Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 60.pdfForm ApprovalU.S.Department of Energy Energy Information Administration Montj,. Monthly EIA923 Power Plant Operations Report 12 Year:2016 p|ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 Boise chobbs@idahopower.com City/Statc/Zip ID 83707 Email (208)388-5614Phone Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Address Operations Finance Leader Box 70 City/Statc/Zip Boise rhcnderson@idahopower.com ID 83707 Email Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home 7953 Plant State ID s ?Yes NoRegulated For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923?Yes No CHP Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year:2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or Tolling Agreement Contract Expiration Date Energy Liquids:BarrelsSourceGases:MCF (MMYY) \/V VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) ^419,574SNG 411.9 325.2 VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 14,996 213.8 210.8 y/ Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year'2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnct Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract ContractChloride Unavailable Mode Mode Percent weight to nearest Type Type Million Btus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% \ VARIOUS (NATURAL GAS SPOT PURCHASES S NG 419574 I PL F F]Yes I I Yes [xl No [xl No t ONLY) VARIOUS S NG 14996 I PL F FIIYesIIYes(NATURAL GAS SPOT PURCHASES ONLYL fx]No [xl No <2 o Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Quantity Source Coal Mine MSHA ID Coal Mine State Coal Mine Type Coal Mine Name Coal Mine County Fuel Supplier Type A Form ApprovalU.S.Department ofEnergy Energy Information Administration Mon[h:^Year:2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Prime Mover Boiler Id Boiler StatusReport Month Quantity Consumed UnitsEnergy Source Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Code Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) Specify other fuel: ( Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year:2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation NetGeneration Id (MWh)(MWh) b Form ApprovalU.S.Department of Energy Energy Information Administration Month:^Year:2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Quantity Consumed Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net GenerationSourceCode(Yes/No)(MWh)(MWh) 4\ i 42,862GTNG434,570 Mcf 1.0000 GT Y 43,017 §0 Specify other fuel: /I Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year-2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status Units Average Heat Content E1A USE (High Heating Value)ONLY (Group code) EIA USE ONLY Energy Quantity Consumed Prime Mover Generator Generator Status Gross Generation NetReport Month Report MonthSource ID Generation (Group code)Code ID Code (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year-2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A C D EB Gross Generation (MWh)Net Generation (MWh)Prime Mover Unit Code (nuclear units) Energy Source 1 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Units Previous Month/ Year Stocks ConsumptionEnergy Source Purchases Adjustment to Stocks End ofMonth/Fuel Balance Comments for Adjustments Year Stocks BA C E GDF H McfNG 434,570 434,570 0 0 0I? Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year:2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part ofnegative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity ofFuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant A B C D 1 V) Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year:2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 2 6 746k oftransport /reservation fees included for all three plants Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year-2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Type Fuel Schedule Mover ID Rpt Month RangesSupplierErrorNumber&Description Override Comment Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year; Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 3 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year.2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact siContact Title Cheryl Hobbs Submit Date Joint Venture Accountant Address PO Box 70 > 7>.City/State/Zip Boise chobbs@idahopowcr.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Title Randy Henderson Operations Finance Leader Address Box 70 City/Statc/Zip Boise rhcndcrson@idahopower.com ID 83707 Email (208)388-2290 Fax (208)388-2521Phone <?Report For Idaho Power CoCompanyName Plant Name Bennett Mountain Plant ID 55733 Plant County Elmore Plant Address Plant City 1015 West Hays St. Mountain Home Plant State ID [*]Yes ?NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?YCS 1*1 No CHP Form ApprovalU.S.Department of Energy Energy Information Administration M0ntiv Form E1A-923 Monthly EIA923 Power Plant Operations Report 12 Year.2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMfltu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Contract Expiration Date Energy Liquids:BarrelsTypeor Tolling Source Gases:MCF Agreement (MMYY) Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnct Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Purchase Energy Type Source Fuel Supplier 0.01% 0.01% | ]Yes I I Yes ?No?No 'J\J Form ApprovalU.S.Department ofEnergy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Quantity Source Coal Mine Coal Mine State Coal Mine Coal Mine Name Coal Mine CountyFuelSupplierTypeMSHAIDType 4A-0*2 Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption Boiler StatusReport Month Prime Mover Boiler Id Quantity Consumed Units Sulfur AshEIAUSE ONLY (Group Code) Energy Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Code Source Content, (petroleum and coal only,to nearest 0.01 %) Content, (coal only,to nearest 0.1%) Specify other fuel: Form ApprovalU.S.Department of Energy Energy Information Administration McmtF Monthly EIA923 Power Plant Operations Report 12 Year:2016 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) O-1> V Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Quantity