Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 6.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Joint Venture AccountantTitle PO Box 70Address City/State/Zip Boise ID 83707 Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey RandyHenderson Operations Finance Leader Contact Title Box 70Address v~-!'•yoCity/State/Zip Boise ID 83707 Email rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home 27953> Plant State ID JblYesX|No El Yes eL'7 (11^- CHP For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 Regulated No o Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:7953 Evander Andrews Power Complex Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) |No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 3>isfSVARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLYl S NG 41,405 293.4 290 2 ifcSNG299,123 417.8 349,2 \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Source Heat Content Sulfur Content Ash Mercury Firm or Content Interrupt- Prcdominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest 0.01% ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01% VARIOUS (NATURAL GAS SPOT PURC'1 1ASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONI V) S NG 1 F PL S NG 1 F PL A u-N»_ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:J OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal Mine Coal Mine Coal Mine Name Coal Mine State Energy Source Coal Mine CountyMSHAIDType (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG <3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that bum organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Source Quantity Type Of Avg Heat Content, (as bumcd) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plar|t:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (If applicable,please check.)Was steam produced forpurposes other than electric power generation during this reporting period? Prime Mover Energy Source Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) \ Y 1.001KGTMG340,528 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify -<S Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p]ant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is notzero please enter a comment) Units NG Mcf 340,528 340,528 0 0 \ <) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fdel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnetgeneration is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten ofthe instructions), Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) ? <3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) 34,551GT34,799 <o J? Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Unit CodeEnergy Source Gross Generation (MWh)Net Generation (MWh) <3 o Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments 2 6 Itteliidcs resci!valIo!iftransport fee of£785,229 this total is for all three plants. 0-c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p'ant:7953 Evander Andrews Power Complex Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Description/ Override Comment Error NumTypeType Code Id Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant;55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Contact Cheryl Hobbs Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Email Boise chobbs@idahopower.com ID 83707 Phone Fax (208)433-5180(208)388-5614 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Pjyyu I-^<T\Box 70Address City/State/Zip Email Boise ID 83707 Q rhenderson@idahopower com Fax (208)388-2521(208)388-2290Phone Report For 2/zl Idaho Power CoCompanyName Plant Name Plant ID Plant Address Plant City Bennett Mountain %55733 Plant County Elmore c>1015 West Hays St. Mountain Home Plant State ID Yes J ^No |X |Yes j j No CHP (2ftForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923Regulated G- Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) jN j No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier ContractType Contract Expiration Date (MMYY) Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF J) r / Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural Gas Only All Fuels Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Supplier Contract Type Contract Expiration Date Energy Heat Content Sulfur Content Ash Mercury Firm or Content Interrupt- Predominant Secondary Source Content Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% lo est>ng distance ) //\ \ NY Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal Mine Coal MineEnergy Source Coal Mine Name Coal Mine State Coal Mine CountyMSHAIDType (MMYY) V tJ) \ £ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant;55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Quantity Type Of Sulfur AshEnergy Source Avg Heat Content, (as bumcd) (MMBtu per ton, barrel,or Mcf) Units Content, (coal only,to nearest 0.1 %) Content, (petroleum and coal only,to nearest0.01%) IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, apleasespecify 5 V KJi 1m\ Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:55733 Bennett Mountain Month:1 OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mef) Source \1.000(1NOGT33,206 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:55733 Bennett Mountain Month:1 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment ifthe balance does not equal zero. Energy Source Type Of Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) Units \NG Mcf 33,206 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:J OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation forall other types of prime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5 PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial orCommercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (sec page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation NetGeneration Id (MWh)(MWh) <5^ oC Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh) Xb U3I (MWh) \b 3,045GTe Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit CodeEnergy Source Gross Generation (MWh)Net Generation (MWh) O Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments <P Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:55733 Bennett Mountain Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Error Description/ Override Comment Fuel Equipment Supplier Error Num Purchase Schedule Prime Mover IdTypeType Code V Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month.J OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Contact Cheryl Hobbs Joint Venture AccountantTitle Accept By Accept Date PO Box 70Address City/Statc/Zip Boise ID 83707 Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact GuyColpron Engineering LeaderTitle P O Box 70Address City/State/Zip Email Boise ID 83707 gcolpron@idahopower.com (208)388-2784 Fax (208)388-6689Phone Report For Company Name Plant Name Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Flighway 30 New Plymouth z/JlZPlantID Plant Address Plant City 57028 PAYETTE Plant State ID (17 hi|*j No |No |Yes j X )Yes CHP For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 (b-,'Regulated Cw «< (zifO(2- Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) |No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 3 a< f?VARIOUS (NATURAL GAS SPOT PURCHASESONLY! S NG 109,569 293.4 290.2 i 349,2VARIOUS(NATURAL GAS SPOT PURCHASES ONLY! S NG 791,575 417.8 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Sulfur Content Ash Mercury Firm or Content Interrupt- PrcdominantContractTypeContract Expiration Date Energy