Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 48.pdfForm ApprovalU.S.Department of Energy Energy Information Administration Monthly E1A923 Power Plant Operations Report Month jo Year:2014 Plant.7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017 Form EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions andtheprovisionconcerningconfidentialityofinformationintheinstructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly andwillinglytomaketoanyAgencyorDepartmentoftheUnitedStatesanyfalse,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Cheryl HobbsContact Submit Date Title Joint Venture Accountant Address PO Box 70 City/StaLe/Zip Email Boise ID 83707 chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy HendersonContact Title Address Operations Finance Leader Box 70 City/State/Zip Boise ID 83707 Email rlienderson@idahopower com Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Plant Name Idaho Power Co Evander Andrews Power Complex Plant CountyPlantID7953 Plant Address 1862 NW Mt Home Hwy Disl Rd Plant City Mountain Home Plant State ID ?X Yes NoRegulated J*'For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?xYes NoCHP -e ^1/'°'Q*CHP Efficiency \V\ Form ApprovalU.S.Department ofEnergy Energy Information Administration Month.^Year; Monthly EIA923 Power Plant Operations Report Plant.7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) ra ?Was Fuel purchased this month?Yes No Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost ("coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date Energy Source Liquids:Barrels Gases:MCF (MMYY) \1/V«(J 184 9VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S 22,160NG 1321.8 426 6SNG15,164 423.6 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2014 p,ant-7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality ofFuels Received Fuel Transportation Natural Gas Mercury Content Ash Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Predominant Supply Delivery Contract Contract Type Type SecondaryChlorideModeModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel overthe longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% V VARIOUS (NATURAL GAS SPOT PURCHASES ONLY! VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 22160 1 PL F F?Yes ?Yes 0 No fxl No *S NG 15164 PL F FIIYes?Yes fxl No i x ]No ^9 Form ApprovalU.S.Department ofEnergy Energy Information Administration Month.^Year. Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Quantity Coal Mine MSHA ID Coal Mine State Coal Mine Coal Mine Name Energy Source Coal Mine County Fuel Supplier Type Type <£) Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION If you are an annual respondent with a generator nameplate capacity of 10MVV or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers andgeneratorsatthisplant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Report Month Prime Mover Boiler Id Boiler Status Energy Source Quantity Consumed Units Avg Heat Content. (High Heating Value) (MMBlu per ton, barrel,orMcl) Sulfur Content, (petroleum and coal only,to nearest 0.01%) AshCodeContent, (coal only,to nearest 0.1 %) Specify other fuel: Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:20 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) -<0<r Form ApprovalU.S.Department of Energy Energy Information Administration Month.Year;^qaa Form EIA-923 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Quantity Consumed Type Of Units Avg Heat Content, (as burned) (MMBtuper ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net GenerationSource Code (Yes/No)(MWh)(MWh) $¦b\\ < GT NG 37,324R Mcf 1 .0000 GT Y 3,509 3,416 Specify other fuel: Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or AbovFuelConsumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Quantity Consumed Energy Source Units Average Heat Content EIAUSE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation Net Generation Report Month Report Month ID(Group code)Code ID Code (MWh)(MWh) ^9 Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/201 7FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-ftlled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only ifnet generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Prime Mover Energy Source Unil Code (nuclear units) Gross Generation (MWh)Net Generation (MWh) <2 Form ApprovalU.S.Department of Energy Energy Information Administration Montj,. Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to Jill both Schedules 4A and 413. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column C:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identity the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are prc-populatcd 011 the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below. UnitsEnergy Source Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/ Year Stocks Fuel Balance Comments for Adjustments A B C D E F G FT McfNG 37,324 37,324 0 0 C7 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2014 pianF 7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity ofFuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant JD Plant Name Fuel Type Quantity ofFuel Shipped to Plant A B C D Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2014 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 2 6 Approx $73 5k transport/reservation is included for all three plants. Changes in Ownership (Provide name of purchaser and date sold.) r\ <2. e Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jo Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 ST Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE!.IDENTIFICATION Survey Contact Cheryl HobbsContact Submit Date JointVenture AccountantTitle Address PO Box 70 City/State/Zip Email Boise ID 83707 chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy HendersonContact Title Operations Finance Leader Address Box 70 5^City/State/Zip Boise rhenderson@idaliopower.com ID 83707 Email (208)388-2290 Fax (208)388-2521Phone JTReportFor wiIdahoPowerCoCompanyName Plant Name Bennett Mountain ii litPlantID55733ElmorePlantCounty 1015 West Hays St.Plant Address Plant City Mountain Home Plant State ID *?Yes NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923No?Yes *CHP CHP Efficiency ^YH ' "X Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 10 Year:2014 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) n !*!Was Fuel purchased this month?Yes No Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Liquids:Barrels Gases:MCF Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date Energy Source (MMYY) Form ApprovalU.S.Department ofEnergy Energy Information Administration Monlh. Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant.55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract Contract Type Type Chloride Unavailable Mode Mode Percent weight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Mode used to transport fuel over the longest distance Parts per Million,or enter 999 if not available Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% I |Yes ?Yes ?No ?No U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant:55733 Bennett Mountain Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Source Quantity Coal Mine Coal Mine State Fuel Supplier Coal Mine Coal Mine Name Coal Mine CountyTypeMSHAIDType Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Ifyou are an annual respondent with a generator namcplate capacity of 10MW or above,report an individual Schedule 3,FarI A for each month in the reporting year/. Plants with a generator namcplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and generators at this plant: Generators with Namcplate Capacity 10MW or Above Fuel Consumption EtA USE ONLY (Group Code) Report Month Prime Mover Boiler Id Boiler Status Sulfur Content, (petroleum and coal only,to nearest 0.01%) Energy Source Quantity Consumed Units Avg Heat Content. (High Heating Value) (MMBtuper ton, barrel,or Mcf) AshCodeContent, (coal only,to nearest 0.1%) Specify other fuel: U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 P'ant:55733 Bennett Mountain Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormE1A-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Quantity ConsumedPrime Mover Energy Type OfUnits Avg Heat Content.Prime Mover Peaking Unit Gross Generation Net GenerationSource Code (Yes/No)(MWh)(MWh)(as burned) (MMBlu per ton, barrel,orMcf) \b $V GT NG 27,281 Mcf 1 .0000 GT 2,612 2,519 Specify other fuel: Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:10 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or AbovFuelConsumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Code ID Energy Source Quantity Consumed Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation(Group code)Code (MWh)(MWh) <9 -cP Form ApprovalU.S.Department ofEnergy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year:2014 p|ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothcrmal,hydroelectric,or other plants where the energy source is noncombustible,suchaspurchasedsteamorwasteheal.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers ofa single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Prime Mover Gross Generation (MWh)Net Generation (MWh)Unit Code (nucJear units) Energy Source Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month 10 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017 Form EIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column C:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Slocks held olT-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pro-populated 011 the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -Ifthe fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Source Units Previous Month/ Year Stocks Purchases Adjustment to Stocks Consumption End Df Month/ Year Stocks Fuel Balance Comments for Adjustments CAB D E F Q II 0NGMcf27,281 27,281 CP" FoiTn ApprovalU.S.Department ofEnergy Energy Information Administration Momh: Monthly EIA923 Power Plant Operations Report 10 Year:2014 p|ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity offuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant B C DA <?> Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 10 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Approx $735k transport/reservation is included for all three plants.2 6 Changes in Ownership (Provide name of purchaser and date sold.) cf- Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report Momh:jq Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment <P Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month 10 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 "V Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 plant;57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit DateContactCherylHobbs Title Joint Venture Accountant Address PO Box 70 City/State/Zip Email Boise ID 83707 chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Address Box 70 City/State/Zip Boise rhejrderson@idahopower.com ID 83707 Email Phone (208)388-2290 Fax (208)388-2521 Report For JrCompanyName Plant Name Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth Yes t'iiiPlantID57028PAYETTE Plant Address Plant City dXVPlantStateID s [NoRegulated For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923*Yes NoCHP vVj -CHP Efficiency 1 0$^o\V Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 10 Year.2014 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) ??Was Fuel purchased this month?Yes No Cost per UnitPurchasesContractInformation Total Delivered Cost Commodity Cost (coal,natural gas) Quantity Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Energy Source Contract Expiration Date Liquids:Barrels Gases:MCF (MMYY) 1/\b?VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 184.91321.823SNG ¦-1 42ft ft 423.6SNG Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jo Year:2014 p'ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormE1A-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants SO megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnel Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% v IVARIOUS (NATURAL GAS SPOT PURCHASES S NG 23 1 PL F F?Yes I I Yes 1 x1 No fx]No ONIYl sVARIOUS NG 15 I PL F F{?Yes ?Yes(NATURAL GAS SPOT PURCHASES ONLY) 171 No 71 No CLP Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Coal Mine InformationPurchases(From Schedule 2,Part A) Coal Mine State Coal Mine Name Coal Mine County Quantity Coal Mine Coal MinePurchaseEnergy Source Fuel Supplier MSHA ID TypeType C- Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Ifyou are an annual respondent with a generator nameplatc capacity of I0MW or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers andgeneratorsatthisplant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption Boiler Status Sulfur Content, (petroleum and coal only,to nearest 0.01%) ErA USE ONLY (Group Code) Report Month Prime Mover Code Boiler Id Energy Quantity Consumed Units Avg Heat Content. (High Heating Value) (MMBtu perton, barrel,or Mcf) Ash Source Content, (coal only,to nearest 0.1%) Specify other fuel; C- U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant:57028 Langley Gulch Power Plant Form Approval Month: Form EIA-923 OMB No.1905-0129 Approval Expires 05/31/2017 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) fT Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 10 Year:2014 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Type Of Units Prime Mover Peaking Unit Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) Specify other fuel: v> Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or AbovFuelConsumption Generation Prime Boiler/Boiler Mover Generation Status EtA USE ONLY Energy Quantity Consumed Units Average Heat Content EtA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation Net Generation Report Month Report Month Source ID (Group code)Code ID Code (MWh)(MWh) £(5?t3ICAIOPNG0Met' A 38 Mcf 1.000 I I GTG OP 0 -274 r —aTiGTGNG1000ICASTGIOP <A <p Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Monlh: Form EIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,suchaspurchasedsteamorwasteheat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-ftlled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only ifnet generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Prime Mover Energy Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh) Source Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column C:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/Fuel Balance Comments for Adjustments Source Year Stocks A B C D E F G H NG Met 38 38 0 0 <r >e? Form ApprovalU.S.Department of Energy Energy Information Administration Mon[h. Monthly EIA923 Power Plant Operations Report 10 Year:2014 Plant;57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity ofFuel shipped to Plant. ¦Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Quantity ofFuel Shipped to PlantFuelType A B C D Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:jq Year:2014 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 2 6 Approx $735k transport/reservation is included for all three plants. Changes in Ownership (Provide name of purchaser and date sold.) c. Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover IDType Rpt Month Supplier ErrorNumber &Description Ranges Override Comment Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 10 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 3 <\