HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 54.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration Month.jj Year;
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Joint Venture AccountantTitle
Address PO Box 70
City/Statc/Zip Boise
chobbs@idahopowcr.com
ID 83707
Email Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact
Title
Randy Henderson
Operations Finance Leader
Address Box 70
City/Statc/Zip Boise
rhcndcrson@idahopower.com
ID 83707
Email Phone (208)388-2290 Fax (208)388-2521
Report For
Company Name
Plant Name
Plant ID
Idaho Power Co
Evander Andrews Power Complex
Plant County
1 862 NW Mt Home Hwy Dist Rd
Mountain Home
7953
Plant Address
Plant City Plant State ID
*Yes ?NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Uv"S NoCHP
o
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.jj Year-2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Contract Information Purchases Cost per Unit
Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gas)
Solids:Tons
Liquids:Barrels
Gases:MCF
Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
Tolling
Agreement
Contract
Expiration
Date
Energy
Source
(MMYY)
2.1^775.5 (J r-202.6VARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)
VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
S NG 10,585
1S.-¦229.1NG-3rS51 _226.l
c1
\25
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year 2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnct Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract ContractChlorideModeModeUnavailablePercentweight
to nearest
Type Type
Million Btus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
overthe
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
\
p-10585VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
F rSNG1PLF?Yes I I Yes
71 No 71 No
F 'NG „TRSIS I F -PL|Yes I I Yes
ti No [71 No
<J
..
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year 2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase
Type
QuantityEnergy Coal Mine Coal Mine
State
Coat Mine
Type
Coal Mine
Name
Coal Mine
CountyFuelSupplierSourceMSHAID
v
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Prime Mover Boiler Id Boiler StatusEIAUSE
ONLY
(Group Code)
Report
Month
Energy Quantity
Consumed
Units Avg Heat
Content.
Sulfur Ash
Code Source Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Specify other fuel:
<D
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.Year.
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Gross Generation Net GenerationGeneratorReport
Month (MWh)Id (MWh)
<0
V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.Year
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Prime Mover Peaking Unit Gross Generation Net GenerationSource
Code (Yes/No)(MWh)(MWh)
\Vn PGTNG<LI36 Mcf 1.0000 GT Y ^l+,526f 4 1,436
Specify other fuel:
O
.1^
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.jj Year-2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Quantity
Consumed
Energy Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
MonthSource ID Generation(Group code)Code ID Code (MWh)(MWh)
<9
3
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.jj Year:2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types ofplants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A B C D E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
J
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month.^Year 2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below.
Energy
Source
Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End ofMonth/
Year Stocks
Fuel Balance Comments for Adjustments
A B C D E F G H
NG Mcf 1 14,436 114,436 0 0PI
<1?
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month.Year.
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity ofFuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant
A B C D
v
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
Year:2015 plant 7953 Evander Andrews Power Complex
U.S.Department of Energy
Energy Information Administration Month:jj OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
ItemPartSchedule
Approx $722k transport/reservation included for all three plants.62
Generator Retirement Dates
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Retirement
Month
CommentsGeneratorId
<)S
U.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:7953 Evander Andrews Power Complex
Form Approval
Month:OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Type Fuel Schedule Mover ID Rpt Month Supplier Error Number &Description Ranges Override Comment
<2
VJP
U.S.Department of Energy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
Year:2015 plant:7953 Evander Andrews Power Complex
Form Approval
on Month:j j OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
3
<D
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/Statc/Zip
Email
Boise
chobbs@idahopowcr.com
ID 83707
Phone (208)388-5614 (208)433-5180Fax
Supervisor of Contact Person for Survey
A f
Contact
Title
Address
Randy Henderson
Operations Finance Leader
Qd "1Box70
0ACity/Statc/Zip
Email
Boise
rhcnderson@idahopowcr.com
ID 83707
V V)(208)388-2290Phone Fax (208)388-2521
Report For
Company Name
Plant Name
Plant ID
Idaho Power Co
Bennett Mountain
55733
1015 West Hays St.
Mountain Home
Plant County Elmore
Plant Address
Plant City Plant State ID
IX,?Yes NoRegulated
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923?Ycs m NoCHP
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy Liquids:BarrelsTypeor
Tolling
Source Gases:MCF
(MMYY)Agreement
&
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year.2015 plant;55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnct Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Type Type
Chloride Mode ModeUnavailablePercentweight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
I I Yes I I Yes
?No ?No
o
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Energy Quantity
Source
Coal Mine
MSHA ID
Coal Mine
State
Coal Mine Coal Mine
Name
Purchase Coal Mine
County
Fuel Supplier Type Type
y
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Quantity
Consumed
EIA USE
ONLY
(Group Code)
Prime MoverReport
Month
Boiler Id Boiler Status Energy Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Sulfur Ash
Code Source Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
¦GL
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Gross Generation Net GenerationReport
Month
Generator
(MWh)(MWh)Id
-eT
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant 55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Quantity ConsumedEnergy
Source
Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net Generation
Code (Yes/No)(MWh)(MWh)
n v()\?YGTNG ^14,974.048,803 Mcf 1.0000 GT —-14,884
Specify other fuel:
&X"
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Quantity
Consumed
Energy
Source
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
(Group code)Code ID Code (MWh)(MWh)
5/-
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
IX Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A C D EB
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End ofMonth/
Year Stocks
Fuel Balance Comments for Adjustments
Source
tiA C D E G HF
148,803NGMcf 0 148,803N
&
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Quantity of Fuel Shipped to PlantPlantIDFuelTypePlantName
A C DB
<9
U.S.Department of Energy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
IX Year:2015 plant:55733 Bennett Mountain
Form Approval
on Month:OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Generator Retirement Dates
Retirement
Month
Generator Id Retirement
Year Comments
Changes in Ownership (Provide name of purchaser and date sold.)
