HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 56.pdfOMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2012
Month:12
Plant:7953 Evander Andrews Power ComplexirmEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Contact Cheryl Hobbs
itle Joint Venture Accountant
PO Box 70address
Jity/State/Zip
imail
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
3SupervisorofContactPersonforSurvey
.£X
,'ontact Randy Henderson
Operations Finance LeaderItle
!<r~Box 70
ere
address
(
i I
Jity/State/Zip
imail
Boise
rhenderson@idahopower.com
ID 83707
Fax (208)388-2521(208)388-2290Phone
Report For
Jompany Name
'lant Name
'lant ID
'lant Address
'lant City
Idaho Power Co
Evander Andrews Power Complex P-'Plant County
1862 NW Mt Home Hwy Dist Rd
7953
Mountain Home Plant State ID
\[^0YesxjNo
H v«
CHP
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month 12
Plant:7953 Evander Andrews Power ComplexrrmEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
|No Receipts
Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts
All Fuels
Cost per Unit
All Fuels
ipplier Contract Type Contract
Expiration
Date
Energy Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gasSource
Solids:Tons
(MMYY)Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
4V "2-\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY}
S NG 53 711.4 287.2'?££
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:12
Plant:7953 Evander Andrews Power ComplexDrmEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality ofFuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
ipplier Contract Type Contract
Expiration
Dale
(MMYY)
Sulfur ContentEnergyHeat
Content
Ash Mercury Firm or
Content Interrupt-
Predominant Secondary
Source Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
\RIOUS (NATURAL GAS SPOT
JltCHASES ONLY)
S NG F PL
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:7953 Evander Andrews Power Complex
jrm EIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Date
Coal Mine Coal Mine
Type
Energy Coal Mine
Name
Coal Mine
State
Coal Mine
CountySourceMSHAID
(MMYY)
\RIOUS (NATURAL GAS SPOT
IRCTIAS.ES ONLY)
S NG
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:7953 Evander Andrews Power ComplexjrmEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
QuantityEnergy
Source
Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Sulfur Ash
Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
r
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:7953 Evander Andrews Power Complex:>rm EJA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions).
(Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy
Source
Quantity Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
V--'53GTNG Mcf 1.000c
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
OMB No.1905-0129
Approval Expires 12/31/2013
acrgy Information Administration Plant:7953 Evander Andrews Power ComplexYear:2012
Month:\2
arm EIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (if balance is not zero please enter a comment)
\53NGMcf 53 0 0*
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:12
Plant:7953 Evander Andrews Power Complex3rmEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition of net generation).
Complete a separate row for each Generator ID (see page ten ofthe instructions).
'rime
/lover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
OMBNo.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2012
Month:\2
Plant:7953 Evander Andrews Power ComplexDrmEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
&-155GT0£
OMB No.1905-0129
Approval Expires 12/31/2013
aergy Information Administration Year:2012
Month:\2
Plant:7953 Evander Andrews Power ComplexDrmEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh)
Source
ciergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:7953 Evander Andrews Power Complex
irm EIA-923
SCHEDULE 9.COMMENTS
Schedule Item CommentsPart
Total delivered cost included npprox $650k of reservation/transport fees.The $650k was used with total received gas
for IPC's 3 plains 111 the calculation <0 calculated the same price for each ofthe three plants.
2 6
aergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:12
Plant:7953 Evander Andrews Power Complex
arm EIA-923
Errors
Purchase fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Plant:55733 Bennett MountainYear:2012
Month:\2
jrm EIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Itle Joint Venture Accountant
PO Box 70\ddrcss
Jity/State/Zip
imail
Boise
chobbs@idahopower.com
ID 83707
(208)388-5614Phone Fax (208)433-5180
Supervisor of Contact Person for Survey
d /J
Randy Henderson
Operations Finance Leader
Contact
"itle
Box 70tddress
CViV-iity/State/Zip
imail
Boise ID 83707
frhenderson@idahopower.com (208)388-2290 Fax (208)388-2521
(|f
Phone
AftReportFor to
1 1 2-^1 '>lompany Name Idaho Power Co
'lant Name
'lant ID
'lant Address 1015 West Hays St.
