Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 57.pdfForm ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,aTlt:7953 Evander Andrews Power Complex Month:12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Cheryl HobbsContact Title Joint Venture Accountant Accept By Accept Date PO Box 70Address City/Statc/Zip Boise chobbs@idahopower com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address Boise rhenderson@idahopower.com City/State/Zip ID 83707 Email (208)388-2290 Fax (208)388-2521Phone Report For Idaho PowerCo Evander Andrews Power Complex Plant County Company Name Plant Name Plant ID Plant Address Plant City 7953 1 862 NW Mt Home Hwy Dist Rd JtV-i '•Mountain Home Plant State TD (l^Ves [X I X Yes |No CHP No i-trl'AForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923Regulated \1/2^\) r / Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p|ant:7953 Evander Andrews Power Complex Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 1sX4VVARIOUS(NATURAL GAS SPOT PURCHASES ONLY) Various (natural gas spot [PURCHASES ONLY) 354.3 404 H S NG 7,509 357 36I\S IK4.302NG 509.2 f) 'vxy Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p|ant:7953 Evander Andrews Power Complex Month:J 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date (MMYY) Sulfur ContentEnergy Source Heat Content Ash Mercury Firm or Content Interrupt- Prcdominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% Various (natural gas spot Purchases onlv) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY! S NG 1 F PL FSNGI PL O}(K) Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Energy Source Coal Mine Coal Mine Type Coal Mine Name Coal Mine State Coal Mine CountyMSHAID (MMYY) Various (natural gas spot [PURCHASES ONLY) .VARIOUS (NATURAL GAS SPOT PURCHASES.ONLY) S NG S NG \ (r Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month.12 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Sulfur Content, (petroleum and coal only,to nearest 0.01%) Ash Source Units Content, (coal only,to nearest 0.1%) IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify / n v Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Source Quantity Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) \Q loot)GT NG 191,811 Mcf 1.0 If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify (/ \y Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE .(Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant arc to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment) NG Mcf 191,811 191,811 00 1 \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:7953 Evander Andrews Power Complex Month.12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 1 0 megawatts and above.Report generation for all other types of prime movers (combustion turbines,TC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (sec page ten of the instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) % 9 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p|ant;7953 Evander Andrews Power Complex Month;\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh) ^1 8,625 (MWh) CiT 18,471 * 9 Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:7953 Evander Andrews Power Complex Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Unit CodeEnergy Source Gross Generation (MWh)Net Generation (MWh) ,o 3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:J2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Approx S7S3k reservation/transport fees are included for all three plants.2 6 \\ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:\2 Form EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeType Code Id \y Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Contact Cheryl Hobbs Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise chobbs@idaltopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/State/Zip Email Boise ID 83707 rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power Co Bennett Mountain Company Name Plant.Name Plant ID Plant Address Plant City )kn/'Y55733PlantCountyElmore 1015 West Hays St. Mountain Home Plant State ID Yes j x 'No X |Yes J No CHP For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Regulated v < \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2013 p,ant 55733 Bennett Mountain Month.12 OMB No,1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) jN j No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All FuelsAllFuels Supplier Contract Type Contract Expiration Date Energy Total Delivered Cost Quantity Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF n/ / b Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 piant:55733 Bennett Mountain Month:12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Sulfur ContentEnergy Source Heat Content Ash Mercury Firm or Content Intenupt- Prcdominant Secondary ModeContentMode Percent weight to nearest Percent weight to nearest 0.01% ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01% P> Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier ContractType Contract Expiration Date Coal Mine Coal Mine Coal Mine Name Coal Mine State Energy Source Coal Mine CountyMSHAIDType (MMYY) 0- Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:55733 Bennett Mountain Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s I (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Mover Id Status Energy Quantity Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Content, (coal only,to nearest 0.1%) Type Of Source Units Content, (petroleum and coal only,to nearest 0.01%) IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify &S Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Quantity Type Of UnitsEnergy Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcl) Source I.000CGTNO106,452 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 1 0 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and ilame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held olT-site that cannot be assigned to an individual plant arc to be reported as slocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) / Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant;55733 Bennett Mountain Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY Tor generatorsat steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,(C engines,wind,or hydro-electric turbines),and steam turbine plants with less than II)megawatts total capacity or fueled by nuclear,solar,gcothcrmal,or otherenergy sources on SCHEDULE 5.PARTS BbrC. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CIIP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (sec page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) ,10 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh) 10,290 (MWh) 10,106GT A (> Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:55733 Bennett Mountain Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Energy Unit Code Gross Generation (MWh)Net Generation (MWh) Source O\V\> Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments 2 Approx $783k reservation/transport fees are included for all three plants.6 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:\2 Form EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:\2 Plant:57028 Langley Gulch Power PlantFormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law,For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Contact Cheryl Hobbs Joint Venture Accountant PO Box 70 Title Address City/Slate/Zip Boise chobbs@idahopower-com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/State/Zip Email Boise ID 83707 rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For / Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth />V//57028 PAYETTE Plant State ID 1 ?v-H x |Y„I | CHP No "For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo A /1/ Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plarit:57028 Langley Gulch Power Plant Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Source Total Delivered Cost Quantity Commodity Cost (coal,natural gas Solids:Tons Liquids:Barrels(MMYY)Cents per MMBtu,to the nearest 0,1 cents Gases.MCF 1 %Various (natural gas spot PURCHASES ONl.Yj VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 354,3 1 S NG 58,574 357 3 S NG i 1.437,689 509,2 464,7 f Vr U Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plaTlt:57028 Langley Gulch Power Plant Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural Gas Only All Fuels Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Supplier Contract Type Contract Expiration Date Energy Source Sulfur ContentHeat Content Ash Mercury Firm or Content Interrapl- Predominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest 0.01% ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% perunit 0,01% VARIOUS (NATURAL GAS SPOT j'UKCHASliS ONLYj VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) s NG I PL S NG PL 9S u Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant;57028 Langley Gulch Power Plant Month:12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Energy Coal Mine Coal Mine Type Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAID (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG S NG Y Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:57028 Langley Gulch Power Plant Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCFIEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Quantity AshEnergy Source Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) CA 1 OP McfNO0 If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify ) Fomi ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 1 0 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (If applicable,please check,)Was sleam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Source Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) 1.00(1!)CT NG 1,496,263 Mcf IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify [/ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:\2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil.No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is notzero please enter a comment) NG Mcf 1,496,2631,496,263 0 0 1 u Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plarit:57028 Langley Gulch Power Plant Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,orother energy sources on SCHEDULE 5.PARTS B orC. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten of the instructions). Prime Mover Generator Generator Status Net GenerationGrossGeneration Id (MWh)(MWh) (SCASTGOP0 %L Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plar|t:57028 Langley Gulch Power Plant Month:12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B,are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) aCT214,913 211,305 L Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Energy Unit Code Gross Generation (MWh)Net Generation (MWh) Source l0 /u Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:57028 Langley Gulch Power Plant Month 12 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Approx S7H.tk reservation/transport fees are included for all three plants.62 y Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant;57028 Langley Gulch Power Plant Month:12 Form EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code S