Form ApprovalU.S.Department of Energy
Energy Information Administration Monih:
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Type Fuel Schedule Mover Rpt Month Supplier Error Number &Description Ranges Override CommentID
~<C?
U.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
]1 Year:2015 plant;55733 Bennett Mountain
Form Approval
Monlh:OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
3
Form ApprovalU.S.Department of Energy
Energy Information Administration Month'
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/Statc/Zip
Email
Boise
chobbs@idahopowcr.com
ID 83707
Phone (208)388-5614 (208)433-5180Fax
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Address Box 70
City/Statc/Zip
Email
Boise ID 83707
rhcnderson@idahopower.com Phone (208)388-2290 Fax (208)388-2521
Report For
Company Name
Plant Name
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
Plant ID 57028 PAYETTE
Plant Address
Plant City Plant State ID
Yes ?NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?Yes m No
CHP
c
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Contract Information Purchases Cost per Unit
Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gas)
Solids:Tons
Liquids:Barrels
Gases:MCF
Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Contract
Expiration
Date
Purchase
Type or
Tolling
Agreement
Energy
Source
(MMYY)
\
tVARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)-202.6—638,188SNG
VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
^23,642 ¦—-229.1 —226.1SNG
_T86.72_^0.795 —2*5.4SNG
<r"
Form ApprovalU.S.Department of Energy
Energy Information Administration M0ntlv
Monthly EIA923 Power Plant Operations Report
11 Year:2015 p'ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/201 7FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnct Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Type Type
Chloride Mode ModeUnavailablePercentweight
to nearest
0.01%
Million Btus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
,\
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
S (»3K188NG I PL F F?Yes I I Yes 7
7 No fxl NoONLY)
—13642VARIOUSSNG I PL •V F?Yes ?Yes(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
171 No [x|No
s NG -4*1795 I PL I I?Yes I]Yes
71 No 7 No
C
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year.2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Coal Mine
State
Coal Mine Coal Mine
Name
Energy
Source
Quantity Coal Mine Coal Mine
County
Fuel Supplier Type MSHA ID Type
c
>•
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Quantity
Consumed
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status UnitsEnergy Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur Ash
Code Source Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1 %)
Specify other fuel:
c
U.S.Department ofEnergy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
11 Year:2015 Plant:57028 Langley Gulch Power Plant
Form Approval
on Month:OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Namepiate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
c
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly ETA923 Power Plant Operations Report
11 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Quantity ConsumedEnergy
Source
Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net Generation
Code (Yes/No)(MWh)(MWh)
Specify other fuel:
<
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
11 Year.2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
(Group code)
Prime Boiler/Boiler
Mover Generation Status
Energy Quantity
Consumed
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator
Status
Generator Gross
Generation
NetReport
Month
Report
Month
Source ID Generation^(MWh)
^—103,735 Q
^(MWh)Code ID Code
1 CAI OP NG 0 Mcf1 0.000 GTG1CT OP 101,713
\_20ICTOPGTGNG2629 Mcf 1.000 I CA STG1 OP 0 a
<
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types ofplants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A C DB E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
Y55
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
11 Year:2015 p,ant:57028 Langley Gulch Power Plant
U.S.Department of Energy
Energy Information Administration Month-OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End ofMonth/
Ycar Stocks
Fuel Balance Comments for AdjustmentsSource
A CB D E F G H
(5t \702.(>25NGMcf702,625 0 0
C
V
c?
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
11 Year.2015 plant 57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part ofnegative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant Name Quantity ofFuel Shipped to PlantPlantIDFuelType
C DBA
<r v
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
11 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule ItemPart
Approx $722k transport/reservation included for all three plants.2 6
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Generator Id Comments
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
Month:u Year:2015 plant:57028 Langley Gulch Power Plant
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department ofEnergy
Energy Information Administration
Form EIA-923
ERRORS
Override CommentRanges
Prime Equipment
Type Fuel Schedule Mover
Purchase
Error Number &DescriptionSupplierRptMonthID
<
o
U.S.Department of Energy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
11 Year:2015 Plant:57028 Langley Gulch Power Plant
Form Approval
on Month:
Form EIA-923
OMB No.1905-0129
Approval Expires 05/3 1/2017
3