Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 51.pdfOMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Year:2012 Month:\\ Plant:7953 Evander Andrews Power ComplexrrmEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By 300002687 Submit Date 18-DEC-12 Cheryl HobbsContact 4tle Joint Venture Accountant Accept By F923ADMIN Accept Date F923ADMIN PO Box 70address 3ity/State/Zip imail Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact "itle Box 70vddress -ity/State/Zip !mail Boise rhenderson@idahopower.com ID 83707 (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power CoCompanyName 'lant Name 'lant ID Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd 7953 'lant Address 'lant City Mountain Home Plant State ID CHP Yes No For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923|X J YesRegulated No tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month 11 Plant:7953 Evander Andrews Power Complex)rm EIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page t.are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts All Fuels Cost per Unit All Fuels ipplier Contract Type Contract Expiration Date (MMYY) Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 356.1\RIOUS (NATURAL GAS SPOT JRCIIASLS ONLY) S NG 12,049 849.7 tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month: Plant:7953 Evander Andrews Power Complex)rm EIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation All Fuels Coal,Pet Coke,Oil Natural GasCoalOnly Coal,Pet Coke and Oil Only ipplier Contract Type Contract Expiration Date (MMYY) Energy Sulfur ContentHeat Content Ash Mercury Firm or Content Interrupl- Predominant Secondary Source Content Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% MllOUS (NATURAL GAS SPOT JRCHASES ONLY) S NG I F PL nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:1 \ Plant:7953 Evander Andrews Power ComplextrrnEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank ipplier Contract Type Contract Expiration Date Coal MineEnergy Coal Mine Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAIDType (MMYY) \RIOUS (NATURAL GAS SPOT JRCUASES ONI V) S NG ncrgy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:7953 Evander Andrews Power ComplexYear:2012 Month J \ jrm EIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (sec page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Sulfur AshSourceUnitsContent, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:7953 Evander Andrews Power ComplexYear:2012 Month:J J jrm EIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, 1C engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Source l.OOOtGTNG12,049 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:J J Plant:7953 Evander Andrews Power ComplexnrmEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant arc to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment) NG Mcf 12,049 12,049 0 0 OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Plant:7953 Evander Andrews Power ComplexYear:2012 Month:U jrm EIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). 'rime /lover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Year:2012 Month Plant:7953 Evander Andrews Power ComplexjrmEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-clectric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (sec instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) GT 1,233 1,143 OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2012 Month:J J Plant:7953 Evander Andrews Power Complex}rm EIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat, Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh) Source ciergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:H Plant:7953 Evander Andrews Power ComplexjrmEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments 2 1 6 Contains reservation fees. tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\\ Plant:7953 Evander Andrews Power Complex Dim EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2012 Month J J Plant:55733 Bennett Mountain 3rm EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By 300002687 Submit Date 18-DEC-12 Cheryl Hobbslontact Joint Venture AccountantItle Accept By F923ADMIN Accept Date F923ADM1N PO Box 70Vddress lity/State/Zip imail Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Jontaet Randy Henderson Operations Finance Leader Box 70 "itle Vddress lity/State/Zip imail Boise ID 83707 rhcnderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For iompany Name Idaho Power Co Mant Name 'lant ID 'lanl Address 1015 West Hays St. 'lant City Bennett Mountain 55733 Plant County Elmore Mountain Home Plant State ID p~|NoCHPYes For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|X j YesRegulated No nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:1 J Plant:55733 Bennett Mountain )rm EIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) N No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels ipplier Contract Type Contract Expiration Date Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF \RIOUS (NATURAL GAS SPOT JRCHASES ONLY) S NG 13,785 849.7 356.1 nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\J Plant:55733 Bennett Mountain i>rm EIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation All Fuels Natural Gas Only Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil ipplier Contract Type Contract Expiration Date Sulfur ContentEnergyHeat Content Ash Mercury Firm or Content Interrupt- Predominant Secondary Source Content Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% \RlOUS (NATURAL GAS SPOT JRCHASES ONLY) S NG I F PL aergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\\ Plant:55733 Bennett Mountain yrm EIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank ipplier Contract Type Contract Expiration Date Coal MineEnergy Coal