HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 51.pdfOMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration Year:2012
Month:\\
Plant:7953 Evander Andrews Power ComplexrrmEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By 300002687
Submit Date 18-DEC-12
Cheryl HobbsContact
4tle Joint Venture Accountant
Accept By F923ADMIN
Accept Date F923ADMIN
PO Box 70address
3ity/State/Zip
imail
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Contact
"itle
Box 70vddress
-ity/State/Zip
!mail
Boise
rhenderson@idahopower.com
ID 83707
(208)388-2290 Fax (208)388-2521Phone
Report For
Idaho Power CoCompanyName
'lant Name
'lant ID
Evander Andrews Power Complex
Plant County
1862 NW Mt Home Hwy Dist Rd
7953
'lant Address
'lant City Mountain Home Plant State ID
CHP Yes No
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923|X J YesRegulated No
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month 11
Plant:7953 Evander Andrews Power Complex)rm EIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page t.are on page 3.)
No Receipts
Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts
All Fuels
Cost per Unit
All Fuels
ipplier Contract Type Contract
Expiration
Date
(MMYY)
Energy Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gasSource
Solids:Tons
Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
356.1\RIOUS (NATURAL GAS SPOT
JRCIIASLS ONLY)
S NG 12,049 849.7
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:
Plant:7953 Evander Andrews Power Complex)rm EIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality ofFuels Received Fuel Transportation
All Fuels Coal,Pet Coke,Oil Natural GasCoalOnly Coal,Pet Coke and Oil
Only
ipplier Contract Type Contract
Expiration
Date
(MMYY)
Energy Sulfur ContentHeat
Content
Ash Mercury Firm or
Content Interrupl-
Predominant Secondary
Source Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
MllOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S NG I F PL
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:1 \
Plant:7953 Evander Andrews Power ComplextrrnEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Coal Mine Type
If you have provided the MSHA ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Date
Coal MineEnergy Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
CountySourceMSHAIDType
(MMYY)
\RIOUS (NATURAL GAS SPOT
JRCUASES ONI V)
S NG
ncrgy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:7953 Evander Andrews Power ComplexYear:2012
Month J \
jrm EIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (sec page s
(Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy Quantity Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Sulfur AshSourceUnitsContent,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:7953 Evander Andrews Power ComplexYear:2012
Month:J J
jrm EIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
1C engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Source
l.OOOtGTNG12,049 Mcf
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:J J
Plant:7953 Evander Andrews Power ComplexnrmEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant arc to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
NG Mcf 12,049 12,049 0 0
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration Plant:7953 Evander Andrews Power ComplexYear:2012
Month:U
jrm EIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition of net generation).
Complete a separate row for each Generator ID (see page ten ofthe instructions).
'rime
/lover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration Year:2012
Month
Plant:7953 Evander Andrews Power ComplexjrmEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-clectric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (sec instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
GT 1,233 1,143
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2012
Month:J J
Plant:7953 Evander Andrews Power Complex}rm EIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat,
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh)
Source
ciergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:H
Plant:7953 Evander Andrews Power ComplexjrmEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
2 1 6 Contains reservation fees.
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\\
Plant:7953 Evander Andrews Power Complex
Dim EIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2012
Month J J
Plant:55733 Bennett Mountain
3rm EIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By 300002687
Submit Date 18-DEC-12
Cheryl Hobbslontact
Joint Venture AccountantItle
Accept By F923ADMIN
Accept Date F923ADM1N
PO Box 70Vddress
lity/State/Zip
imail
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Jontaet Randy Henderson
Operations Finance Leader
Box 70
"itle
Vddress
lity/State/Zip
imail
Boise ID 83707
rhcnderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone
Report For
iompany Name Idaho Power Co
Mant Name
'lant ID
'lanl Address 1015 West Hays St.
'lant City
Bennett Mountain
55733 Plant County Elmore
Mountain Home Plant State ID
p~|NoCHPYes
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|X j YesRegulated No
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:1 J
Plant:55733 Bennett Mountain
)rm EIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
N No Receipts
Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
ipplier Contract Type Contract
Expiration
Date
Energy Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gasSource
Solids:Tons
(MMYY)Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S NG 13,785 849.7 356.1
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\J
Plant:55733 Bennett Mountain
i>rm EIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality ofFuels Received Fuel Transportation
All Fuels Natural Gas
Only
Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
ipplier Contract Type Contract
Expiration
Date
Sulfur ContentEnergyHeat
Content
Ash Mercury Firm or
Content Interrupt-
Predominant Secondary
Source Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
\RlOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S NG I F PL
aergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\\
Plant:55733 Bennett Mountain
yrm EIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
If you have provided the MSHA ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Date
Coal MineEnergy Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
CountySourceMSHAIDType
(MMYY)
\RIOUS (NATURAL GAS SPOT
JRCI1ASES ONLY)
S NG
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Plant:55733 Bennett MountainYear:2012
Month:]\
>rm EIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler
Mover Id
Status Energy Quantity Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Sulfur Ash
Source Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:J J
Plant:55733 Bennett Mountain
)rm EIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
1C engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions).