ConsumedEnergy Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net GenerationSourceCode(Yes/No)(MWh)(MWh) iA\iGTNG56,402 Mcf 1.0000 GT Y 5,829 5,705 f fI Specify other fuel: Form ApprovalU.S.Department of Energy Energy Information Administration Mont(l: Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation E1A USE ONLY Prime Boiler/Boiler Mover Generation Status Quantity Consumed Units Average Heat Content EIAUSE (High Heating Value)ONLY (Group code) Energy Prime Mover Generator Generator Status Gross Generation NetReport Month Report MonthSource ID Generation (Group code)Code ID Code (MWh)(MWh) X 0 Form ApprovalU.S.Department of Energy Energy Information Administration Month: Form EIA-923 Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A B C D E Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source ] .1 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/ Year Stocks Fuel Balance Comments forAdjustments Source A B C D E F G H JO0 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero ifno shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant A B C D -H Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 12 Year:2016 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments A* Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 ERRORS Prime Equipment Fuel Schedule Mover ID Rpt Month Purchase Type RangesErrorNumber&DescriptionSupplier Override Comment Q V Form ApprovalU.S.Department ofEnergy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 $-4 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Title Cheryl Hobbs Submit Date Joint Venture Accountant Address PO Box 70 City/Statc/Zip Email Boise ID 83707 chobbs@idahopowcr.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Title Address Randy Henderson Operations Finance Leader Box 70 City/Statc/Zip Email Boise ID 83707 rhcndcrson@idahopowcr.com (208)388-2290Phone Fax (208)388-2521 Report For Company Name Idaho Power Co Plant Name Plant ID Plant Address Plant City Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth Yes 57028 PAYETTE Plant State ID *?NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?Ycs m No CHP I' Form ApprovalU.S.Department of Energy Energy Information Administration M0Ilth- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Contract Expiration Date Energy Liquids:BarrelsTypeorSourceGases:MCFTolling Agreement (MMYY) kIs\t8VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 350,622 411.9 325.2 ,\S NG 12,683 213.8 210.8 \4,229VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) S NG 397.2 315.7 ( 9- L ' Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Chloride ContentMercuryContent Moisture Mercury Mercury Chloride Contnct Content Unavailable Content Contract Information Average Heat Sulfur Content Content PredominantAshContent Secondary Supply Delivery Contract Contract Type Type Chloride Mode ModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Mode used to transport fuel overthe longest distance Mode used to transport fuel over the second longest distance Percent weight to nearest Parts per Million,or enter 999 if not available Fuel Supplier Purchase Energy Type Source 0.01% 0.01% \ FVARIOUS (NATURAL GAS SPOT PURCHASES S NG 350622 1 PL FIIYesIIYes [x]No [x]No ONLY) VARIOUS S NG 12683 1 PL F F?Yes I I Yes(NATURAL GAS SPOT PURCHASES fx]No fx]No ONLY) VARIOUS NG 4229S 1 PL I I?Yes ?Yes(NATURAL GAS SPOT PURCHASES ONLY) [xl No Hxl No O-7C Form ApprovalU.S.Department of Energy Energy Information Administration Month' Monthly EIA923 Power Plant Operations Report 12 Year:2016 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Quantity Source Coal Mine Coal Mine State Coal Mine Type Coal Mine Name Coal Mine CountyFuelSupplierTypeMSHAID fL U' Form ApprovalU.S.Department ofEnergy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 12 Year:2016 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption Quantity Consumed Boiler StatusReport Month Prime Mover Boiler Id Units Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) SulfurEIAUSE ONLY (Group Code) Energy Ash Code Source Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) Specify other fuel: L~ Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Namepiate Capacity 10MW or Above Generation Gross Generation Net GenerationGeneratorReport Month Id (MWh)(MWh) L Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Quantity ConsumedEnergy Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net GenerationSourceCode(Yes/No)(MWh)(MWh) Specify other fuel: -1I Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year.2016 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status Quantity Consumed Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Energy Generator Generator Status Gross Generation EIA USE ONLY NetReport Month Report MonthSource ID Generation Aa(Group code)Code ID Code (MWh)(MWh) I CA OP NG 0 Mcf 0.000 CT GTG OP 48,444 46,68011If6\CT GTG OP NG 367534 Mcf 1.000 CA STG OPII1 0 0 7e' Form ApprovalU.S.Department of Energy Energy Information Administration Month' Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A B C D E Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source u-1 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. End of Month/Fuel Balance Comments for AdjustmentsPreviousMonth/ Year Stocks Purchases Consumption Adjustment to Stocks Energy Units Year StocksSource G HABCDEF Mcf 367,534 367,534 0 0NG P l Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero ifno shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plan!ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant A B C D Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 2 746k of transport /reservation fees included for all three plants6 Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments E Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 12 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Prime Equipment Type Fuel Schedule Mover Purchase Rpt Month Supplier Error Number &Description RangesID Override Comment 1?u Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 12 Year.2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 J1/