FIcat Content Secondary Content Mode ModeSource Percent weight to nearest Percent weight to nearest ible Million Btus Percent weight to nearest Mode usedto transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMYY) (MMBtus)0.01% per unit 0.01%0.01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLYI 1 FSNG PL NG 1 FS PL c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month:J OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Energy Coal Mine Coal Mine Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAIDType (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG C Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id QuantityEnergy Source Type Of Avg Heat Content, (as bumed) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) CA 1 OP NG 0 Mcf IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify $-• Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Quantity Type OfUnitsEnergy Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Source \ 1.IW00NG901,144 McfCT IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment ifthe balance does not equal zero. Comment (ifbalance is not zero please enter a comment)Adjustments To Stocks BalanceCurrentMonth's Consumption Current Month's Ending Stocks Prior Month's Ending Stocks Current Month's Receipts Energy Source Type Of Units 0901,144 0Mcf901,144NG C> Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:J OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,orhydro-elcctric turbines),and steam turbine plants with less than 10 megawatts total capacity orfueled bynuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). Gross Generation Net GenerationPrime Mover Generator Status Generator (MWh)(MWh)Id 0 0STGOPCA c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:J OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) $5CT 129,360 V P Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Unit Code Gross Generation (MWh)Net Generation (MWh) Source C O Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Includes reservation/transport fee ofS785,229 this is the total for all three plants.2 6 C Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month J Form EIA-923 Errors FuelPurchase Schedule Error Description/ Override Comment Prime Mover Equipment Supplier Error NumTypeIdType Code c WHAT'S NEW ON THE FORM 923 FOR 2012 ANNUAL AND SUPPLEMENTAL SURVEYS AND 2013 MONTHLY SURVEY Schedule 1 -Identification No changes Schedule 2 -Cost and Quality of Fossil Fuels The requirements for reporting fuel receipts,costs and quality have been changed. There are two changes: 1)Receipts,cost and quality data are no longer required to be reported on Schedule 2 for the following fuels:Kerosene,Jet Fuel,Other Gases,Blast Furnace Gas, Propane and/or Waste Oil 2)Plants where the sum of nameplate capacity primarily fueled by Natural Gas, Distillate or Residual Fuel Oils,and Petroleum Coke or any combination of these energy sources is less than 200 MW are no longer required to report on Schedule 2,unless required for coal capacity.Plants where the sum ofnameplate capacity primarily fueled by coal is 50 MW or more will continue to be required to report Schedule 2. N£ Clarifications to the instructions Primary Mode of Transportation Primary Mode is the longest distance traveled by the fuel from the primary origin,such as the coal mine,to the power plant.It is not the longest distance from the point of ownership ofthe fuel to the power plant.Coal shipments longest distance should be determined from the location of the mine of origin to the power plant.Reasonable estimates of the mode of transportation are encouraged where hard information is unavailable. Mercury Content Mercury Content is a required field.If no testing or contract values are known,enter an override comment to explain the reason the mercury content ofthe coal cannot be reported. Supplier Name Supplier names and fuel codes are preprinted from the previous month's report.Delete unneeded rows.Add supplier/fuel types from the drop down lists.Ifthe supplier is not on the list,contact EIA to have a new supplier added.If you choose "Name Pending"while waiting for a new supplier to be added,you MUST report the supplier name in an override comment in response to the edit flag before the data can be submitted. Schedule 3A and 3B -Fuel Consumption No changes Note prime mover and boiler ID codes are preprinted.If changes are needed,open the drop down list and/or contact EIA. Schedule 4 -Fuel Stocks and Fuel Balance No changes Adjustment to Stocks Please remember to enter a comment for all non-zero Adjustments to Stocks.Enter an Adjustment amount to balance the stocks/consumption and receipts of fossil fuels. Natural Gas receipts should balance with consumption.If a discrepancy exists,enter an Adjustment and a comment to clarify the nature of the adjustment. Schedules 5A,5B and 5C-Net and Gross Generation No changes Note prime mover and Generator ID codes are preprinted.Ifchanges are needed,open the drop down list and/or contact EIA. Schedule 6 and 7 No changes Direct Use versus Station Use Direct Use is electric energy used by industrial or commercial sector plants for uses beyond the needs ofthe power house to generate electric power.Examples are industrial processes,machinery,heating and cooling systems,and commercial building electrical needs.Utility and independent power producers do not normally have direct use of power. Station Use is the power used by auxiliary equipment to support electric power generation.Examples are pumps for cooling water,FGD equipment,conveyor belts,and power house computer systems and lighting. Schedule 8A No changes. Schedule 8B No changes Schedule 8C No changes Note boiler ID codes are preprinted.If changes are needed,open the drop down list and/or contact EIA. Schedule 8D No changes Note cooling system ID codes are preprinted.If changes are needed,open the drop down list and/or contact EIA.Ifyou are reporting cooling system data at a plant level in lieu of individual cooling IDs,delete the lines for the IDs and add PLANT from the drop down list. Cooling System Hours in Service The Hours in Service should be the hours used to calculate the Average Rate of Withdrawal or Diversion.Please see the revised diagrams for cooling systems. Schedule 8E No changes Note FGP ID codes are preprinted.If changes are needed,open the drop down list and/or contact EIA. Schedule 8F No changes Note FGD ID codes are preprinted.If changes are needed,open the drop down list and/or contact ELA. QUALITY CONTROL SCHEDULE AND PROCESS Overview of the quality control process for Form EIA-923 Annual and Supplemental forms Once received,data undergo numerous checks by EIA staff for accuracy and reasonableness.These QA checks utilize historical data trends,industry standards and range parameters. Respondents will receive email notifications for data values which are identified as unusual in these quality checks.The email will include a spreadsheet containing the data in question as it was reported and with the unusual values highlighted. Please reply promptly to QA emails.If clarification is needed,contact the staff person listed in the email. The QA process begins in the week following the due date,or when a significant number ofresponses have been received,and continues for the following three months as forms are received and processed. Prompt attention to QA inquiries will allow EIA to complete the 2012 data cycle by June 30,2013,