C ED F G H )1,402,995NGMet"1,402,995 0 0Ie* v' Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Quantity ofFuel Shipped to PlantPlantNameFuelType A B C D V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant;57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Approximately 764k of transport/reservation fees for all three plants.2 6 Changes in Ownership (Provide name of purchaser and date sold.) A V Form ApprovalMonthlyEIA923PowerPlantOperationsReport 1 Year:2015 plant 57028 Langley Gulch Power Plant U.S.Department ofEnergy Energy Information Administration Month:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Prime Equipment Fuel Schedule Mover ID Override Comment Purchase RangesErrorNumber&DescriptionSupplierRptMonthType viV Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 1 Year:2015 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 3 V* V