Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 56.pdfOMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2012 Month:12 Plant:7953 Evander Andrews Power ComplexirmEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Contact Cheryl Hobbs itle Joint Venture Accountant PO Box 70address Jity/State/Zip imail Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 3SupervisorofContactPersonforSurvey .£X ,'ontact Randy Henderson Operations Finance LeaderItle !<r~Box 70 ere address ( i I Jity/State/Zip imail Boise rhenderson@idahopower.com ID 83707 Fax (208)388-2521(208)388-2290Phone Report For Jompany Name 'lant Name 'lant ID 'lant Address 'lant City Idaho Power Co Evander Andrews Power Complex P-'Plant County 1862 NW Mt Home Hwy Dist Rd 7953 Mountain Home Plant State ID \[^0YesxjNo H v« CHP For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month 12 Plant:7953 Evander Andrews Power ComplexrrmEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) |No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts All Fuels Cost per Unit All Fuels ipplier Contract Type Contract Expiration Date Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 4V "2-\RIOUS (NATURAL GAS SPOT JRCHASES ONLY} S NG 53 711.4 287.2'?££ nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:12 Plant:7953 Evander Andrews Power ComplexDrmEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only ipplier Contract Type Contract Expiration Dale (MMYY) Sulfur ContentEnergyHeat Content Ash Mercury Firm or Content Interrupt- Predominant Secondary Source Content Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% \RIOUS (NATURAL GAS SPOT JltCHASES ONLY) S NG F PL nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:7953 Evander Andrews Power Complex jrm EIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank ipplier Contract Type Contract Expiration Date Coal Mine Coal Mine Type Energy Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAID (MMYY) \RIOUS (NATURAL GAS SPOT IRCTIAS.ES ONLY) S NG tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:7953 Evander Andrews Power ComplexjrmEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id QuantityEnergy Source Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) r If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:7953 Evander Andrews Power Complex:>rm EJA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Source Quantity Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) V--'53GTNG Mcf 1.000c If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify OMB No.1905-0129 Approval Expires 12/31/2013 acrgy Information Administration Plant:7953 Evander Andrews Power ComplexYear:2012 Month:\2 arm EIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) \53NGMcf 53 0 0* tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:12 Plant:7953 Evander Andrews Power Complex3rmEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). 'rime /lover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) OMBNo.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2012 Month:\2 Plant:7953 Evander Andrews Power ComplexDrmEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) &-155GT0£ OMB No.1905-0129 Approval Expires 12/31/2013 aergy Information Administration Year:2012 Month:\2 Plant:7953 Evander Andrews Power ComplexDrmEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh) Source ciergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:7953 Evander Andrews Power Complex irm EIA-923 SCHEDULE 9.COMMENTS Schedule Item CommentsPart Total delivered cost included npprox $650k of reservation/transport fees.The $650k was used with total received gas for IPC's 3 plains 111 the calculation <0 calculated the same price for each ofthe three plants. 2 6 aergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:12 Plant:7953 Evander Andrews Power Complex arm EIA-923 Errors Purchase fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:55733 Bennett MountainYear:2012 Month:\2 jrm EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Itle Joint Venture Accountant PO Box 70\ddrcss Jity/State/Zip imail Boise chobbs@idahopower.com ID 83707 (208)388-5614Phone Fax (208)433-5180 Supervisor of Contact Person for Survey d /J Randy Henderson Operations Finance Leader Contact "itle Box 70tddress CViV-iity/State/Zip imail Boise ID 83707 frhenderson@idahopower.com (208)388-2290 Fax (208)388-2521 (|f Phone AftReportFor to 1 1 2-^1 '>lompany Name Idaho Power Co 'lant Name 'lant ID 'lant Address 1015 West Hays St. 'lant City Bennett Mountain Plant County55733 Elmore .e)Mountain Home Plant State ID Jb'C '?v-H |X 1 Yes j j No CHP No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 \)iA\vRegulated nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:55733 Bennett Mountain3rmEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) jN No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All FuelsAllFuels ipplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF Is 7NG\RIOUS (NATURAL GAS SPOT JRCHASES ONLY) S &21,061 711.4 287.2I OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Plant:55733 Bennett MountainYear:2012 Month:\2 arm EIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation All Fuels Natural Gas Only Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil ipplier Contract Type Contract Expiration Date Energy Sulfur ContentFleat Content Ash Mercury Firm or Content Interrupt- Predominant Secondary ModeSourceContentMode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% s"\RIOUS (NATURAL GAS SPOT JRCHASES ONLY) NG F PL icrgy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:12 Plant:55733 Bennett Mountain3rmEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contracl Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank ipplier Contract Type Contract Expiration Date Coal Mine Coal Mine Coal Mine Name Energy Coal Mine State Coal Mine CountySourceMSHAIDType (MMYY) \RIOUS (NATURAL GAS SPOT JRCHASES ONLY) S NG nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:55733 Bennett MountainjrmEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s I I (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Sulfur AshSourceUnitsContent, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) c IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:55733 Bennett MountainYear:2012 Month:12 rrm EIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover QuantityEnergy Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Source 1 .0000VGTNG21,061 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify OMB No.1905-0129 Approval Expires 12/31/2013 aergy Information Administration Year:2012 Month 12 Plant:55733 Bennett MountainjrmEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Slocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Adjustments To Stocks Current Month's Ending Stocks Balance Comment (if balance is not zero please enter a comment) \21,061NGMcf 21,061 0 0f nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:J2 Plant:55733 Bennett Mountain rrm EIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten of the instructions). 'rime /lover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:55733 Bennett MountainYear:2012 Month:\2 Drm EIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL 1C engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) \fi/2,101GTV2,194VX OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2012 Month:12 Plant:55733 Bennett Mountain :>rm EIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh) Source tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:12 Plant:55733 Bennett Mountain )rm EIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Total delivered cost included approx S650k oi reservation/transport fees.The S650k was used with total received gas for IPC's 3 plants in the calculation to calculated the same price for each ofthe three plants. 2 6 nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:12 Plant:55733 Bennett Mountain arm EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code OMB No.1905-0129 Approval Expires 12/31/2013 uergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012 Month:12 yrm EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact "itle Joint Venture Accountant PO Box 70address iity/State/Zip imail Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Guy ColpronContact 7tie Engineering Leader PO Box 70address iity/State/Zip imail Boise gcolpron@idahopower.com ID 83707 i(208)388-2784 Fax (208)388-6689 cJArtPhone Report For v\iompany Name 'lanl Name 'lant ID 'lant Address Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth (Lfr 57028 PAYETTE JW\\ vfr?)l3'lant City Plant State ID Yes |X ] QTj Yes CHP No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month \2 Plant:57028 Langley Gulch Power PlantrrmEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels ipplier Contract Type Contract Expiration Date (MMYY) Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 10 711.4 f1\RIOUS (NATURAL GAS SPOT JRCHASBS ONLY) S NG 140,821 287.2 nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:57028 Langley Gulch Power PlanturmEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation All Fuels Natural GasCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only ipplier Contract Type Contract Expiration Date (MMYY) Sulfur ContentEnergyHeat Content Ash Mercury Finn or Content Interrupt- Predominant SecondarySourceContentModeMode Percent weight to nearest Percent weight to nearest ible Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% \RIOUS (NATURAL GAS SPOT JRCHASES ONLY! S NG F PL nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:57028 Langley Gulch Power PlantYear.2012 Month:\2 jrm EIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank ipplier Contract Type Contract Expiration Date Coal Mine Coal MineEnergy Source Coal Mine Name Coal Mine State Coal Mine CountyMSHAIDType (MMYY) MIIOUS (NATURAL GAS SPOT JRCHASES ONLY) S NG aergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:57028 Langley Gulch Power PlantYear:2012 Month:\2 jrm EIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Avg Heat Content, (as burned) (MMBtu per ton. barrel,or Met) Sulfur AshSourceUnitsContent, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) CA 1 OP NO 0 Mcf If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:57028 Langley Gulch Power PlantYear:2012 Month:12 jrm EIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). |(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover QuantityEnergy Source Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) *£140,821CTNO Mcf 1.0000 If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012 Month:\2 )rm EIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment) 1 140,821NGMcf 140,821 0 0 f tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:57028 Langley Gulch Power Plant jrm E1A-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 1 0 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten of the instructions). 'rime dover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) ri|CA STG OP 0 OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012 Month:\2 rrm EIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-clectric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) CT 20,938 19,752 nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:12 Plant:57028 Langley Gulch Power PlantjrmEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Energy Source Unit Code Gross Generation (MWb)Net Generation (MWh) nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant.57028 Langley Gulch Power PlantjrmEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Total delivered cost included approx $650k of reservation/transport fees.The 5650k was used with total received gas for IPC's 3 plants in the calculation to calculated the same price for each ofthe three plants. 2 6 tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\2 Plant:57028 Langley Gulch Power PlantDimEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentlypeTypeId Code