Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 49.pdfForm ApprovalU.S.Department of Energy Energy Information Administration Month.Year 2015 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 City/State/Zip Boise chobbs@idahopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Address Operations Finance Leader Box 70 City/Statc/Zip Boise ID 83707 Email rhcnderson@idahopowcr.com Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Evander Andrews Power Complex Plant County7953 1 862 NW Mt Home Hwy Dist Rd Mountain Home Plant Slate ID )?Yes NoRegulated ,For contact detail go to http://www.eia.doe.g0v/oss/forms.html#eia-923?v"H No /ft* CHP V Mtfiy^ v Form ApprovalU.S.Department of Energy Energy Information Administration Month.year;2Q\$ Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1 .are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or Tolling Agreement Contract Expiration Date Energy Source Liquids:Barrels Gases:MCF (MMYY) 1/fjs297205,523 '\l -Ml.2VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) S NG % <0 Form ApprovalU.S.Department of Energy Energy Information Administration Month.Year:2015 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnct Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% \ ^—20552.1 F VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG I PL F?Yes I I Yes 171 No 71 No 7) Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year. Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Coal Mine InformationPurchases(From Schedule 2,Part A) Coal Mine Name Purchase Quantity Coal Mine Coal Mine State Coal MineEnergy Source Coal Mine County Fuel Supplier MSHA ID TypeType <J A- Form ApprovalU.S.Department ofEnergy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 10 Year:2015 p|ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption EtA USE ONLY (Group Code) Prime Mover Boiler IdReport Month Boiler Status Quantity Consumed Energy Source Units Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Content, (coal only,to nearest 0.1%) Code Content, (petroleum and coal only,to nearest 0.01%) Specify other fuel: A U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Year:2015 Plant:7953 Evander Andrews Power Complex Form Approval Month:jq OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) o Form ApprovalU.S.Department of Energy Energy Information Administration Month.Year 2015 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Quantity Consumed Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net GenerationSource Code (Yes/No)(MWh)(MWh) 6^—-20,020N.-205,523GTNG Mcf 1.0000 GT Y q —»,927Q Specify other fuel: <3 7-3 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or AbovFuelConsumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Energy Source Quantity Consumed Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation(Group code)Code ID Code (MWh)(MWh) o v Form ApprovalU.S.Department ofEnergy Energy Information Administration Month.Year; Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A CB D E Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source <3 Form ApprovalU.S.Department of Energy Energy Information Administration Month.Year.20jg Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End ofMonth/Fuel Balance Comments for AdjustmentsSourceYearStocks A B C D F.F G H \205,523NGMcfV205,523 0 0? <3 V C7 Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year. Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part ofnegative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant A B C D Form ApprovalU.S.Department of Energy Energy Information Administration Month.^year. Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/201 7FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 2 6 Approx $744k of transport/reservation included for all three plants Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments N Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant;7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 ERRORS Purchase Prime Equipment Type Fuel Schedule Mover ID Rpt Month Supplier Error Number &Description Ranges Override Comment <D CP U.S.Department of Energy Energy Information Administrati Monthly EIA923 Power Plant Operations Report 2015 Plant.7953 Evander Andrews Power Complex Form Approval on Month:10FormEIA-923 OMB No.1905-0129 Approval Expires 05/31/2017 3 O Form ApprovalU.S.Department ofEnergy Energy Information Administration Month: Monthly E1A923 Power Plant Operations Report 10 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Cheryl Hobbs Submit DateContact Joint Venture AccountantTitle Address PO Box 70 City/Statc/Zip Boise chobbs@idahopowcr.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Address Box 70 City/State/Zip Boise rhendcrson@idahopowcr.com ID 83707 Email (208)388-2290Phone Fax (208)388-2521 Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Bennett Mountain 55733 1015 West Hays St. Mountain Home Plant County Elmore Plant State ID (Zl ?NoYesRegulated crtt , For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?L*jYes NoCHP I'(l^ V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Liquids:Barrels Gases:MCF Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Contract Expiration Date Energy Type or Tolling Source Agreement (MMYY) c? Form ApprovalU.S.Department of Energy Energy Information Administration M(mth. Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contact Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Ash Content Predominant Secondary ModeChloride Unavailable Mode Percent weight to nearest Mode used to transport fuel over the longest distance Million Btus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% ?Yes I I Yes ?No ?No U=> Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.arc on page 7.) Coal Mine InformationPurchases(From Schedule 2,Part A) Coal Mine State Coal Mine Name Purchase Energy Quanlity Source Coal Mine MSHA ID Coal Mine Type Coal Mine County Fuel Supplier Type <P Form ApprovalU.S.Department of Energy Energy Information Administration M()nlh. Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption Quantity Consumed EIA USE ONLY (Group Code) Prime MoverReport Month Boiler Id Boiler Status Energy Units Avg Heat Content. Sulfur AshCodeSourceContent, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) (High Heating Value) (MMBtu per ton, barrel,or Met) Specify other fuel: <5^ Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 10 Year.2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Net GenerationGrossGenerationGeneratorReport Month (MWh)(MWh)Id <8$ \ Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Quantity ConsumedEnergy Source Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Prime Mover Peaking Unit Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) £7yt —4,106I.