Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 7.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise chobbs@idahopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address City/State/Zip Boise rhenderson@idahopower.com ID 83707 Email (208)388-2290 Fax (208)388-2521Phone Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home 7953 Plant State ID , ^NoYes X Yes CHP For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923RegulatedNo "c//r ft r crtJ- lo~I :s y tV\ A Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant;7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts ?Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date (MMYY) Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 1>\??508 5?VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCTIASLS ONLY) S NG 33 454.3 LsNG 2 421.7 418.7 1/ Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant 7953 Evander Andrews Power Complex Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Source Sulfur ContentHeat Content Ash Mercury Firm or Content Interrupt- Prcdominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest 0.01% ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01% KARIOUS (NATURAL GAS SPOT 'URC1IA.SI-S ONLYJ VARIOUS (NATURAL GAS SPOT i'URCMAShS ONI.Yj S NO I F PL S NG I F PL <0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MTNE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal Mine Type Energy Source Coal Mine Coal Mine Name Coal Mine State Coal Mine CountyMSHAID (MMYY) [VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT ¦PURCHASES ONLY)_ s NG S NG 4 A- Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.0 1%) Ash Source Content, (coal only,to nearest 0.1%) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify •4 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, 1C engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type Of Units Avg Heat Source Content. (as burned) (MMBtu per ton, barrel,or Mcf) ,\35 Mcf t.uoobNGGT IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify <3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant;7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oilJet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment ifthe balance does not equal zero. Energy Source Type Of Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment)Units McfNG 35 35 0 0 -d3 > Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month \ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geotherntal,or other energy sources on SCHEDULE 5,PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the (del consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten ofthe instructions), Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) ¦>p Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) ?GT Is 0 -217 Z) *Q Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plai1t:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Reporl generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Unit Code Gross Generation (MWh)Net Generation (MWh) Source Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant'7953 Evander Andrews Power Complex Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments 2 6 Approx S77IK reservation/tranportation fess are included for all three plants. *£>*"V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 P,ant:55733 Bennett Mountain Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl Hobbs Joint Venture Accountant Contacl Title PO Box 70Address City/Statc/Zip Boise ID 83707 chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address City/State/Zip Boise ID 83707 rhenderson@idahopower.comEmail (208)388-2290 Fax (208)388-2521Phone Report For Company Name Plant Name Idaho Power Co Bennett Mountain Plant ID Plant Address Plant City 55733 Plant County Elmore 1015 West Hays St. Mountain Home Plant State ID Yes |X J Yes CHP X No hihi Oj !<i «'V For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923RegulatedNo 7/W %vT Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month:1 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) |N J No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Costper Unit All Fuels All Fuels Supplier Quantity Total Delivered Cost Contract Type Contract Expiration Date (MMYY) Energy Commodity Cost (coal,natural gasSource Solids:Tons Liquids:Barrels Cents per MMBtu,to the nearest 0,1 cents Gases:MCF ft 2. Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2014 p|ant:55733 Bennett Mountain Month ] OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Source Sulfur ContentHeat Content Ash Mercury Firm or Content Intermpt- SccondaryPredominant Content Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus(MMYY)Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% 8-3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal Mine Name Coal Mine State Contract Type Contract Expiration Date Energy Source Coal Mine Coal Mine Type Coal Mine CountyMSHAID (MMYY) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or 1C engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Avg Heat Content, (as bumed) (MMBtu perton, barrel,or Mcf) Sulfur AshSourceUnitsContent, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify &'S Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). ](If applicable,please check.)Was steam produced for purposes otherthan electric power generation during this reporting period? Prime Mover Energy Source Quantity Type OfUnits Avg Heat Content. (as burned) (MMBtu per ton, barrel,or Mcf) tN(iGT 32,904 Mcf 1.000(1 If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify & Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p'ant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oilJet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned 10 an individual plant arc to be reported as stocks held at a central storage site.Each central storage site must bereportedseparately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments T0 Stocks Balance Comment (ifbalance is not zero please entera comment) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant 55733 Bennett Mountain Month:1 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources 011 SCHEDULE 5.PARTS B orC. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is notmeasured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) Vs- Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month.J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 1 0 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Net GenerationGrossGeneration (MWh) \U377 ! (MWh) 17-3,087!GT f e <5° Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2014 Plant 55733 Bennett Mountain Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source isnoncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit Code Gross Generation (MWh)Net Generation (MWh)Energy Source c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2014 plant:55733 Bennett Mountain Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule CommentsPartItem Approx $77 1 K reseivation/tranportation fess are included for all three plants.62 CP* U.S.Department of Energy Energy Information Administrati EIA923 Power Plant Operations Report 2014 plant:55733 Bennett Mountain Form Approval ion Year:OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Month J Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Type Error Num Error Description/ Override CommentTypeId Code P Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month J OMB No.1905-0129 Approval Expires 12/31/2013 Form EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions andtheprovisionconcerningconfidentialityofinformationintheinstructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address Cily/Statc/Zip Boise chobbs@idahopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/State/Zip Email Boise rhenderson@idahopower.com ID 83707 (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth Company Name Plant Name Plant ID Plant Address Plant City 57028 PAYETTE Plant State ID ^J>C b7 • ?Ves 0 ID Yes I ' CHP No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Regulated ANo c TA ¦20# zf&f'i Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 P'ant:57028 Langley Gulch Power Plant Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) j No Receipts Is there a fuel tolling agreement in place forthis plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons Liquids:Barrels Gases:MCF (MMYY)Cents per MMBtu,to the nearest 0.1 cents 1 ?^1,363,624 %454.3¦VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT (PURCHASES ONLY) NGS 508 5 ?1 1SNG54,610 421.7 418 7 <v Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2,COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Source Sulfur ContentHeat Content Ash Mercury Firm or Content Interrupt- Prcdominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0 01% VARIOUS (NATURAL GAS SPOT PURCHASES ONI.Yj VARIOUS (NATURAL GAS SPOT PURCiIASKS ONLY) S NG F PL S NG I F PL r Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant.57028 Langley Gulch Power Plant Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal Mine Coal Mine Type Energy Source Coal Mine Name Coal Mine State Coal Mine CountyMSHAID (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) s NG S NG cN Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant 57028 Langley Gulch Power Plant Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B,Complete a separate row for each Boiler ID (see page s (Ifapplicable,please cheek.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover td QuantityEnergy Type Of Sulfur AshAvgHeat Content, (as burned) (MMBtuperton, barrel,or Mcf) Source Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1 %) CA 1 OP NO Mcf0 If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRTME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (Ifapplicable,please check,)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover QuantityEnergy Source Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) iNCiCT t.oooq1,41 8,234 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify <r s CT Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) DistiMale-type oils (including diesel oil.No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant arc to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) NG Mcf 1,418,234 1,418,234 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report OMB No.1905-0129 Approval Expires 12/31/2013 Year:2014 Month:1 Plant:57028 Langley Gulch Power PlantFormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation forall other types ofprime movers (combustion turbines,TC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B orC.Generation reportedon SCHEDULE 5,Part A corresponds to the fuel consumptionreported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). Prime Mover Net GenerationGeneratorGenerator Status Gross Generation Id (MWh)(MWh) <CA STG OP 0 Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) c 'V 215,261 .CT \ < V. Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Unit Code Gross Generation (MWh)Net Generation (MWh) Source < c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month:\ OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Commenls Appro*$77IK lescrviition/lrunportulion fess are included for all three plants.2 6 V U.S.Department ofEnergy Energy Information Administrati EIA923 Power Plant Operations Report 2014 Plant:57028 Langley Gulch Power Plant Form Approval ion Year: Form EIA-923 OMB No.1905-0129 Approval Expires 12/31/2013 Month J Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Type Error NuinType Error Description/ Override CommentId Code C s