'lant City
Bennett Mountain
Plant County55733 Elmore
.e)Mountain Home Plant State ID
Jb'C '?v-H
|X 1 Yes j j No
CHP No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923
\)iA\vRegulated
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:55733 Bennett Mountain3rmEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
jN No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All FuelsAllFuels
ipplier Contract Type Contract
Expiration
Date
Energy
Source
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas
Solids:Tons
(MMYY)Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
Is
7NG\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S &21,061 711.4 287.2I
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration
Plant:55733 Bennett MountainYear:2012
Month:\2
arm EIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality of Fuels Received Fuel Transportation
All Fuels Natural Gas
Only
Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
ipplier Contract Type Contract
Expiration
Date
Energy Sulfur ContentFleat
Content
Ash Mercury Firm or
Content Interrupt-
Predominant Secondary
ModeSourceContentMode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
s"\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
NG F PL
icrgy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:12
Plant:55733 Bennett Mountain3rmEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contracl Information
Complete for All Fuels Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Date
Coal Mine Coal Mine Coal Mine
Name
Energy Coal Mine
State
Coal Mine
CountySourceMSHAIDType
(MMYY)
\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S NG
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:55733 Bennett MountainjrmEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
I I (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy Quantity Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Sulfur AshSourceUnitsContent,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
c
IfEnergy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:55733 Bennett MountainYear:2012
Month:12
rrm EIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
QuantityEnergy Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Source
1 .0000VGTNG21,061 Mcf
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
OMB No.1905-0129
Approval Expires 12/31/2013
aergy Information Administration Year:2012
Month 12
Plant:55733 Bennett MountainjrmEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Slocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Adjustments
To Stocks
Current Month's
Ending Stocks
Balance Comment (if balance is not zero please enter a comment)
\21,061NGMcf 21,061 0 0f
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:J2
Plant:55733 Bennett Mountain
rrm EIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition of net generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
'rime
/lover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:55733 Bennett MountainYear:2012
Month:\2
Drm EIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion ofthe operation is under 10 MW,and ALL 1C engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
\fi/2,101GTV2,194VX
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2012
Month:12
Plant:55733 Bennett Mountain
:>rm EIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh)
Source
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:12
Plant:55733 Bennett Mountain
)rm EIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Total delivered cost included approx S650k oi reservation/transport fees.The S650k was used with total received gas
for IPC's 3 plants in the calculation to calculated the same price for each ofthe three plants.
2 6
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:12
Plant:55733 Bennett Mountain
arm EIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
OMB No.1905-0129
Approval Expires 12/31/2013
uergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012
Month:12
yrm EIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
"itle Joint Venture Accountant
PO Box 70address
iity/State/Zip
imail
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Guy ColpronContact
7tie Engineering Leader
PO Box 70address
iity/State/Zip
imail
Boise
gcolpron@idahopower.com
ID 83707
i(208)388-2784 Fax (208)388-6689 cJArtPhone
Report For
v\iompany Name
'lanl Name
'lant ID
'lant Address
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
(Lfr
57028 PAYETTE
JW\\
vfr?)l3'lant City Plant State ID
Yes |X ]
QTj Yes
CHP No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month \2
Plant:57028 Langley Gulch Power PlantrrmEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
ipplier Contract Type Contract
Expiration
Date
(MMYY)
Energy Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gasSource
Solids:Tons
Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
10 711.4 f1\RIOUS (NATURAL GAS SPOT
JRCHASBS ONLY)
S NG 140,821 287.2
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:57028 Langley Gulch Power PlanturmEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality of Fuels Received Fuel Transportation
All Fuels Natural GasCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
ipplier Contract Type Contract
Expiration
Date
(MMYY)
Sulfur ContentEnergyHeat
Content
Ash Mercury Finn or
Content Interrupt-
Predominant SecondarySourceContentModeMode
Percent weight
to nearest Percent weight
to nearest
ible
Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY!
S NG F PL
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:57028 Langley Gulch Power PlantYear.2012
Month:\2
jrm EIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Date
Coal Mine Coal MineEnergy
Source
Coal Mine
Name
Coal Mine
State
Coal Mine
CountyMSHAIDType
(MMYY)
MIIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S NG
aergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:57028 Langley Gulch Power PlantYear:2012
Month:\2
jrm EIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy Quantity Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton.
barrel,or Met)
Sulfur AshSourceUnitsContent,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
CA 1 OP NO 0 Mcf
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:57028 Langley Gulch Power PlantYear:2012
Month:12
jrm EIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
|(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
QuantityEnergy
Source
Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
*£140,821CTNO Mcf 1.0000
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012
Month:\2
)rm EIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
1 140,821NGMcf 140,821 0 0
f
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:57028 Langley Gulch Power Plant
jrm E1A-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 1 0 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
'rime
dover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
ri|CA STG OP 0
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration
Plant:57028 Langley Gulch Power PlantYear:2012
Month:\2
rrm EIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-clectric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not
measured (see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
CT 20,938 19,752
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:12
Plant:57028 Langley Gulch Power PlantjrmEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Energy
Source
Unit Code Gross Generation (MWb)Net Generation (MWh)
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant.57028 Langley Gulch Power PlantjrmEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Total delivered cost included approx $650k of reservation/transport fees.The 5650k was used with total received gas
for IPC's 3 plants in the calculation to calculated the same price for each ofthe three plants.
2 6
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\2
Plant:57028 Langley Gulch Power PlantDimEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentlypeTypeId
Code