^-4,199GTNGMcf1.0000 I GT Y Specify other fuel: <50 Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:55733 Bennett MountainFormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Quantity Consumed Prime Mover Energy Source Generator Generator Status Gross Generation NetReport Month Report Month ID Generation (Group code)Code ID Code (MWh)(MWh) <Si ©a Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year.2015 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such aspurchasedsteamorwasteheat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.-Report nuclear data by generating unt. -Complete a separate row for each prime mover type. CAB ED Unit Code (nuclear units) Prime Mover Energy Gross Generation (MWh)Net Generation (MWh) Source <£> \ Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column G:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. UnitsEnergy Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/Fuel Balance Comments for AdjustmentsSourceYearStocksABCDGEFH NG Mcf ^43,916 0 43,916e o Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant 55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant A B C D <P V U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2015 Plant:55733 Bennett Mountain Form Approval Month:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Generator Retirement Dates Retirement Month Generator Id Retirement Year Comments Changes in Ownership (Provide name of purchaser and date sold.) CP Form ApprovalMonthlyEIA923PowerPlantOperationsReport Month.10 Year:2015 Plant 55733 Bennett Mountain U.S.Department of Energy Energy Information Administration OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 ERRORS Prime Equipment Fuel Schedule Mover Override Comment Purchase Type RangesErrorNumber&DescriptionSupplierRptMonthID <P U.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2015 Plant:55733 Bennett Mountain Form Approval Month:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2015 P!ant 57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 City/Statc/Zip Boise chobbs@idahopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Address Box 70 City/Statc/Zip Boise ID 83707 Email rhcndcrson@idahopowcr.com Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Plant Name Plant ID Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth 57028 PAYETTE Plant Address Plant City Plant State ID a ?Yes NoRegulated )lk-z For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?Yes No OTP CHP Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2015 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Cost per UnitContractInformationPurchases Total Delivered Cost Quantity Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or Tolling Agreement EnergyContract Expiration Date Liquids:BarrelsSourceGases:MCF (MMYY) &£(11-276.6VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 25S.W T, 6.5SNG Vat 31.2J_i97SNG5,433 c. Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Form EIA-923 Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant 57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality ofFuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Ash Content Content Predominant Secondary Supply Delivery Contract Contract Type Type Chloride Mode ModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Mode used to transport fuel over the second longest distance Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% 5NG^-"258499 ?.o ^£>& VARIOUS (NATURAL GAS SPOT PURCHASES ONLY! VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S 1 PL?Yes ?Yes H No fxl No \ 35433SNG I PL?Yes I I Yes NHNofx]No <r Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Coal MineEnergy Source Quantity Coal Mine State Coal Mine Type Coal Mine Name Coal Mine County Fuel Supplier MSHA IDType Cv \ Form ApprovalU.S.Department of Energy Energy Information Administration Montli: Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Report Month Prime Mover Boiler Id Boiler Status Energy Quantity Consumed Units Avg Heat Content. Sulfur AshCodeSourceContent, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) (High Heating Value) (MM Btu perton, barrel,or Mel) Specify other fuel: <u U.S.Department ofEnergy Energy Information Administrati Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant 57028 Langley Gulch Power Plant Form Approval on Month:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration Monlh. Monthly EIA923 Power Plant Operations Report 10 Year.2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Quantity ConsumedEnergy Type Of Units Avg Heat Content, (as burned) (MMBtu perton, barrel,orMef) Prime Mover Peaking Unit Gross Generation Net GenerationSource Code (Yes/No)(MWh)(MWh) Specify other fuel: > Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Quantity Consumed Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Energy Prime Mover Generator Generator Status Gross Generation NetReport Month Report MonthSource ID Generation (Group code)Code ID Code (MWh) ^^-^128,858 ^(MWh) O —126,343T(CI :I I CA I OP NG 0 Met 0.000 I OPGTG S7 0GTGOPIING^,-893932 Mcf 1.000 I 1 CA OPSTG 0 6 Form ApprovalU.S.Department of Energy Energy Information Administration MontJl. Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A B C D E Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source I Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B, Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column G:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. UnitsEnergy Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/Fuel Balance Comments for AdjustmentsSourceYearStocks A B C GDEF H V -S93.932NGMef 893,932fV 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 10 Year:2015 Plant 57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant B CA D < U.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2015 plant 57028 Langley Gulch Power Plant Form Approval Month:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 2 6 Approx $744k oftransport/reservation included for all three plants Generator Retirement Dates Retirement Month Generator Id Retirement Year Comments Changes in Ownership (Provide name of purchaser and date sold.) U.S.Department of Energy Energy Information Administration Form ApprovalMonthlyEIA923PowerPlantOperationsReport 10 Year:2015 Pl»nt:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 ERRORS Purchase Prime Equipment Type Fuel Schedule Mover Rpt MonthID Supplier Error Number &Description Ranges Override Comment U.S.Department of Energy Energy Information Administration Monthly F.IA923 Power Plant Operations Report 10 Year:2015 plant:57028 Langley Gulch Power Plant Form Approval Month:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3