Mine Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAIDType (MMYY) \RIOUS (NATURAL GAS SPOT JRCI1ASES ONLY) S NG OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:55733 Bennett MountainYear:2012 Month:]\ >rm EIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Mover Id Status Energy Quantity Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Sulfur Ash Source Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:J J Plant:55733 Bennett Mountain )rm EIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, 1C engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type Of Units Avg Heal Content, (as bumed) (MMBtu per ton, barrel,or Mcf) Source GT NG 13,785 Mcf 1.000C If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2012 Month:\\ Plant:55733 Bennett MountainrrmEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Adjustments To Stocks Current Month's Ending Slocks Comment (ifbalance is not zero please enter a comment)Balance NG Mcf 13,785 13,785 0 0 ncrgy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:U Plant:55733 Bennett Mountain)rm EIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten of the instructions). 'rime dover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) J OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Plant:55733 Bennett MountainYear:2012 Month:H jrm EIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generalion Net Generation (MWh)(MWh) GT 1,233 1,143 tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:55733 Bennett MountainYear:2012 Month:XI rrm EIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PARI'B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh) Source L lergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\\ Plant:55733 Bennett Mountain urm EIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Contains reservation fees216 nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:J J Plant:55733 Bennett Mountain )rm EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012 Month:1 \ trm EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By 300002687 Submit Date 18-DEC-12 Cheryl HobbsContact 7tie Joint Venture Accountant Accept By F923ADMIN Accept Date F923ADMIN PO Box 70address lity/State/Zip Imail Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Finance Leader"itle P O Box 70address 7ty/State/Zip imail Boise ID 83707 rhcnderson@idahopower.com (208)388-2290 Fax (208)433-5180Phone Report For Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth Company Name 'lant Name 'lant ID 'lant Address 57028 PAYETTE 'lant City Plant State ID CHP Yes No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|X |YesRegulated No nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:JJ Plant:57028 Langley Gulch Power Plant jrm EIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels ipplier Contract Type Contract Expiration Date (MMYY) QuantityEnergy Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 356.1\R10US (NATURAL GAS SPOT JRCHASES ONLY) S NG 104,604 849.7 nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:\\ Plant:57028 Langley Gulch Power PlantrrmEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only ipplier Contract Type Contract Expiration Date Sulfur ContentEnergyHeat Content Ash Mercury Firm or Content interrupt- Predominant Secondary Source Content Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% 1\RlOUS (NATURAL GAS SPOT JRCHASKS ONLY! S NG F PL nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:|| Plant:57028 Langley Gulch Power Plant irm EIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank ipplier Contract Type Contract Expiration Coal Mine MSHA ID Coal MineEnergy Coal Mine Name Coal Mine State Coal Mine CountySourceType Date (MMYY) MUOUS (NATURAL GAS SPOT JRCHASES ONLY1 S NG OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012 Month:XI rrm EIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.!Did any boiler produce sieam for purposes other than electric power generation during this reporting period? Prime Boiler Mover Id Status Quantity Type OfEnergy Source Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.01%) Ash Units Content, (coal only,to nearest 0.1%) OPCA1 NG Mcf0 0 If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:J J Plant:57028 Langley Gulch Power Plant jrm EIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover QuantityEnergy Source Type Of Units Avg Heal Content, (as burned) (MMBtu per ton, barrel,or Mcf) CT NG 104,604 Mcf 1.0000 If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2012 Month J J Plant:57028 Langley Gulch Power Plant rrm EIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instmctions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Consumption Current Month's Receipts Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment) NG Mcf 104,604 104,604 0 0 ncrgy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:1 J Plant:57028 Langley Gulch Power PlantjrmEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). 'rime /lover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) CA STG OP 00 nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month 1 J Plant:57028 Langley Gulch Power PlantjrmEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) CT 14,31315,314 OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:57028 Langley Gulch Power PlantYear:2012 Month:1 J arm EIA-923 SCHEDULE 5.PART C.GENERATION EROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit Code Gross Generation (MWh)Net Generation (MWh)Energy Source nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:XI Plant:57028 Langley Gulch Power PlantjrmEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments 2 1 6 Contains transport cost ofapprox S500k nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:J J Plant:57028 Langley Gulch Power Plant rrm EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code