(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type Of Units Avg Heal
Content,
(as bumed)
(MMBtu per ton,
barrel,or Mcf)
Source
GT NG 13,785 Mcf 1.000C
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2012
Month:\\
Plant:55733 Bennett MountainrrmEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Adjustments
To Stocks
Current Month's
Ending Slocks
Comment (ifbalance is not zero please enter a comment)Balance
NG Mcf 13,785 13,785 0 0
ncrgy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:U
Plant:55733 Bennett Mountain)rm EIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
'rime
dover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
J
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration Plant:55733 Bennett MountainYear:2012
Month:H
jrm EIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generalion Net Generation
(MWh)(MWh)
GT 1,233 1,143
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:55733 Bennett MountainYear:2012
Month:XI
rrm EIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PARI'B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh)
Source
L
lergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\\
Plant:55733 Bennett Mountain
urm EIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Contains reservation fees216
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:J J
Plant:55733 Bennett Mountain
)rm EIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Plant:57028 Langley Gulch Power PlantYear:2012
Month:1 \
trm EIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By 300002687
Submit Date 18-DEC-12
Cheryl HobbsContact
7tie Joint Venture Accountant
Accept By F923ADMIN
Accept Date F923ADMIN
PO Box 70address
lity/State/Zip
Imail
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Finance Leader"itle
P O Box 70address
7ty/State/Zip
imail
Boise ID 83707
rhcnderson@idahopower.com (208)388-2290 Fax (208)433-5180Phone
Report For
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
Company Name
'lant Name
'lant ID
'lant Address
57028 PAYETTE
'lant City Plant State ID
CHP Yes No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|X |YesRegulated No
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:JJ
Plant:57028 Langley Gulch Power Plant
jrm EIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
ipplier Contract Type Contract
Expiration
Date
(MMYY)
QuantityEnergy Total Delivered
Cost
Commodity
Cost (coal,natural gasSource
Solids:Tons
Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
356.1\R10US (NATURAL GAS SPOT
JRCHASES ONLY)
S NG 104,604 849.7
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:\\
Plant:57028 Langley Gulch Power PlantrrmEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality of Fuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
ipplier Contract Type Contract
Expiration
Date
Sulfur ContentEnergyHeat
Content
Ash Mercury Firm or
Content interrupt-
Predominant Secondary
Source Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
1\RlOUS (NATURAL GAS SPOT
JRCHASKS ONLY!
S NG F PL
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:||
Plant:57028 Langley Gulch Power Plant
irm EIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Coal Mine
MSHA ID
Coal MineEnergy Coal Mine
Name
Coal Mine
State
Coal Mine
CountySourceType
Date
(MMYY)
MUOUS (NATURAL GAS SPOT
JRCHASES ONLY1
S NG
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012
Month:XI
rrm EIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Ifapplicable,please check.!Did any boiler produce sieam for purposes other than electric power generation during this reporting period?
Prime Boiler
Mover Id
Status Quantity Type OfEnergy
Source
Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Ash
Units Content,
(coal only,to
nearest 0.1%)
OPCA1 NG Mcf0 0
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:J J
Plant:57028 Langley Gulch Power Plant
jrm EIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
QuantityEnergy
Source
Type Of Units Avg Heal
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
CT NG 104,604 Mcf 1.0000
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2012
Month J J
Plant:57028 Langley Gulch Power Plant
rrm EIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instmctions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Consumption
Current Month's
Receipts
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
NG Mcf 104,604 104,604 0 0
ncrgy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:1 J
Plant:57028 Langley Gulch Power PlantjrmEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten ofthe instructions).
'rime
/lover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
CA STG OP 00
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month 1 J
Plant:57028 Langley Gulch Power PlantjrmEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
CT 14,31315,314
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012
Month:1 J
arm EIA-923
SCHEDULE 5.PART C.GENERATION EROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Unit Code Gross Generation (MWh)Net Generation (MWh)Energy
Source
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:XI
Plant:57028 Langley Gulch Power PlantjrmEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
2 1 6 Contains transport cost ofapprox S500k
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2012
Month:J J
Plant:57028 Langley Gulch Power Plant
rrm EIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code